Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch control system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Electromechanical systems with transient high power response operating from a resonant AC link

The combination of an inherently robust asynchronous (induction) electrical machine with the rapid control of energy provided by a high frequency resonant AC link enables the efficient management of higher power levels with greater versatility. This could have a variety of applications from launch vehicles to all-electric automobiles. These types of systems utilize a machine which is operated by independent control of both the voltage and frequency. This is made possible by using an indirect field-oriented control method which allows instantaneous torque control in all four operating quadrants. Incorporating the AC link allows the converter in these systems to switch at the zero crossing of every half cycle of the AC waveform. This zero loss switching of the link allows rapid energy variations to be achieved without the usual frequency proportional switching loss. Several field-oriented control systems were developed by LeRC and General Dynamics Space Systems Division under contract to NASA. A description of a single motor, electromechanical actuation system is presented. Then, focus is on a conceptual design for an AC electric vehicle. This design incorporates an induction motor/generator together with a flywheel for peak energy storage. System operation and implications along with the associated circuitry are addressed. Such a system would greatly improve all-electric vehicle ranges over the Federal Urban Driving Cycle (FUD).

Burrows, Linda M.↗

Electromechanical systems with transient high power response operating from a resonant ac link

The combination of an inherently robust asynchronous (induction) electrical machine with the rapid control of energy provided by a high frequency resonant ac link enables the efficient management of higher power levels with greater versatility. This could have a variety of applications from launch vehicles to all-electric automobiles. These types of systems utilize a machine which is operated by independent control of both the voltage and frequency. This is made possible by using an indirect field-oriented control method which allows instantaneous torque control all four operating quadrants. Incorporating the ac link allows the converter in these systems to switch at the zero crossing of every half cycle of the ac waveform. This zero loss switching of the link allows rapid energy variations to be achieved without the usual frequency proportional switching loss. Several field-oriented control systems were developed under contract to NASA.

Burrows, Linda M.↗

Orion Abort Flight Test

The purpose of NASA's Constellation project is to create the new generation of spacecraft for human flight to the International Space Station in low-earth orbit, the lunar surface, as well as for use in future deep-space exploration. One portion of the Constellation program was the development of the Orion crew exploration vehicle (CEV) to be used in spaceflight. The Orion spacecraft consists of a crew module, service module, space adapter and launch abort system. The crew module was designed to hold as many as six crew members. The Orion crew exploration vehicle is similar in design to the Apollo space capsules, although larger and more massive. The Flight Test Office is the responsible flight test organization for the launch abort system on the Orion crew exploration vehicle. The Flight Test Office originally proposed six tests that would demonstrate the use of the launch abort system. These flight tests were to be performed at the White Sands Missile Range in New Mexico and were similar in nature to the Apollo Little Joe II tests performed in the 1960s. The first flight test of the launch abort system was a pad abort (PA-1), that took place on 6 May 2010 at the White Sands Missile Range in New Mexico. Primary flight test objectives were to demonstrate the capability of the launch abort system to propel the crew module a safe distance away from a launch vehicle during a pad abort, to demonstrate the stability and control characteristics of the vehicle, and to determine the performance of the motors contained within the launch abort system. The focus of the PA-1 flight test was engineering development and data acquisition, not certification. In this presentation, a high level overview of the PA-1 vehicle is given, along with an overview of the Mobile Operations Facility and information on the White Sands tracking sites for radar & optics. Several lessons learned are presented, including detailed information on the lessons learned in the development of wind placards for flight. PA-1 flight data is shown, as well as a comparison of PA-1 flight data to nonlinear simulation Monte Carlo data.

Hayes, Peggy Sue↗

Flight performance of SEASAT-1 attitude control system

The paper describes the attitude control flight performance of SEASAT-A, (launched in June 1978), until failure of the power subsystem terminated the mission in Oct. 1978. Information provided by the satellite pertained to surface winds and coastal storm activity, currents and wave heights, ocean topography and temperature. The ACS used three-axis momentum exchange and magnetic momentum containment and was set in a nose-down configuration. Attitude control sensing was via horizon sensors and attitude anomalies, resulting from solar interference with the sensors, is covered in detail. Remedial action was taken by reconfiguring the IR scanners, but failure resulted nevertheless. Recommendations for similar future missions include consideration of the effect of light sources and circuit time constants and scan rates. A block diagram of the ACS is included.

Beach, S. W.↗

Flight control issues of the next generation space transportation launch vehicles

Some of the issues that affect the flight control and guidance system designs for vertical-takeoff and horizontal-takeoff vehicles were investigated. A two-stage all-rocket vehicle was used to represent the vertical-takeoff system and a generic aerospace plane concept to represent the horizontal-takeoff vehicle. Two flight control issues for the vertical-takeoff rocket were uncovered. The first was the large gimbal angle range required for pitch trim when using parallel mated vehicles. The second was control during staging. Two issues were also identified for the air-breathing vehicle. The first is that the drag losses due to aerodynamic trim are a significant fraction of the total ideal velocity required to achieve orbit. The second issue is that since the vehicle flies at high dynamic pressure for most of the ascent, the guidance system design will be more difficult to ensure accurate insertion than that for the vertical-takeoff rocket system.

Powell, Richard W.↗

Modeling and Control for a Flexible Inverted Pendulum Robot

This report describes the tasks accomplished during Fall 2020 at the Kennedy Space Center under the scope of the Robotic Control System Design internship project. These tasks primarily supported development of an augmented adaptive control system for an inverted pendulum (IP) robotic system on a 4-wheel mobile base (Penny). This system serves as an analogue to the control problems in the flight of rockets in the initial and latter stages of launch, and methods developed as part of this research can later be applied to more complex IP systems, such as launch vehicles. To more accurately model launch vehicles, a flexible aluminum pendulum is used both on the hardware and in the simulated models. In order to capture the flexible dynamics of the system, hardware modifications were made to Penny (including installation of a rate gyro at the tip of the pendulum). Simulink models were created to control and model the hardware system, and Simscape models were created/updated to model the system in simulation. MATLAB programs were created throughout the internship to analyze data generated from hardware and simulation runs. Linear fixed-gain controllers have been applied to the simulated and hardware system, and work continues with augmenting these controllers using sensor blending and direct output adaptive control methods to improve stabilization of system states and cancel flex dynamics. In addition to describing the work done to support these modeling efforts, an Independent Research and Technology Development (IR&TD) proposal for a lunar simulation with soil deformation modeling developed during the internship is briefly described.

Nashir A Janmohamed↗

Computer-Assisted Monitoring Of A Complex System

Propulsion System Advisor (PSA) computer-based system assists engineers and technicians in analyzing masses of sensory data indicative of operating conditions of space shuttle propulsion system during pre-launch and launch activities. Designed solely for monitoring; does not perform any control functions. Although PSA developed for highly specialized application, serves as prototype of noncontrolling, computer-based subsystems for monitoring other complex systems like electric-power-distribution networks and factories.

Beil, Bob J.↗

Environmental Control Systems for Exploration Missions One and Two

In preparing for Exploration Missions One and Two (EM-1 & EM-2), the Ground Systems Development and Operations Program has significant updates to be made to nearly all facilities. This is all being done to accommodate the Space Launch System, which will be the world’s largest rocket in history upon fruition. Facilitating the launch of such a rocket requires an updated Vehicle Assembly Building, an upgraded Launchpad, Payload Processing Facility, and more. In this project, Environmental Control Systems across several facilities were involved, though there is a focus around the Mobile Launcher and Launchpad. Parts were ordered, analysis models were updated, design drawings were updated, and more.

EM-2↗

Geoscience Laser Altimetry System (GLAS) On-Orbit Flight Report on the Propylene Loop Heat Pipes (LHPs)

The Geoscience Laser Altimetry System (GLAS) instrument which is the sole instrument on ICESat was launched on January 12, 2003. GLAS utilizes two actively controlled propylene Loop Heat Pipes (LHPs) as the core of its thermal system. The LHPs started quickly when the Dale Ohm starter heaters were powered and have as designed. The low control heater power and on-orbit tight temperature control appear independent of gravity effects when comparing ground testing to flight data. The use of coupling blocks was also unique to these LHPs. Their application reduced control heater power by reducing the subcooling from the radiator. The effectiveness in reducing subcooling of the coupler blocks decreased during flight from ground testing, but internal thermal isolation in the compensation chamber between the subcooled returning liquid increased in flight resulting in no net increase in control heater power versus ground measurements. Overall the application of LHPs in the thermal system for GLAS met instrument requirements and provided flexibility for the overall system as last minute requirements became known.

Baker, Charles L.↗

The reusable Space Shuttle Main Engine prepares for long life

Attention is given to Space Shuttle Main Engine (SSME) life extension and logistical systems that support launch and ground operations. The operations and maintenance tasks involved in this aspect of SSME development include turnaround requirements, ground support equipment, and control documentation. A discussion is presented on the spare parts provisioning system, which emphasizes the source of decision-making data and encompasses the hardware tracking system, usage data from ground testing and launch operations, and current and projected life limits. The life extension test program leads the launch program, offering comfortable life limit margins. Planned overhauls for the extension of useful hardware life beyond the 55-mission requirement, a turnabout improvement program, and a continuous training program contribute to launch cost reductions, reliable operations, and long life.

Klatt, F. P., Jr.↗

Revisiting the Soyuz-1 Parachute Failure in the Context of Safety in the Modern Era

The Soyuz‑1 accident remains one of the most consequential parachute related failures in human spaceflight history and provides enduring lessons for modern Entry, Descent, and Landing (EDL) system design. Occurring during the height of the Cold War and the Space Race, the mission unfolded under extraordinary political and schedule pressure as the Soviet Union sought to maintain its early leadership in space achievements following the death of chief designer Sergei Korolev. Despite unresolved propulsion, electrical, and parachute system deficiencies, Soyuz‑1 proceeded to launch and immediately encountered critical inflight anomalies, including a failed solar panel deployment, attitude control issues, and communication dropouts. Upon reentry, a malfunction in the parachute system, driven by a primary main canopy that failed to deploy, and subsequent entanglement of the reserve main canopy with the primary drogue parachute, resulted in insufficient deceleration and the fatal crash of cosmonaut Vladimir Komarov. Subsequent investigations revealed deep rooted cultural and organizational issues within the Soviet space program, including inadequate testing, suppression of dissent, undocumented last minute design changes, and the absence of integrated parachute system verification. More than 200 design flaws were identified after the accident, and firsthand accounts, including those from Yuri Gagarin, highlighted widespread concern prior to launch. Over time, the Soviet program implemented substantial reforms: systematic design corrections, rigorous process documentation, and an extensive series of drop tests that ultimately transformed the Soyuz system into one of the world’s most reliable human-rated return vehicles. This paper examines the technical architecture of the Soyuz‑1 parachute system, reconstructs the likely deployment sequence and failure mechanism, and analyzes the cultural contributors that shaped the accident. The study draws parallels to modern spacecraft parachute development, emphasizing the critical importance of integrated system testing, transparent engineering culture, and continuous hardware surveillance. These lessons remain directly relevant to today’s NASA and Commercial Crew Programs (CCP), where the Government continues to refine its understanding of aggregate risk and strengthen overall astronaut safety in the face of increasingly complex parachute systems.

Aaron L Morris↗

Programmable Low-Voltage Circuit Breaker and Tester

An instrumentation system that would comprise a remotely controllable and programmable low-voltage circuit breaker plus several electric-circuit-testing subsystems has been conceived, originally for use aboard a spacecraft during all phases of operation from pre-launch testing through launch, ascent, orbit, descent, and landing. The system could also be adapted to similar use aboard aircraft. In comparison with remotely controllable circuit breakers heretofore commercially available, this system would be smaller, less massive, and capable of performing more functions, as needed for aerospace applications.

Greenfield, Terry↗

New millimeter-wave diagnostics to locally probe internal density and magnetic field fluctuations in National Spherical Torus Experiment-Upgrade (invited)

A set of new millimeter-wave diagnostics will deliver unique measurement capabilities for National Spherical Torus Experiment-Upgrade to address a variety of plasma instabilities believed to be important in determining thermal and particle transport, such as micro-tearing, global Alfvén eigenmodes, kinetic ballooning, trapped electron, and electron temperature gradient modes. These diagnostics include a new integrated intermediate-k Doppler backscattering (DBS) and cross-polarization scattering (CPS) system (four channels, 82.5–87 GHz) to measure density and magnetic fluctuations, respectively. The system can access reasonably large normalized wavenumbers k θ ρ s ranging from ≤0.5 to 15 (where ion sound gyroradius ρ s = 1 cm and k θ is the binormal density turbulence wavenumber). The system addresses the challenges for making useful DBS/CPS measurements with a remote control of launch polarization (X- or O-mode), probed wavenumber, polarization match of the launch beam with the edge magnetic field pitch angle, and beam steering of the launched beam for wave-vector alignment. In addition, a low-k DBS system consisting of eight fixed frequencies (34–52 GHz) and four tunable frequencies (55–75 GHz) for low-k density turbulence and fast ion physics will be located at a nearby port location. Finally, the combined systems cover the near LCFS and pedestal regions (34–52 GHz), the pedestal or mid-radius (50–75 GHz), and core plasmas (82.5–87 GHz).

47 OTHER INSTRUMENTATION↗

Orion MPCV GN and C End-to-End Phasing Tests

End-to-end integration tests are critical risk reduction efforts for any complex vehicle. Phasing tests are an end-to-end integrated test that validates system directional phasing (polarity) from sensor measurement through software algorithms to end effector response. Phasing tests are typically performed on a fully integrated and assembled flight vehicle where sensors are stimulated by moving the vehicle and the effectors are observed for proper polarity. Orion Multi-Purpose Crew Vehicle (MPCV) Pad Abort 1 (PA-1) Phasing Test was conducted from inertial measurement to Launch Abort System (LAS). Orion Exploration Flight Test 1 (EFT-1) has two end-to-end phasing tests planned. The first test from inertial measurement to Crew Module (CM) reaction control system thrusters uses navigation and flight control system software algorithms to process commands. The second test from inertial measurement to CM S-Band Phased Array Antenna (PAA) uses navigation and communication system software algorithms to process commands. Future Orion flights include Ascent Abort Flight Test 2 (AA-2) and Exploration Mission 1 (EM-1). These flights will include additional or updated sensors, software algorithms and effectors. This paper will explore the implementation of end-to-end phasing tests on a flight vehicle which has many constraints, trade-offs and compromises. Orion PA-1 Phasing Test was conducted at White Sands Missile Range (WSMR) from March 4-6, 2010. This test decreased the risk of mission failure by demonstrating proper flight control system polarity. Demonstration was achieved by stimulating the primary navigation sensor, processing sensor data to commands and viewing propulsion response. PA-1 primary navigation sensor was a Space Integrated Inertial Navigation System (INS) and Global Positioning System (GPS) (SIGI) which has onboard processing, INS (3 accelerometers and 3 rate gyros) and no GPS receiver. SIGI data was processed by GN&C software into thrust magnitude and direction commands. The processing changes through three phases of powered flight: pitchover, downrange and reorientation. The primary inputs to GN&C are attitude position, attitude rates, angle of attack (AOA) and angle of sideslip (AOS). Pitch and yaw attitude and attitude rate responses were verified by using a flight spare SIGI mounted to a 2-axis rate table. AOA and AOS responses were verified by using a data recorded from SIGI movements on a robotic arm located at NASA Johnson Space Center. The data was consolidated and used in an open-loop data input to the SIGI. Propulsion was the Launch Abort System (LAS) Attitude Control Motor (ACM) which consisted of a solid motor with 8 nozzles. Each nozzle has active thrust control by varying throat area with a pintle. LAS ACM pintles are observable through optically transparent nozzle covers. SIGI movements on robot arm, SIGI rate table movements and LAS ACM pintle responses were video recorded as test artifacts for analysis and evaluation. The PA-1 Phasing Test design was determined based on test performance requirements, operational restrictions and EGSE capabilities. This development progressed during different stages. For convenience these development stages are initial, working group, tiger team, Engineering Review Team (ERT) and final.

Neumann, Brian C.↗

Monitoring Spacecraft Telemetry Via Optical or RF Link

A patent disclosure document discusses a photonic method for connecting a spacecraft with a launch vehicle upper-stage telemetry system as a means for monitoring a spacecraft fs health and status during and right after separation and deployment. This method also provides an efficient opto-coupled capability for prelaunch built-in-test (BIT) on the ground to enable more efficient and timely integration, preflight checkout, and a means to obviate any local EMI (electromagnetic interference) during integration and test. Additional utility can be envisioned for BIT on other platforms, such as the International Space Station (ISS). The photonic telemetry system implements an optical free-space link with a divergent laser transmitter beam spoiled over a significant cone angle to accommodate changes in spacecraft position without having to angle track it during deployment. Since the spacecraft may lose attitude control and tumble during deployment, the transmitted laser beam interrogates any one of several low-profile meso-scale retro-reflective spatial light modulators (SLMs) deployed over the surface of the spacecraft. The return signal beam, modulated by the SLMs, contains health, status, and attitude information received back at the launch vehicle. Very compact low-power opto-coupler technology already exists for the received signal (requiring relatively low bandwidths, e.g., .200 kbps) to enable transfer to a forward pass RF relay from the launch vehicle to TDRSS (Tracking and Data Relay Satellite System) or another recipient. The link would be active during separation and post-separation to monitor spacecraft health, status, attitude, or other data inventories until attitude recovery and ground control can be re-established. An optical link would not interfere with the existing upper stage telemetry and beacon systems, thus meeting launch vehicle EMI environmental constraints.

Fielhauer, K. B.↗

X-ray satellite

The projected launch date has been delayed approx. 7 weeks from the planned launch date. The Engineering Model (EM) of the automatic measurement and control system (AMCS) is in the critical phase. The contract change no. 1 to the main contract has been signed. A new version of the welding seam location specifications for the wide field camera (WFC) was proposed by the WFC Consortium. The payload integration plan (PIP) has been signed. Production of the EM/QM prototype and ground station equipment has proceeded according to plan with the exception of some delays. Production of the EM equipment has begun. Preparations for the qualification tests of the EM/QM equipment and the integration of EM equipment has begun. The cause of the delay in the launch date include the combined effects of the postponement of the target date for the EM equipment, along with the fact that only a structural model is available.

Source record↗

Systems Integration Processes for NASA Ares I Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable Low Earth Orbit (LEO). This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and nonpropulsion elements within NASA's Crew Launch Vehicle (CLV), now known as the Ares I. The objective of the Ares I is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to LEO in support of the lunar and Mars missions. The Ares I must successfully provide this capability within cost and schedule, and with an acceptable risk approach. This paper will describe the systems engineering management processes that will be applied to assure Ares I Project success through complete and efficient technical integration. Discussion of technical review and management processes for requirements development and verification, integrated design and analysis, integrated simulation and testing, and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The Ares I Project is logically divided into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these Ares I elements and among the other Constellation projects. Also discussed is launch vehicle stack integration (Ares I to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage. The processes for decomposing requirements to the elements and ensuring that requirements have been correctly validated, decomposed, and allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements, will be discussed.

Taylor, James L.↗