Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbital operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Health and Fitness Evaluations for Long Duration Microgravity Exposure

The current health maintenance program for ISS is adequate; however the future of medical care and research in space requires a change where crew time efficiency and autonomy are emphasized. NASA s medical personnel are currently refining their ability to monitor and provide remote health care in such a manner. The proposed plan would evaluate health and fitness of the on orbit crew to; perform on orbit operations, and readiness to return to a terrestrial environment. A two tiered approach will utilize exercise and medical equipment, as well as periodic medical conferences with the flight surgeon, to provide a quantitative and clinical picture of the crew s health and fitness. Any off nominal health and fitness issues that could arise will be evaluated by providing an "armamentarium" of devices both medical and exercise specific to the on orbit crew to use. The ability for the crew to provide autonomous health care, with decreasing earth support, will become increasingly more important for exploration missions. This new plan of health care and maintenance will allow us to, development such efforts while continuing to monitor and provide the best possible health, care and medical research through the microgravity environment on board ISS.

Roden, Sean Kevin↗

International Utilization at the Threshold of "Assembly Complete"- Science Returns from the International Space Station

The European Columbus and Japanese Kibo laboratories are now fully operational on the International Space Station (ISS), bringing decades of international planning to fruition. NASA is now completing launch and activation of major research facilities that will be housed in the Destiny U.S. Laboratory, Columbus, and Kibo. These facilities include major physical sciences capabilities for combustion, fluid physics, and materials science, as well as additional multipurpose and supporting infrastructure. Expansion of the laboratory space and expansion to a 6-person crew (planned for May 2009), is already leading to significant increases in research throughput even before assembly is completed. International research on the ISS includes exchanges of results, sharing of facilities, collaboration on experiments, and joint publication and communication of accomplishments. Significant and ongoing increases in research activity on ISS have occurred over the past year. Although research results lag behind on-orbit operations by 2-5 years, the surge of early research activities following Space Shuttle return to flight in 2005 is now producing an accompanying surge in scientific publications. Evidence of scientific productivity from early utilization opportunities combined with the current pace of research activity in orbit are both important parts of the evidence base for evaluating the potential future achievements of a complete and active ISS.

Robinson, Julie A.↗

Heavy Lift for Exploration: Options and Utilization

Every study of exploration capabilities since the Apollo Program has recommended the renewal of a heavy lift launch capability for the United States. NASA is aggressively pursuing that capability. This paper will discuss several aspects of that effort and the potential uses for that heavy lift capability. The need for heavy lift was cited most recent in the findings of the Review of U.S. Human Space Flight Plans Committee. Combined with considerations of launch availability and on-orbit operations, the Committee finds that exploration will benefit from the availability of a heavy-lift vehicle, the report said. In addition, heavy lift would enable the launching of large scientific observatories and more capable deep-space missions. It may also provide benefit in national security applications. The most recent focus of NASA s heavy lift effort is the Ares V cargo launch vehicle, which is part of the Constellation Program architecture for human exploration beyond low Earth orbit (LEO). The most recent point-of-departure configuration of the Ares V was approved during the Lunar Capabilities concept Review (LCCR) in 2008. The Ares V first stage propulsion system consists of a core stage powered by six commercial liquid hydrogen/liquid oxygen (LH2/LOX) RS-68 engines, flanked by two 5.5-segment solid rocket boosters (SRBs) based on the 5-segment Ares I first stage. The boosters use the same Polybutadiene Acrylonitrile (PBAN) propellant as the Space Shuttle. Atop the core stage is the Earth departure stage (EDS), powered by a single J-2X upper stage engine based on the Ares I upper stage engine. The 33-foot-diameter payload shroud can enclose a lunar lander, scientific instruments, or other payloads. Since LCCR, NASA has continued to refine the design through several successive internal design cycles. In addition, NASA has worked to quantify the broad national consensus for heavy lift in ways that, to the extent possible, meet the needs of the user community.

Creech, Steve↗

A Journey with MOM

In late 2013, the Indian Space Research Organization (ISRO) launched its "Mars Orbiter Mission" (MOM). ISRO engaged NASA's Jet Propulsion Laboratory (JPL) for navigation services to support ISRO's objectives of MOM achieving and maintaining Mars orbit. The navigation support included planning, documentation, testing, orbit determination, maneuver design /analysis, and tracking data analysis. Several of MOM's attributes had an impact on navigation processes, e.g., S -band telecommunications, Earth Orbit Phase maneuvers, and frequent angular momentum desaturation s (AMDs). The primary source of tracking data was NASA/ JPL's Deep Space Network (DSN); JPL also conducted a performance assessment of Indian Deep Space Network (IDSN) tracking data. Planning for the Mars Orbit Insertion (MOI) was complicated by a pressure regulator failure that created uncertainty regarding MOM's main engine and raised potential planetary protection issues. A successful main engine test late on approach resolved these issues; it was quickly followed by a successful MOI on 24-September - 2014 at 02:00 UTC. Less than a month later, Comet Siding Spring's Mars flyby necessitated plans to minimize potential spacecraft damage. At the time of this writing, MOM's orbital operations continue, and plans to extend JPL 's support are in progress. This paper covers the JPL 's support of MOM through the Comet Siding Spring event.

Mars orbiter↗

Applying Contamination Modelling to Spacecraft Propulsion Systems Designs and Operations

Molecular and particulate contaminants generated from the operations of a propulsion system may impinge on spacecraft critical surfaces. Plume depositions or clouds may hinder the spacecraft and instruments from performing normal operations. Firing thrusters will generate both molecular and particulate contaminants. How to minimize the contamination impact from the plume becomes very critical for a successful mission. The resulting effect from either molecular or particulate contamination of the thruster firing is very distinct. This paper will discuss the interconnection between the functions of spacecraft contamination modeling and propulsion system implementation. The paper will address an innovative contamination engineering approach implemented from the spacecraft concept design, manufacturing, integration and test (I&T), launch, to on- orbit operations. This paper will also summarize the implementation on several successful missions. Despite other contamination sources, only molecular contamination will be considered here.

Chen, Philip T.↗

ATS-6 solar cell experiment/improvement

ATS 6 solar cell flight experiment data through 2 years of synchronous orbit operation are presented. Comparisons are made of the performances of the 13 different types of solar cell/cover configurations, including new cover processes and materials, and the COMSAT violet cell. These performances are also compared to the performances of the LES 6 solar cell experiment, the ATS 6 main solar arrays, and the Hughes Aircraft Company solar arrays, and to laboratory spectrum electron irradiations. It was found that the cells of the ATS 6 experiment generally performed as expected through 6 to 9 months in orbit, but that at 2 years they were more severely degraded than expected.

Goldhammer, L. J.↗

Thermal modeling of nickel-hydrogen battery cells operating under transient orbital conditions

An analytical study of the thermal operating characteristics of nickel-hydrogen battery cells is presented. Combined finite-element and finite-difference techniques are employed to arrive at a computationally efficient composite thermal model representing a series-cell arrangement operating in conjunction with a radiately coupled baseplate and coldplate thermal bus. An aggressive, low-mass design approach indicates that thermal considerations can and should direct the design of the thermal bus arrangement. Special consideration is given to the potential for mixed conductive and convective processes across the hydrogen gap. Results of a compressible flow model are presented and indicate the transfer process is suitably represented by molecular conduction. A high-fidelity thermal model of the cell stack (and related components) indicates the presence of axial and radial temperature gradients. A detailed model of the thermal bus reveals the thermal interaction of individual cells and is imperative for assessing the intercell temperature gradients.

Schrage, Dean S.↗

Initial guidelines and estimates for a power system with inertial (flywheel) energy storage

The starting point for the assessment of a spacecraft power system utilizing inertial (flywheel) energy storage. Both general and specific guidelines are defined for the assessment of a modular flywheel system, operationally similar to but with significantly greater capability than the multimission modular spacecraft (MMS) power system. Goals for the flywheel system are defined in terms of efficiently train estimates and mass estimates for the system components. The inertial storage power system uses a 5 kw-hr flywheel storage component at 50 percent depth of discharge (DOD). It is capable of supporting an average load of 3 kw, including a peak load of 7.5 kw for 10 percent of the duty cycle, in low earth orbit operation. The specific power goal for the system is 10 w/kg, consisting of a 56w/kg (end of life) solar array, a 21.7 w-hr/kg (at 50 percent DOD) flywheel, and 43 w/kg power processing (conditioning, control and distribution).

Slifer, L. W., Jr.↗

ATS-6 solar cell flight experiment through 2 years in orbit

ATS-6 solar cell flight experiment data through 2 years of synchronous orbit operation are presented. Comparisons are made of the performances of the 13 different types of solar cell/cover configurations, including new cover processes and materials, and the Comsat violet cell. These performances are also compared: (1) to the performances of the LES-6 solar cell experiment, the ATS-6 main solar arrays, and the Hughes Aircraft Company solar arrays, and (2) to laboratory spectrum electron irradiations. It was found that the cells of the ATS-6 experiment generally performed as expected through 6 to 9 months in orbit, but that at 2 years they were more severely degraded than expected.

Goldhammer, L. J.↗

Description of the Space Shuttle Reaction Control System

The Space Shuttle RCS (reaction control system) is required to provide propulsion thrust for precise attitude control and three-axis translation. This capability must be provided for external tank separation, on-orbit operation, deorbit, and reentry. In order to meet these requirements a bipropellant, pressure-fed system utilizing monomethylhydrazine as fuel, and nitrogen tetroxide as oxidizer has been selected. The RCS engines include 38 primary thrusters rated at 870 lbf thrust and 6 vernier thrusters rated at 25 lbf thrust. The system is divided into three removable modules (one forward and two aft) to achieve maintenance and turnaround requirements. In order to provide additional mission flexibility, the aft modules can be connected together or interconnected with the OMS (orbital maneuvering system).

Blevins, D. R.↗

Tracking and data system support for the Mariner Mars 1971 mission. Volume 3: Orbit insertion through end of primary mission

The Tracking and Data System (TDS) Support for the Mariner Mars 1971 Mission final report contains the deep space tracking and data acquisition activities in support of orbital operations. During this period a major NASA objective was accomplished: completion of the 180th revolution and 90th day of data gathering with the spacecraft about the planet Mars. Included are presentations of the TDS flight support pass chronology data for each of the Deep Space Stations used, and performance evaluation for the Deep Space Network Telemetry, Tracking, Command, and Monitor Systems. With the loss of Mariner 8 at launch, Mariner 9 assumed the mission plan of Mariner 8, which included the TV mapping cycles and a 12-hr orbital period. The mission plan was modified as a result of a severe dust storm on the surface of Mars, which delayed the start of the TV mapping cycles. Thus, the end of primary mission date was extended to complete the TV mapping cycles.

Barnum, P. W.↗

Project EGRESS: The design of an assured crew return vehicle for the space station

Keeping preliminary studies by NASA in mind, an Assured Crew Return Vehicle (ACRV) was developed. The system allows the escape of one or more crew members from Space Station Freedom in case of emergency. The design of the vehicle addresses propulsion, orbital operations, reentry, landing and recovery, power and communication, and life support. In light of recent modifications in Space Station design, Project EGRESS (Earthbound Guaranteed ReEntry from Space Station) pays particular attention to its impact on Space Station operations, interfaces and docking facilities, and maintenance needs. A water landing, medium lift vehicle was found to best satisfy project goals of simplicity and cost efficiency without sacrificing the safety and reliability requirements. With a single vehicle, one injured crew member could be returned to Earth with minimal pilot involvement. Since the craft is capable of returning up to five crew members, two such permanently docked vehicles would allow full evacuation of the Space Station. The craft could be constructed entirely with available 1990 technology and launched aboard a shuttle orbiter.

Source record↗

Cesium and rubidium frequency standards status and performance on the GPS program

This paper is an update of the on-orbit operational performance of the frequency standards on the Block I GPS 8 to 11 Navstar satellites, the Block II GPS 13 to 21 Navstar satellites and the Block IIA GPS 22 to 40 Navstar satellites. A brief history of the frequency standards depicting improvements incorporated in the GPS Program with corresponding results will be presented. The frequency standards configurations from the start to the present, including the various Block IIA clock configurations will be discussed. Topics such as clock observations and long term trending analysis which could enhance on-orbit performance analysis will be covered.

Vanmelle, M. J.↗

Study of EVA operations associated with satellite services

Extravehicular mobility unit (EMU) factors associated with satellite servicing activities are identified and the EMU improvements necessary to enhance satellite servicing operations are outlined. Areas of EMU capabilities, equipment and structural interfaces, time lines, EMU modifications for satellite servicing, environmental hazards, and crew training are vital to manned Eva/satellite services and as such are detailed. Evaluation of EMU capabilities indicates that the EMU can be used in performing near term, basic satellite servicing tasks; however, satellite servicing is greatly enhanced by incorporating key modifications into the EMU. The servicing missions involved in contamination sensitive payload repair are illustrated. EVA procedures and equipment can be standardized, reducing both crew training time and in orbit operations time. By standardizing and coordinating procedures, mission cumulative time lines fall well within the EMU capability.

Nash, J. O.↗

Comparison of VIIRS Prelaunch RVS Among Independent Studies

The Visible Infrared Imaging Radiometer Suite (VIIRS) is a key sensor carried on the NPOESS (National Polar-orbiting Operational Environmental Satellite System), upgraded and developed recently from heritage instruments including AVHRR, OLS, MODIS, and SeaWiFS. It has on-board calibration components including a solar diffuser (SD) and a solar diffuser stability monitor (SDSM) for the reflective solar bands (RSB), a V-groove blackbody for the thermal emissive bands (TEB), and a space view (SV) port for background subtraction. These on-board calibrators are located at fixed scan angles. The VIIRS response versus scan angle (RVS) was characterized prelaunch in lab ambient conditions and will be used on-orbit to characterize the response for the all scan angles relative to the calibrator scan angle (SD for RSB and blackbody for TEB). Since the RVS is vitally important to the quality of calibrated radiance products, several independent studies were performed and their results were compared and validated. This document provides RVS results from three groups: the NPP Instrument Calibration Support Team (NICST), Raytheon, and the Aerospace Corporation. A comparison of the RVS results obtained using a 2nd order polynomial fit to measurement data is conducted for each band, detector, and half angle mirror (HAM) side. The associated RVS fitting residuals are examined and compared with the relative differences in RVS found between independent studies. Results show that the agreement is within 0.1% and comparable with fitting residuals for all bands except for RSB band M9, where a difference of 0.2% results from the application of the atmospheric water vapor correction for laboratory conditions during the test by Raytheon. NICST has slightly larger RSB RVS uncertainties but still well within the 0.3% total uncertainty allowed for the RVS characterization defined in the Performance Verification Plan.

Wu, Aisheng↗

Evaluating Lunar Descent and Landing Performance From a Near Rectilinear Halo Orbit Using Linear Covariance Resetting Techniques

Upcoming lunar programs are striving the achieve precision landing in a safe and robust manner. Various elements impact this mission objective ranging from on-orbit operations with ground station tracking to incorporating relative sensors with hazard detection and avoidance (HDA) to support the final approach and landing phase. Modeling the impacts of ground tracking, trajectory replanning, relative navigation sensors, and particularly a potential HDA system on the integrated closed-loop GN\&C system performance poses a unique challenge due to the complexity and interaction with multiple facets of the vehicle including the trajectory design, sensing hardware, navigation system, guidance and targeting, and the overall mission concept of operations. This paper outlines techniques to systematically analyze and compare the performance impacts of ground tracking and replanning and an HDA system where the onboard navigation errors are reset or uploaded from an external source and the vehicle's reference trajectory is regenerated requiring the system dispersions to also be reset to reflect this in-flight profile adjustment. To illustrate the application of these general techniques for analyzing the performance impacts due to incorporating these resetting events, they are demonstrated with a human lunar descent and landing scenario starting from a near rectilinear halo orbit (NRHO) until the vehicle precisely reaches its predetermined landing site on the lunar surface. Performance metrics such as inertial and relative navigation errors, trajectory dispersions, footprint dispersions, and propellant usage are provided.

GN&C↗