Search NASA⌕ Search

SEARCH · Search NASA

Results for “power simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Experimental study of a low radio frequency power driven relativistic klystron amplifier

Using particle in cell simulation codes, a low radio frequency (rf) power driven relativistic klystron amplifier is designed according to the beam with current of 7.5 kA and voltage of 750 kV with special measures to avoid the mode competition. Simulated power reaches 1.7 GW when the driven rf power is 7.0 kW, the corresponding gain is 53.9 dB. Also the experiment is carried out on a telsa-typed accelerator, whose beam is with current of 8 kA and voltage of 800 kV. The measured rf output power reaches 2.04 GW in the experiment when the input rf power is 62 kW and frequency 2.850 GHz, the corresponding gain is 45.1 dB and efficiency is 32%. The maximum gain reaches 46.7 dB when the input decreases to 39 kW, the corresponding output rf power is 1.84 GW.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Interpretation of energy deposition data from historical operation of the transient test facility (TREAT)

The Transient Test Reactor (TREAT) at Idaho National Laboratory will resume operations in late 2017 after a 23 year hiatus while maintained in a cold standby state. Over that time period, computational power and simulation capabilities have increased substantially and now allow for new multiphysics modeling possibilities that were not practical or feasible for most of TREAT's operational history. Hence the return of TREAT to operational service provides a unique opportunity to apply state-of-the-art software and associated methods in the modeling and simulation of general three-dimensional steady state and kinetic behavior for reactor operation, and for coupling of the core power transient model to experiment simulations. However, measurements taken in previous operations were intended to predict power deposition in experimental samples, with little consideration of three-dimensional core power distributions. Hence, interpretation of data for the purpose of validation of modern methods can be challenging. For the research discussed herein, efforts are described for the process of proper interpretation of data from the most recent calibration experiments performed in the core, the M8 calibration series (M8-CAL). These measurements were taken between 1990 and 1993 using a set of fission wires and test fuel pins to estimate the power deposition that would be produced in fast reactor test fuel pins during the M8 experiment series. Because of the decision to place TREAT into a standby state in 1994, the M8 series of transients were never performed. However, potentially valuable information relevant for validation is available in the M8-CAL measurement data, if properly interpreted. This article describes the current state of the process of recovery of useful data from M8-CAL measurements and quantification of biases and uncertainties to potentially apply to the validation of multiphysics methods.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Using Co-Simulation to Model Interconnect-Scale Power Systems from Loads to Generators

Co-simulation is a modeling technique that allows analysts to combine simulation tools and their corresponding models to exchange data during run-time, allowing the creation of larger and more complex models across heterogeneous domains. HELICS is a co-simulation platform developed over the past six years that has been shown to be effective for these multi-domain analysis. Recently, a HELICS-based analysis was completed where the ERCOT electrical interconnect in the United States was modeled in high detail from bulk power system generation to individual customer loads. This model was used to evaluate a flat-rate and transactive energy tariff with integrated wholesale and retail real-time and day-ahead energy markets. This modeling allows detailed analysis showing how the operations of the power system under these tariffs impact all actors in the power system, from individual customers to bulk power system operators.

co-simulation, HELICS, transactive energy system, ↗

Estimating manufacturing electricity costs by simulating dependence between production parameters

The electricity costs associated with manufacturing generally consist of an energy charge and a demand charge, which are calculated by total kWh × kWh and peak kW × kW, respectively. While these two charges have been extensively studied with production scheduling, dependence between production parameters has not been thoroughly investigated for production energy costs when the production parameters are assumed to be independent. Such dependence, however, can significantly affect the peak kW and resulting energy costs. Therefore, industrial practitioners need a tool to simulate the production power demand and cost to evaluate energy costs for each production plan and for any dependence in the parameters. In this paper, we propose a method for simulating the power demand at the machine and facility levels, focusing on the dependence in milling machine parameters. Using probabilistic techniques with copulas, we quantify the degree of dependence between two milling parameters (processing times and processing amounts) and build a power demand simulator combining discrete event simulation and numerical simulation models. From 35 illustrative examples, we show that a production strategy to adjust dependence can reduce the peak kW and energy costs by more than 15% and 4%, respectively. In addition to dependence, less variability in processing times results in less peak kW and energy costs. Other factors such as a marginal probability distribution and copula types having the same degree of variability have been found to have limited effects on reducing energy costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Tale of Two Simulators—A Comparative Human-in-the-Loop Nuclear Power Plant Operations Study on Thermal Power Dispatch for Hydrogen Production

A study was designed for a reconfigurable, full-scale, full-scope nuclear power plant control room simulator to compare two different thermal power dispatch systems, on separate simulator platforms, demonstrating a TPD concept of operation. A TPD system can provide a desirable alternative revenue source for utilities but requires addressing new and unique operational issues. The selection of representative scenarios and the scenario-based experimental design are presented as key elements to capture evidence for validating the developed TPD concept of operations overcome these operational issues.

Ulrich, Thomas A.↗

Control of wind turbine generators connected to power systems

A unique simulation model based on a Mode-O wind turbine is developed for simulating both speed and power control. An analytical representation for a wind turbine that employs blade pitch angle feedback control is presented, and a mathematical model is formulated. For Mode-O serving as a practical case study, results of a computer simulation of the model as applied to the problems of synchronization and dynamic stability are provided. It is shown that the speed and output of a wind turbine can be satisfactorily controlled within reasonable limits by employing the existing blade pitch control system under specified conditions. For power control, an additional excitation control is required so that the terminal voltage, output power factor, and armature current can be held within narrow limits. As a result, the variation of torque angle is limited even if speed control is not implemented simultaneously with power control. Design features of the ERDA/NASA 100-kW Mode-O wind turbine are included.

Hwang, H. H.↗

Impact of SiC Devices on Hybrid Electric and Plug-In Hybrid Electric Vehicles

The application of SiC devices (as battery interface, motor controller, etc.) in a hybrid electric vehicle (HEV) will benefit from their high-temperature capability, high-power density, and high efficiency. Moreover, the light weight and small volume will affect the whole power train system in a HEV, and thus performance and cost. In this work, the performance of HEVs is analyzed using PSAT (powertrain system analysis tool, vehicle simulation software). Power loss models of a SiC inverter are incorporated into PSAT powertrain models in order to study the impact of SiC devices on HEVs. Two types of HEVs are considered. One is the 2004 Toyota Prius HEV, the other is a plug-in HEV (PHEV), whose powertrain architecture is the same as that of the 2004 Toyota Prius HEV. The vehicle-level benefits from the introduction of the SiC devices are demonstrated by simulations. Not only the power loss in the motor controller but also those in other components in the vehicle powertrain are reduced. As a result, the system efficiency is improved and the vehicles consume less energy and emit less harmful gases. It also makes it possible to improve the system compactness with simplified thermal management system. For the PHEV, the benefits are more distinct. Especially, the size of battery bank can be reduced for optimum design.

33 ADVANCED PROPULSION SYSTEMS↗

Geomagnetic Storms and Long-Term Impacts on Power Systems

Pacific Northwest National Laboratory was commissioned to study the potential impact of a severe GIC event on the western U.S.-Canada power grid (referred to as the Western Interconnection). The study identified long transmission lines (length exceeding 150 miles) that did not include series capacitors. The basic assumption for the study is that a GIC is more likely to couple to long transmission lines, and that series capacitors would block the flow of the induced DC GIC. Power system simulations were conducted to evaluate impacts to the bulk power system if transformers on either end of these lines failed. The study results indicated that the Western Interconnection was not substantially at risk to GIC because of the relatively small number of transmission lines that met this criterion. This report also provides a summary of the Hydro-Québec blackout on March 13, 1989, which was caused by a GIC. This case study delves into the failure mechanisms of that event, lessons learned, and preventive measures that have been implemented to minimize the likelihood of its reoccurrence. Finally, the report recommends that the electric power industry consider the adoption of new protective relaying approaches that will prevent severe GIC events from catastrophically damaging transformers. The resulting changes may increase the likelihood of smaller disruptions but should prevent an unlikely yet catastrophic national-level event.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2024.03.13 Bushing Subcommittee presentation on Transformer Bushing Seismic Resilience: Design, Hazard, & Prevention Analysis [Slides]

Presents results from power grid simulations on synthetic grids that estimate the impact from power transformer failures due to earthquakes. In the best-case scenario, there is an 82.9% likelihood of load loss greater or equal to 51 MW. Methodologies are described as well as path forward to improving transformer resilience and, consequently, the resilience of the bulk power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Failure Modes in Capacitors When Tested Under a Time-Varying Stress

Steady step surge testing (SSST) is widely applied to screen out potential power-on failures in solid tantalum capacitors. The test simulates the power supply's on and off characteristics. Power-on failure has been the prevalent failure mechanism for solid tantalum capacitors for decoupling applications. On the other hand, the SSST can also be reviewed as an electrically destructive test under a time-varying stress. It consists of rapidly charging the capacitor with incremental voltage increases, through a low resistance in series, until the capacitor under test is electrically shorted. Highly accelerated life testing (HALT) is usually a time-efficient method for determining the failure mechanism in capacitors; however, a destructive test under a time-varying stress like SSST is even more effective. It normally takes days to complete a HALT test, but it only takes minutes for a time-varying stress test to produce failures. The advantage of incorporating specific time-varying stress into a statistical model is significant in providing an alternative life test method for quickly revealing the failure modes in capacitors. In this paper, a time-varying stress has been incorporated into the Weibull model to characterize the failure modes. The SSST circuit and transient conditions to correctly test the capacitors is discussed. Finally, the SSST was applied for testing polymer aluminum capacitors (PA capacitors), Ta capacitors, and multi-layer ceramic capacitors with both precious metal electrode (PME) and base-metal-electrodes (BME). It appears that testing results are directly associated to the dielectric layer breakdown in PA and Ta capacitors and are independent on the capacitor values, the way the capacitors being built, and the manufactures. The testing results also reveal that ceramic capacitors exhibit breakdown voltages more than 20 times the rated voltage, and the breakdown voltages are inverse proportional to the dielectric layer thickness. The possibility of ceramic capacitors in front-end decoupling applications to block the surge noise from a power supply is also discussed.

Liu, David (Donhang)↗