Search NASA⌕ Search

SEARCH · Search NASA

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

ePROJECT BUILDER: PROMOTING WIDER ADOPTION OF ENERGY SAVINGS PERFORMANCE CONTRACTS THROUGH STANDARDIZATION AND TRANSPARENCY

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Earni, Shankar↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

RELAP5-3D results for phase I (Exercise 2) of the OECD/NEA MHTGR-350 MW benchmark

The coupling of the PHISICS code suite to the thermal hydraulics system code RELAP5-3D has recently been initiated at the Idaho National Laboratory (INL) to provide a fully coupled prismatic Very High Temperature Reactor (VHTR) system modeling capability as part of the NGNP methods development program. The PHISICS code consists of three modules: INSTANT (performing 3D nodal transport core calculations), MRTAU (depletion and decay heat generation) and a perturbation/mixer module. As part of the verification and validation activities, steady state results have been obtained for Exercise 2 of Phase I of the newly-defined OECD/NEA MHTGR-350 MW Benchmark. This exercise requires participants to calculate a steady-state solution for an End of Equilibrium Cycle 350 MW Modular High Temperature Reactor (MHTGR), using the provided geometry, material, and coolant bypass flow description. The paper provides an overview of the MHTGR Benchmark and presents typical steady state results (e.g. solid and gas temperatures, thermal conductivities) for Phase I Exercise 2. Preliminary results are also provided for the early test phase of Exercise 3 using a two-group cross-section library and the Relap5-3D model developed for Exercise 2. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Response Time Analysis and Test of Protection System Instrument Channels for APR1400 and OPR1000

Safety limits are required to maintain the integrity of physical barriers designed to prevent the uncontrolled release of radioactive materials in nuclear power plants. The safety analysis establishes two critical constraints that include an analytical limit in terms of a measured or calculated variable, and a specific time after the analytical limit is reached to begin protective action. Keeping with the nuclear regulations and industry standards, satisfying these two requirements will ensure that the safety limit will not be exceeded during the design basis event, either an anticipated operational occurrence or a postulated accident. Various studies on the setpoint determination methodology for the safety-related instrumentation have been actively performed to ensure that the requirement of the analytical limit is satisfied. In particular, the protection setpoint methodology for the advanced power reactor 1400 (APP1400) and the optimized power reactor 1000 (OPR1000) has been recently developed to cover both the design basis event and the beyond design basis event. The developed setpoint methodology has also been quantitatively validated using specific computer programs and setpoint calculations. However, the safety of nuclear power plants cannot be fully guaranteed by satisfying the requirement of the analytical limit. In spite of the response time verification requirements of nuclear regulations and industry standards, it is hard to find the studies on the systematically integrated methodology regarding the response time evaluation. In cases of APR1400 and OPR1000, the response time analysis for the plant protection system is partially included in the setpoint calculation and the response time test is separately performed via the specific plant procedure. The test technique has a drawback which is the difficulty to demonstrate completeness of timing test. The analysis technique has also a demerit of resulting in extreme times that not actually possible. Thus, the establishment of the systematic response time evaluation methodology is needed to justify the conformance to the response time requirement used in the safety analysis. This paper proposes the response time evaluation methodology for APR1400 and OPR1000 using the combined analysis and test technique to confirm that the plant protection system can meet the analytical response time assumed in the safety analysis. In addition, the results of the quantitative evaluation performed for APR1400 and OPR1000 are presented in this paper. The proposed response time analysis technique consists of defining the response time requirement, determining the critical signal path for the trip parameter, allocating individual response time to each component on the signal path, and analyzing the total response time for the trip parameter, and demonstrates that the total analyzed response time does not exceed the response time requirement. The proposed response time test technique is composed of defining the response time requirement, determining the critical signal path for the trip parameter, determining the test method for each component on the signal path, performing the response time test, and demonstrates that the total test result does not exceed the response time requirement. The total response time should be tested in a single test that covers from the sensor to the final actuation device on the instrument channel. When the total channel is not tested in a single test, separate tests on groups of components or single components including the total instrument channel shall be combined to verify the total channel response. For APR1400 and OPR1000, the ramp test technique is used for the pressure and differential pressure transmitters and the step function testing technique is applied to the signal processing equipment and final actuation device. As a result, it can be demonstrated that the response time requirement is satisfied by the combined analysis and test technique. Therefore, the proposed methodology in this paper plays a crucial role in guaranteeing the safety of the nuclear power plants systematically satisfying one of two critical requirements from the safety analysis. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Verification and Validation of Optimization of Replacement Portal Monitoring Replay Tools

The Los Alamos National Laboratory and the Johns Hopkins Applied Physics Laboratory (APL) are both developing optimization software to fulfill the objective of Phase III of the Replacement Portal Monitoring (RPM) Program for the Department of Homeland Security. The objective of the Phase III of the RPM Program is to conduct an evaluation of three RPM systems designed to enhance mission effectiveness, gain operational efficiencies, and to address emerging mission needs against the Countering Weapons of Mass Destruction (CWMD ) nuclear threat basis and special nuclear material (SNM) used in performance testing. As such this task involves the use of global optimization algorithms.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Heat load of a GaAs photocathode in an SRF electron gun

A great deal of effort has been made over the last decades to develop a better polarized electron source for high energy physics. Several laboratories operate DC guns with a gallium arsenide photocathode, which yield a highly polarized electron beam. However, the beam's emittance might well be improved by using a superconducting radio frequency (SRF) electron gun, which delivers beams of a higher brightness than that from DC guns because the field gradient at the cathode is higher. SRF guns with metal and CsTe cathodes have been tested successfully. To produce polarized electrons, a Gallium-Arsenide photo-cathode must be used: an experiment to do so in a superconducting RF gun is under way at BNL. Since a bulk gallium arsenide (GaAs) photocathode is normal conducting, a problem arises from the heat load stemming from the cathode. In this paper, we present our measurements of the electrical resistance of GaAs at cryogenic temperatures, a prediction of the heat load and verification by measuring the quality factor of the gun with and without the cathode at 2 K. We simulate heat generation and flow from the GaAs cathode using the ANSYS program. Finally, by following the findings with the heat load model, we designed and fabricated a new cathode holder (plug) to decrease the heat load from GaAs.

2 K test↗

Building America

Builders generally use a 'spec and purchase' business management system (BMS) when implementing energy efficiency. A BMS is the overall operational and organizational systems and strategies that a builder uses to set up and run its company. This type of BMS treats building performance as a simple technology swap (e.g. a tank water heater to a tankless water heater) and typically compartmentalizes energy efficiency within one or two groups in the organization (e.g. purchasing and construction). While certain tools, such as details, checklists, and scopes of work, can assist builders in managing the quality of the construction of higher performance homes, they do nothing to address the underlying operational strategies and issues related to change management that builders face when they make high performance homes a core part of their mission. To achieve the systems integration necessary for attaining 40% + levels of energy efficiency, while capturing the cost tradeoffs, builders must use a 'systems approach' BMS, rather than a 'spec and purchase' BMS. The following attributes are inherent in a systems approach BMS; they are also generally seen in quality management systems (QMS), such as the National Housing Quality Certification program: Cultural and corporate alignment, Clear intent for quality and performance, Increased collaboration across internal and external teams, Better communication practices and systems, Disciplined approach to quality control, Measurement and verification of performance, Continuous feedback and improvement, and Whole house integrated design and specification.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Report: Wireless Instrument for Automated Measurement of Clean Cookstove Usage and Black Carbon Emissions

Black carbon (BC) emissions from traditional cooking fires and other sources are significant anthropogenic drivers of radiative forcing. Clean cookstoves present a more energy-efficient and cleaner-burning vehicle for cooking than traditional wood-burning stoves, yet many existing cookstoves reduce emissions by only modest amounts. Further research into cookstove use, fuel types, and verification of emissions is needed as adoption rates for such stoves remain low. Accelerated innovation requires techniques for measuring and verifying such cookstove performance. The overarching goal of the proposed program was to develop a low-cost, wireless instrument to provide a high-resolution profile of the cookstove BC emissions and usage in the field. We proposed transferring the complexity of analysis away from the sampling hardware at the measurement site and to software at a centrally located server to easily analyze data from thousands of sampling instruments. We were able to build a low-cost field-based instrument that produces repeatable, low-cost estimates of cookstove usage, fuel estimates, and emission values with low variability. Emission values from our instrument were consistent with published ranges of emissions for similar stove and fuel types.

09 BIOMASS FUELS↗

FOCAL Campaign I: Advanced Wind Turbine Control Strategies

Campaign I of the Floating Offshore-wind Controls Advanced Laboratory Experimental Program (FOCAL) aims to generate a dataset enabling the validation of aerodynamic performance of a scaled turbine mounted on a rigid tower in a fixed condition. The turbine considered in the FOCAL testing campaigns is the IEA-Wind 15MW Reference Wind Turbine. This scaled model is capable of simulating advanced blade-pitch control strategies in a high-quality wind field. The turbine is fully instrumented to record a variety of parameters in real time such as structural loads and dynamics. The test data considered was generated at the University of Maine's Harold Alfond Wind and Wave (W2) testing facility. The Load Cases (LC) considered in this testing campaign are as follows: LC 1.X - Constant wind and blade-pitch with varying rotor speeds LC 2.X - Constant wind and rotor speed with varying blade-pitch LC 3.X - Varying wind with active closed-loop control Detailed properties on the modeled system are found in the following reference: Lenfest E., Floating Offshore-wind Controls Advanced Laboratory (FOCAL) Experimental Program - Campaign I: 1:70 Model-scale Testing of the IEA-Wind 15MW Reference Turbine. UMaine ASCC Report Number 23-40-1183. Details on the results of the verification and validation are found in the following reference: Mendoza, Nicole et al., "Verification and Validation of Model-Scale Turbine Performance and Control for the IEA Wind 15 MW Reference Wind Turbine," Energies, vol. 15, no. 20, 2022, https://doi.org/10.3390/en15207649.

17 WIND ENERGY↗

Using the BEopt Automated Residential Simulation Test Suite to Enable Comparative Analysis Between Energy Simulation Engines: Preprint

Verification and validation are crucial software quality control procedures when developing and implementing models. This is particularly important as a variety of stakeholders rely on accurate predictions from building simulation programs. This study uses the BEopt Automated Residential Simulation Test Suite (BARTS) to facilitate comparison of two energy simulation engines across various building components and includes models that isolate the impacts of specific building components on annual energy consumption. As a case study, BARTS has been used to identify important discrepancies between the engines for several components of the building models; these discrepancies are caused by differences in the models used by the engines or coding errors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Light Water Reactor Sustainability Program Operator Performance Metrics for Control Room Modernization: A Practical Guide for Early Design Evaluation

As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate the operator performance using these systems as part of a verification and validation process. There are no standard, predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages of a new system. This report identifies the process and metrics for evaluating human system interfaces as part of control room modernization. The report includes background information on design and evaluation, a thorough discussion of human performance measures, and a practical example of how the process and metrics have been used as part of a turbine control system upgrade during the formative stages of design. The process and metrics are geared toward generalizability to other applications and serve as a template for utilities undertaking their own control room modernization activities.

99 GENERAL AND MISCELLANEOUS↗

Surveillance of PLUS7{sup TM} fuel for PWR nuclear power plant

The surveillance program on the advanced nuclear fuel of PLUS{sup TM} developed for Optimized Power Reactors of 1000 MWe (OPR1000s) and Advanced Power Reactors of 1400 MWe (APR1400s) in Korea was completed in the early of 2011. This fuel had been jointly developed through the extensive out-of-pile tests with Westinghouse for three years since 1999. The irradiation tests for the in-reactor verification using four lead test assemblies (LTAs) had been started in Ulchin unit 3 in 2002. During the overhaul period after each irradiation test, the eight (8) burnup-dependent parameters were measured without disassembling using the precise measurement systems in pool-side. After three cycle irradiations, one test assembly was disassembled and the rod-wise inspection on twenty rods was performed. During this stage, five (5) parameters were measured and evaluated. Among these twenty rods, ten rods including skeleton were sent to hot-cell test facility for further detailed examination and are currently being examined. After in-reactor verifications during two cycles, this fuel was commercially supplied to eight (8) OPR1000s sequentially. Currently all eight (8) OPR1000s were replaced with this fuel. In addition, this fuel is going to be supplied to four (4) APR1400s being constructed in Braka, UAE as well as four(4) OPR1000s and four(4) APR1400s being constructed in Korea. In the meanwhile, the surveillance program for the commercially supplied fuel has been launched to confirm growth, creep, corrosion and deformation, etc. obtained during LTA irradiation. Four (4) limiting fuel assemblies, that is, two (2) assemblies to be discharged after 2 cycle irradiations and the other two (2) after 3 cycle irradiations were selected for this surveillance program. Irradiation data of commercially supplied fuels are compared and confirmed to LTA irradiation performance behaviors on this paper. Among the eight (8) burnup-dependent parameters, the interesting ones were irradiation-induced growths of grid width, rod and assembly lengths while cladding oxide thickness, rod creep and swelling followed the LTA results, and assembly bow/twist and rod bow were well below the design limits. The rod growths were on the lower bound of database and contributed to assembly growth. It was evaluated that these results were attributed to PLUS{sup TM} design characteristics which adopted Inconel top and bottom grids and conformal-shaped mid grid spring. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Benchmark On Sensitivity Calculation (Phase III)

The sensitivities of the keff eigenvalue to neutron cross sections have become commonly used in similarity studies and as part of the validation algorithm for criticality safety assessments. To test calculations of the sensitivity coefficients, a benchmark study (Phase III) has been established by the OECD-NEA/WPNCS/EG UACSA (Expert Group on Uncertainty Analysis for Criticality Safety Assessment). This paper presents some sensitivity results generated by the benchmark participants using various computational tools based upon different computational methods: SCALE/TSUNAMI-3D and -1D, MONK, APOLLO2-MORET 5, DRAGON-SUSD3D and MMKKENO. The study demonstrates the performance of the tools. It also illustrates how model simplifications impact the sensitivity results and demonstrates the importance of 'implicit' (self-shielding) sensitivities. This work has been a useful step towards verification of the existing and developed sensitivity analysis methods.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bell Creek Test Site - Development of a Cost-Effective, Long-Term Monitoring Strategy

The Bell Creek oil field is operated by Denbury Onshore LLC (Denbury) as a commercial enhanced oil recovery (EOR) project which provides an opportunity to improve the understanding of associated carbon dioxide (CO 2 ) storage that occurs as a natural part of the EOR process as well as provides a large-scale CO 2 injection site that can be used to inform carbon storage in deep saline formations (DSFs). The Plains CO 2 Reduction (PCOR) Partnership Bell Creek project, which is conducted in collaboration with the commercial project, provides a substantive opportunity for the validation of viable monitoring, verification, and accounting (MVA) strategies with applicability to both large-scale carbon storage in DSFs and associated carbon storage through EOR. In collaboration with Denbury, a 5-year research MVA program was conducted to demonstrate 16 MVA techniques with applications to geologic CO 2 storage scenarios. The program represents 1.5 years of preinjection and over 3 years of operational MVA activities coinciding with the first 3.2 million tons of associated CO 2 storage. Insights provided through the Bell Creek project and investigation into a long-term monitoring plan have resulted in an ongoing field demonstration of two emerging geophysical techniques, the Krauklis seismic wave (K-wave) and scalable, automated, semipermanent seismic array (SASSA), through complementary projects. These techniques show promise for providing more cost-efficient, lower-impact, near-real-time solutions for long-term monitoring. If proven successful, these techniques will provide additional techniques compatible with long-term monitoring strategies. While the development of a long-term monitoring plan for the Bell Creek project will take into consideration specific operations and benefits to the project, the case study will provide recommendations that are expected to be broadly applicable for commercial carbon storage projects throughout the PCOR Partnership region and the wider deployment of carbon capture and storage.

02 PETROLEUM↗

DMTN-107: Options for Alert Production in LSST Operations Year 1

This document reviews five options for alert production in LSST Operations Year 1 (LOY1), taking into account any implications on LSST formal requirements including up-scopes, down-scopes or explicit violations. The Data Management System Science Team's preferred option for maximizing LSST science is to generate template images from as much of the data from the commissioning and/or science verification phases as possible and use them to run Difference Image Analysis and alert production during LOY1. A proposal to increase the sky area covered during commissioning via a "filler" scheduler program is also presented. As a potential moderate up-scope, this study presents an option to build interim templates on a $\sim$monthly basis during LOY1, which could increase the accessible sky area by ~1000-2000 deg**2 per month, and should be reconsidered closer to the start of Operations.

79 ASTRONOMY AND ASTROPHYSICS↗

Monitoring the Long-Term Safety Performance of a Repository for Used Nuclear Fuel - 12294

The nuclear waste management programs of several nations include plans for the design, construction and operation of deep geological repositories. Some of these programs have initiated the licensing process for their repository designs. Monitoring strategies and systems are at different levels of development in each program and there is common ground with respect to the ultimate goal of the monitoring function. In this context, the primary functions of a monitoring system are considered to be the verification of safety performance and making available information that may be required for implementation of future decisions such as the timing of repository decommissioning and closure or the possible retrieval of waste containers. This study examines some of the relevant issues and outlines a conceptual monitoring system for further study and development during implementation of Adaptive Phased Management, the method selected by the Government of Canada for long-term management of used nuclear fuel. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safeguards by Design Table Top Exercises Final Report (FY 2023)

This University Engagement project challenged engineering students at universities, that do not have bachelor’s degree programs in nuclear engineering but do have research reactors and some nuclear engineering coursework, to develop capacity in Safeguards by Design concepts through the application of Tabletop Exercises. This University Engagement project was part of the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), Office of Defense Nuclear Nonproliferation, Office of International Nuclear Safeguards, Next Generation Safeguards Initiative (NGSI), Human Capital Development (HCD): University Engagement Program. This program exposed university students with Mechanical Engineering majors and Nuclear Engineering minors to the concepts of international nuclear safeguards. In FY22, three teams at the University of Rhode Island and two teams at the University of Texas Austin participated in researching, designing, building, and testing projects to support international nuclear safeguards measurements or verification. The projects involved engaging in activities at the university’s research reactors. All the projects engaged students with prototyping a design and/or tool for application at the Universities’ reactor. However, for FY23, the direction of the HCD project had changed to implementing a Tabletop Exercise in Safeguards by Design (SBD). A Tabletop Exercise was not executed during FY23, but relationships with both Universities was maintained and how to integrate the exercise into the curriculum of both programs was determined.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗