Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource planning optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

ATLAS jet trigger update for the LHC run II

The CERN Large Hadron Collider is the biggest and most powerful particle collider ever built. It produces up to 40 million proton-proton collisions per second at unprecedented energies to explore the fundamental laws and properties of Nature. The ATLAS experiment is one of the detectors that analyses and records these collisions. It generates dozens of GB/s of data that has to be reduced before it can be permanently stored, the event selection is made by the ATLAS trigger system, which reduces the data volume by a factor of 105. The trigger system has to be highly configurable in order to adapt to changing running conditions and maximize the physics output whilst keeping the output rate under control. A particularly interesting pattern generated during collisions consists of a collimated spray of particles, known as a hadronic jet. To retain the interesting jets and efficiently reject the overwhelming background, optimal jet energy resolution is needed. Therefore the Jet trigger software requires CPU-intensive reconstruction algorithms. In order to reduce the resources needed for the reconstruction step, a partial detector readout scheme was developed, which effectively suppresses the low activity regions of the calorimeter. In this paper we describe the overall ATLAS trigger software, and the jet trigger in particular, along with the improvements made on the system. We then focus on detailed studies of the algorithm timing and the performance impact of the full and partial calorimeter readout schemes. We conclude with an outlook of the jet trigger plans for the next LHC data-taking period. (authors)

43 PARTICLE ACCELERATORS↗

A Compact, Broad-Band Hyperspectral SpectroRadiometer (Final Report)

The Phase I effort has laid the foundation for developing a complete, high-performance hyperspectral imaging system based on a patented approach. Detailed optical modeling has been performed to identify an optimal design that promises excellent imaging, low stray-light, and large signal-to-noise ratios across the full spectral range of 350-2500 nm. Vibration analysis indicates the instrument’s primary optics will be stable when deployed in high-vibration environments such as onboard a UAV, and a mechanical design has been developed. A two-step development plan has been formulated to minimize risk. In the first step, a deployable prototype instrument will be built that provides full performance but will utilize a somewhat heavy, but proven, data acquisition system. This will leave sufficient time and resources to address problems that may arise and incorporate a more advanced data acquisition system during the second step, plus leave time and resources to make other improvements identified during testing done during the first step. In summary, the effort will lead to an advanced instrument for vegetation monitoring, which may find applications in agriculture, pipeline monitoring, and it will find applications for a broad range of research including work devoted to understanding of the carbon cycle.

54 ENVIRONMENTAL SCIENCES↗

Temperature Constraints on the Storage and Curation of Volatile-Rich Samples from the Lunar Poles

Final Document is attached. Introduction: NASA's Lunar Exploration Campaign includes Lunar sample return efforts beginning in the mid-2020's and human landed missions in the late 2020's-early 2030's. Volatile-rich samples from the Lunar poles will be high-priority targets due to their resource potential for human explorers and high science value. In order to precisely characterize the nature of these polar volatile materials upon return to Earth, they will need to be transported and curated under conditions that minimize their chemical and physical alteration. NASA Policy Directive (NPD) 7100.10F mandates the preservation of existing extraterrestrial samples with minimal alteration, extensive and quantitative documentation of alteration that is provided to investigators, and "the development of long-range plans" for samples yet to be acquired. This abstract summarizes new efforts by the Astromaterials Acquisition and Curation Office at JSC to assess the optimal

Mitchell, J. L.↗

Human Factors and Modeling Methods in the Development of Control Room Modernization Concepts

nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical tool currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While these tools are useful, there is still considerable uncertainty during a typical outage that bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy’s Advanced Outage Control Center project. This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators.

99 GENERAL AND MISCELLANEOUS↗

Alaskan North Slope Oil & Gas Transportation Support

North Slope oil and gas resources are a critical part of US energy supplies and their development is facing a period of new growth to meet increasing national energy needs. While this growth is taking place in areas active in development for more than 20 years, there are many increasing environmental challenges facing industry and management agencies. A majority of all exploration and development activities, pipeline maintenance and other field support activities take place in the middle of winter, when the fragile tundra surface is more stable. The window for the critical oil and gas winter operational season has been steadily decreasing over the last 25 years. The number of companies working on the North Slope is increasing. Many of these companies are smaller and working with fewer resources than the current major companies. The winter operations season starts with the tundra-travel opening, which requires 15 cm of snow on the land surface in the coastal management areas and 23 cm in the foothills management areas. All state managed areas require -5°C soil temperatures at a soil depth of 30 cm. Currently there are no methods to forecast this opening date, so field mobilization efforts are dependent on agency personnel visiting field sites to measure snow and soil temperature conditions. Weeks can be easily lost in the winter operating season due to delays in field verification of tundra conditions and the resulting mobilization. After the season is open, a significant percentage of exploration, construction, and maintenance do not proceed until ice roads and pads can be built. This effort is dependent on access to lake ice and under-ice water. Ice chipping is a common ice-road construction technique used to build faster and stronger ice roads. Seasonal variability in water availability and permitting approaches are a constant constraint to industry. At the end of the winter season, projects reliant on ice-road networks are often faced with ending operations early or risk being caught on ice roads with flooded stream crossings, or unusable sections of ice road due to local melt. These challenges result in higher oil and gas field exploration and operational costs. Much of the scientific understanding to address transportation issues for oil and gas development on the North Slope exists, but has not been placed into a set of tools and data sets useful for industry and management agencies. Optimizing North Slope transportation networks during winter operation seasons is critical in managing increasing resource development and will provide a framework for environmentally-responsive development. Understanding the physical environment (such as snow, water, ice, soils) is necessary to ensure protection of fisheries and other natural resources on the sensitive tundra landscape. Solutions also have to do more than just describe current conditions, they need the ability to forecast short-term conditions. This will allow management agencies to respond to future variability in snow cover, soil temperature, and water availability more effectively. In turn, industry will then have more time to plan the significant mobilization taking place every winter season.

02 PETROLEUM↗

Deployable Wind-Hybrid Power Systems for Defense and Disaster Response Applications

This report presents an analysis of the performance of deployable energy systems comprised of wind energy systems integrated with diesel generators, photovoltaic systems, and battery storage to meet the load requirements of a representative U.S. Army forward operating base. The analysis is conducted using HOMER, a microgrid analysis software that can search through a wide range of parameters to design and optimize microgrid power systems. The search parameters include the system architecture, the wind and solar resources, and the availability of diesel fuel. The results of the analysis measure the relative performance of the different systems and environments in terms of the overall transportation cost to deploy the system and the ability to provide resilience in terms of meeting mission critical loads.

02 PETROLEUM↗

reVRt (reV Routing) [SWR-25-112]

The reV Routing (reVRt) tool is a computational framework for modeling and optimizing transmission infrastructure requirements for electrical grid connections. By employing a spatially-aware least-cost-path methodology, it allows users to incorporate a wide range of factors including siting constraints, regional component costs, land composition costs, point-of-interconnection costs, and network upgrade costs. Additionally, the tool enables advanced follow-on analyses, such as land characterization for potential transmission line routes, to support informed decision-making. Although it's designed to integrate seamlessly with the reV model, the reV Routing tool is versatile and can also be utilized independently for standalone analyses in transmission planning and resource assessment scenarios.

Pinchuk, Pavlo (Paul) [National Renewable Energy L↗

Space platform accommodations

The results of studies performed at NASA of five space platform design reference missions (DRM) are presented. The DRM's were planned in an effort to eliminate problems, rather than to enhance optimization. A diagram of each payload is included, and the space platform concept is presented with the most important features being a continuous total power supply of 12.5 kW to the payloads at 30 and/or 120 Vdc regulated, a high-rate multiplexer with a total output of 48 Mbps, and and a thermal control system capable of dissipating the platform power output at payload fluid temperatures of 0 C to 3 C. Payload interface requirements were analyzed and appropriate integration hardware was added. Payload viewing characteristics are considered, and resource use is discussed. It is concluded that, in payload applications, efficient use of STS transportation and the platform must be considered.

Bailey, W.↗

Gas-Turbines and the Competitiveness of Aviation Plants

The challenge for Russian gas-turbine manufacturers is to create an optimal product line—optimal in the sense that gas-turbine engines may be supplied not only to the aviation industry but to other prospective customers with limited finances. That approach will not only ensure the efficient use of available resources but also quickly bring up-to-date marine and stationary gas-turbine engines to the market. For gas-turbine manufacturers, expansion of the markets for their products will result in significant increase in competitiveness.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The state of the art for neutron irradiation experiments from the perspective of the High Flux Isotope Reactor (HFIR)

Irradiation experiment campaigns are critical to advancing nuclear energy technologies by providing data on material performance under relevant radiation conditions. Successful irradiation experiments require integrated design efforts that balance technical goals with facility constraints. Here, this paper presents an expert-informed overview of irradiation experiment design at the High Flux Isotope Reactor. It addresses the nuclear materials research and irradiation experiment communities to guide them toward developing technically sound, facility-compatible campaigns. The High Flux Isotope Reactor is a multipurpose reactor supporting isotope production, neutron scattering, and materials testing. Its high, steady-state neutron flux is ideal for irradiation experiments, but successful execution demands coordinated thermal, structural, and reactor physics analyses. The paper outlines the complete development workflow from concept definition and design optimization to safety qualification and post-irradiation examination. Standardized capsule platforms are also discussed in terms of flexibility, specimen capacity, and thermal performance. Common failure modes such as unanticipated geometric variations, can impact temperature-dose profiles and compromise data reliability. Therefore, detailed thermal modeling and accurate as-built characterization are essential for meaningful post-irradiation data interpretation. Key recommendations include early engagement all stakeholders, clearly defined design expectations, and alignment of specimen geometries with post-irradiation examination capabilities. This approach reduces design iterations, enhances data quality, and supports more efficient use of irradiation resources. Strategic and well-planned irradiation testing not only improves individual campaign success but also accelerates the deployment of advanced nuclear technologies. By closing critical data gaps and reducing development risks, the nuclear materials community can more effectively contribute to the future of clean, resilient energy systems.

Experiments↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating and Visualizing Tropical Cyclone Data Using the Real Time Mission Monitor

The Real Time Mission Monitor (RTMM) is a visualization and information system that fuses multiple Earth science data sources, to enable real time decision-making for airborne and ground validation experiments. Developed at the NASA Marshall Space Flight Center, RTMM is a situational awareness, decision-support system that integrates satellite imagery, radar, surface and airborne instrument data sets, model output parameters, lightning location observations, aircraft navigation data, soundings, and other applicable Earth science data sets. The integration and delivery of this information is made possible using data acquisition systems, network communication links, network server resources, and visualizations through the Google Earth virtual globe application. RTMM is extremely valuable for optimizing individual Earth science airborne field experiments. Flight planners, scientists, and managers appreciate the contributions that RTMM makes to their flight projects. A broad spectrum of interdisciplinary scientists used RTMM during field campaigns including the hurricane-focused 2006 NASA African Monsoon Multidisciplinary Analyses (NAMMA), 2007 NOAA-NASA Aerosonde Hurricane Noel flight, 2007 Tropical Composition, Cloud, and Climate Coupling (TC4), plus a soil moisture (SMAP-VEX) and two arctic research experiments (ARCTAS) in 2008. Improving and evolving RTMM is a continuous process. RTMM recently integrated the Waypoint Planning Tool, a Java-based application that enables aircraft mission scientists to easily develop a pre-mission flight plan through an interactive point-and-click interface. Individual flight legs are automatically calculated "on the fly". The resultant flight plan is then immediately posted to the Google Earth-based RTMM for interested scientists to view the planned flight track and subsequently compare it to the actual real time flight progress. We are planning additional capabilities to RTMM including collaborations with the Jet Propulsion Laboratory in the joint development of a Tropical Cyclone Integrated Data Exchange and Analysis System (TC IDEAS) which will serve as a web portal for access to tropical cyclone data, visualizations and model output.

Goodman, H. Michael↗

A multifidelity Bayesian optimization method for inertial confinement fusion design

Due to their cost, experiments for inertial confinement fusion (ICF) heavily rely on numerical simulations to guide design. As simulation technology progresses, so too can the fidelity of models used to plan for new experiments. However, these high-fidelity models are by themselves insufficient for optimal experimental design, because their computational cost remains too high to efficiently and effectively explore the numerous parameters required to describe a typical experiment. Therefore, traditionally, ICF design has relied on low-fidelity modeling to initially identify potentially interesting design regions, which are then subsequently explored via selected high-fidelity modeling. In this paper, we demonstrate that this two-step approach can be insufficient: even for simple design problems, a two-step optimization strategy can lead high-fidelity searching toward incorrect regions and consequently waste computational resources on parameter regimes far away from the true optimal solution. We reveal that a primary cause of this behavior in ICF design problems is the presence of low-fidelity optima in different regions of the parameter space far away from high-fidelity optima. To address this issue, we propose an iterative multifidelity Bayesian optimization method based on Gaussian Process Regression that leverages both low- and high-fidelity models simultaneously. We demonstrate, using both two- and eight-dimensional ICF test problems, that our algorithm can effectively utilize both low-fidelity and high-fidelity models to refine the designs. This approach proves to be more efficient than relying solely on high-fidelity modeling for optimization.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Inverter Model Validation and Calibration Using Phasor Measurement Unit Data

As the penetration of inverter-based renewable energy resources increases in the power grid, especially at the distribution and microgrid levels, the need to accurately represent them in planning studies increases as well. However, due to the lack of well-established standard procedures, and vendor reluctance towards the detailed sharing of proprietary models, automated dynamic model validation and parameter calibration tools for inverter based resources (IBRs) remain scarce. This work presents a model validation and parameter calibration platform for representing IBRs with generic phasor-domain models. Phasor measurements of power system events are used for continuous validation using the data playback method, and model parameters are re-calibrated if a significant mismatch between measurements and model response is observed. Unique features of the proposed platform include- (a) an iterative Bayesian optimization approach towards parameter calibration to address a possible mismatch between the structures of generic models implemented in simulation softwares and actual commercial inverters, (b) error metrics designed to account for a possible mismatch between the time resolution of simulation and measurements, and (c) analysis of the measurement-simulation mismatch to provide guidance to engineering personnel regarding model shortcomings. The performance of the platform has been illustrated using both simulated data and field measurements to validate/calibrate inverter models in GridLAB-D.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Report of a workshop on nuclear power growth and nonproliferation held at the Woodrow Wilson international center for scholars, Washington, DC, April 21, 2010

The workshop addressed the future of nuclear power and nonproliferation in light of global nuclear energy developments, changing US policy and growing concerns about nuclear proliferation and terrorism. The discussion reflected wide agreement on the need for nuclear power, the necessity of mitigating any proliferation and terrorism risks and support for international cooperation on solutions. There were considerable differences on the nature and extent of the risks of differing fuel cycle choices. There was some skepticism about the prospects for a global nuclear energy renaissance, but there was a recognition that nuclear power would expand somewhat in the decades ahead with some states expanding capacity dramatically (e.g., China) and at least a few new states developing nuclear power programs. It was also argued by some participants that under the right conditions, a genuine renaissance could occur some decades from now. The prospects for a dramatic growth in nuclear power will depend on the ability of governments and industry to address these concerns, including the effectiveness of, and the resources devoted to, plans to develop and implement technologies and approaches that strengthen nonproliferation, nuclear materials accountability and nuclear security Several participants noted that the United States will not be able to continue to lead global nonproliferation efforts and to shape the growth of nuclear power as well as the global environment and energy debates without a robust US nuclear energy program. Some participants argued that fully integrating nuclear energy growth and nonproliferation, proliferation resistance and physical protection objectives was possible. The growing consensus on these objectives and the growing concern about the potential impact of further proliferation on the industry was one reason for optimism. The Blue Ribbon commission led by Scowcroft and Hamilton was seen as going far beyond the need to find an alternative to Yucca Mountain, and the preeminent forum in the next years to address the back end of the fuel cycle and other issues. Some argued that addressing these issues is the critical missing element, or the final piece of the puzzle to ensure the benefits of nuclear power and to promote nonproliferation. In this context, many argued that R&D on closed as well as open fuel cycle options in order to ensure a suite of long-term options was essential.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Distributed Smart Grid Asset Control Strategies for Providing Ancillary Services

With large-scale plans to integrate renewable generation driven mainly by state-level renewable portfolio requirements, more resources will be needed to compensate for the uncertainty and variability associated with intermittent generation resources. Distributed assets can be used to mitigate the concerns associated with renewable energy resources and to keep costs down. Under such conditions, performing primary frequency control using only supply-side resources becomes not only prohibitively expensive but also technically difficult. It is therefore important to explore how a sufficient proportion of the loads could assume a routine role in primary frequency control to maintain the stability of the system at an acceptable cost. The main objective of this project is to develop a novel hierarchical distributed framework for frequency based load control. The framework involves two decision layers. The top decision layer determines the optimal gain for aggregated loads for each load bus. The gains are computed using decentralized robust control methods, and will be broadcast to the corresponding participating loads every control period. The second layer consists of a large number of heterogeneous devices, which switch probabilistically during contingencies so that aggregated power change matches the desired amount according to the most recently received gains. The simulation results show great potential to enable systematic design of demand-side primary frequency control with stability guarantees on the overall power system. The proposed design systematically accounts for the interactions between the total load response and bulk power system frequency dynamics. It also guarantees frequency stability under a wide range of time varying operating conditions. The local device-level load response rules fully respect the device constraints (such as temperature setpoint, compressor time delays of HVACs, or arrival and departure of the deferrable loads), which are crucial for implementing real load control programs. The promise of autonomous, Grid Friendly™ response by smart appliances in the form of under-frequency load shedding was demonstrated in the GridWise Olympic Peninsula Demonstration in 2006. Each controller monitored the power grid voltage signal and requested that electrical load be shed by its appliance whenever electric power-grid frequency fell below 59.95 Hz. The controllers and their appliances responded reliably to each shallow under-frequency event, which was an average of one event per day and shed their loads for the durations of these events. Another objective of this project was to perform extensive simulation studies to investigate the impact of a population of Grid Friendly™ Appliances (GFAs) on the bulk power system frequency stability. The GFAs considered in this report are represented as demonstration units with water heaters individually modeled.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Learning from Arctic Microgrids: Cost and Resiliency Projections for Renewable Energy Expansion with Hydrogen and Battery Storage

Electricity in rural Alaska is provided by more than 200 standalone microgrid systems powered predominantly by diesel generators. Incorporating renewable energy generation and storage to these systems can reduce their reliance on costly imported fuel and improve sustainability; however, uncertainty remains about optimal grid architectures to minimize cost, including how and when to incorporate long-duration energy storage. This study implements a novel, multi-pronged approach to assess the techno-economic feasibility of future energy pathways in the community of Kotzebue, which has already successfully deployed solar photovoltaics, wind turbines, and battery storage systems. Using real community load, resource, and generation data, we develop a series of comparison models using the HOMER Pro software tool to evaluate microgrid architectures to meet over 90% of the annual community electricity demand with renewable generation, considering both battery and hydrogen energy storage. We find that near-term planned capacity expansions in the community could enable over 50% renewable generation and reduce the total cost of energy. Additional build-outs to reach 75% renewable generation are shown to be competitive with current costs, but further capacity expansion is not currently economical. We additionally include a cost sensitivity analysis and a storage capacity sizing assessment that suggest hydrogen storage may be economically viable if battery costs increase, but large-scale seasonal storage via hydrogen is currently unlikely to be cost-effective nor practical for the region considered. While these findings are based on data and community priorities in Kotzebue, we expect this approach to be relevant to many communities in the Arctic and Sub-Arctic regions working to improve energy reliability, sustainability, and security.

25 ENERGY STORAGE↗