Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduling software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Automated System Checkout to Support Predictive Maintenance for the Reusable Launch Vehicle

The Propulsion Checkout and Control System (PCCS) is a predictive maintenance software system. The real-time checkout procedures and diagnostics are designed to detect components that need maintenance based on their condition, rather than using more conventional approaches such as scheduled or reliability centered maintenance. Predictive maintenance can reduce turn-around time and cost and increase safety as compared to conventional maintenance approaches. Real-time sensor validation, limit checking, statistical anomaly detection, and failure prediction based on simulation models are employed. Multi-signal models, useful for testability analysis during system design, are used during the operational phase to detect and isolate degraded or failed components. The TEAMS-RT real-time diagnostic engine was developed to utilize the multi-signal models by Qualtech Systems, Inc. Capability of predicting the maintenance condition was successfully demonstrated with a variety of data, from simulation to actual operation on the Integrated Propulsion Technology Demonstrator (IPTD) at Marshall Space Flight Center (MSFC). Playback of IPTD valve actuations for feature recognition updates identified an otherwise undetectable Main Propulsion System 12 inch prevalve degradation. The algorithms were loaded into the Propulsion Checkout and Control System for further development and are the first known application of predictive Integrated Vehicle Health Management to an operational cryogenic testbed. The software performed successfully in real-time, meeting the required performance goal of 1 second cycle time.

Patterson-Hine, Ann↗

Software cost/resource modeling: Deep space network software cost estimation model

A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. J.↗

DSN data systems software methodology

A software methodology for JPL deep space network (DSN) data systems software implementations through transfer and delivery is presented. The DSN Data Systems Software Methodology is compatible with and depends on DSN software methodology and also incorporates the characteristics of real-time program development in a DSN environment. The DSN Data Systems software implementation consists of a series of six distinct phases. An Independent Group is responsible for verification and validation of the DSN Data Systems software during developing phases. The DSN data systems software methodology is applied to all development software provided for or by the DSN data systems section in Mark IV where there is a desire for reliability, maintainability, and usability within budget and schedule constraints.

Hung, C. K.↗

CHIMERA II - A real-time multiprocessing environment for sensor-based robot control

A multiprocessing environment for a wide variety of sensor-based robot system, providing the flexibility, performance, and UNIX-compatible interface needed for fast development of real-time code is addressed. The requirements imposed on the design of a programming environment for sensor-based robotic control is outlined. The details of the current hardware configuration are presented, along with the details of the CHIMERA II software. Emphasis is placed on the kernel, low-level interboard communication, user interface, extended file system, user-definable and dynamically selectable real-time schedulers, remote process synchronization, and generalized interprocess communication. A possible implementation of a hierarchical control model, the NASA/NBS standard reference model for telerobot control system is demonstrated.

Stewart, David B.↗

Virtual environment and computer-aided technologies used for system prototyping and requirements development

The Space Station Freedom (SSF) Data Management System (DMS) consists of distributed hardware and software which monitor and control the many onboard systems. Virtual environment and off-the-shelf computer technologies can be used at critical points in project development to aid in objectives and requirements development. Geometric models (images) coupled with off-the-shelf hardware and software technologies were used in The Space Station Mockup and Trainer Facility (SSMTF) Crew Operational Assessment Project. Rapid prototyping is shown to be a valuable tool for operational procedure and system hardware and software requirements development. The project objectives, hardware and software technologies used, data gained, current activities, future development and training objectives shall be discussed. The importance of defining prototyping objectives and staying focused while maintaining schedules are discussed along with project pitfalls.

Logan, Cory↗

NASA's Design and Development of a Field Goniometer Instrument Using Solid Works

With NASA suffering severe funding cutbacks, engineers at NASA are required to produce state-of-the-art hardware with limited personnel and financial resources. In light of these constraints, the new NASA mandate is to build better, faster and cheaper. In April of 1998, Stennis Space Center's Commercial Remote Sensing Program contracted to the Systems Engineering Division at NASA Ames Research Center to develop a device known as a Field Goniometer. A Field Goniometer is a device that measures bi-directional reflectance of a target, such as vegetation, relative to the sun and an imaging system in an aircraft or spacecraft. The device is able to provide a spectral fingerprint of the surface it is measuring in wavelengths from 350nm-2500nm using a hyperspectral imager. To accomplish this project, several obstacles had to be overcome. First, the design had to be completed in less than four months. Second, due to the complexity of the design, the use of solid modeling was highly desirable but most of the group's solid modelers were assigned to other jobs. Third, the amount of funding available from the customer was one half to one third the funding typically expended for a job of this nature. Our choices for this project were to design with standard 2-D CAD systems currently used in-house or train additional engineers on our existing solids package or purchase a new solid model package. The use of a 2D CAD system was very undesirable due to the complexity of the design. Using our existing solids modeler would have required a learning curve for our engineers that would be incompatible with our schedule. Prior to this project, a member of our design group researched the solid modeling industry and decided to purchase SolidWorks. After examining the product for ease of use, modeling capability, training time required and cost, we decided our highest probability of success would be to design with Solidworks. During the design phase, our fabrication group was able to provide input at the very early stages, which added significant benefit to the final product. Fabrication cost and schedule savings have been realized by having complex part geometries translated directly from the SolidWorks design models to Surfcam and other computer-aided manufacturing (CAM) software. This direct model translation capability optimized the fabrication processes. The end result was that we were able to successfully complete the project on time and on budget. Other advantages of using SolidWorks, as cited by the design team, include a rapid negotiation of the initial learning curve, the ability to develop solid model hardware prototypes (used to communicate the design intent to both the customer and the fabricator), and the ability to work as a team collaborating on a large, complex model. These types of tools and efforts represent our response to NASA's challenge to produce higher quality products within shorter design and fabrication times.

Turner, Mark↗

BIO-Plex Information System Concept

This paper describes a suggested design for an integrated information system for the proposed BIO-Plex (Bioregenerative Planetary Life Support Systems Test Complex) at Johnson Space Center (JSC), including distributed control systems, central control, networks, database servers, personal computers and workstations, applications software, and external communications. The system will have an open commercial computing and networking, architecture. The network will provide automatic real-time transfer of information to database server computers which perform data collection and validation. This information system will support integrated, data sharing applications for everything, from system alarms to management summaries. Most existing complex process control systems have information gaps between the different real time subsystems, between these subsystems and central controller, between the central controller and system level planning and analysis application software, and between the system level applications and management overview reporting. An integrated information system is vitally necessary as the basis for the integration of planning, scheduling, modeling, monitoring, and control, which will allow improved monitoring and control based on timely, accurate and complete data. Data describing the system configuration and the real time processes can be collected, checked and reconciled, analyzed and stored in database servers that can be accessed by all applications. The required technology is available. The only opportunity to design a distributed, nonredundant, integrated system is before it is built. Retrofit is extremely difficult and costly.

Jones, Harry↗

Earthbound applications for NASA's physician workstation

The dream of a space probe to Mars or an astronaut colony on the moon persists. Despite years of setbacks and delays, NASA continues to lay the foundation for a new frontier in space. The necessity of a self contained health maintenance facility is an integral part of this stellar venture. As a subsystem of this health maintenance facility, the physician or astronaut workstation was envisioned as the vehicle of interface between the computer resources of the space station and the care provider. Our efforts to define and build this interface have resulted in a series of programs which can now be tested and refined using earth-based applications. The modules which have dual-use application from the NASA workstation include: patient scheduling and master patient index, pharmacy, laboratory, medical library, problem list/progress notes, and digital medical records. Our current plan is to develop these tools as objects that can be assembled in a variety of configurations. This will allow the technology to be used by the private sector where each doctor can select the starting point of his outpatient office system and add modules as he makes progress in system integration and training.

NASA Discipline Number 70-30↗

Air Traffic Management Technology Demonstration-1 Concept of Operations (ATD-1 ConOps)

The operational goal of the ATD-1 ConOps is to enable aircraft, using their onboard FMS capabilities, to fly Optimized Profile Descents (OPDs) from cruise to the runway threshold at a high-density airport, at a high throughput rate, using primarily speed control to maintain in-trail separation and the arrival schedule. The three technologies in the ATD-1 ConOps achieve this by calculating a precise arrival schedule, using controller decision support tools to provide terminal controllers with speeds for aircraft to fly to meet times at a particular meter points, and onboard software providing flight crews with speeds for the aircraft to fly to achieve a particular spacing behind preceding aircraft.

Baxley, Brian T.↗

Digital Prototyping Methods to Enable Product Development Analysis Cycle Compression in Aerospace Systems

Historically, the product development life cycle (spanning from origination of a systems concept to initial delivery or fielding) for large-scale aerospace systems is 10-25 years. Examples of recent programs exhibiting this timeline are the Space Shuttle (13 years), , International Space Station (18 years), NASA Hubble telescope (16 years), USAF F-35 Strike Fighter (22 years), Missile Defense Agency THAAD (21 years), USAF V-22 Osprey (26 years), USAF B-2 Spirt (19 years), US Army RAH-66 Comanche (22 years, cancelled prior to fielding), James Webb Space Telescope (25 years), Space Launch System (10 years). This list illustrates the challenges of developing and fielding a modern integrated multi-disciplinary aerospace system. These development timelines are often preceded by significant research and development programs and followed by multiple increments, blocks, or spirals to reach planned operational capability. In the modern era of aerospace system acquisition, there is significant pressure to reduce system development timelines to meet system objectives and enable competitiveness in the current industry and landscape. Across the aerospace industry, a range of rapid acquisition and prototyping programs are seeking to achieve system development within timelines considerably less than 10 years. Notably, in September of 2019, NASA issued a solicitation for the development and demonstration of a Human Landing System (HLS) to deliver humans to the lunar surface by 2024 (5 years) and for the development and demonstration of a more sustainable HLS by 2026 (7 years). Lengthy product development cycle timelines are a product of multiple factors ranging from programmatic, sociological, technical, and systems engineering issues. New approaches in systems engineering provide new ways to enable these compressed development timelines. These approaches employ expanded application of advanced systems engineering methods and cross-cutting digital tools to accelerate system development, utilizing digital prototyping to connect maturing sub-system or component technologies into system or system-of-systems hardware prototypes. Approaches such as the use of system integrating physics relationships to reduce the number of design analysis cycle iterations and state analysis modeling to reduce necessary software testing (and improving coverage of system execution scenarios) represent steps forward in reducing the engineering time needed to field new systems. In addition to cost, schedule and performance benefits, expanded digital exploration and demonstration reduce risk in live system test and demonstration. This incremental demonstration approach, where digital prototyping and demonstration leads and informs full system test and demonstration, could be more important for space applications because of the increased difficulty of test and demonstration of space systems and architectures. The Advanced Concepts Office (ACO) at Marshall Space Flight Center merges traditional multi-disciplinary concept definition methods with modern, cross-cutting systems engineering concepts to enable iterative design and analysis of space architectures and systems through coordinated, strategic management of human capital, technical processes, and technology. This paper provides an overview of that approach, including recent examples and a strategic path forward to enabling continued reduction of aerospace system product development life cycles.

Michael D Watson↗

Scheduling Earth Observing Satellites with Evolutionary Algorithms

We hypothesize that evolutionary algorithms can effectively schedule coordinated fleets of Earth observing satellites. The constraints are complex and the bottlenecks are not well understood, a condition where evolutionary algorithms are often effective. This is, in part, because evolutionary algorithms require only that one can represent solutions, modify solutions, and evaluate solution fitness. To test the hypothesis we have developed a representative set of problems, produced optimization software (in Java) to solve them, and run experiments comparing techniques. This paper presents initial results of a comparison of several evolutionary and other optimization techniques; namely the genetic algorithm, simulated annealing, squeaky wheel optimization, and stochastic hill climbing. We also compare separate satellite vs. integrated scheduling of a two satellite constellation. While the results are not definitive, tests to date suggest that simulated annealing is the best search technique and integrated scheduling is superior.

Globus, Al↗

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Deep Space Network (DSN) Data Systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit DSN software life cycle statistics. The estimation model output scales a standard DSN Work Breakdown Structure skeleton, which is then input into a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. C.↗

Space shuttle descent design: From development to operations

The descent guidance system, the descent trajectories design, and generating of the associated flight products are discussed. The programs which allow the successful transitions from development to STS operations, resulting in reduced manpower requirements and compressed schedules for flight design cycles are addressed. The topics include: (1) continually upgraded tools for the job, i.e., consolidating tools via electronic data transfers, tailoring general purpose software for needs, easy access to tools through an interactive approach, and appropriate flexibility to allow design changes and provide growth capability; (2) stabilizing the flight profile designs (I-loads) in an uncertain environment; and (3) standardizing external interfaces within performance and subsystems constraints of the Orbiter.

Crull, T. J.↗

Space shuttle low cost/risk avionics study

All work breakdown structure elements containing any avionics related effort were examined for pricing the life cycle costs. The analytical, testing, and integration efforts are included for the basic onboard avionics and electrical power systems. The design and procurement of special test equipment and maintenance and repair equipment are considered. Program management associated with these efforts is described. Flight test spares and labor and materials associated with the operations and maintenance of the avionics systems throughout the horizontal flight test are examined. It was determined that cost savings can be achieved by using existing hardware, maximizing orbiter-booster commonality, specifying new equipments to MIL quality standards, basing redundancy on cost effective analysis, minimizing software complexity and reducing cross strapping and computer-managed functions, utilizing compilers and floating point computers, and evolving the design as dictated by the horizontal flight test schedules.

Source record↗

Multiagent Work Practice Simulation: Progress and Challenges

Modeling and simulating complex human-system interactions requires going beyond formal procedures and information flows to analyze how people interact with each other. Such work practices include conversations, modes of communication, informal assistance, impromptu meetings, workarounds, and so on. To make these social processes visible, we have developed a multiagent simulation tool, called Brahms, for modeling the activities of people belonging to multiple groups, situated in a physical environment (geographic regions, buildings, transport vehicles, etc.) consisting of tools, documents, and a computer system. We are finding many useful applications of Brahms for system requirements analysis, instruction, implementing software agents, and as a workbench for relating cognitive and social theories of human behavior. Many challenges remain for representing work practices, including modeling: memory over multiple days, scheduled activities combining physical objects, groups, and locations on a timeline (such as a Space Shuttle mission), habitat vehicles with trajectories (such as the Shuttle), agent movement in 3D space (e.g., inside the International Space Station), agent posture and line of sight, coupled movements (such as carrying objects), and learning (mimicry, forming habits, detecting repetition, etc.).

Clancey, William J.↗

Multiagent Work Practice Simulation: Progress and Challenges

Modeling and simulating complex human-system interactions requires going beyond formal procedures and information flows to analyze how people interact with each other. Such work practices include conversations, modes of communication, informal assistance, impromptu meetings, workarounds, and so on. To make these social processes visible, we have developed a multiagent simulation tool, called Brahms, for modeling the activities of people belonging to multiple groups, situated in a physical environment (geographic regions, buildings, transport vehicles, etc.) consisting of tools, documents, and computer systems. We are finding many useful applications of Brahms for system requirements analysis, instruction, implementing software agents, and as a workbench for relating cognitive and social theories of human behavior. Many challenges remain for representing work practices, including modeling: memory over multiple days, scheduled activities combining physical objects, groups, and locations on a timeline (such as a Space Shuttle mission), habitat vehicles with trajectories (such as the Shuttle), agent movement in 3d space (e.g., inside the International Space Station), agent posture and line of sight, coupled movements (such as carrying objects), and learning (mimicry, forming habits, detecting repetition, etc.).

Clancey, William J.↗

Software Reliability 2002

In FY01 we learned that hardware reliability models need substantial changes to account for differences in software, thus making software reliability measurements more effective, accurate, and easier to apply. These reliability models are generally based on familiar distributions or parametric methods. An obvious question is 'What new statistical and probability models can be developed using non-parametric and distribution-free methods instead of the traditional parametric method?" Two approaches to software reliability engineering appear somewhat promising. The first study, begin in FY01, is based in hardware reliability, a very well established science that has many aspects that can be applied to software. This research effort has investigated mathematical aspects of hardware reliability and has identified those applicable to software. Currently the research effort is applying and testing these approaches to software reliability measurement, These parametric models require much project data that may be difficult to apply and interpret. Projects at GSFC are often complex in both technology and schedules. Assessing and estimating reliability of the final system is extremely difficult when various subsystems are tested and completed long before others. Parametric and distribution free techniques may offer a new and accurate way of modeling failure time and other project data to provide earlier and more accurate estimates of system reliability.

Wallace, Dolores R.↗

Hardware Verification and Validation for a Navigation Sensor Software Model in Support of Flight Vehicle Performance Analysis

… or, “It’s in the details, how to make complicated software perform like complicated hardware.” In attempts to minimize development time and quickly build an operational vehicle, NASA’s Space Launch System (SLS) has had to be intentional about integrated testing. Constraints on budget and schedule have required balance between testing needs and the desire for an integrated flight vehicle as soon as possible. To provide key insights early in design and analysis cycles, a large amount of effort has shifted into maturing and validating models at the component level with integrated testing as a means to validate their integration. In terms of SLS Navigation, this, and the model-based design approach have pushed explicit requirements for sensor models to be validated against flight hardware to high precision. This paper covers the approach taken to verify and validate the models for the two key navigation sensors on the SLS vehicle, the Redundant Inertial Navigation Sensor and the Rate Gyro Assembly. These models are used in performance evaluation, fault detection, and operations development extensively. Using a mix of data from hardware vendor documentation and testing reports, limited in-house testing, and integration activities, these models were able to be validated against flight hardware at multiple levels, from the internal software design to statistical behavior at the raw sensor and integrated box levels. The high level of insight into the hardware elements is instrumental to support flight certification activities and building confidence in SLS Navigation capability. Focused testing enabled additional insight and validation that proved invaluable and the resulting insights were used to focus and mature models. Additionally, of having validated performance-based hardware models enables a wide breadth of activities including detailed fault detection studies and integration into future vehicle frameworks, such as an upper stage and provide a valuable asset to continued SLS analysis and design.

Evan J Anzalone↗