Search NASA⌕ Search

SEARCH · Search NASA

Results for “wind engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Computational Aeroheating Predictions for X-34

Radiative equilibrium surface temperatures, heating rates, streamlines, surface pressures, and flow-field features as predicted by the Langley Aerothermodynamic Upwind Relaxation Algorithm (Laura) are presented for the X-34 Technology Demonstrator. Results for two trajectory points corresponding to entry peak heating and two control surface deflections are discussed. This data is also discussed in context of Thermal Protection System (TPS) design issues. The work presented in this report is part of a larger effort to define the X-34 aerothermal environment, including the application of engineering codes and wind-tunnel studies.

Kelb, William L.↗

Computational Aeroheating Predictions for X-34

Radiative equilibrium surface temperatures, heating rates, streamlines, surface pressures, and flow-field features as predicted by the Langley Aerothermodynamic Upwind Relaxation Algorithm (LAURA) are presented for the X-34 Technology Demonstrator. Results for two trajectory points corresponding to entry peak heating and two control surface deflections are discussed. This data is also discussed in the context of Thermal Protection System (TPS) design issues. The work presented in this report is part of a larger effort to define the X-34 aerothermal environment, including the application of engineering codes and wind-tunnel studies.

Kleb,William H.↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Turbulent Aeroheating Testing of Mars Science Laboratory Entry Vehicle in Perfect-Gas Nitrogen

An experimental investigation of turbulent aeroheating on the Mars Science Laboratory entry vehicle heat shield has been conducted in the Arnold Engineering Development Center Hypervelocity Wind Tunnel No. 9. Testing was performed on a 6-in. (0.1524 m) diameter MSL model in pure N2 gas in the tunnel s Mach 8 and Mach 10 nozzles at free stream Reynolds numbers of 4.1x10(exp 6)/ft to 49x10(exp 6)/ft (1.3x10(exp 7)/m to 16x10(exp 7)/m) and 1.2x10(exp 6)/ft to 19x10(exp 6)/ft (0.39x10(exp 7)/m to 62x10(exp 7)/m), respectively. These conditions were sufficient to span the regime of boundary-layer flow from completely laminar to fully-developed turbulent flow over the entire forebody. A supporting aeroheating test was also conducted in the Langley Research Center 20-Inch Mach 6 Air Tunnel at free stream Reynolds number of 1x10(exp 6)/ft to 7x10(exp 6)/ft (0.36x10(exp 7)/m to 2.2x10(exp 7)/m) in order to help corroborate the Tunnel 9 results. A complementary computational fluid dynamics study was conducted in parallel to the wind tunnel testing. Laminar and turbulent predictions were generated for all wind tunnel test conditions and comparisons were performed with the data for the purpose of helping to define uncertainty margins on predictions for aeroheating environments during entry into the Martian atmosphere. Data from both wind tunnel tests and comparisons with the predictions are presented herein. It was concluded from these comparisons that for perfect-gas conditions, the computational tools could predict fully-laminar or fully-turbulent heating conditions to within 10% of the experimental data

Hollis, Brian R.↗

Turbulent Aeroheating Testing of Mars Science Laboratory Entry Vehicle

An experimental investigation of turbulent aeroheating on the Mars Science Laboratory entry vehicle heat shield has been conducted in the Arnold Engineering Development Center Hypervelocity Wind Tunnel No. 9. Testing was performed on a 6-in. (0.1524 m) diameter MSL model in pure N2 gas in the tunnel's Mach 8 and Mach 10 nozzles at free stream Reynolds numbers of 4.1 x 10(exp 6)/ft to 49 x 10(exp 6)/ft (1.3 x 10(exp 7)/m to 19 x 10(exp 6/ft) and 1.2 x 10(exp 6)/ft to 19 x 10(exp 6)/ft (0.39 x 10(exp 7)/m to 62 x 10(exp 7)/m), respectively. These conditions were sufficient to span the regime of boundary-layer flow from completely laminar to fully-developed turbulent flow over the entire forebody. A supporting aeroheating test was also conducted in the Langley Research Center 20-Inch Mach 6 Air Tunnel at free stream Reynolds number of 1 x 10(exp 6)/ft to 7 x 10(exp 6)/ft (0.36 x 10(exp 7)/m to 2.2 x 10(exp 7)/m) in order to help corroborate the Tunnel 9 results. A complementary computational fluid dynamics study was conducted in parallel to the wind tunnel testing. Laminar and turbulent predictions were generated for the wind tunnel test conditions and comparisons were performed with the data for the purpose of helping to define uncertainty margins on predictions for aeroheating environments during entry into the Martian atmosphere. Data from both wind tunnel tests and comparisons with the predictions are presented herein. It was concluded from these comparisons that for perfect-gas conditions, the computational tools could predict fully-laminar or fully-turbulent heating conditions to within 12% or better of the experimental data.

Hollis, Brian R.↗

Aeroheating Testing and Predictions for Project Orion CEV at Turbulent Conditions

An investigation of the aeroheating environment of the Project Orion Crew Exploration Vehicle was performed in the Arnold Engineering Development Center Hypervelocity Wind Tunnel No. 9 Mach 8 and Mach 10 nozzles and in the NASA Langley Research Center 20 - Inch Mach 6 Air Tunnel. Heating data were obtained using a thermocouple-instrumented approx.0.035-scale model (0.1778-m/7-inch diameter) of the flight vehicle. Runs were performed in the Tunnel 9 Mach 10 nozzle at free stream unit Reynolds numbers of 1x10(exp 6)/ft to 20x10(exp 6)/ft, in the Tunnel 9 Mach 8 nozzle at free stream unit Reynolds numbers of 8 x 10(exp 6)/ft to 48x10(exp 6)/ft, and in the 20-Inch Mach 6 Air Tunnel at free stream unit Reynolds numbers of 1x10(exp 6)/ft to 7x10(exp 6)/ft. In both facilities, enthalpy levels were low and the test gas (N2 in Tunnel 9 and air in the 20-Inch Mach 6) behaved as a perfect-gas. These test conditions produced laminar, transitional and turbulent data in the Tunnel 9 Mach 10 nozzle, transitional and turbulent data in the Tunnel 9 Mach 8 nozzle, and laminar and transitional data in the 20- Inch Mach 6 Air Tunnel. Laminar and turbulent predictions were generated for all wind tunnel test conditions and comparisons were performed with the experimental data to help define the accuracy of computational method. In general, it was found that both laminar data and predictions, and turbulent data and predictions, agreed to within less than the estimated 12% experimental uncertainty estimate. Laminar heating distributions from all three data sets were shown to correlate well and demonstrated Reynolds numbers independence when expressed in terms of the Stanton number based on adiabatic wall-recovery enthalpy. Transition onset locations on the leeside centerline were determined from the data and correlated in terms of boundary-layer parameters. Finally turbulent heating augmentation ratios were determined for several body-point locations and correlated in terms of the boundary-layer momentum Reynolds number.

Hollis, Brian R.↗

NDARC - NASA Design and Analysis of Rotorcraft Validation and Demonstration

Validation and demonstration results from the development of the conceptual design tool NDARC (NASA Design and Analysis of Rotorcraft) are presented. The principal tasks of NDARC are to design a rotorcraft to satisfy specified design conditions and missions, and then analyze the performance of the aircraft for a set of off-design missions and point operating conditions. The aircraft chosen as NDARC development test cases are the UH-60A single main-rotor and tail-rotor helicopter, the CH-47D tandem helicopter, the XH-59A coaxial lift-offset helicopter, and the XV-15 tiltrotor. These aircraft were selected because flight performance data, a weight statement, detailed geometry information, and a correlated comprehensive analysis model are available for each. Validation consists of developing the NDARC models for these aircraft by using geometry and weight information, airframe wind tunnel test data, engine decks, rotor performance tests, and comprehensive analysis results; and then comparing the NDARC results for aircraft and component performance with flight test data. Based on the calibrated models, the capability of the code to size rotorcraft is explored.

Johnson, Wayne↗

The Ames Power Monitoring System

The Ames Power Monitoring System (APMS) is a centralized system of power meters, computer hardware, and specialpurpose software that collects and stores electrical power data by various facilities at Ames Research Center (ARC). This system is needed because of the large and varying nature of the overall ARC power demand, which has been observed to range from 20 to 200 MW. Large portions of peak demand can be attributed to only three wind tunnels (60, 180, and 100 MW, respectively). The APMS helps ARC avoid or minimize costly demand charges by enabling wind-tunnel operators, test engineers, and the power manager to monitor total demand for center in real time. These persons receive the information they need to manage and schedule energy-intensive research in advance and to adjust loads in real time to ensure that the overall maximum allowable demand is not exceeded. The APMS (see figure) includes a server computer running the Windows NT operating system and can, in principle, include an unlimited number of power meters and client computers. As configured at the time of reporting the information for this article, the APMS includes more than 40 power meters monitoring all the major research facilities, plus 15 Windows-based client personal computers that display real-time and historical data to users via graphical user interfaces (GUIs). The power meters and client computers communicate with the server using Transmission Control Protocol/Internet Protocol (TCP/IP) on Ethernet networks, variously, through dedicated fiber-optic cables or through the pre-existing ARC local-area network (ARCLAN). The APMS has enabled ARC to achieve significant savings ($1.2 million in 2001) in the cost of power and electric energy by helping personnel to maintain total demand below monthly allowable levels, to manage the overall power factor to avoid low power factor penalties, and to use historical system data to identify opportunities for additional energy savings. The APMS also provides power engineers and electricians with the information they need to plan modifications in advance and perform day-to-day maintenance of the ARC electric-power distribution system.

Osetinsky, Leonid↗

The Development of NDE Techniques for Large Cryogenic Storage Tanks

Objectives of this project are: (1) Develop and demonstrate NDE techniques to evaluate the condition of large cryogenic Dewars (typically 50,000 to 900,000 gaL). (2) These tanks are used across NASA for launch pads, engine test stands, cryogenic wind tunnels and other facilities: they represent a major investment. (3) Issues addressed: (1) Insulation integrity of existing Dewars (powdered insulation under vacuum or sometimes ambient pressure (LO2), (2) Post fabrication insulation verification without full chill-down to avoid thermal cycling the tank (fatigue limitation of piping and compaction of Perlite).

Youngquist, Robert↗

Experimental Investigation of Mars Science Laboratory Entry Vehicle Aeroheating in AEDC Hypervelocity Tunnel 9

An experimental investigation of the aeroheating environment of the Mars Science Laboratory entry vehicle was conducted in the Arnold Engineering Development Complex Hypervelocity Wind Tunnel 9. Testing was performed on a 6-in. (0.1524 m) diameter model in the tunnel's Mach 8 and Mach 10 nozzles at free stream Reynolds numbers from 4.1×10*exp 6)/ft to 49×10(exp 6)/ft and from 1.2×10(exp 6)/ft to 19×10(exp 6)/ft, respectively, using pure nitrogen test gas. These conditions spanned the boundary layer flow regimes from completely laminar to fully turbulent flow over the entire forebody. A computational fluid dynamics study was conducted in support of the wind tunnel testing. Laminar and turbulent solutions were generated for all wind tunnel test conditions and comparisons of predicted heating distributions were performed with the data. These comparisons showed agreement for most cases to within the estimated +/-12% experimental uncertainty margin for fully-laminar or fully-turbulent conditions, while transitional heating data were bounded by laminar and turbulent predictions. These results helped to define uncertainty margins on the use of computational tools for vehicle design.

Hollis, Brian R.↗

Field Test Results of Using a Nacelle-Mounted Lidar for Improving Wind Energy Capture by Reducing Yaw Misalignment (Presentation)

Presented at the Nordic Wind Power Conference on November 5, 2014. This presentation describes field-test campaigns performed at the National Wind Technology Center in which lidar technology was used to improve the yaw alignment of the Controls Advanced Research Turbine (CART) 2 and CART3 wind turbines. The campaigns demonstrated that whether by learning a correction function to the nacelle vane, or by controlling yaw directly with the lidar signal, a significant improvement in power capture was demonstrated.

17 WIND ENERGY↗

Drivetrain Reliability from Inherent to Operational

Despite reliability improvements made to wind turbine drivetrains over the years, premature component failures are still challenging the wind industry. There are, however, opportunities to understand drivetrain reliability challenges and investigate potential mitigation solutions. This presentation discusses a few research and development (R&D) activities on drivetrain reliability carried out by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) over the last ten years. It covers two angles of reliability, inherent and operational, and goes into detail on specific R&D activities. Some inherent reliability challenges covered include gearbox planetary stage loads investigation, high speed shaft and main bearing operational condition understanding, dynamic modeling approaches, and recommended practices. The R&D activities on operational reliability improvements covered include benchmarking, performance and condition monitoring, and predictions on the remaining useful life of components. The presentation concludes with a list of necessary drivetrain reliability improvements that could close the loop between operational and inherent reliability efforts. The team hopes that some of these lessons learned can contribute to relevant international standards or recommended practices.

17 WIND ENERGY↗

Emulator for rotary energy sources

An emulator is described herein, wherein the emulator is configured to emulate a rotary energy generator. The rotary energy generator can be one of a wind turbine, a diesel engine, or a hydrokinetic generator. The emulator includes an electromechanical motor that is mechanically linked to a generator. A motor drive is electrically coupled to the electromechanical motor, and controls torque at a rotor of the electromechanical motor. Electromagnetic torque produced by the generator is estimated, and the motor drive is controlled based upon the estimated generator torque.

24 POWER TRANSMISSION AND DISTRIBUTION↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Small Turbine Certification and/or Listing Awardee: Sonsight Wind

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Sonsight Wind for Small Turbine Certification and/or Listing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Technology Commercialization Awardee: Siva Powers America Inc.

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Siva Powers America Inc. for a Technology Commercialization Award. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗