Search NASA⌕ Search

SEARCH · Search NASA

Results for “Approximation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

2017 Puget Sound Regional Travel Study

# 2017 Puget Sound Regional Travel Study The 2017 Puget Sound Regional Travel Study collected household- and person-level activity and travel pattern information from residents throughout the Puget Sound Regional Council's four-county region in Washington State. It followed the [2014-2015 Puget Sound Regional Travel Study](https://www.nrel.gov/transportation/secure-transportation-data/tsdc-puget-sound-travel-study), starting a planned six-year data collection that includes 2019 and 2021. The multiyear program's goal is to maintain an updated source of household travel behavior data that: - Supports modeling and planning needs - Facilitates trend analysis over time - Allows for regular study design updates to integrate evolving data collection methods and emerging travel behaviors and transportation issues. ## Data Collection Agency The Puget Sound Regional Council conducted the study. ## Methodology The 2017 study featured both the design and administration of a one-day household travel diary (approximately 80% of households before data cleaning) and a seven-day smartphone global positioning system (GPS) diary (approximately 20% of households before data cleaning). It combined data collection methods, including smartphone, online, and telephone. The survey design included several stages to recruit and collect data about households, their members, and their travel behaviors during the assigned travel period. ## Survey Records Survey records include a total of 6,254 participants. ## More Information For more information, see the [survey documentation](https://www.nrel.gov/media/docs/libraries/tsdc/zip/tsdc-2017-puget-sound-travel-study-documentation.zip?sfvrsn=45991f2f_1). ## Transportation Data The data set contains a demographic and socioeconomic composition of 6,254 people from 3,285 households in the Puget Sound regional area, as well as detailed information on the travel behavior of each household for a designated 24-hour period. The survey logged over 508 thousand vehicle miles of travel by participants during 52,492 trips. Transportation data are available as zipped files. [Download Winzip](http://www.winzip.com/downwz.htm).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2017 Puget Sound Regional Travel Study

# 2017 Puget Sound Regional Travel Study The 2017 Puget Sound Regional Travel Study collected household- and person-level activity and travel pattern information from residents throughout the Puget Sound Regional Council's four-county region in Washington State. It followed the [2014-2015 Puget Sound Regional Travel Study](https://www.nrel.gov/transportation/secure-transportation-data/tsdc-puget-sound-travel-study), starting a planned six-year data collection that includes 2019 and 2021. The multiyear program's goal is to maintain an updated source of household travel behavior data that: - Supports modeling and planning needs - Facilitates trend analysis over time - Allows for regular study design updates to integrate evolving data collection methods and emerging travel behaviors and transportation issues. ## Data Collection Agency The Puget Sound Regional Council conducted the study. ## Methodology The 2017 study featured both the design and administration of a one-day household travel diary (approximately 80% of households before data cleaning) and a seven-day smartphone global positioning system (GPS) diary (approximately 20% of households before data cleaning). It combined data collection methods, including smartphone, online, and telephone. The survey design included several stages to recruit and collect data about households, their members, and their travel behaviors during the assigned travel period. ## Survey Records Survey records include a total of 6,254 participants. ## More Information For more information, see the [survey documentation](https://www.nrel.gov/media/docs/libraries/tsdc/zip/tsdc-2017-puget-sound-travel-study-documentation.zip?sfvrsn=45991f2f_1). ## Transportation Data The data set contains a demographic and socioeconomic composition of 6,254 people from 3,285 households in the Puget Sound regional area, as well as detailed information on the travel behavior of each household for a designated 24-hour period. The survey logged over 508 thousand vehicle miles of travel by participants during 52,492 trips. Transportation data are available as zipped files. [Download Winzip](http://www.winzip.com/downwz.htm).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Porewater and Surface Water Chemistry of Wetland, Old Woman Creek National Estuarine Research Reserve, Huron, OH, 2022-07-06 to 2023-12-15

This dataset contains the chemistry data of surface water and porewater samples collected from a wetland, referred to as The Cove, at Old Woman Creek Estuarine Research Reserve in Huron, OH. Surface and pore water samples were taken to analyze what nutrient and/or metal constituents were present at different depths in the wetland at different times and to compare to redox potential values. Porewater was collected by constructed sippers and deployed into the underlying soil of the wetland, and they were samples approximately every 2 weeks (when groundwater was present) in 2023. Surface water was collected approximately 1 inch below the surface of the water column (if available) via a syringe. Unfiltered and 0.45 micron filtered samples were collected. Samples were analyzed for various chemistry and is reported in the SWChem (surface water chemistry) and PWChem (porewater chemistry) .csv datafiles. Collection information about the samples can be found within the PWChem_SWChem_SampleMetdata.csv file. All files associated with this dataset are listed in the PWChem_SWChem_FLMD.csv file.

54 ENVIRONMENTAL SCIENCES↗

Integrating Characteristic Arctic Vegetation in a Land Surface Model Improves Representation of Carbon Dynamics Across a Tundra Landscape: Modeling Archive

This modeling archive is in support of the Next-Generation Ecosystem Experiments in the Arctic (NGEE Arctic) publication "Integrating Characteristic Arctic Vegetation in a Land Surface Model Improves Representation of Carbon Dynamics Across a Tundra Landscape", by Murphy et al. (2025). This archive contains model input files and outputs from landscape-scale simulations conducted using ELM, the land model component of the Department of Energy’s Energy Exascale Earth System Model (E3SM), at the Council NGEE Arctic field site (Council Road mile marker 71) on Alaska’s Seward Peninsula. Input data and model output from two sets of ELM simulations are provided. The first set of simulations were conducted with the two default ELM Arctic plant functional types (PFTs; broadleaf deciduous boreal shrub and a C3 grass) and the second set of simulations were conducted with a set of nine Arctic-specific PFTs including nonvascular mosses and lichens, graminoids, forbs, evergreen dwarf shrubs, three height classes of deciduous shrubs (dwarf, low, and low to tall), and deciduous alder shrubs (Sulman et al., 2021). Parameter names and major parameter changes in the Arctic-specific PFT configuration are described in Sulman et al. (2021) and archived in the Sulman et al. (2021) dataset (see below). Simulations were spatially explicit, covering an approximately 6.4X3.3 km domain at the Council site with a spatial resolution of 100 m for a total of 2,112 simulated grid cells under each ELM PFT configuration. The modeling archive contains meteorological forcing (seven *.nc files and one *.txt file), a domain definition file (one *.nc files), land surface configuration files (two *.nc files), parameter files (two *.nc files), annual ELM output files spanning 1980-2014 (68 *.nc files), and a User’s Guide (*pdf file). Additional information on the provided files is in the “Modeling Archive Contents” section of the User’s Guide. Model outputs are aggregated to the column scale (i.e. PFT-specific outputs are not provided here).

Murphy, Bailey [ORNL] (ORCID:0000000203995221)↗

Soil Temperature Sensor Data, 2025, Five sites in Knoxville, Tennessee

This dataset contains surface soil temperature measurements from five urban parks in Knoxville, Tennessee: Cumberland Estates Park (CE), Socially Equal Energy Efficient Development (SD), West View Park (WV), Victor Ashe Park (VA), and West Hills Park (WH). The dataset includes 16 CSV files documenting soil temperature measurements recorded by HOBO Pendant MX Water Temperature Data Loggers. Data collection for all sites began on January 1, 2025. The end time for each sensor is provided in the End Time_2025.csv file. Each logger was installed at a depth of 10 inches and positioned approximately 3 to 6 feet from the weather station at each site. This dataset is part of a broader study examining the effects of soil moisture and plant evapotranspiration on ambient temperature and relative humidity across multiple urban parks in Knoxville.

Salvador, Christian [ORNL] (ORCID:0000000283287777↗

Data-Driven Modeling and Correction of Vehicle Dynamics

We develop a data-driven framework for learning and correcting nonautonomous vehicle dynamics. Physics-based vehicle models are often simplified for tractability and therefore exhibit inherent model-form uncertainty, motivating the need for data-driven correction. Moreover, nonautonomous dynamics are governed by time-dependent control inputs, which pose challenges in learning predictive models directly from temporal snapshot data. To address these, we reformulate the vehicle dynamics via a local parameterization of the time-dependent inputs, yielding a modified system composed ofa sequence of local parametric dynamical systems. Here, we approximate these parametric systems using two complementary approaches. First, we employ the dimension reduction and interpolation in parameter space (DRIPS) methodology to construct efficient linear surrogate models, equipped with lifted observable spaces and manifold-based operator interpolation. This enables data-efficient learning of vehicle models whose dynamics admit accurate linear representations in the lifted spaces. Second, for more strongly nonlinear systems, we employ flow map learning (FML), a deep neural network (DNN) approach that approximates the parametric evolution map without requiring special treatment of nonlinearities. We further extend FML with a transfer-learning-based model correction procedure, enabling the correction of misspecified prior models using only a sparse set of high-fidelity or experimental measurements, without assuming a prescribed form for the correction term. Through a suite of numerical experiments on unicycle, simplified bicycle, and slip-based bicycle models, we demonstrate that DRIPS offers robust and highly data-efficient learning of nonautonomous vehicle dynamics, while FML provides expressive nonlinear modeling and effective correction of model-form errors under severe data scarcity.

data-driven modeling↗

AmeriFlux FLUXNET-1F US-EA5 Uvalde Ranch Mesquite Woodland

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-EA5 Uvalde Ranch Mesquite Woodland. This is the FLUXNET version of the carbon flux data for the site US-EA5 Uvalde Ranch Mesquite Woodland produced by applying the standard ONEFlux (1F) software. Site Description - This tower was located on a private ranch located approximately 25 km northwest of Uvalde, TX. The tower was installed on a trailer and situated amongst primarily mesquite trees. The lat/long provided here is approximate as the landowner wishes to maintain anonymity.

McKinney, Tyson [The University of Texas at Austin↗

AmeriFlux US-SB1 Sweet Briar Land-Atmosphere Research Station

This is the AmeriFlux version of the carbon flux data for the site US-SB1 Sweet Briar Land-Atmosphere Research Station. Site Description - The facility features a 36.5m (120') triangular tower and a climate-controlled shed laboratory with line power and high speed internet. The site is located in a 27 ha loblolly pine (Pinus taeda) plantation on the campus of Sweet Briar College. The average canopy height is approximately 20 meters in the immediate footprint of the tower, where the loblolly trees are approximately 25 years old. Beyond the loblolly plantation, the site is surrounded by regionally representative, middle-aged, mixed deciduous forest that is dominated by red maple (Acer rubrum), tulip poplar (Liriodendron tulipifera), white oak (Quercus alba), and chestnut oak (Quercus prinus)

Ahlswede, Benjamin [Virginia Tech]↗

Insights into Slip-Rate Time Functions, Rupture Parameter Correlations, and Ground Motions from Validated Multicycle Earthquake Ruptures

Earthquake strong-motion predictions using kinematic source modeling require knowledge of the slip-rate functions (SRFs) along the rupture and their distinct characteristics in asperities, background (off-asperity) areas and near the surface. Here, in this study we analyzed SRFs from well-validated, self-consistent, and fully dynamic rupture models from earthquake cycles obeying a rate-and-state friction law, from our companion study (Galvez et al., 2021). The shapes of SRFs in asperities are well described by the regularized Yoffe function (RYF), which has only two parameters: rise time T r and smoothing time T s , which control the generation of long- and short-period ground motions, respectively. In background areas, we demonstrate that, in addition to the primary rupture, multiple secondary ruptures may also nucleate from rupture heterogeneities related to asperities, resulting in SRFs with multiple peaks. Because it is impossible to fit a multiple-peak SRF by the single-peak RYF, we describe SRFs in background areas in an effective way by fitting their amplitude spectra with the RYF spectra. Such spectrally effective RYFs capture salient aspects of seismic-wave generation and can be used in rupture generators for strong motion prediction. We found that small T s values correlate with small characteristic weakening distances, large peak slip rates (PSRs), and large rupture velocities. T r values are larger in background areas and smaller in asperities. Within the shallow aseismic zone, T s values approximately quadruple whereas T r values approximately double. Because of this dominant T s increase, PSR values decrease in the near-surface zone. These features indicate that the generation of strong motions by the near-surface portions of the rupture is negligible in the studied scenarios.

Geosciences↗

Rapid and Temporary Deployment of Fiber-Optic Arrays to Measure Surface Chemical Explosion Series with Distributed Acoustic Sensing

Rapid and temporary distributed acoustic sensing (DAS) deployments are crucial for accurately capturing the seismic wavefield following major events, such as earthquakes, or in anticipation of known events of interest, such as chemical explosions. We provide an overview of two DAS campaigns conducted in May and October 2024 to record the seismoacoustic waves generated by two series of surface chemical explosions in New Mexico, United States, involving 1- and 10-ton trinitrotoluene-equivalent charges. In both campaigns, we deployed approximately 2 km of fiber-optic cables in a dry riverbed, about 12 km east of the explosion sites. For the October campaign, seven geophones and two anemometers were collocated with the fiber. We describe the field deployments and present preliminary results from the recorded signals. Specifically, we cross analyze the data recorded in May and October, validate the DAS data with geophone measurements, and highlight the benefits of burying fibers to reduce wind noise and improve signal-to-noise ratios. This study demonstrates the potential of DAS to record the seismoacoustic waves generated by surface chemical explosions of varying sizes at distances of approximately 10 km from the source.

58 GEOSCIENCES↗

Carbon Management Projects (CONNECT) Database and Explorer

Overview The Carbon Management Projects (CONNECT) Toolkit is an online exploratory visualization tool developed by the U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM) with support from other federal agencies such as the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Transportation (DOT). It provides a single point of access to authoritative information on federal agency investment in a portfolio of research, development, and demonstration (RD&D) projects that have been publicly announced to advance technologies for point source carbon capture, carbon dioxide removal, transport, storage, and conversion, collectively referred to as carbon management. The RD&D programs covered in this tool are authorized by annual congressional appropriations ("Base Program") and the 2021 Infrastructure Investment and Jobs Act (IIJA). The tool also incorporates public information on other federal initiatives, such as the Regional Clean Hydrogen Hubs, and public information released by other government agencies, such as the Environmental Protection Agency's (EPA) and Primacy States’ Underground Injection Control Class VI permits and EPA’s facility level greenhouse gas (GHG) emissions. Developed in a geographic information system, the tool organizes carbon management projects into five groups based on the primary technology that a project aims to advance, each visually represented as a digital layer ("carbon management project layer"). Only federally funded projects are included, which can be awarded projects that are completed or ongoing, or projects that have been selected but are currently under negotiation. Project information can be viewed in the map or in the attribute table below it when turned on. In the map view, each project is displayed at either its host site (for field work), where available, or its performer site (project lead's location, further explained in the table below). Host sites and performer sites are represented in distinct icons. Several reference layers offer additional public information on infrastructural and natural resource environment for carbon management. These reference layers, combined with multiple geographical basemaps, enable users to visualize the carbon management project layers in context. Carbon management project information will be updated monthly based on feedback and information availability. Carbon management project layers Point Source Carbon Capture (PSC) This layer contains DOE-funded projects focused on capturing carbon dioxide (CO2) from power plants or industrial facilities. Carbon Dioxide Removal (CDR) This layer contains DOE-funded projects focused on capturing CO2 from the atmosphere, including direct air capture (DAC) and DAC hubs, direct ocean capture, enhanced mineralization, and biomass carbon removal and storage. For projects with multiple host sites, each of the sites are displayed individually with the project cost and cost sharing information representing the total for the entire project. Carbon Transport This layer contains DOE- and DOT-funded projects focused on CO2 transport. The Transport Research and Development sublayer contains projects that do not involve physical infrastructure; the Proposed Transport Corridor sublayer contains projects for which either a route for the transport infrastructure has been proposed or a general area for the transport infrastructure has been identified. Carbon Storage This layer contains DOE-funded key projects focused on CO2 storage. For projects with multiple field-work sites, each of the sites are displayed individually on the map with the project cost and cost sharing information representing the overall total for the entire project. Carbon Conversion This layer contains DOE-funded projects focused on converting CO2 into economically valuable products. Reference layers The following layers provide additional information in the geographic proximity of carbon management projects. Users should reference the original sources for more details (weblinks provided below and in pop-up windows on the map). Regional Clean Hydrogen Hub and Facility These layers illustrate the approximate areas of the Regional Clean Hydrogen Hubs announced by DOE's Office of Clean Energy Demonstrations (OCED) and the approximate locations of individual facilities that constitute the hubs (see "Where are the H2Hubs located?" on the webpage linked above). EPA Facility Level GHG Emissions (direct emitter) This layer shows direct CO2 emissions from stationary sources in 2022, using data extracted from EPA's Facility Level Information on GreenHouse gases Tool (FLIGHT). Captured and injected CO2 are not deducted from direct emitters’ total emissions. Contact EPA for additional details. Underground Injection Control Class VI permit/permit application This layer shows the locations of CO2 injection wells that are granted or in the process of applying for an Underground Injection Control Class VI permit by EPA or a Primacy State (currently Louisiana, North Dakota, and Wyoming). The URLs for the permits or permit applications are provided in the pop-up windows associated with the well locations. Contact EPA for additional details. Carbon Storage Resource This layer contains information on prospective CO2 storage resources in saline formations and oil and gas reservoirs provided by the National Carbon Sequestration Database and Geographic Information System (NATCARB) spatial database. Contact NETL for additional details. Existing CO2 pipeline This layer shows active CO2 pipelines based on information digitized from the map issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA). Contact PHMSA for additional details.

Carbon Conversion↗

Geologic Characterization of the South Georgia Rift Basin for Source Proximal CO2 Storage

The project Geologic Characterization of the South Georgia Rift Basin for Source Proximal CO2 Storage is one of 9 site characterization projects that were implemented as part of ARRA (American Recovery and Reinvestment Act). Data from this project was used to improve resolution of data in NATCARB in the area of study. Data related to this study has already been incorporated in NATCARB Atlas. The South Carolina Research Foundation and partners evaluated the feasibility of CCS in the Jurassic/ Triassic (J / TR) saline formations of the buried Mesozoic South Georgia Rift (SGR) Basin that extends from South Carolina into Georgia. The J / TR sequence, based on preliminary assessment of limited geologic and geophysical data, appears to have both the appropriate areal extent and multiple horizons to permanently and safely store CO2 The presence of several igneous rock layers within the sequence may potentially provide adequate seals to prevent upward CO2 migration into the Coastal Plain aquifer systems. Approximately 81 kilometers of 2-D seismic reflection data were collected by Bay Geophysical, Inc. to explore a portion of the SGR located in southern Georgia. The 81 kilometers were divided into two lines approximately 40.5 kilometers each, with Line 1 intersecting Georgia well GGS 3457. Line 2 intersects Line 1 at the southern portion of Line 1 to maximize the extent of coverage away from GGS-3457 (a deep well drilled in the 1980s for oil and gas exploration). This well had a set of usable logs, including gamma and neutron logs that provided promising results related to CO2 storage. Results showed sandstone with porosity values greater than 10 percent and a thickness of 120 meters. The design of the seismic shot was to extrapolate information away from the well and to better define the extent of the SGR and the necessary reservoir and caprock for a successful CO2 injection. A numerical simulation model of CO2 Injection and migration was developed based on the geology log for the GGS-3457 well. The simulation model was used to investigate the feasibility of injecting 30 million metric tons of CO2 into SGR J / TA sediments and integrity of the diabase layers as seals to prevent CO2 migration.

2-D seismic↗

Characterization of the Triassic Newark Basin of New York and New Jersey for Geologic Storage of Carbon Dioxide

The project Characterization of the Triassic Newark Basin of New York and New Jersey for Geologic Storage of Carbon Dioxide is one of 9 site characterization projects that were implemented as part of ARRA (American Recovery and Reinvestment Act). Data from this project was used to improve resolution of data in NATCARB in the area of study. Data related to this study has already been incorporated in NATCARB Atlas. Sandia Technologies, LLC, and co-investigator Conrad Geoscience Corporation, examined the potential for large-scale, permanent CO2 storage in sedimentary strata within the Newark Rift Basin. The Newark Rift Basin underlies an industrialized, developed region comprising parts of New York, New Jersey, and Pennsylvania. The project characterized and investigated the suitability of Triassic age sedimentary formations for potential geologic CO2 storage. The project team drilled and cored two test wells to define the sedimentary geologic formations underlying the basin and to document or reach basement rock. With this geologic characterization phase, an integration of seismic, geologic, borehole, and formation core results provided a higher resolution assessment of CO2 storage potential. The Stockton Formation is known to be a potentially favorable geologic storage formation in the basin. In 2011, the 1-NYSTA Tandem Lot stratigraphic test well was drilled to a depth of 6,855 feet in the northern portion of the Newark Basin in southern New York State. Approximately 9 miles south-southeast on the Lamont Doherty Campus, TW-4 was drilled and cored in 2013 to a depth of 1,802 feet and contacted apparent igneous basement at a depth of 1,712 feet. Both wells penetrated the Palisades Sill ranging from 800 feet thick in the eastern well to approximately 1,800 feet in thickness at the 1-NYSTA Tandem Lot deep drill site. A diabase sill can provide an excellent seal and dense confining layer for potential CO2 storage reservoirs and flow layers that are situated beneath it within the Stockton Sandstone. The Stockton Sandstone was encountered beneath the sill in the TW-4 well on the Lamont campus, and data integration suggests that it was likely observed near total depth in the deep 1-NYSTA Tandem Lot well. The test wells confirm and define reservoirs are present beneath the sill and offer CO2 storage potential. The integration of geologic and reservoir characterization of well logs, formation cores, and formation fluids indicated Triassic age lacustrine playa lake and mudbank shales of the Upper Passaic Group can provide an effective seal for the porous and permeable underlying sandstone reservoir layers. This project acquired seismic data, drilled borehole well logs, acquired core samples, and integrated these findings to provide a better understanding of the subsurface geologic formations in the Newark Rift Basin. These findings have contributed to a higher degree of accuracy in predicting potential geologic storage opportunities, while refining geologic storage capacity estimates for the indicated reservoirs and flow units.

.las↗

Alternative solenoid compensation scheme for the FCC-ee interaction region

We present the optics design of the solenoid compensation scheme at the FCC-ee. The 2T solenoids from the experiments induce coupling on the beams, generating an increase on vertical emittance. This compensation scheme minimizes emittance growth, with a final value of approximately 5% of the nominal. A screening solenoid is placed around the Final Focus Quadrupoles to protect them from the experiment’s field. A skew quadrupole component is added to the Final Doublet, aligning the magnet axis to the rotated reference frame of the beam. Two anti-solenoids placed approximately ±20 m from the IP are used to cancel the field integral. The vertical orbit generated by the horizontal crossing angle in the detector field is compensated by vertical correctors placed right after the beam pipe separation and next to the final focus quadrupoles. We describe the IR optics in this scheme, including the detector solenoid and the magnetic elements used for compensation.

43 PARTICLE ACCELERATORS↗

Sputter coating of Nb₃Sn into SRF cavity using stoichiometric target

Nb₃Sn has emerged as a leading alternative material due to its higher superconducting critical temperature (Tc) and superheating field (Hsh), promising a viable solution to the intrinsic performance limit currently faced by Nb superconducting radiofrequency (SRF) cavities. We sputter-coated Nb₃Sn inside Nb SRF cavity using a stoichiometric Nb₃Sn tube target in a DC cylindrical magnetron sputter coater. The target was fabricated by growing an estimated >20 μm thick Nb₃Sn layer on a Nb tube via Sn vapor diffusion using Jefferson Lab’s coating system. Approximately 150 nm thick Nb-Sn films were sputter-deposited onto flat Nb samples at positions representing the beam tubes and equator of a 2.6 GHz Nb cavity. Post-deposition annealing at 950 °C for 3 h resulted in the formation of Nb₃Sn. Microstructural analysis of the annealed films was carried out to investigate the morphology and structure of the Nb₃Sn films. Later, a 2.6 GHz Nb SRF cavity was coated with a ~1.2 μm thick sputtered Nb-Sn film using a stoichiometric Nb₃Sn target, followed by annealing. Cryogenic RF testing of the annealed cavity demonstrated a Tc of 17.8 K, indicating the formation of Nb₃Sn. After a light Sn recoating treatment, the cavity achieved a quality factor (Q0) of 6.7E+08 at lower field at 2.0 K.

Accelerator Physics↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Retrofitting Holcim Ste. Genevieve Cement Plant with CO2 Capture Plant Using Air Liquide Cryocap™ FG Technology

The global cement manufacturing industry is a major contributor to carbon dioxide emissions. The International Energy Agency's "Net Zero Emissions by 2050 Scenario" identifies CCS as a major strategy for meeting that goal. This project is among the first attempts to transfer capture technology developed at coal-fired power plants to the cement industry. The main objective of the project is to execute and complete a front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separates 95% of the total CO2 emissions at the Holcim (US) Ste. Genevieve cement manufacturing facility using Air Liquide’s Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology. The Holcim Ste. Genevieve cement plant in Missouri, US, boasts one of the largest single cement production lines in the world, with a capacity of approximately 12,000 t/day. The plant currently uses traditional fuels, namely coal and petcoke. The captured CO2 will be pipeline and geological storage grade. The industrial host site emits approximately 3.0 million tonne CO2/yr. Air Liquide’s Cryocap™ technology has been developed over the last 18+ years for CO2 capture applications. It has been shown to be applicable to a variety of industrial applications (e.g., steel, cement, SMR, Fluidized Catalytic Crackers (FCCs)). Cryocap™ FG consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The project team is led by the Prairie Research Institute at the University of Illinois at Urbana-Champaign. The tasks include: complete FEED study for retrofitting the industrial facility with a carbon capture system to support developing a detailed cost estimate; business case analysis outlining the anticipated revenue and credits if projects was built and operated; technoeconomic analysis (TEA) outlining how capture system achieves DOE capture goals; and life cycle (LCA) analysis demonstrating zero net carbon emissions. The FEED study was successfully completed. This includes completing the process basis of design; preliminary engineering; outside battery limits (OSBL) detailed engineering including a Zero Liquid Discharge (ZLD) wastewater treatment system; inside battery limits (ISBL) detailed engineering [1]. An overall project capital cost estimate within a -20%/+30% accuracy was developed. The major contributors to the Total Plant Cost (TPC), by system, are the costs associated with the Outside Battery Limit (OSBL) section of the plant which includes a new river water intake structure and a Zero Liquid Discharge (ZLD) system. By cost category, the major contributors to the TPC are equipment and subcontractor costs, followed closely by engineering, construction management, home office and contractor fees. The TEA has been created to reflect the findings of the project. It analyzes the economic performance of the Cryocap™ technology by reviewing the estimated capital costs, operating cost, and revenue. The Cost of Capture (COC) associated with the Cryocap™ technology for 95% CO2 capture, when considering NETL 2018 economic assumptions (42/58 debt/equity ratio, 5.15% interest on debt and 1.42% return on equity in real dollars) and 2022 economic assumptions (42/58 debt/equity ratio, 8.82% interest on debt and 4.90% return on equity in real dollars) was found to be much lower than that for the DOE-NETL’s base-line cases. The highest contributors to the COC are annualized capital expenditures (CAPEX) and electricity consumption which can be offset by using lower cost renewable sources. The LCA was conducted using OpenLCA which is an open-source software that is recommended by NETL. The database utilized for this study was a modified version of TRACI 2.1 (developed by the US. Environmental Protection Agency’s National Risk Management Research Laboratory and modified by NETL). The Cryocap™ FG technology does not consume fuels in significant quantities and does not utilize specialized chemical solvents subject to decomposition, such as those utilized in amine-based carbon capture systems. The Cryocap™ FG technology mainly utilizes electricity as its energy input; hence, its calculated emissions are mainly associated with the generation of electricity offsite and are dependent on the energy matrix of the grid at the time of project implementation. The water consumption impact of the Cryocap™ FG is mostly for makeup of the water lost by evaporation in the cooling tower; however, the carbon capture plant will be equipped with a ZLD system to avoid effluent streams and minimize water consumption. The successful construction and operation of this plant based on this study results will provide a means to demonstrate an economically attractive and transformational capture technology that can be used to retrofit existing plants and be deployed at new plants.

01 COAL, LIGNITE, AND PEAT↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗