Search NASA⌕ Search

SEARCH · Search NASA

Results for “Decision analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

System Analysis Support of Consent-Based Siting Efforts - 23400

To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the Integrated Waste Management (IWM) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate things like the implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, and different assumed system operation start dates. Some example system analysis results have been published previously. With the passage of the consolidated appropriations acts for fiscal years 2021 and 2022, Congress provided funding and direction for the DOE to move forward with interim storage to support near-term action in managing the nation’s SNF as an important component of an IWMS. Consent-based siting is a phased, adaptive, and collaborative approach to siting facilities that focuses on the needs and concerns of people and communities. Communities participate in the siting process by working carefully through a series of phases and steps with the DOE (as the implementing organization). Each step and phase helps a community determine whether and how hosting a facility to manage SNF is aligned to the community’s goals. By its nature, a consent-based siting process must be transparent, flexible, adaptive, and responsive to community concerns. Thus, the phases and steps are intended to serve as a guide, not a prescriptive set of instructions. System analysis research analysts interface with DOE’s consent-based siting for a federal interim storage program and can perform preliminary system analyses as requested to support various aspects of the consent-based siting team’s work. This paper provides an overview of IWM program’s system analysis activities that support the ongoing consent-based siting process. The questions that decision-makers, planners, communities, and stakeholders might have during the consent-based siting process are similar to questions that have been explored by system analysts previously. Specifically, this paper discusses work that will inform consent-based siting efforts in the areas of community impacts, cost estimates, various SNF acceptance rates by potential facilities, potential consolidated interim storage facility (CISF) capacities and configurations, and the implications of a CISF on the overall waste management system. It is expected that system analysis will continue to be performed to support the consent-based siting process in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quantifying Movement Motivations, Demand, and Inflow-Outflow Dynamics in Four Cities (New York, Chicago, Austin, and San Diego) During COVID-19

The COVID-19 pandemic has impacted a wide range of human activities, from food delivery habits to major moving and travel decisions. Results indicate multiple pandemic-related factors have influenced millions of relocation decisions by Americans (e.g., health risk, financial pressures, more space, and employment), and there are various positive economic and social outcomes of this influence (e.g., remote work and education), enabling more affordable living and opportunity. This paper addresses COVID-19 impacts on mobility, especially involving permanent relocations. Survey design and data analysis with U-Haul targeted customers in Austin, New York, San Diego, and Chicago to understand mobility, new moving dynamics, and motivations.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

A Privacy First Path Analysis using Clickstream Data

In the modern digital economy, data-driven decision making is crucial for effectively meeting the ever-evolving demands of consumer engagement and satisfaction. Clickstream data has become invaluable for understanding customer behavior, yet concerns over privacy and security persist, especially with some internet service providers profiting from its sale. This article introduces an innovative methodology that blends experiential learning with advanced cryptographic techniques, including differential privacy and graph analytics. The core objective of this methodology is to estimate Customer Lifetime Value (CLV) by analyzing clickstream data, achieving an average prediction accuracy of 92.4% in user engagement levels while ensuring user anonymity through Recency, Frequency, and Monetary (RFM) analysis. Our study introduces the concept of a “data depositor” and a privacy manager, employing the composition theorem to merge non-adaptive queries effectively. Privacy budgets (? = 1.0, d = 10-5), sensitivity-specific techniques, and data partitioning were applied. Randomization and noise addition protect data integrity, with special handling for categorical values. This approach, differing from prior studies, offers a 12.6% improvement in privacy-preserving targeting accuracy while maintaining strict confidentiality, presenting a novel path forward in data-driven decision-making.

Frequency and Monetary (RFM) analysis↗

Evaluation of Contamination Inspection and Analysis Methods through Modeling System Performance

Contamination is usually identified as a risk on the risk register for sensitive space systems hardware. Despite detailed, time-consuming, and costly contamination control efforts during assembly, integration, and test of space systems, contaminants are still found during visual inspections of hardware. Improved methods are needed to gather information during systems integration to catch potential contamination issues earlier and manage contamination risks better. This research explores evaluation of contamination inspection and analysis methods to determine optical system sensitivity to minimum detectable molecular contamination levels based on IEST-STD-CC1246E non-volatile residue (NVR) cleanliness levels. Potential future degradation of the system is modeled given chosen modules representative of optical elements in an optical system, minimum detectable molecular contamination levels for a chosen inspection and analysis method, and determining the effect of contamination on the system. By modeling system performance based on when molecular contamination is detected during systems integration and at what cleanliness level, the decision maker can perform trades amongst different inspection and analysis methods and determine if a planned method is adequate to meet system requirements and manage contamination risk.

Seasly, Elaine↗

Quantifying Movement Motivations, Demand, and Inflow-Outflow Dynamics in Four Cities (New York, Chicago, Austin, and San Diego) During COVID-19: Preprint

COVID-19 has impacted human activities ranging from food delivery habits to major moving and travel decisions. It’s clear that multiple pandemic-related factors have influenced millions of relocation decisions by Americans (e.g. health risk, financial pressures, more space, employment). There are positive economic and social outcomes of this influence (e.g. remote work and education) enabling more affordable living and opportunity. This paper addresses COVID-19 impacts on mobility, especially the mobility that involves permanent relocation from place to place. Survey design and data analysis with U-Haul targeted customers in Austin, New York, San Diego, and Chicago to understand mobility, new moving dynamics, and motivations.

ADVANCED PROPULSION SYSTEMS↗

Flat-plate solar array project. Volume 8: Project analysis and integration

Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

Mcguire, P.↗

How data science methods can improve the quality and efficiency of ICF and HEDP research

Data Science methods (many that are Bayesian based) are widely used in the physical sciences to estimate model parameters from experimental data, synthesize heterogeneous data, calibrate models, design experiments, and determine statistical significance of data. These methods provide a wealth of advantages over traditional analysis techniques because: 1) uncertainties are rigorously defined and propagated naturally through complex systems including covariance, 2) prior information is captured within the analysis framework (including rad-MHD and rad-hydro simulations), 3) competing models can be selected and/or ruled out using quantitative criteria, and 4) complex, heterogeneous data can be incorporated simultaneously. While these methods have been widely adopted as the gold standard in fields such as particle physics, astronomy, and biology, they have been slow to catch on in Inertial Confinement Fusion (ICF) and High Energy Density Physics (HEDP) research. Recently, several teams at LLNL, SNL, LANL, and the LLE have been exploring the use of these tools in their research and have found success. Here we propose that a concerted effort to consolidate these independent research efforts by developing and deploying common tools for use across the complex can revolutionize the way we approach data analysis, assimilation of theory and experiment, and decision making. The Bayesian formalism provides a means to accomplish this, but we are lacking certain infrastructure to make it happen on a large scale. Furthermore, once adopted, these techniques can be used to develop standards by which discoveries can be judged, similar to the so-called 5σ rule in high energy particle physics. Such standards may be used in the future to address the issue of unknown reproducibility in ICF and HED experiments caused by low shot rate and high cost per experiment. Our goals as a group are to advance the state of the art in HED measurement science by enabling: 1) better inferences from data with well-defined uncertainties, 2) better use of the data we have and continue to collect, 3) intelligent synthesis of data, 4) evaluation of the statistical significance of our data, and 5) informed decision making regarding the design of new experiments and instruments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Pit Production Strategic Analysis Tool

The LANL Pit Production Strategic Analysis tool is an executive-level decision support tool for planning related to the demand and production of pits. The spreadsheet-based tool includes decision factors for stockpile program demand combined with production and infrastructure planning at PF-4, Savanna River, and future production options. The tool graphically compares supply and demand under different scenarios. The tool is based on NNSA planning documents and process analyses.

97 MATHEMATICS AND COMPUTING↗

Design-Space Data: Informing Common Design Decisions with Pre-Simulated Data

Design Space Exploration (DSE) analysis techniques represent a data-centric approach to integrating performance analysis in early design phases when there is the greatest potential to cheaply improve the energy efficiency of a building. We focus on a novel extension of DSE called Universal Design Space Exploration (UDSE), which leverages massive databases of pre-simulated analysis that represent all possible outcomes of common analysis workflows. These databases, called Design Spaces, become “universal” when a single pre-simulated design space can be re-applied to future unknown projects. Unlike current simulation methods, which require a design to exist before it can be analyzed and often take minutes or hours to simulate, UDSE leverages pre-simulation to deliver rapid and relevant insight as new designs are conceptualized. The data underpinning UDSE enables advanced statistical and Artificial Intelligence methods, allowing UDSE to deliver a greater understanding of the larger problem being explored, rather than simply delivering analysis of several pre-conceived design options. We believe that UDSE can provide instantaneous, relevant analysis for all building design projects at negligible cost. This paper has two main goals, to develop a relevant Universal Design Space that showcases the potential of UDSE and to release this data freely to industry and academia; thereby lowering the barrier to entry to digital literacy in statistics, ML and AI within the architecture, engineering, construction (AEC) industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Climate Vulnerability Assessment and Resilience Planning for Idaho National Laboratory

Idaho National Laboratory’s (INL’s) mission is to discover, demonstrate, and secure innovative nuclear energy solutions, other clean energy options, and critical infrastructure. This INL’s Climate Vulnerability Assessment and Resilience Plan (VARP) was developed to enable and sustain that mission while ensuring the viability of operations considering expected climate change impacts. The VARP was developed according to the narrative requirements from the “Vulnerability Assessment and Resilience Planning Guidance, Version 1.2” document issued in February 2022. A prescribed process was used to identify mission-critical systems and components, determine historical and expected climate impacts, and develop resilient solutions. Experts from across INL, including operations staff, researchers, and climate scientists supplied input to the process. Analyses of climate modeling sources revealed that under scenarios of higher and lower greenhouse gas emissions (Representative Concentration Pathway (RCP) 4.5 and RCP 8.5), INL anticipates an increase in climate hazards, including drought, heat waves, wildfire, and precipitation. Increased frequency and duration of climatic hazards forecasts high impacts on certain mission-critical asset and infrastructure types. Utilizing the VARP Risk Assessment Tool, projected high climate hazard impacts across multiple asset and infrastructure types at the INL include energy generation and distribution systems, Site buildings, specialized or mission-critical equipment, and transportation and fleet infrastructure. Some of these mission-critical asset and infrastructure types maintain high adaptive capacity to climatic changes; however, others may need additional adaptive capacity to withstand increased frequency and duration of climate hazards. INL identified close to 300 resilient solutions that were consolidated into 11 solution categories to be tracked in the Department of Energy Sustainability Dashboard. The identified solutions are a starting point for future project development and analysis. These data are intended to inform decision makers on climate issues and potential solutions across INL and associated communities. The VARP is not intended to be a budget tool or project decision document on its own, but rather one of many tools used by decision makers to establish resilient priorities. This initial document provides the framework and foundation to resilient solutions. In the coming years, each solution needs to be fully developed, costed, and prioritized based on mission-critical risk and funding priorities.

54 ENVIRONMENTAL SCIENCES↗

Axion Dark Matter Experiment Cavity Locking; System Development and Testing

This report documents the comparison of two frequency locking techniques for the four-cavity system under development for run 2A of the Axion Dark Matter eXperiment (ADMX). This report covers the requirements and technical challenges facing both of these techniques, a summary of tests performed at the University of Florida in late 2017 / early 2018 in order to compare them, and the final outcome and decision based on these tests and subsequent analysis.

79 ASTRONOMY AND ASTROPHYSICS↗

Valuation of Wind Energy Turbines Using Volatility of Wind and Price

The limitedness of the nonrenewable local energy resources in Israel, even in the background of the later gas fields’ findings, continues to force the state to devote various efforts towards ‘green’ energy development. These efforts include installations, both for the solar and for wind energy, thus improving the diversity of energy sources. While the standard discounted cash flow (DCF) method using the net present value (NPV) criterion is extensively adopted to evaluate investments, the standard DCF method is inappropriate for the rapidly changing investment climate and for the managerial flexibility in investment decisions. In recent years, the real options analysis (ROA) technique has been widely applied in many studies for the valuation of renewable energy investment projects. Taking into account the above background, we apply, in this study, the real options analysis approach for the valuation of wind energy turbines and apply it to the analysis of wind energy economic potential in Israel, which is the context of our work. We hypothesize that due to nature of wind energy production uncertainties, the ROA method is better than the alternative. The novelty of this paper includes the following: real world wind statistics of the Merom Golan site in Israel (velocity 3.73 m/s, with a standard deviation of 2.03 m/s), a realistic power generation estimation (power generation of 1205.84 kW with a standard deviation of about 0.5% in annual value which is worth about 1.3 M$ per annum), and an economic model to evaluate the profitability of such a project. We thus discuss the existing challenges of diversifying renewable energy sources in Israel by adding wind installations. Our motivation is to introduce a method which will allow investors and officials to take into account uncertainties when deciding in investing in such wind installations. The outcomes of the paper, which are obtained using the method of Weibull statistics and the Black–Scholes ROA technique, include the result that market price volatility adds to the uncertainties much more than any wind fluctuations, provided that the analysis is integrated over a long enough time.

17 WIND ENERGY↗

Implementing Software Safety in the NASA Environment

Until recently, NASA did not consider allowing computers total control of flight systems. Human operators, via hardware, have constituted the ultimate safety control. In an attempt to reduce costs, NASA has come to rely more and more heavily on computers and software to control space missions. (For example. software is now planned to control most of the operational functions of the International Space Station.) Thus the need for systematic software safety programs has become crucial for mission success. Concurrent engineering principles dictate that safety should be designed into software up front, not tested into the software after the fact. 'Cost of Quality' studies have statistics and metrics to prove the value of building quality and safety into the development cycle. Unfortunately, most software engineers are not familiar with designing for safety, and most safety engineers are not software experts. Software written to specifications which have not been safety analyzed is a major source of computer related accidents. Safer software is achieved step by step throughout the system and software life cycle. It is a process that includes requirements definition, hazard analyses, formal software inspections, safety analyses, testing, and maintenance. The greatest emphasis is placed on clearly and completely defining system and software requirements, including safety and reliability requirements. Unfortunately, development and review of requirements are the weakest link in the process. While some of the more academic methods, e.g. mathematical models, may help bring about safer software, this paper proposes the use of currently approved software methodologies, and sound software and assurance practices to show how, to a large degree, safety can be designed into software from the start. NASA's approach today is to first conduct a preliminary system hazard analysis (PHA) during the concept and planning phase of a project. This determines the overall hazard potential of the system to be built. Shortly thereafter, as the system requirements are being defined, the second iteration of hazard analyses takes place, the systems hazard analysis (SHA). During the systems requirements phase, decisions are made as to what functions of the system will be the responsibility of software. This is the most critical time to affect the safety of the software. From this point, software safety analyses as well as software engineering practices are the main focus for assuring safe software. While many of the steps proposed in this paper seem like just sound engineering practices, they are the best technical and most cost effective means to assure safe software within a safe system.

Wetherholt, Martha S.↗

A measurement system for large, complex software programs

This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.

Rone, Kyle Y.↗

The TPS Advanced Development Project for CEV

The CEV TPS Advanced Development Project (ADP) is a NASA in-house activity for providing two heatshield preliminary designs (a Lunar direct return as well as a LEO only return) for the CEV, including the TPS, the carrier structure, the interfaces and the attachments. The project s primary objective is the development of a single heatshield preliminary design that meets both Lunar direct return and LEO return requirements. The effort to develop the Lunar direct return capable heatshield is considered a high risk item for the NASA CEV development effort due to the low TRL (approx. 4) of the candidate TPS materials. By initiating the TPS ADP early in the development cycle, the intent is to use materials analysis and testing in combination with manufacturing demonstrations to reduce the programmatic risk of using advanced TPS technologies in the critical path for CEV. Due to the technical and schedule risks associated a Lunar return heatshield, the ADP will pursue a parallel path design approach, whereby a back-up TPS/heatshield design that only meets LEO return requirements is also developed. The TPS materials and carrier structure design concept selections will be based on testing, analysis, design and evaluation of scalability and manufacturing performed under the ADP. At the TPS PDR, the preferred programmatic strategy is to transfer the continued (detailed) design, development, testing and evaluation (DDT&E) of both the Lunar direct and LEO return designs to a government/prime contractor coordinated sub-system design team. The CEV prime contractor would have responsibility for the continued heatshield sub-system development. Continued government participation would include analysis, testing and evaluation as well as decision authority at TPS Final System Decision (FSD) (choosing between the primary and back-up heatshields) occurring between TPS PDR and TPS Critical Design Review (CDR). After TPS FSD the prime CEV contractor will complete the detailed design, certification testing, procurement, and integration of the CEV TPS.

Reuther, James↗

Organization, Management and Function of International Space Station (ISS) Multilateral Medical Operations

Long duration crews have inhabited the ISS since November of 2000. The favorable medical outcomes of its missions can be largely attributed to sustained collective efforts of all ISS Partners medical organizations. In-flight medical monitoring and support, although crucial, is just a component of the ISS system of Joint Medical Operations. The goal of this work is to review the principles, design, and function of the multilateral medical support of the ISS Program. The governing documents, which describe the relationships among all ISS partner medical organizations, were evaluated, followed by analysis of the roles, responsibilities, and decision-making processes of the ISS medical boards, panels, and working groups. The degree of integration of the medical support system was evaluated by reviewing the multiple levels of the status reviews and mission assurance activities carried out throughout the last six years. The Integrated Medical Group, consisting of physicians and other essential personnel in the mission control centers represents the front-line medical support of the ISS. Data from their day-to-day activities are presented weekly at the Space Medicine Operations Team (SMOT), where known or potential concerns are addressed by an international group of physicians. A broader status review is conducted monthly to project the state of crew health and medical support for the following month, and to determine measures to return to nominal state. Finally, a comprehensive readiness review is conducted during preparations for each ISS mission. The Multilateral Medical Policy Board (MMPB) issues medical policy decisions and oversees all health and medical matters. The Multilateral Space Medicine Board (MSMB) certifies crewmembers and visitors for training and space flight to the Station, and physicians to practice space medicine for the ISS. The Multilateral Medical Operations Panel (MMOP) develops medical requirements, defines and supervises implementation of operational countermeasures, environmental monitoring, medical care, and emergency medical services. MMOP assures the medical readiness of the Station for each subsequent mission or critical event. All boards and panels have functioned effectively and without interruptions even in various challenging circumstances. Based on the experience of the authors, consensus has prevailed as the primary nature of decisions made by all ISS medical groups, at all levels. The six first years of piloted operation have demonstrated the ability of the ISS medical authority groups and the medical infrastructure to implement medical policies and requirements, effectively interface with non-medical groups, and maintain the health and productivity of the crew in an integrated, multilaterally coordinated fashion. The medical support system appears to be mature and ready for further expansion of all Partners roles, and for the anticipated increase in the size of ISS crews.

Duncan, James M.↗