Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Analysis and Prediction of Weather Impacted Ground Stop Operations

When the air traffic demand is expected to exceed the available airport's capacity for a short period of time, Ground Stop (GS) operations are implemented by Federal Aviation Administration (FAA) Traffic Flow Management (TFM). The GS requires departing aircraft meeting specific criteria to remain on the ground to achieve reduced demands at the constrained destination airport until the end of the GS. This paper provides a high-level overview of the statistical distributions as well as causal factors for the GSs at the major airports in the United States. The GS's character, the weather impact on GSs, GS variations with delays, and the interaction between GSs and Ground Delay Programs (GDPs) at Newark Liberty International Airport (EWR) are investigated. The machine learning methods are used to generate classification models that map the historical airport weather forecast, schedule traffic, and other airport conditions to implemented GS/GDP operations and the models are evaluated using the cross-validations. This modeling approach produced promising results as it yielded an 85% overall classification accuracy to distinguish the implemented GS days from the normal days without GS and GDP operations and a 71% accuracy to differentiate the GS and GDP implemented days from the GDP only days.

Analysis↗

Surface Hold Advisor Using Critical Sections

The Surface Hold Advisor Using Critical Sections is a system and method for providing hold advisories to surface controllers to prevent gridlock and resolve crossing and merging conflicts among vehicles traversing a vertex-edge graph representing a surface traffic network on an airport surface. The Advisor performs pair-wise comparisons of current position and projected path of each vehicle with other surface vehicles to detect conflicts, determine critical sections, and provide hold advisories to traffic controllers recommending vehicles stop at entry points to protected zones around identified critical sections. A critical section defines a segment of the vertex-edge graph where vehicles are in crossing or merging or opposite direction gridlock contention. The Advisor detects critical sections without reference to scheduled, projected or required times along assigned vehicle paths, and generates hold advisories to prevent conflicts without requiring network path direction-of-movement rules and without requiring rerouting, rescheduling or other network optimization solutions.

Law, Caleb Hoi Kei↗

Single-Event Effect Report for EPC Series eGaN FETs: EPC1001, EPC1010, EPC1014, EPC1012

Heavy ion testing of newly available GaN FETs from EPC were tested in March of 2012 at TAM. The EPC1010, EPC1001, EPC1012, and EPC1014 were tested for general radiation response from gold and xenon ions. Overall the devices showed radiation degradation commensurate with breakdown in isolation oxides, and similar testing by EPC and Microsemi agrees with these data. These devices were the first generation production of the device called Gen1. Gen2 parts are scheduled for later in the third quarter of FY2012

Scheick, Leif↗

US Spent (Used) Fuel Status, Management and Likely Directions- 12522

As of 2010, the US has accumulated 65,200 MTU (42,300 MTU of PWR's; 23,000 MTU of BWR's) of spent (irradiated or used) fuel from 104 operating commercial nuclear power plants situated at 65 sites in 31 States and from previously shutdown commercial nuclear power plants. Further, the Department of Energy (DOE) has responsibility for an additional 2458 MTU of DOE-owned defense and non defense spent fuel from naval nuclear power reactors, various non-commercial test reactors and reactor demonstrations. The US has no centralized large spent fuel storage facility for either commercial spent fuel or DOE-owned spent fuel. The 65,200 MTU of US spent fuel is being safely stored by US utilities at numerous reactor sites in (wet) pools or (dry) metal or concrete casks. As of November 2010, the US had 63 'independent spent fuel storage installations' (or ISFSI's) licensed by the US Nuclear Regulatory Commission located at 57 sites in 33 states. Over 1400 casks loaded with spent fuel for dry storage are at these licensed ISFSI's; 47 sites are located at commercial reactor sites and 10 are located 'away' from a reactor (AFR's) site. DOE's small fraction of a 2458 MTU spent fuel inventory, which is not commercial spent fuel, is with the exception of 2 MTU, being stored at 4 sites in 4 States. The decades old US policy of a 'once through' fuel cycle with no recycle of spent fuel was set into a state of 'mass confusion or disruption' when the new US President Obama's administration started in early 2010 stopping the only US geologic disposal repository at the Yucca Mountain site in the State of Nevada from being developed and licensed. The practical result is that US nuclear power plant operators will have to continue to be responsible for managing and storing their own spent fuel for an indefinite period of time at many different sites in order to continue to generate electricity because there is no current US government plan, schedule or policy for taking possession of accumulated spent fuel from the utilities. There are technical solutions for continuing the safe storage of spent fuel for 100 years or more and these solutions will be implemented by the US utilities that need to keep their nuclear power plants operating while the unknown political events are played out to establish future US policy decisions that can remain in place long enough regarding accumulated spent fuel inventories to implement any new US spent fuel centralized storage or disposition policy by the US government. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System cost/performance analysis (study 2.3). Volume 1: Executive summary

The relationships between performance, safety, cost, and schedule parameters were identified and quantified in support of an overall effort to generate program models and methodology that provide insight into a total space vehicle program. A specific space vehicle system, the attitude control system (ACS), was used, and a modeling methodology was selected that develops a consistent set of quantitative relationships among performance, safety, cost, and schedule, based on the characteristics of the components utilized in candidate mechanisms. These descriptive equations were developed for a three-axis, earth-pointing, mass expulsion ACS. A data base describing typical candidate ACS components was implemented, along with a computer program to perform sample calculations. This approach, implemented on a computer, is capable of determining the effect of a change in functional requirements to the ACS mechanization and the resulting cost and schedule. By a simple extension of this modeling methodology to the other systems in a space vehicle, a complete space vehicle model can be developed. Study results and recommendations are presented.

Kazangey, T.↗

The AP1000{sup R} China projects move forward to construction completion and equipment installation

The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand the impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained from the first-of-a-kind activities for Sanmen Unit 1 and AP1000 equipment design and manufacturing. For example, the nuclear island basemat at Haiyang Units 1 and 2 and Sanmen Unit 2 was laid in less time than that of Sanmen Unit 1, the ultra-large steam generator and RV forging lead times were reduced for the follow on units, and the fabrication of the auxiliary building module for Haiyang Unit 1 took less time than for the Sanmen first unit. These benefits are also being realized by the United States AP1000 project construction and fabrication modules, and equipment. Some difficulties arise from building this first-of-a-kind (advanced passive) type of plant; however, these difficulties are being overcome and the overall schedule remains achievable. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Scheduler Modeling of Distributed Energy Resources for Providing Ancillary Services

Distribution energy resources (DERs) have been integral components of modern power systems, and their capability to provide grid services has been widely studied. To promote the deployment of these resources in providing grid services in real-world utility operations, this paper proposes a day-ahead scheduler model for a distribution system connected DER plant. A certain amount of generation capacity of this DER plant is reserved for frequency services, and some ancillary services for the distribution system-including peak load reduction, voltage regulation, and power factor control-are integrated into the model. The model is tested on a real-world distribution system. From the simulation results, the energy and reserve schedule of the solar photovoltaic (PV) unit and battery energy storage system (BESS) can be determined, and voltage and power factor are well maintained. Additionally, in order to demonstrate the specific characteristics of the co-located and hybrid operation modes for the PV and BESS, these two modes are analyzed both theoretically and through real-time simulation. Simulation results show that most of PV's variability is transferred to the net power in the co-located mode, whereas it is transferred to the BESS in the hybrid mode. This proposed scheduler model and the comparison of co-located and hybrid modes can provide practical guidance for the applications of DER plant in the real-world utility.

14 SOLAR ENERGY↗

CGSim: A Simulation Framework for Large Scale Distributed Computing Environment

Large-scale distributed computing infrastructures such as the Worldwide LHC Computing Grid (WLCG) require comprehensive simulation tools for evaluating performance, testing new algorithms, and optimizing resource allocation strategies. However, existing simulators suffer from limited scalability, hardwired algorithms, lack of real-time monitoring, and inability to generate datasets suitable for modern machine learning approaches. We present CGSim, a simulation framework for large-scale distributed computing environments that addresses these limitations. Built upon the validated SimGrid simulation framework, CGSim provides high-level abstractions for modeling heterogeneous grid environments while maintaining accuracy and scalability. Key features include a modular plugin mechanism for testing custom workflow scheduling and data movement policies, interactive real-time visualization dashboards, and automatic generation of event-level datasets suitable for AI-assisted performance modeling. We demonstrate CGSim’s capabilities through a comprehensive evaluation using production ATLAS PanDA workloads, showing significant calibration accuracy improvements across WLCG computing sites. Scalability experiments show near-linear scaling for multi-site simulations, with distributed workloads achieving 6 × better performance compared to single-site execution. The framework enables researchers to simulate WLCG-scale infrastructures with hundreds of sites and thousands of concurrent jobs within practical time budget constraints on commodity hardware.

Vatsavai, Sairam Sri [Brookhaven National Laborato↗

An Enabling Technology for New Planning and Scheduling Paradigms

The Night Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called ?ask models," from the scientists and technologists for the tasks that are to be scheduled. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next, a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, the models are modified to be compatible with the scheduling engine. Then the models are submitted to the scheduling engine for automatic scheduling or, when requirements are expressed in notes, the timeline is built manually. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components: (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphical methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm that can exploit timing flexibilities and constraint and relationship options. (3) An innovative architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the remote users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Integrating Variable Renewable Energy: Challenges and Solutions

In the U.S., a number of utilities are adopting higher penetrations of renewables, driven in part by state policies. While power systems have been designed to handle the variable nature of loads, the additional supply-side variability and uncertainty can pose new challenges for utilities and system operators. However, a variety of operational and technical solutions exist to help integrate higher penetrations of wind and solar generation. This paper explores renewable energy integration challenges and mitigation strategies that have been implemented in the U.S. and internationally, including forecasting, demand response, flexible generation, larger balancing areas or balancing area cooperation, and operational practices such as fast scheduling and dispatch.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance Tradeoffs of Spectrum Sensing and Target State Estimation and Fusion

We consider a scenario where a cognitive radio sensor performs spectrum sensing and target tracking alternately. Both tasks may impose certain performance guarantee requirements that necessitate considerations of how to schedule these tasks over time. In addition, multiple such cognitive radio sensors can perform collaborative spectrum sensing and target tracking, where a fusion center serves to collect the sensor estimates and their covariances to generate fused target state estimates. We study the performance tradeoffs of these two tasks from variable scheduling intervals. The effect of sensing errors on the target tracking performance due to induced loss from perceived channel unavailability is investigated and conclusions are drawn based on the observed performance tradeoffs.

Liu, Qiang↗

Artificial Neural Network Modeling for Airline Disruption Management

Since the 1970s, most airlines have incorporated computerized support for managing disruptions during flight schedule execution. However, existing platforms for airline disruption management (ADM) employ monolithic system design methods that rely on the creation of specific rules and requirements through explicit optimization routines, before a system that meets the specifications is designed. Thus, current platforms for ADM are unable to readily accommodate additional system complexities resulting from the introduction of new capabilities, such as the introduction of unmanned aerial systems (UAS), operations and infrastructure, to the system. To this end, we use historical data on airline scheduling and operations recovery to develop a system of artificial neural networks (ANNs), which describe a predictive transfer function model (PTFM) for promptly estimating the recovery impact of disruption resolutions at separate phases of flight schedule execution during ADM. Furthermore, we provide a modular approach for assessing and executing the PTFM by employing a parallel ensemble method to develop generative routines that amalgamate the system of ANNs. Our modular approach ensures that current industry standards for tardiness in flight schedule execution during ADM are satisfied, while accurately estimating appropriate time-based performance metrics for the separate phases of flight schedule execution.

Kolawole Ogunsina↗

Time Utility Functions for Modeling and Evaluating Resource Allocations in a Heterogeneous Computing System

This study considers a heterogeneous computing system and corresponding workload being investigated by the Extreme Scale Systems Center (ESSC) at Oak Ridge National Laboratory (ORNL). The ESSC is part of a collaborative effort between the Department of Energy (DOE) and the Department of Defense (DoD) to deliver research, tools, software, and technologies that can be integrated, deployed, and used in both DOE and DoD environments. The heterogeneous system and workload described here are representative of a prototypical computing environment being studied as part of this collaboration. Each task can exhibit a time-varying importance or utility to the overall enterprise. In this system, an arriving task has an associated priority and precedence. The priority is used to describe the importance of a task, and precedence is used to describe how soon the task must be executed. These two metrics are combined to create a utility function curve that indicates how valuable it is for the system to complete a task at any given moment. This research focuses on using time-utility functions to generate a metric that can be used to compare the performance of different resource schedulers in a heterogeneous computing system. The contributions of this paper are: (a) a mathematical model of a heterogeneous computing system where tasks arrive dynamically and need to be assigned based on their priority, precedence, utility characteristic class, and task execution type, (b) the use of priority and precedence to generate time-utility functions that describe the value a task has at any given time, (c) the derivation of a metric based on the total utility gained from completing tasks to measure the performance of the computing environment, and (d) a comparison of the performance of resource allocation heuristics in this environment.

99 GENERAL AND MISCELLANEOUS↗

An Infrared Telescope for Planet Detection and General Astrophysics

NASA plans to launch a Terrestrial Planet Finder (TPF) mission in 2014 to detect and characterize Earth-like planets around nearby stars, perform comparative planetology studies, and obtain general astrophysics observations. During our recently completed a TPF Mission Architecture study for NASA/JPL we developed the conceptual design for a 28-meter telescope with an IR Coronagraph that meets these mission objectives. This telescope and the technology it embodies are directly applicable to future Far-IR and Submillimeter space missions. The detection of a 30th magnitude planet located within 50 milli-arc-seconds of a 5th (Visual) magnitude star is an exceptionally challenging objective. Observations in the thermal infrared (7-17 microns) are somewhat easier since the planet is "only" 15(sup m) fainter than the star at these wavelengths, but many severe challenges must still be overcome. These challenges include: 1. Designing a coronagraph for star:planet separations less than or equal to lambda/D. 2. Developing the deployment scheme for a 28m space telescope that can fit in an existing launch vehicle payload fairing. 3. Generating configuration layouts for the IR telescope, coronagraph, spacecraft bus, sunshade, solar array, and high-gain antenna. 4. Providing: Structural stability to within 10 microns to support the optics. Thermal control to achieve the necessary structural stability, as well as providing a stable (approx. 30K) thermal environment for the optics. Dynamics isolation from potential jitter sources. 5. Minimizing launch mass to provide the maximum payload for the science mission Interfacing to an EELV Heavy launch vehicle, including acoustic and stress loads for the launch environment. 6. Identifying the key technologies (which can be developed by 2009) that will enable TPF mission to be performed. 7. Generating a manufacturing plan that will permit TPF to be developed at a reasonable cost and schedule. Many of these design challenges result in inherently conflicting requirements on the design of TPF. Drawing on our experience with large space telescopes such as the Chandra X-ray Observatory and the Next Generation Space Telescope, we have created a conceptual design for TPF that successfully meets these challenging requirements. This paper describes our solution to these challenges.

Lillie, C. F.↗

Design, development and commissioning of a multi-alkali semiconductor photocathode deposition system for the IUAC Delhi light source photoinjector

A fourth-generation light source, called Delhi Light Source (DLS) based on photocathode-based RF gun has been commissioned at Inter-University Accelerator Centre, New Delhi. Presently, the electron beam is being generated from copper photocathode and the beam is being used for scheduled experiments. Soon, the semiconductor photocathode will be used to produce higher beam current. Here, to develop the semiconductor photocathode, a dedicated photocathode deposition facility was developed in collaboration with Brookhaven national Laboratory (BNL) and has been successfully commissioned and becomes operational at IUAC. This deposition facility is an integrated system with the electron gun and is a unique system as it is capable of producing, preserving (without residual gas poisoning) and in-vacuum transfer of the deposited photocathodes from the deposition chamber up to the RF electron gun. The system is designed to operate under ultra-high vacuum (UHV) and is equipped with load-lock chambers, substrate heating assembly, thickness monitoring via a quartz crystal microbalance (QCM), and an in-situ setup for quantum efficiency (QE) measurements. After testing of all the subsystems and a detailed calibration, the first deposition of a cesium telluride (Cs 2 Te) photocathode was successfully performed on a copper (Cu) substrate. This successful commissioning and initial deposition mark a significant step toward the indigenous photocathode development and lays the groundwork for further research into advanced photo emissive materials at IUAC. This paper will discuss the salient features, installation, commissioning, first semiconductor photocathode deposition and its results.

47 OTHER INSTRUMENTATION↗

MICCO: An Enhanced Multi-GPU Scheduling Framework for Many-Body Correlation Functions

Calculation of many-body correlation functions is one of the critical kernels utilized in many scientific computing areas, especially in Lattice Quantum Chromodynamics (Lattice QCD). It is formalized as a sum of a large number of contraction terms each of which can be represented by a graph consisting of vertices describing quarks inside a hadron node and edges designating quark propagations at specific time intervals. Due to its computation- and memory-intensive nature, real-world physics systems (e.g., multi-meson or multi-baryon systems) explored by Lattice QCD prefer to leverage multi-GPUs. Different from general graph processing, many-body correlation function calculations show two specific features: a large number of computation-/data-intensive kernels and frequently repeated appearances of original and intermediate data. The former results in expensive memory operations such as tensor movements and evictions. The latter offers data reuse opportunities to mitigate the data-intensive nature of many-body correlation function calculations. However, existing graph-based multi-GPU schedulers cannot capture these data-centric features, thus resulting in a sub-optimal performance for many-body correlation function calculations. To address this issue, this paper presents a multi-GPU scheduling framework, MICCO, to accelerate contractions for correlation functions particularly by taking the data dimension (e.g., data reuse and data eviction) into account. This work first performs a comprehensive study on the interplay of data reuse and load balance, and designs two new concepts: local reuse pattern and reuse bound to study the opportunity of achieving the optimal trade-off between them. Based on this study, MICCO proposes a heuristic scheduling algorithm and a machine-learning-based regression model to generate the optimal setting of reuse bounds. Specifically, MICCO is integrated into a real-world Lattice QCD system, Redstar, for the first time running on multiple GPUs. The evaluation demonstrates MICCO outperforms other state-of-art works, achieving up to 2.25× speedup in synthesized datasets, and 1.49× speedup in real-world correlation functions.

Wang, Qihan↗