Search NASA⌕ Search

SEARCH · Search NASA

Results for “INTERCEPTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

576 records · Page 32

Pool scrubbing under jet injection regime: An enhancement of the SPARC90 code

The SPARC90 code was developed to calculate the aerosol pool trapping during vent discharge processes, at low gas velocities. However, there are accident sequences, like SGTR core meltdown sequences, at which particle laden gases reach the aqueous ponds at very high velocities and new particle removal mechanisms become effective right at the inlet. As a result of the shearing off of roll wave water crests, water droplets are entrained in the gas core and sweep out aerosol particles, mainly by inertial impaction and interception. This paper summarizes the update of the SPARC90 code based on state-of-the-art equations for jet hydrodynamics and aerosol removal. Equations for variables like droplets population, size and velocity have been implemented. Based on the anticipated conditions in case of an SGTR severe accident sequence, comparisons of estimates from this new version (SPAR90-Jet) and the original one are set in terms of decontamination factor. Even though further work is still ahead, this work highlights how substantial particle retention at the pool inlet can reach under jet regime and how different aerosol removal mechanisms are with respect to the globule injection regime. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated behavior-based infrastructure command validation

A cybersecurity infrastructure command validation system is provided herein for validating asset commands issued within an infrastructure network. The cybersecurity infrastructure command validation system can be integrated into an infrastructure network to monitor and validate infrastructure asset commands in real-time or while the infrastructure network is active. The cybersecurity infrastructure command validation system can receive or intercept commands issued by asset controllers. The cybersecurity infrastructure command validation system can validate the commands based on a command validation model. The command validation model can represent normal operating behavior of the infrastructure network. The cybersecurity infrastructure command validation system can provide valid commands to the intended infrastructure asset, or can reject invalid commands. The cybersecurity infrastructure command validation system can store validation results for use in updating the command validation model. The cybersecurity infrastructure command validation system can flag or otherwise warn the infrastructure network or administrators of invalid commands.

Akyol, Bora A.↗

Remediation of the Highland Drive South Ravine, Port Hope, Ontario: Contaminated Groundwater Discharge Management Using Permeable Reactive Barriers and Contaminated Sediment Removal - 13447

The Highland Drive South Ravine (HDSR) is the discharge area for groundwater originating from the Highland Drive Landfill, the Pine Street North Extension (PSNE) roadbed parts of the Highland Drive roadbed and the PSNE Consolidation Site that contain historical low-level radioactive waste (LLRW). The contaminant plume from these LLRW sites contains elevated concentrations of uranium and arsenic and discharges with groundwater to shallow soils in a wet discharge area within the ravine, and directly to Hunt's Pond and Highland Drive South Creek, which are immediately to the south of the wet discharge area. Remediation and environmental management plans for HDSR have been developed within the framework of the Port Hope Project and the Port Hope Area Initiative. The LLRW sites will be fully remediated by excavation and relocation to a new Long-Term Waste Management Facility (LTWMF) as part of the Port Hope Project. It is projected, however, that the groundwater contaminant plume between the remediated LLRW sites and HDSR will persist for several hundreds of years. At the HDSR, sediment remediation within Hunt's Ponds and Highland Drive South Creek, excavation of the existing and placement of clean fill will be undertaken to remove current accumulations of solid-phase uranium and arsenic associated with the upper 0.75 m of soil in the wet discharge area, and permeable reactive barriers (PRBs) will be used for in situ treatment of contaminated groundwater to prevent the ongoing discharge of uranium and arsenic to the area in HDSR where shallow soil excavation and replacement has been undertaken. Bench-scale testing using groundwater from HDSR has confirmed excellent treatment characteristics for both uranium and arsenic using permeable reactive mixtures containing granular zero-valent iron (ZVI). A sequence of three PRBs containing ZVI and sand in backfilled trenches has been designed to intercept the groundwater flow system prior to its discharge to the ground surface and the creek and ponds in the HDSR. The first of the PRBs will be installed immediately up-gradient of the wet discharge area approximately 50 m from the creek, the other two will be installed across the area of shallow soil replacement, and all will extend from ground surface to the base of the water table aquifer through which the impacted groundwater flows. The PRBs have been designed to provide the removal of uranium and arsenic for decades, although the capacity of the treatment mixture for contaminant removal suggests that a longer period of treatment may be feasible. The environmental management plan includes an allowance for on-going monitoring, and replacement of a PRB(s) as might be required. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Riparian and Upland Restoration at the U.S. Department of Energy Rocky Flats, Colorado, Site - 12360

Remedial investigation and cleanup at the Rocky Flats, Colorado, Site was completed in 2005. Uplands, riparian, and wetland habitat were disturbed during cleanup and closure activities and required extensive revegetation. Unavoidable disturbances to habitat of the Preble's meadow jumping mouse (a federally listed species) and wetlands required consultation with regulatory agencies and mitigation. Mitigation wetlands were constructed in two drainages, and a third developed naturally where a soil borrow area intercepted the groundwater table. During the 50-plus years of site operations, 12 ponds were constructed in three drainages to manage and retain runoff and sewage treatment plant discharges prior to release off site. A batch-release protocol has been used for the past several decades at the terminal ponds, which has affected the riparian communities downstream. To return the hydrologic regime to a more natural flow-through system similar to the pre-industrial-use conditions, seven interior dams (of 12) have been breached, and the remaining five dams are scheduled for breaching between 2011 and 2020. At the breached dams, the former open water areas have transformed to emergent wetlands, and the stream reaches have returned to a flow-through system. Riparian and wetland vegetation has established very well. The valves of the terminal ponds were opened in fall 2011 to begin flow-through operations and provide water to the downstream plant communities while allowing reestablishment of vegetation in the former pond bottoms prior to breaching. A number of challenges and issues were addressed during the revegetation effort. These included reaching an agreement on revegetation goals, addressing poor substrate quality and soil compaction problems, using soil amendments and topsoil, selecting seeds, determining the timing and location of revegetation projects relative to continuing closure activities, weed control, erosion control, revegetation project field oversight, and contractual limitations. A variety of ecological restoration techniques were conducted at the site to meet these challenges. These efforts have resulted in vegetation becoming well established in most locations. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar-Powered Air Stripping at the Rocky Flats Site, Colorado - 12361

The U.S. Department of Energy's Rocky Flats Site (the Site), near Denver, Colorado, is a former nuclear weapons facility that was constructed beginning in 1951. With the end of the Cold War, the Site was cleaned up and closed in 2005. Four gravity-driven groundwater treatment systems were installed during cleanup, and their continued operation was incorporated into the final remedy for the Site. All utilities, including electrical power, were removed as part of this closure, so all Site electrical power needs are now met with small solar-powered systems. The Mound Site Plume Treatment System (MSPTS) was installed in 1998 as an innovative system based on zero-valent iron (ZVI). Groundwater flow from the Mound source area containing elevated concentrations of volatile organic compounds (VOCs), primarily in the tetrachloroethene (PCE)-trichloroethene (TCE) family of chlorinated solvents, is intercepted by a collection trench and routed to twin ZVI treatment cells. Later, in 2005, remediation of VOC-contaminated soils at a second up-gradient source area included adding an electron donor to the backfill to help stimulate biodegradation. This reduced concentrations of primary constituents but caused down-gradient groundwater to contain elevated levels of recalcitrant degradation byproducts, particularly cis-1,2-dichloroethene and vinyl chloride. A gravel drain installed as part of the 2005 remediation directs contaminated groundwater from this second source area to the MSPTS for treatment. This additional contaminant load, coupled with correspondingly reduced residence time within the ZVI media due to the increased flow rate, resulted in reduced treatment effectiveness. Elevated concentrations of VOCs were then detected in MSPTS effluent, as well as in surface water at the downstream performance monitoring location for the MSPTS. Subsequent consultations with the Site regulators led to the decision to add a polishing component to reduce residual VOCs in MSPTS effluent. Initially, several alternatives such as commercial air strippers and cascade aerators were evaluated; resulting cost estimates exceeded $100,000. After several simpler alternatives were considered and prototype testing was conducted, the existing effluent metering manhole was converted to house a spray-nozzle based, solar-powered air stripper, at a cost of approximately $20,000. About two-thirds of this cost was for the solar power system, which was initially designed to only provide power for 12 hours per day. Performance data are being collected and adjustments made to optimize the design, determine maintenance requirements, and establish power needs for continuous operation. Analytical data confirm the air stripper is sharply reducing concentrations of residual contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose zone monitoring at the radioactive waste management sites at the Nevada national security site - 15294

Two lysimeter facilities continuously monitor the vadose zone at the radioactive waste disposal sites at the Nevada National Security Site. The time-series data collected at these facilities support the performance assessments of the radioactive waste disposal sites, the closure cover designs, and the long-term monitoring decisions for these sites. The Weighing Lysimeter Facility at the Area 5 Radioactive Waste Management Site (RWMS) consists of a bare-soil weighing lysimeter and a vegetated weighing lysimeter. The upper surfaces of both weighing lysimeters are exposed to precipitation. The Drainage Lysimeter Facility at the Area 3 RWMS includes bare-soil lysimeters that receive precipitation or precipitation supplemented with irrigation equal to double precipitation and vegetated lysimeters that have the same upper boundary conditions as the bare-soil lysimeters. Lysimeter sensors are connected to data-loggers that are accessed remotely for data acquisition. Lysimeter water balance measurements show the arid climate and native vegetation at the NNSS provide a natural sustainable system to effectively prevent transport of contaminants from the RWMSs through the vadose zone to groundwater. Transport by infiltration and percolation of present day precipitation at the RWMSs is prevented. The native desert vegetation is adapted to extract moisture from very dry soils and maintains negative matric potentials at the base of the root zone effectively buffering the deep vadose zone from episodic precipitation events at the surface. The very negative matric potential at the base of the root zone effectively intercepts all infiltration from precipitation and draws moisture upward from the vadose zone below the root zone. This system is sustainable because it does not rely on engineered features and mimics the stable landscapes and no groundwater recharge of the current condition surrounding the RWMSs. The system depends on establishing native vegetation in the covers above the waste cells and a stable climate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress toward cleanup of operable unit 1 groundwater at the US DOE0 Mound, Ohio, site: success of a phased-combined remedy - 15310

Industrial solvents (primarily trichloroethene) and other volatile organic compounds (VOCs) that originated from the former solid waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound, Ohio, Site. The landfill was used from 1948 to 1974 for the disposal of trash, debris, and liquid waste. In 1977, much of the waste was relocated and encapsulated onsite. The landfill site and surrounding area (Operable Unit 1 [OU-1]) occupy approximately 1.6 hectares (4 acres) in the southwestern portion of the site. The historical pathway of concern consisted of leaching of contaminants from site soils or disposed wastes down into the groundwater, entrainment in the flowing groundwater, and migration toward former Mound site water-production wells. A groundwater pump-and-treat (P and T) system was initiated in 1996 to interdict the plume and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,000 cubic meters (99,400 cubic yards) of material were removed from the OU-1 landfill area; the remaining soils in the OU-1 area meet the site cleanup objectives for future industrial or commercial use. Operation of the groundwater P and T system continued throughout this period. During the remediation time frame, groundwater monitoring and a number of innovative characterization campaigns were completed to assess the contaminant and biogeochemical conditions in the subsurface at OU-1. For example, in 2013 an integral pumping test was performed to characterize the amount (mass) of the low-level VOCs in groundwater. Soil and groundwater were also collected to obtain site-specific data to identify if geochemical conditions support natural attenuation reactions. Contaminant and hydrogeologic data collected from this test, as well as historical data, were evaluated to identify the distribution and potential sources of VOCs, refine the hydrogeologic description, update the conceptual model of VOC fate and transport, and determine if monitored natural attenuation remains a viable option to address VOCs in groundwater. To date, the performance of the phased-combined remedy has resulted in significant reductions in the concentrations of VOCs in the groundwater. For example, in 2013 the trichloroethene in all wells was less than 40 micrograms per liter, with a plurality of the wells near or below maximum contaminant levels. The generally observed declining concentration trends and the low concentrations for 2013 represent the net impact of source removal actions, P and T operation, and natural attenuation. In accordance with the current conditions, the joint US DOE and regulator Core Team is proceeding with a field demonstration of enhanced attenuation-an engineering and regulatory strategy that was recently developed by the Interstate Technology and Regulatory Council. Enhanced attenuation strategies focus on altering a target site in such a way that it can transition to natural attenuation. The combination of technologies to be deployed includes neat (pure) vegetable oil deployment in the deep vadose zone of the former landfill area and emulsified vegetable oil deployment within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient plume (via co-metabolism). If the proposed activities are successful, they will accelerate the progress of the Mound OU-1 toward remedial goals and convert the current active P and T remedy into a passive attenuation-based remedy that represents a cost-effective final step in a phased remediation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Enhanced Attenuation at the DOE Mound Site OU-1 Landfill: Accelerating Progress and Reducing Costs - 16270

A field demonstration of enhanced attenuation (EA) was initiated in 2014 to expedite the remediation of industrial solvents in the groundwater impacted by the former landfill Operable Unit 1 (OU-1) at the US Department of Energy (DOE) Mound, Ohio, Site. EA uses active engineering solutions to alter the target site so that the contaminant plume will passively stabilize and shrink. For OU-1, the EA was implemented by targeted injection of an electron donor (vegetable oil) to create 'structured geochemical zones'. Volatile organic compounds (VOCs) in the altered subsurface system encounter alternating anaerobic and aerobic environments along the plume flow path. The effect of these structured geochemical zones is effective and rapid degradation of parent compounds such as trichloroethene (TCE) and tetrachloroethene (PCE), and daughter compounds such as cis-1,2-dichloroethene and vinyl chloride. EA at Mound OU-1 provides a transition to natural attenuation and is an alternative to the baseline pump-and-treat (P and T) system. Industrial solvents (primarily TCE) and other VOCs that originated from the former solid-waste landfill contaminated the groundwater in the Buried Valley Aquifer beneath the Mound site. A groundwater P and T system was initiated in 1996 to control the plume, and a soil vapor extraction system was installed and operated from 1997 to 2003 to remove the bulk of the VOC sources from the vadose zone. Physical removal of the landfill waste and contaminated soil was performed between 2006 and 2010. Approximately 76,100 cubic meters (99,500 cubic yards) of material were removed from the OU-1 landfill area. Operation of the groundwater P and T system continued throughout this period. The principles and technical basis of the ongoing EA field demonstration were developed by the Interstate Technology and Regulatory Council. The goal of the EA implementation is to provide a bridge between active groundwater treatments and monitored natural attenuation. EA relies on understanding and manipulating the contaminant mass balance. Technologies are applied to sustainably reduce the contaminant loading from the source and/or increase the rate of natural attenuation processes within the plume. In 2014, a core team that included DOE, the US Environmental Protection Agency (EPA), the Ohio EPA, and technical support organizations evaluated remedial options for OU-1. During the 2014 evaluation, the team projected a cleanup time frame for the baseline P and T system of 26 additional years and a cleanup time frame for the EA remedy of 13 years. On the basis of that evaluation, EPA approved the implementation of the EA remedy that required the shutdown of the P and T system. The combination of technologies implemented for OU-1 EA included (a) neat vegetable oil in the vadose zone in the former landfill and (b) emulsified vegetable oil within the footprint of the groundwater plume. In the first part of the deployment, neat oil spreads laterally and forms a thin layer on the water table beneath residual soil sources to intercept and reduce future VOC loading and to reduce oxygen inputs to the local groundwater. In the second part of the deployment, emulsified oil forms active bioremediation anaerobic treatment zones within the plume footprint to degrade existing groundwater contaminants (via reductive dechlorination, co-metabolism, or both) and stimulates long-term attenuation capacity in the down-gradient aerobic plume (via co-metabolism). The results from the first year of the field demonstration indicate that the dissolved TCE and PCE plumes have decreased in size and mass. Statistical tests indicate that the VOC concentrations in the majority of the source-area wells are decreasing. The VOC concentrations throughout the plume are projected to be below the target maximum contaminant level of 2 to 5 μg/L within 5 to 10 years-sooner than the design projection of 13 years. The biogeochemistry and microbial community within the structured geochemical zones are consistent with the design and appear to be stable. At Mound OU-1, EA has accelerated progress toward the remedial action objectives and reduced costs. Ongoing monitoring will determine whether the EA remedy has transitioned the site into monitored natural attenuation status and whether the EA will continue to be effective, timely, and sustainable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Towards Lightweight Data Integration Using Multi-Workflow Provenance and Data Observability

Modern large-scale scientific discovery requires multidisciplinary collaboration across diverse computing facilities, including High Performance Computing (HPC) machines and the Edge-to-Cloud continuum. Integrated data analysis plays a crucial role in scientific discovery, especially in the current AI era, by enabling Responsible AI development, FAIR, Reproducibility, and User Steering. However, the heterogeneous nature of science poses challenges such as dealing with multiple supporting tools, cross-facility environments, and efficient HPC execution. Building on data observability, adapter system design, and provenance, we propose MIDA: an approach for lightweight runtime Multi-workflow Integrated Data Analysis. MIDA defines data observability strategies and adaptability methods for various parallel systems and machine learning tools. With observability, it intercepts the dataflows in the background without requiring instrumentation while integrating domain, provenance, and telemetry data at runtime into a unified database ready for user steering queries. We conduct experiments showing end-to-end multi-workflow analysis integrating data from Dask and MLFlow in a real distributed deep learning use case for materials science that runs on multiple environments with up to 276 GPUs in parallel. We show near-zero overhead running up to 100,000 tasks on 1,680 CPU cores on the Summit supercomputer.

Santos Souza, Renan↗

Radiological Shielding Design for the Neutron Backscattering Spectrometer EMU

In this paper we present modelling and design of compact radiation shielding required for operation of the EMU instrument, located at Australia's OPAL nuclear reactor. The acceptance criteria for the shielding design were (i) safety - dose rate ≤ 3 μSv/h at external surfaces of the instrument's experimental area, (ii) floor load limit < 20 tons/m{sup 2}, (iii) low cost and (iv) for maintenance purposes 'easy access' to components of the instruments. The EMU instrument is a cold neutron backscattering spectrometer designed to measure inelastic neutron scattering. Its distinctive feature is that it has a tight elastic energy transfer resolution, of about 1 μeV. The instrument provides unique opportunities to study diffusion in complex materials, e.g. water molecules in confinement, polymers or biological molecules, particularly in the Asia-Oceania region. EMU is the first instrument located on the CG3 neutron beam line of the OPAL Neutron Guide Hall (NGH). A pre-existing evacuated neutron guide of dimensions 200 mm (height) x 50 mm (width) feeds into the shared EMU/KOOKABURRA pre-monochromator bunker shielding assembly, and its bottom cross section will be intercepted ∼200 mm further in air by the highly orientated pyrolytic graphite (HOPG) EMU pre-monochromator (take-off angles from 125.4 deg. to 148 deg.). The bunker shielding assembly for EMU also contains a beryllium filter and Focusing Guide Section D (FGD, 170 mm (height) x 50 mm (width)). To accommodate the range of take-off angles Pb cylindrical shielding blocks of radius 140 mm and 500 mm height have been designed. These blocks will be located at the section of the bunker where the neutron beam will exit towards the experimental area and they will reside on top of a hollow steel base (sides 10 mm thick), on which they move by sliding and are integrated with the tertiary shutter. The experimental area is enclosed by a concrete wall of 2.5 m height and 300 mm thickness, shared with the KOOKABURRA instrument, Gyprock Plasterboard panels with viewing windows, a wall from the Out-of-Pile Bunker and the CG3 shielding. The neutron beam enters the experimental area via the tertiary shutter, into the Focusing Guide Section C (FGC), which has an entrance guide cross-section of 158 mm (height) x 79 mm (width) and exit guide cross-section of 149 mm (height) x 85 mm (width) and is of length 816 mm. The vacuum chamber of FGC will be connected to the vacuum chamber of the Background Chopper (BC, disc of outer radius 350 mm). Focusing Guide Section B (FGB) is aligned with FGC and its vacuum shared with the BC vacuum. The FGB has an exit guide cross section of 50 mm (height) x 49 mm (width) and is of length 4046 mm, which will focus the neutron beam vertically and horizontally towards the Al window entrance (0.82 mm thickness, labelled N16) of the Scattering Tank assembly (constructed from 20 mm - 40 mm thickness stainless steel and will be under vacuum < 1 x 10{sup -3} mbar). Inside the Scattering Tank there is another section of Focusing Guide (FGA), with an exit guide cross-section of 30 mm (height) 30 mm (width) and of length 417 mm. The neutron beam exiting the FGA will be reflected by the HOPG crystal pieces of the Graphite Chopper (GC) towards the Backscattering Monochromator (BM). The reflected neutron beam will first pass through the other Al window (0.82 mm thickness, labelled N17) of the Scattering Tank and then enter into a flight tube (steel of 10 mm thickness). The BM is formed in an 1800 mm spherical radius array of Si crystal elements (0.87 mm thickness) and is oscillated by the linear motor Doppler Drive. The neutron beam will be reflected back at 180 deg. from, and focussed by the BM to reenter the Scattering Tank through the N17 Al window. It will then pass through the GC (HOPG crystals are rotated out of the way) and will reach the scattering sample of interest to the instrument end user. Also, inside the Scattering Tank there will be {sup 3}He linear position-sensitive detectors, and Analyser Arrays formed in an 1800 mm radius spherical arrays of Si crystal elements (0.87 mm thickness) glued on aluminium support frames (10 mm thickness) and span ∼160 deg. arc.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Performance Evaluation of Multi-Vendor Grid-Forming Inverters for Grid-Connected Operation Through Hardware Experimentation

This paper presents the functional performance evaluation tests of multiple (three) commercial grid-forming (GFM) inverters when they operate in parallel with the grid through hardware experiments. The goal of these tests is to explore and benchmark the GFM inverters' functionalities and dynamic response when they are operated in parallel with power grids. Both steady-state (changing the inverter's frequency and voltage droop) and transient (adding step changes to grid's frequency/voltage) tests are performed for each GFM inverter with the same testing circuit and testing protocol. The key findings are summarized as follows: 1) The GFM inverters can be dispatched through frequency and voltage droop intercepts to output the target power; and 1) the GFM inverters automatically respond to system frequency and voltage events to output the needed power; 3) all the GFM inviters shows stability issues when absorbing reactive power from the grid.

frequency droop↗

Thermal Analysis of Thermal Shield for PIP-II SSR1 Cryomodule

Fermilab's PIP-II project plans to enhance the onsite accelerator into the world's most intense neutrino beam, bringing Fermilab into the next generation of particle accelerators. The five different types of cryomodules are vital parts of the PIP-II project and each requires numerous engineering analyses to prove operation. For example, the thermal shield of the Single Spoke Resonator-1 (SSR1) cryomodule required a thermal analysis to ensure the design was operating as intended before fabrication commenced. The thermal shield is cooled by the supercritical helium inside of the extrusion and must remain between 45 and 80 Kelvin. The main purpose of the thermal shield is to intercept different high heat loads and thermal radiation and prevent them from reaching the more sensitive internal components. Finite Element Analysis (FEM) was used to determine temperature estimates of the thermal shield based on the location of a variety of heat sources. Results determined temperatures exceeding the design limit around the crucial component of the current leads. Due to superconducting properties, the areas around the current leads cannot surpass 68 Kelvin. Different solutions to the critical high-temperature areas will be proposed. These solutions range from changing the properties of the helium flow to designing an attachment for the thermal shield. Each proposition works as a viable solution, however, each proposition also has its own set of advantages and disadvantages that are described for further design consideration.

43 PARTICLE ACCELERATORS↗

Dispatching Grid-Forming Inverters in Grid-Connected and Islanded Mode: Preprint

This paper explores the dispatch-ability of grid-forming (GFM) inverters in grid-connected and islanded mode. Grid-forming (GFM) inverters usually use droop control to automatically share power with other GFM sources (inverters and synchronous generator (SG)) and follow the change of the load demand. However, they can be dispatched like their grid-following (GFL) counterparts to output the target active and reactive power. This will help the grid operator better manage their inverter-based resources (IBRs) for improved operation efficiency and reliability. Therefore, this paper proposes an innovative concept of dispatching GFM sources (inverters and SG) to output the target power for both grid-connected and islanded mode by adjusting their droop intercepts. The fundamental principle of doing so is that the GFM inverter's active and reactive power is dictated by its frequency and voltage, thus, dispatching active and reactve power of a GFM inverter can be achieved through dispatching its frequency and voltage. Moreover, the concept distinguishes the dispatch rules for grid-connected and islanded mode. Finally, the concept is validated with an example microgrid system with two GFM inverters, one diesel generator, one grid-following inverter and loads in both grid-connected and islanded mode. This pioneering work results in a practical guidance for power system energy management system (EMS) development to control a future grid with GFM and GFL inverters.

droop control↗

Gridded RF Gun Design for SRF Linac Applications

The thermionic gridded gun is described which generates short electron bunches for further acceleration in a Nb3Sn conduction cooled SRF linac. The gun is built into the first cavity of the 250 keV injector [1] for the 20 kW, 10 MeV, 1.3 GHz CW conduction cooled one-cavity linac. The beam current is 2 mA. The RF gun design is presented as well as the results of perveance measurements, which are in a good agreement with the design parameters. The design of the RF resonator of the gun is presented also. The beam generated by the gun is matched to the injector to provide lack of current interception in the SRF cavity.

43 PARTICLE ACCELERATORS↗

HEP High Power Targetry Roadmap -- Workshop Report

Designing a reliable target is already a challenge for MW-class facilities today and has led several major accelerator facilities to operate at lower than design power due to target concerns. With present plans to increase beam power for next generation accelerator facilities in the next decade, timely R and D in support of robust high power targets is critical to secure the full physics benefits of ambitious accelerator power upgrades. A comprehensive R and D program must be implemented to address the many complex challenges faced by multi MW beam intercepting devices. This roadmap is envisioned to be helpful to the DOE-OHEP office when planning and prioritizing future R and D activities as well as leveraging synergies across the Office of Science. The roadmap will be extremely beneficial to the broader (external to DOE HEP) HPT community by communicating OHEP s high level strategy and objectives for HPT R and D and highlighting possible opportunities for collaboration.

43 PARTICLE ACCELERATORS↗

Employing a Hardware-in-the-Loop Approach to Realize a Fully Homomorphic Controller for a Small Modular Advanced High Temperature Reactor

This paper addresses the cybersecurity challenges of advanced nuclear reactors by integrating fully homomorphic encryption (FHE) into their control systems, enabling encrypted processing of control signals without compromising functionality. Advanced nuclear reactors, including Small Modular Reactors (SMRs) and microreactors, aim to achieve autonomous and remote operations, reducing costs and enhancing competitiveness. However, these advancements expand the attack surface for cyberattacks, particularly in autonomous and remote operation scenarios. Cyberattacks can exploit vulnerabilities to manipulate physical processes, causing shutdowns, asset damage, or public harm. Such attacks begin with passive reconnaissance, where adversaries intercept communications or observe behaviors to gather information, which is then leveraged to execute cyber-physical attacks by injecting malicious commands. Nuclear power must adopt cybersecurity protection measures to secure the integrity and availability of their digital control systems. This paper demonstrates the application of FHE to secure operations by enabling encrypted processing of sensitive signals and parameters -- ensuring privacy without exposing data. FHE supports secure mathematical operations on encrypted data without requiring decryption. Using a hardware-in-the-loop (HIL) approach, this paper implements an FHE-integrated controller on a BeagleBone Black (BBB) controlling a simulation of the Small Modular Advanced High Temperature Reactor (SmAHTR). By doing so, the encrypted controller protects the integrity of critical set points and control signals during transmission and processing. Thus, FHE-integrated controllers enhance secure operations of advanced nuclear reactors while maintaining functionality.

control systems↗

High-Fidelity Microstructural Characterization and Performance Modeling of Aluminized Composite Propellant

Image processing and stereological techniques were used to characterize the heterogeneity of composite propellant and inform a predictive burn rate model. Composite propellant samples made up of ammonium perchlorate (AP), hydroxyl-terminated polybutadiene (HTPB), and aluminum (Al) were faced with an ion mill and imaged with a scanning electron microscope (SEM) and x-ray tomography (micro-CT). Properties of both the bulk and individual components of the composite propellant were determined from a variety of image processing tools. An algebraic model, based on the improved Beckstead-Derr-Price model developed by Cohen and Strand, was used to predict the steady-state burning of the aluminized composite propellant. In the presented model the presence of aluminum particles within the propellant was introduced. The thermal effects of aluminum particles are accounted for at the solid-gas propellant surface interface and aluminum combustion is considered in the gas phase using a single global reaction. In conclusion, properties derived from image processing were used directly as model inputs, leading to a sample-specific predictive combustion model.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗