Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase III”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

SECARB Annual Report on In-Situ Monitoring Program

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest prototype of commercial CO 2 capture from a coal-fired power station and transportation, injection, storage and monitoring. This report details the results of the second and third year of injection monitoring results for the Anthropogenic Test. Monitoring methods include both direct and indirect measurements. The Class V Experimental Permit requires extensive monitoring of injected CO 2 at the surface and at deep and shallow depths. The safety, integrity and information objectives of the CO 2 monitoring plan are in place to: (1) create and sustain wellbore integrity; (2) assure safe CO 2 injection operations; 3) verify the location and migration of the injected CO 2 plume; and (4) monitor for any CO 2 leakage. A robust suite of monitoring approaches are utilized for the insitu monitoring and include, pressure monitoring, various seismic surveys, pulsed neutron logging, reservoir fluid sampling and injection surveys. Data and observations collected using these monitoring methods will be used in the numerical model to inform the post-injection site care monitoring plan. This report describes actions pertaining to in situ monitoring at the Anthropogenic Test Site that were undertaken during the period of October 2013 to January 2015. This report details the results of the second and third year of injection monitoring results for the Anthropogenic Test. Work Product 9.2.2.b details the shallow monitoring results for 2014. CO 2 injection operations began on August 20, 2012 and terminated on September 1st 2014.

01 COAL, LIGNITE, AND PEAT↗

Southeast Regional Carbon Sequestration Partnership (SECARB): Analyze Data Collected, Revise Surface Monitoring Plan to Maximize Benefit and Continue Data Collection

Objectives of the shallow groundwater study at the Cranfield site since 2008, as a part of the SECARB Phase III early test, were to 1) assess potential impacts of CO 2 leakage on groundwater quality; and 2) test and develop monitoring technologies for CO 2 leakage detection. The study did not intend to seek CO2 leakage signals via monitoring groundwater chemistry in the Cranfield shallow aquifer. Instead, quarterly or semi-annually groundwater sampling from the shallow aquifer was used to characterize spatial and temporal variations in geochemical parameters because CO 2 injection into the deep reservoir started in 2008.

01 COAL, LIGNITE, AND PEAT↗

SECARB Report on Post-Injection In-Situ Monitoring

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest prototype of commercial CO 2 capture from a coal-fired power station and transportation, injection, storage and monitoring. This report focuses on the results of the post-injection monitoring period for the Anthropogenic Test. Monitoring methods include both direct and indirect measurements. The Class V Experimental Permit requires extensive monitoring of injected CO 2 at the surface and at deep and shallow depths. The safety, integrity and information objectives of the CO 2 monitoring plan are in place to: (1) create and sustain wellbore integrity; (2) assure safe CO 2 injection operations; (3) verify the location and migration of the injected CO 2 plume; and (4) monitor for any CO 2 leakage. A robust suite of monitoring approaches is utilized for the in-situ monitoring and include, pressure monitoring, various seismic surveys, pulsed neutron logging, reservoir fluid sampling and injection surveys. Data and observations collected using these monitoring methods will be used in the numerical model to inform the post-injection site care monitoring plan. This report describes actions pertaining to in situ monitoring at the Anthropogenic Test Site that were undertaken during the period of September 2014 to May 2016. These monitoring techniques include the acquisition of pressure data, seismic data, pulsed neutron capture logs, reservoir fluid sampling, and tracer gas monitoring. CO 2 injection operations began on August 20, 2012 and terminated on September 1, 2014.

01 COAL, LIGNITE, AND PEAT↗

SECARB Post Injection Assessment Report

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and The Bureau of Economic Geology (BEG), at the University of Texas at Austin, managed all activities associated with the Early Test field site near Cranfield, Mississippi (the Early Test or Cranfield Project). The SECARB project at Cranfield was focused downdip of the oil rim and on demonstrating the stacked nature of the storage potential at this location: enhanced oil recovery (EOR) up-dip and saline downdip. Because the injection for EOR continued after the SECARB project ended, no actual post-injection period occurred. However, information collected during the SECARB-monitored injection period, including pressure and CO2 plume position, was utilized in an EOR carbon lifecycle assessment. The carbon lifecycle assessment provided insight on tracking injection fronts and production efficiencies across the field. To complete the post injection assessment, taking into account the continuing EOR period after closeout of SECARB field activities, this report provides data and analysis done under another DOE-funded project. The follow up project focused on the carbon lifecycle of EOR and included an assessment of EOR at as-operated and under possible future scenarios. This work was published by Hossieni et al. (2018) and Hosseininoosheri (2019).

01 COAL, LIGNITE, AND PEAT↗

SECARB Semi-Annual Field Review Reports - Early Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and The Bureau of Economic Geology (BEG), at the University of Texas at Austin, managed all activities associated with the Early Test field site near Cranfield, Mississippi (the Early Test or Cranfield Project). BEG was assisted in the management of site activities by Sandia Technologies (Sandia). BEG and Sandia implemented reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semiannual chronology. The Cranfield Project was located approximately 12 miles east of Natchez, Mississippi. Denbury Onshore, LLC, began operating a commercial CO 2 flood of the field (using the subsurface injection of CO 2 for EOR) in June 2008. Carbon dioxide from the Jackson Dome, a natural source near Jackson, Mississippi, was delivered to the Cranfield oilfield via pipeline. Beginning in October 2008, the SECARB Early Test team characterized the surface and subsurface of the Cranfield site. During the field test CO 2 was injected into the lower Tuscaloosa Formation, a regionally extensive saline formation with the potential to hold millions of tons of CO 2 emissions. By January 2015, the team injected more than 11 million metric tons of CO 2 and monitored a total stored CO 2 mass of 5,326,975 metric tons. SECARB’s study operations occurred in four integrated research program areas within Cranfield field: (1) the High Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” Carbon dioxide injection activities were conducted at the HiVIT and the DAS. Figure 1.1-1 provides a depiction of the DAS.

01 COAL, LIGNITE, AND PEAT↗

SECARB 2020 Semi-Annual Field Review Reports - Anthropogenic Test

The Southern States Energy Board (SSEB) managed the overall Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III project and the Electric Power Research Institute (EPRI) managed all activities associated with the Anthropogenic Test site. Advanced Resources International, Inc. (ARI) assisted EPRI with the management of site activities. EPRI and ARI followed reporting procedures that included monthly and quarterly technical progress reports, as well as periodic reporting on key field activities. Subsequent sections of this report catalog the field activities and are organized in a semi-annual chronology. The SECARB Anthropogenic Test was the largest demonstration of a fully integrated, pulverized coal-fueled carbon capture and storage (CCS) project in the United States as of 2012 and supports a commercial prototype of CO 2 capture; transportation; subsurface storage; and monitoring, verification, and accounting (MVA); and assessment. The demonstration-scale, post-combustion CO 2 capture facility at Alabama Power Company’s Plant Barry diverted flue gas (25MW equivalent) from its Unit #5 coal burning facility and captured the CO 2 using Mitsubishi Heavy Industries (MHI) KM-CDRTM advanced amine technology. The captured CO2 was compressed at Plant Barry and transported by pipeline to the injection location southeast of Citronelle, Alabama. The Citronelle Project’s geologic storage and MVA sites were located on the flanks of the Citronelle Dome, approximately three miles southeast of the city of Citronelle. The injection zone, the Paluxy Formation, a saline formation that occurs at approximately 9,400 feet and overlies the oil production horizon of the Citronelle oilfield, presents a favorable injection reservoir in terms of areal extent and petrophysical characteristics. The confining zone, the basal shale of the overlying Washita-Fredericksburg Formation, is persistent throughout the Citronelle area and possesses the appropriate criteria to act as an effective CO 2 seal.

01 COAL, LIGNITE, AND PEAT↗

SECARB Annual Report on In-Situ Monitoring Program

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest prototype of commercial CO 2 capture from a coal-fired power station and transportation, injection, storage and monitoring. This report details the results of the background and first year of injection monitoring results for the Anthropogenic Test. Monitoring methods include both direct and indirect measurements. The Class V Experimental Permit requires extensive monitoring of injected CO 2 at the surface and at deep and shallow depths. The safety, integrity and information objectives of the CO 2 monitoring plan are in place to: (1) create and sustain wellbore integrity; (2) assure safe CO 2 injection operations; 3) verify the location and migration of the injected CO 2 plume; and (4) monitor for any CO 2 leakage. A robust suite of monitoring approaches are utilized for the in-situ monitoring and include, pressure monitoring, various seismic surveys, pulsed neutron logging, reservoir fluid sampling and injection surveys. Data and observations collected using these monitoring methods will be used in the numerical model to inform the post-injection site care monitoring plan.

01 COAL, LIGNITE, AND PEAT↗

Information products and communication materials for NGOs

The Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test is a full integrated carbon dioxide (CO 2 ) capture, transportation, and geologic storage project located in southern Alabama. The CO 2 for the Anthropogenic Test is obtained from a demonstration-scale, post-combustion CO 2 capture facility at Southern Company's subsidiary Alabama Power's existing 2,657 Megawatt (MW) Barry Electric Generating Plant in Mobile County, Alabama. A small amount of flue gas from Plant Barry (equivalent to the amount produced when generating 25 MW of electricity) is being diverted from the plant's #5 coal burning unit and captured using a process developed by Mitsubishi Heavy Industries (MHI) to produce high purity CO 2 . The captured CO 2 is compressed at Plant Barry and transported approximately 19 kilometers (12 miles) by dedicated pipeline to the injection location at Citronelle Field. Public outreach and education associated with the Anthropogenic Test is critical to promoting public acceptance and eventual deployment of CCS technologies near large CO 2 sources in the Southeast. Southern Company, with support from the project team, has kept NGO communities informed of project status through press releases, public meetings, and presentations since site selection was announced on May 200, 2009. Maintaining good community relationships with neighbors and customers near its facilities is a priority. Goals are to educate NGO's about the demonstration, request that they inform their constituencies, and learn about their concerns related to CCS. The following report documents outreach activities by Southern Company and the project team through websites, press releases, local outreach, and presentations and outreach events.

01 COAL, LIGNITE, AND PEAT↗

Southeast Regional Carbon Sequestration (SECARB) Anthropogenic Test Annual Partner Information

The Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test is a full integrated carbon dioxide (CO 2 ) capture, transportation, and geologic storage project located in southern Alabama. The CO 2 for the Anthropogenic Test will be obtained from a demonstration-scale, post-combustion CO 2 captures facility at Southern Company's subsidiary Alabama Power's existing 2,657 Megawatt (MW) Barry Electric Generating Plant in Mobile County, Alabama. A small amount of flue gas from Plant Barry (equivalent to the amount produced when generating 25 MW of electricity) will be diverted from the plant's #5 coal burning unit and captured using a process developed by Mitsubishi Heavy Industries to produce high purity CO 2 . The captured CO 2 is compressed at Plant Barry and transported to the plant gate where Denbury Onshore, LLC takes ownership of the CO 2 . Denbury then transports CO 2 approximately 19 kilometers (12 miles) by dedicated pipeline to the injection location at Citronelle Field. The CO 2 will be injected by Denbury into the saline Paluxy Formation, which stratigraphically overlies the Rodessa Formation oil resevoir. The SECARB team will apply proven and experimental MVA technologies to monitor CO 2 movement in the subsurface during and post-injection. This activity is aligned with U.S. Department of Energy program goals. Coordination among the CO 2 supplier (the power plant), the field operators, industrial partner companies, and cost share providers is essential in conducting a successful project. Goals are to develop and maintain strong industrial partner support for the field test and the overall CO 2 capture and storage effort. The following report documents annual partner information outreach, education, and team meetings/workshops conducted to taste.

01 COAL, LIGNITE, AND PEAT↗

Information Products & Communication Materials for SSEB, SGA, SLC and Partners [Slides]

Contents include the following: 1) Southeastern Regional Carbon Sequestration Partnership (SECARB)–Southern States Energy Board's 48th Annual Meeting, August 8, 2008; 2) Southern States Energy Board Carbon Management Program SSEB Associate Members Meeting, August 21, 2009; 3) Carbon Capture and Sequestration (CCS) Demonstration Project, August 21, 2009; 4) Clean Energy in the Southern Region, August 27, 2010; 5) Carbon Management–Southern Leadership of a Regional Partnership, October 17, 2011; 6) Southeastern Regional Carbon Sequestration Partnership "Knowledge Sharing", August 10, 2012; 7) Southeastern Regional Carbon Sequestration Partnership; 8) Site Visit by Southern Legislative Group, July 30, 2013; 9) SECARB Awards Anthropogenic Test, March 4, 2014; 10) Southern Company/MHI Ltd. 500 TPD CCS Demonstration; 11) SECARB Anthropogenic Test Project Assessment, March 4-5, 2014; 12) Advanced Monitoring Technologies SECARB Phase III CO 2 Storage Citronell, Alabama, March 4, 2014; 13) Geomechanics at Cranfield, March 5, 2014; 14) Gulf Coast Carbon Center Near-Surface Update, March 4-5, 2014; 15) Monitoring Design Best Practices, March 5, 2014; 16) Special Projects–Carbon Management Program, 2015; 17) Special Projects, November 2-3, 2016; 18) Carbon Management Program Carbon Capture & Storage Projects, September 24, 2017; 19) Remarks Before the 58th Annual Meeting of the Executive Committee, September 16, 2018; 20) Annual Business Session, September 24, 2019; and 21) Recent Activities & 2019-2020 Elections Insights, February 7, 2020.

01 COAL, LIGNITE, AND PEAT↗

Adaptive Sampling for In Situ Cloud Probe (Final Report)

Clouds play a leading role in the Earth's global energy and solar radiation balance and hydrological cycle. Improving cloud models requires detailed information on the cloud microphysical properties, such as droplet size distribution and number density, liquid water content and cloud composition (droplets, ice particles), which can only be provided by aerial in situ measurements. However, for many atmospheric measurement instruments, the lack of flexibility in selecting the operational mode during operation can lead to uncertainties in sampling and measurement characteristics under continuously varying atmospheric conditions. This SBIR project is developing an advanced, compact optical imaging technology for in situ characterization of cloud hydrometeors. The development involves a deep modification of the existing Mesa Photonics’ Cloud Droplet Measurement System (CDMS) in order to implement real-time automatic adaptive sampling based on the acquired in situ data and environmental parameters. The new system, CDMS-2, implements two measurement modes: side-scatter imaging for smaller hydrometeors and direct bright-field-illumination imaging for larger hydrometeors in a significantly larger sample volume. The system measures the droplet size distribution (DSD) and number density with an added capability of discriminating between liquid water and ice hydrometeors (based on polarization-resolved side-scatter imaging). The instrument will implement automatic switching or alternating between the regular side-scatter imaging mode and sparse/large hydrometeor mode (based on the acquired data). Other adaptive sampling capabilities include variable sample volume and dynamic range (based on the measured DSD). The preferred deployment platforms are uncrewed aircraft systems (UAS) and tethered balloon/kite systems (TBS). The Phase I project achieved (or exceeded) the goals listed in the Work Plan. A CDMS-2 laboratory prototype implementing the polarization-resolved side-scatter imaging mode and direct bright-field-illumination imaging mode was designed and built. Additional capabilities included the variable illumination pulse energy and sample volume. The smallest detectable droplet diameter was improved to 3–4 μm (from the nominal 10 μm value specified for the original CDMS). Discrimination between water droplets and ice particles was experimentally demonstrated. The Phase I prototype was extensively tested and calibrated in the laboratory and also tested in the Pi Cloud Chamber at Michigan Technological University (MTU). The two intensive experimental campaigns at MTU provided unique opportunities of testing the CDMS-2 laboratory prototype under realistic warm and mixed-phase cloud conditions (stable for long periods of time), testing different sampling modes and intercomparing the CDMS-2 prototype to other co-located cloud characterization instruments. The Phase I project successfully demonstrated the feasibility of the proposed technology and identified the engineering challenges of designing a field deployable prototype instrument in Phase II. The Phase I study provides a solid basis for development, characterization and field-testing of the proposed advanced cloud probe with adaptive sampling in Phase II followed by commercialization of the technology in Phase III.

47 OTHER INSTRUMENTATION↗

Improving Subsurface Stress Characterization for Carbon Dioxide Storage Projects by Incorporating Machine Learning Techniques

The overall objective of this project is to develop a framework for reliable characterization and prediction of the state of stress in the overburden and underburden (including the basement) in CO 2 storage reservoirs using machine learning and integrated geomechanics and geophysical methods. Specifically, we propose to develop workflow encompassing of technologies and/or methods to predict stress and pressure changes due to CO 2 injection in an active tertiary recovery site and their impacts on subtle fault activation, fractures and occurrence of microseismic events and compare responses to field observations. In this project, we anticipate using dataset from the Farnsworth field Unit (FWU) which is operated by Purdure Petroleum. A novel elastic-waveform VSP inversion technique will be used to estimate high-resolution spatial and temporal changes of elastic moduli in CO 2 storage reservoirs, which will be combined with velocity-stress relationship derived from laboratory tests to obtain subsurface pressure and stress. Clustered microseismic data will be jointly inverted for improved focal mechanisms. Least-squares reverse-time migration of microseismic waveform data will be performed to directly image fracture/fault zones. Additionally, a deep neural network machine learning technique with convolutional and recurrent layers will be used for learning the spectro-temporal structures in microseismic waveforms. The results of this geotechnical data analysis will be integrated to develop a high-resolution 3D mechanical earth model extending from the overburden sealing formations to the underburden including the basement. Mechanical properties will be derived through integration of mechanical logs, tests, available results from chemo-mechanical laboratory tests, and elastic inversion of seismic data using a combination of Bayesian and stochastic methods as well as machine learning technique. Failure features (faults/fractures) will be represented and/or modeled based on seismic and core data analysis. A transient hydrodynamic-geomechanical model will be developed through coupling with the calibrated FWU reservoir simulation model. The full physics coupled model will be used to train a reduced order proxy model using machine learning algorithm for estimating stress which will then be used with appropriate constitutive relationships and forward seismological models to simulate pressure changes and induced microseismicity. An advanced optimization framework will be developed to perform a history match to minimize error between field observations and simulated. The history matched proxy model will be verified against the full-physics equivalent. The field observations that will be used in the coupled model calibration process include pressure/stress inverted from VSP, moment magnitude from microseismic analysis, real time downhole pressure measurements, production and injection data. Parameter sensitivity and uncertainty analysis will be performed to characterize the impact of model parameter uncertainty on stress estimates. The proposed project will have significant impact on future field implementation of the proposed technology. Because the project field site is an ongoing CO 2 EOR development, the value of the new technology will be demonstrated in an operational context and evaluated as a viable risk mitigation strategy. Cost/benefit will be evaluated together with the various commercial incentives for CO 2 sequestration available to oil and gas operators. The extensive available dataset and ongoing data acquisition under the SWP Phase III work plan provides flexibility for investigation of multiple approaches and reduces technical risk.

58 GEOSCIENCES↗

Rock Valley Direct Comparison Relocation Working Group Location Results and Recommendations (Version 4.0)

The Source Physics Experiments (SPE) were designed to improve our physics-based understanding of explosion sources for the purposes of nuclear test monitoring. Phase I consisted of 6 chemical explosions in the Climax Stock Granite of the Nevada National Security Site (NNSS), while Phase II consisted of 4 explosions in a contrasting dry alluvium geology (DAG) in Yucca Flat, providing essential data in various media and emplacement conditions to further modeling efforts. For Phase III, the Rock Valley Direct Comparison (RVDC) seeks to directly compare earthquake and explosion source types. An unusually shallow series of events in 1993 along the Rock Valley Fault Zone in the southeastern portion of the NNSS has been targeted for this direct comparison. Depth ranges for the events, previously estimated to be less than 3 km, is achievable by modern drilling techniques and accessibility to the epicentral locations would require minimal improvements to the infrastructure. The events providing this unique opportunity for direct comparison are the focus of this report.

58 GEOSCIENCES↗

Integrating Qualitative and Quantitative Aspects of Risk Management

This topical report summarizes the integration of qualitative and quantitative aspects of the risk management workflow for the Southwest Regional Partnership on Carbon Sequestration (SWP) Phase III Demonstration Project, located near the community of Farnsworth in northernmost Texas. Detail on some aspects of this subject has been previously provided in internal project reports on qualitative risk assessment processes, in a published paper summarizing quantitative risk modeling, and in many other published papers on specific risk modeling efforts. These prior documents are cited but the details are not repeated here. The report documents work undertaken for Task 7.4.1 of U.S. Department of Energy award number DE- FC26-05NT42591.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Risk Communications and Risk Mitigation

This topical report summarizes risk communications and risk treatment (a.k.a. mitigation) aspects of risk management workflow for the Southwest Regional Partnership on Carbon Sequestration (SWP) Phase III Demonstration Project, located near the community of Farnsworth in northernmost Texas. Detail on risk communications previously provided in an internal project report is summarized here, while detail on risk treatment is presented for the first time. A principal message is that the effective development and execution of risk treatments depends on effective communications among project staff. Farnsworth Project relied primarily on internal communications; in contrast, projects that also rely heavily on public approval will be relatively more dependent upon effective information sharing with external stakeholders. The report documents work undertaken for Tasks 7.4.2 and 7.4.3 of U.S. Department of Energy

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Smart Pixels: In-pixel AI for on-sensor data filtering

We present a smart pixel prototype readout integrated circuit (ROIC) designed in CMOS 28 nm bulk process, with in-pixel implementation of an artificial intelligence (AI) / machine learning (ML) based data filtering algorithm designed as proof-of-principle for a Phase III upgrade at the Large Hadron Collider (LHC) pixel detector. The first version of the ROIC consists of two matrices of 256 smart pixels, each 25$\times$25 µm\textsuperscript{2} in size. Each pixel consists of a charge-sensitive preamplifier with leakage current compensation and three auto-zero comparators for a 2-bit flash-type ADC. The frontend is capable of synchronously digitizing the sensor charge within 25 ns. Measurement results show an equivalent noise charge (ENC) of $\sim$30e\textsuperscript{-} and a total dispersion of $\sim$100e\textsuperscript{-} The second version of the ROIC uses a fully connected two-layer neural network (NN) to process information from a cluster of 256 pixels to determine if the pattern corresponds to highly desirable high-momentum particle tracks for selection and readout. The digital NN is embedded in-between analog signal processing regions of the 256 pixels without increasing the pixel size and is implemented as fully combinatorial digital logic to minimize power consumption and eliminate clock distribution, and is active only in the presence of an input signal. The total power consumption of the neural network is $\sim$ 300 $\mu$W. The NN performs momentum classification based on the generated cluster patterns and even with a modest momentum threshold, it is capable of 54.4\% – 75.4\% total data rejection, opening the possibility of using the pixel information at 40MHz for the trigger. The total power consumption of analog and digital functions per pixel is $\sim$ 6 $\mu$W per pixel, which corresponds to $\sim$ 1 W/cm\textsuperscript{2} staying within the experimental constraints.

Parpillon, Benjamin↗

Radiation-Hard Smart-Pixel Detector ASIC ReadOut with Digital AI in 28nm

Detectors at future high energy colliders will face enormous technical challenges. Disentangling the unprecedented numbers of particles expected in each event will require highly granular silicon pixel detectors with billions of readout channels. With event rates as high as 40 MHz, these detectors will generate petabytes of data per second. To enable discovery within strict bandwidth and latency constraints, future trackers must be capable of fast, power efficient, and radiation hard data-reduction at the source. This effort is pursuing the co-design development of high-performance readout smart pixel ASICs for a future Phase III High Luminosity upgrade of the Large Hadron Collider. A 1.6mm2 ASIC prototype was designed by Fermilab in CMOS 28 nm bulk process and submitted for manufacturing in February 2024. It leverages the analog front-end pixel design of a previous prototype fabricated and tested in 2023, which achieved a simulated detection level of ~400e- with 30fF input capacitance. The ROIC consists of two matrices of 16×16 smart pixels, each 25×25 μm2 in size. Each smart pixel contains a charge-sensitive preamplifier with leakage current compensation and three auto-zero comparators for a 2-bit flash-type ADC. There is digital space for the integration of our fully combinatorial AI that performs momentum classification at the bunch crossing rate. The total power consumption is ∼6μW per pixel, which corresponds to ~1mW/cm2. The ASIC incorporates programmable front-end charge injection circuitry to generate pixel cluster charges during characterization. The cluster profile will be generated to duplicate hit characteristics of various momentum (pT). We will present early results from chip testing.

Parpillon, Benjamin↗