Search NASA⌕ Search

SEARCH · Search NASA

Results for “Phase Retrieval”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Characterization of Settler Tank and KW Container Sludge Simulants

The Sludge Treatment Project (STP), managed by CH2M Hill Plateau Remediation Company (CHPRC) has specified base formulations for non-radioactive sludge simulants for use in the development and testing of equipment for sludge sampling, retrieval, transport, and processing. In general, the simulant formulations are based on the average or design-basis physical and chemical properties obtained by characterizing sludge samples. The simulants include surrogates for uranium metal, uranium oxides (agglomerates and fine particulate), and the predominant chemical phases (iron and aluminum hydroxides, sand). Specific surrogate components were selected to match the nominal particle-size distribution and particle-density data obtained from sludge sample analysis. Under contract to CHPRC, Pacific Northwest National Laboratory (PNNL) has performed physical and rheological characterization of simulants, and the results are reported here. Two base simulant types (dry) were prepared by STP staff at the Maintenance and Storage Facility and received by PNNL on February 12, 2009: Settler Tank Simulant and KW Container Sludge Simulant. The objectives of this simulant characterization effort were to provide baseline characterization data on simulants being used by STP for process development and equipment testing and provide a high-level comparison of the simulant characteristics to the targets used to formulate the simulants.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Settler Tank, KW Container and KE Container Sludge Simulants

The Sludge Treatment Project (STP), managed by CH2M Hill Plateau Remediation Company (CHPRC) has specified base formulations for non-radioactive sludge simulants for use in the development and testing of equipment for sludge sampling, retrieval, transport, and processing. In general, the simulant formulations are based on the average or design-basis physical and chemical properties obtained by characterizing sludge samples. The simulants include surrogates for uranium metal, uranium oxides (agglomerates and fine particulate), and the predominant chemical phases (iron and aluminum hydroxides, sand). Specific surrogate components were selected to match the nominal particle-size distribution and particle-density data obtained from sludge sample analysis. Under contract to CHPRC, Pacific Northwest National Laboratory (PNNL) has performed physical and rheological characterization of simulants, and the results are reported here. Two base simulant types (dry) were prepared by STP staff at the Maintenance and Storage Facility and received by PNNL in February 2009: Settler Tank Simulant and KW Container Sludge Simulant. A third simulant, KE Container Sludge Simulant was received by PNNL in December 2010. The objectives of this simulant characterization effort were to provide baseline characterization data on simulants being used by STP for process development and equipment testing and provide a high-level comparison of the simulant characteristics to the targets used to formulate the simulants.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Search for a Cloud Phase Feedback in the Arctic Climate System

This project was motivated by a hypothesis involving the transition in lower troposphere temperatures across the freezing point of water. Specifically, at temperatures just below to about ten degrees below freezing, Arctic clouds should be in a mixed-phase, with strong influences from secondary ice production (e.g., the Hallett-Mossop process). At temperatures just above freezing, clouds should become entirely deglaciated. We hypothesized that, with multiple years of ARM data, a statistically significant change could be detected in cloud radiative properties and surface radiative fluxes that could be directly attributed to this phase change. Furthermore, in a gradually warming climate, these phase change-related responses in surface radiation would represent a cloud phase feedback as part of Arctic amplification. We designed this research project to coincide with a new ARM Arctic cloud radar product developed by Ed Luke and collaborators at BNL (Luke et al., 2021: PNAS, doi:10.1073/pnas.2021387118) that explicitly contains SIP cloud properties retrieved from radar data. This research project has successfully concluded after analysis of a much larger North Slope of Alaska (NSA) data sample than originally anticipated, and the results are quite different than originally hypothesized.

58 GEOSCIENCES↗

Decommissioning, Decontamination, and Disposal of LLW-LL, and ILW-LL at a Former Rare Earths Processing Facility in Malaysia - 19087

Geosyntec Consultants, Inc. (Geosyntec) was the design-build Contractor for a project involving the remediation and disposal of low level (LLW-LL and ILW-LL) NORM and TENORM wastes at a former rare earth processing facility in Malaysia. These sites were associated with a plant that extracted rare earth elements from local tin ores. Because of the naturally occurring radioactivity contained in the raw materials, these productions resulted in by-products and residues containing LLW-LL and ILW-LL thorium hydroxide and uranium hydroxide. The total mass of uranium (∼120 tons) and thorium (∼1,200 tons) managed in a single repository required the project design incorporate requirements related to inventory, security and safeguards around nuclear precursor materials. The requirement to consider a performance over a period of more than 10,000 years led to significant challenges in design and modeling of the disposal facility as this disposal facility was purposely designed and permitted as a final disposal for the LLW-LL and ILW-LL. The first phase of the project was the decommissioning, decontamination, and demolition of the 14- acre former rare earth processing plant and excavation of contaminated soils, construction of an engineered cell at the repository for waste disposal, and transportation and disposal of the waste materials into the cell. Final status surveys were carried out to allow the site to be successfully released by the Malaysian regulatory authorities as a clean site for re-development as common industrial use. Over 11,000 loads of material, including approximately 75,000 cubic meters of excavated soils and plant debris, were transported in specially designed steel transport boxes on public roads for disposal in the engineered cell. The second phase of the project included the design and construction of a second engineered cell, enhanced with protective barrier systems and a final cover system constructed of natural materials. Ancillary facilities such as substations, offices, processing buildings, and wastewater treatment plants were constructed to support retrieval and processing of the materials from more than 87,000 individual drums using a semi-automated process. The drums, waste packages, and other materials in the storage facility were systematically extracted, sorted, inventoried, solidified using Portland cement, transported, and disposed in the cell. All temporary facilities were decontaminated, demolished, and disposed in the cell. Radiological inventory and radiation safety programs were implemented to quantify the waste activity and to control exposure to workers and the public during the project. The total mass of radioactive contaminated waste disposed in the two projects is nearly 200,000 tons. The projects were carried out under a high level of scrutiny from Malaysian and international regulatory bodies. Between 2014 and 2017, performance monitoring and modeling activities were carried out to demonstrate that the disposal facility was performing in accordance with design requirements established by regulatory agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Profiling the Quito basin (Ecuador) using seismic ambient noise

SUMMARY Quito, the capital of Ecuador, with more than 2.5 M inhabitants, is exposed to a high seismic hazard due to its proximity to the Pacific subduction zone and active crustal faults, both capable of generating significant earthquakes. Furthermore, the city is located in an intermontane piggy-back basin prone to seismic wave amplification. To understand the basin’s seismic response and characterize its geological structure, 20 broad and medium frequency band seismic stations were deployed in Quito’s urban area between May 2016 and July 2018 that continuously recorded ambient seismic noise. We first compute horizontal-to-vertical spectral ratios to determine the resonant frequency distribution in the entire basin. Secondly, we cross-correlate seismic stations operating simultaneously to retrieve interstations surface-wave Green’s functions in the frequency range of 0.1–2 Hz. We find that Love waves travelling in the basin’s longitudinal direction (NNE–SSW) show much clearer correlograms than those from Rayleigh waves. We then compute Love wave phase-velocity dispersion curves and invert them in conjunction with the HVSR curves to obtain shear-wave velocity profiles throughout the city. The inversions highlight a clear difference in the basin’s structure between its northern and southern parts. In the centre and northern areas, the estimated basin depth and mean shear-wave velocity are about 200 m and 1800 ms−1, respectively, showing resonance frequency values between 0.6 and 0.7 Hz. On the contrary, the basement’s depth and shear-wave velocity in the southern part are about 900 m and 2500 ms−1, having a low resonance frequency value of around 0.3 Hz. This difference in structure between the centre-north and the south of the basin explains the spatial distribution of low-frequency seismic amplifications observed during the Mw 7.8 Pedernales earthquake in April 2016 in Quito.

Pacheco, D. (ORCID:0000000282355096)↗

Experimental investigation of radiative thermal rectifier using vanadium dioxide

Vanadium dioxide (VO{sub 2}) exhibits a phase-change behavior from the insulating state to the metallic state around 340 K. By using this effect, we experimentally demonstrate a radiative thermal rectifier in the far-field regime with a thin film VO{sub 2} deposited on the silicon wafer. A rectification contrast ratio as large as two is accurately obtained by utilizing a one-dimensional steady-state heat flux measurement system. We develop a theoretical model of the thermal rectifier with optical responses of the materials retrieved from the measured mid-infrared reflection spectra, which is cross-checked with experimentally measured heat flux. Furthermore, we tune the operating temperatures by doping the VO{sub 2} film with tungsten (W). These results open up prospects in the fields of thermal management and thermal information processing.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

About excitation of surface plasma waves by elliptical relativistic electron beam in a magnetized dusty plasma column with elliptical cross section

The surface plasma waves in a magnetized dusty plasma elliptical cylinder driven by elliptic relativistic electron beam propagating inside the elliptical cylinder are studied. The dispersion relation of surface plasma waves has been retrieved from the derived dispersion relation by considering that the beam is absent and there is no dust in the plasma cylinder. Mathematically, it is shown that the beam can interact with the surface plasma waves via Cerenkov interaction and fast cyclotron interaction. The growth rate and phase velocity in every cases are obtained. Finally, the numerical results and graphs are presented.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Evaluation of Low-cost, Full HD, CMOS Cameras for Use in the Calcine Retrieval Project - 19530

This paper describes results from radiation testing conducted on low-cost, commercial off-the-shelf, full high-definition (HD) resolution (1920 x 1080 p), complementary metal-oxide-semiconductor (CMOS) camera sensors. The purpose of the testing was to evaluate the sensors' suitability for use in the Calcine Retrieval Project by determining their image quality and life expectancy while operating in an ionizing radiation field of 20.0 Gy/h. The two camera sensors tested were the Axis FA1105 and Axis FA1125. These commercial camera sensors were designed for retail security surveillance and have no radiation-hardened (rad-hard) components. In addition to radiation testing, the sensors' field-of-view, resolution, and low-light image quality were tested at several target distances to ensure they meet project requirements. Testing was divided into two phases. During Phase 1, four FA1105 sensors and four FA1125 sensors were tested simultaneously without any shielding in radiation fields of 25.5 Gy/h and 49.3 Gy/h. In Phase 2, three FA1105 and five FA1125 sensors were shielded by 22.2 mm of lead and tested simultaneously in radiation fields of 26.8 Gy/h, 52.3 Gy/h, 143.0 Gy/h, 200.7 Gy/h, 404.6 Gy/h, and 2,317.5 Gy/h. Dose rate values were established using film dosimetry readings. Apertures in the shielding allowed for a 40-degree field of view while shielding all parts of the sensor except for directly in front of the CMOS sensor array. All testing was conducted at the Idaho Accelerator Center in Pocatello, Idaho, using a 450 keV X-ray generator. Sensor images were automatically captured at regular intervals throughout the testing for qualitative evaluation by the test team. Film dosimetry was placed near the sensors to record actual dose totals. The 450 keV setting generates X-ray radiation with an energy level close to the primary gamma energy level produced by the Cesium-137 isotope in the calcine, which is 662 keV. Results from Phase 1 indicate the sensors failed at an average cumulative dose of 226.3 Gy. For a given 20.0 Gy/h field this results in a mean time to failure (MTTF) of 11.3 hours. Recorded images from all sensors showed minimal image degradation due to radiation-induced noise. When the sensors finally failed, the failure mode was an abrupt loss of video. The image went black suggesting some other component in the sensor head besides the CMOS sensor array was responsible for the failure. During a portion of Phase 1 testing, a commercial, rad-hard camera was irradiated in the 25.5 Gy/h field along with the eight Axis FA series sensors. Image quality from the FA series sensors significantly outperformed the image quality of the rad-hard camera in radiation-induced noise tolerance, image resolution, and dynamic range. During Phase 2 testing, all sensors produced excellent images in radiation fields as high as 404.6 Gy/h. One FA1125 sensor was tested at the highest dose rate of 2,317.5 Gy/h. At this dose rate, the image was color shifted towards red and contained a significant amount radiation-induced noise. The sensor did not fail and was producing usable imagery after one hour, at which time the test was ended due to allotted beam-time at the test facility. Eighteen hours after X-rays were shut off, the sensor image returned to normal color and all eight sensors continued to operate without any visible, permanent image degradation. For Phase 2 testing, it was not possible to establish a MTTF since none of the shielded sensors failed during the allotted test time. However, given the highest cumulative dose of 4,142.1 Gy received by a shielded FA1125 sensor, a minimum life expectancy of 207 hours (8.6 days) is predicted while operating in a 20.0 Gy/h field. Test results indicate the radiation tolerance of the FA series sensor's CMOS array, along with the small form factor, full HD image quality, wide dynamic range, and Ethernet standard makes it suitable for short-term use in monitoring and visually documenting waste remediation efforts for the Calcine Retrieval Project at the INL. The sensor's low-cost of about $140 US, compared to commercial rad-hard cameras costing between $5,000 and $7,000 US each, allow them to be used as an affordable, disposable resource for many short-duration, radioactive waste remediation efforts where decontamination of an expensive, commercial rad-hard camera is undesirable or not possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synthetic observations of wave propagation in a sunspot umbra

Spectropolarimetric temporal series from Fe I λ6301.5 Å and Ca II infrared triplet lines are obtained by applying the Stokes synthesis code NICOLE to a numerical simulation of wave propagation in a sunspot umbra from MANCHA code. The analysis of the phase difference between Doppler velocity and intensity core oscillations of the Fe I λ6301.5 Å line reveals that variations in the intensity are produced by opacity fluctuations rather than intrinsic temperature oscillations, except for frequencies between 5 and 6.5 mHz. On the other hand, the photospheric magnetic field retrieved from the weak field approximation provides the intrinsic magnetic field oscillations associated to wave propagation. Our results suggest that this is due to the low magnetic field gradient of our sunspot model. The Stokes parameters of the chromospheric Ca II infrared triplet lines show striking variations as shock waves travel through the formation height of the lines, including emission self-reversals in the line core and highly abnormal Stokes V profiles. Magnetic field oscillations inferred from the Ca II infrared lines using the weak field approximation appear to be related with the magnetic field strength variation between the photosphere and the chromosphere.

79 ASTRONOMY AND ASTROPHYSICS↗

Method of differential-phase/absolute-amplitude QAM

A method of quadrature amplitude modulation involving encoding phase differentially and amplitude absolutely, allowing for a high data rate and spectral efficiency in data transmission and other communication applications, and allowing for amplitude scaling to facilitate data recovery; amplitude scale tracking to track-out rapid and severe scale variations and facilitate successful demodulation and data retrieval; 2.sup.N power carrier recovery; incoherent demodulation where coherent carrier recovery is not possible or practical due to signal degradation; coherent demodulation; multipath equalization to equalize frequency dependent multipath; and demodulation filtering.

97 MATHEMATICS AND COMPUTING↗

Method of differential-phase/absolute-amplitude QAM

A method of quadrature amplitude modulation involving encoding phase differentially and amplitude absolutely, allowing for a high data rate and spectral efficiency in data transmission and other communication applications, and allowing for amplitude scaling to facilitate data recovery; amplitude scale tracking to track-out rapid and severe scale variations and facilitate successful demodulation and data retrieval; 2.sup.N power carrier recovery; incoherent demodulation where coherent carrier recovery is not possible or practical due to signal degradation; coherent demodulation; multipath equalization to equalize frequency dependent multipath; and demodulation filtering.

97 MATHEMATICS AND COMPUTING↗

A Practical Approach of Mining Operational Risks in Cigeo - A field-test - 19349

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository, aka DGR). Various technical issues are at stake, including the risk management requirements linked to the safety of 'Mining Operations' (i.e. occupational safety issues related to underground excavation/dismantling works at some 500 m of depth), at different stages of the DGR life cycle (i.e. from its construction start-up to its final closure and future monitoring/or conversely a decision of waste retrieval). These occupational safety requirements have a significant impact on Cigeo's design, its progressive construction and later closure. On a shorter term, one must demonstrate that the design bases are technically sound and that the solutions selected (to build, operate, close the DGR infrastructures or conversely retrieve the waste) are both feasible and safe. In that sense (and following an identification of operational risks during construction), Andra focused on two sensitive cases: - The construction of large diameter drift crossings, in particular those related to the connection between a transfer drift (main) and a IL-LLW disposal vault (i.e. during construction operations), - The partial dismantling of a drift concrete lining (made of concrete segment rings, erected and placed by a TBM) at time of construction of a horizontal seal (i.e. during closure operations). The discussion starts with a description of the geotechnical conditions prevailing at the (French) Bure site, in the Callovo-Oxfordian (COx) claystone formation. Then the paper presents the Cigeo underground architecture (at large) and the specific structural choices made (at the end of the detailed engineering phase) for drifts, disposal vaults and seals. The discussion on construction - deconstruction challenges for each of the critical issues cited above provides an opportunity to explain the operational sequences (and how the methodology selected enables to reduce the risks). The following part of the paper focuses the technological demonstration (an in-situ test to be planned in detail) of a partial dismantling of the concrete segments rings forming the support lining of two tunnels previously built in the Meuse/Haute-Marne URL (Underground Research Laboratory) infrastructures, combined with the construction of a specific drift crossing. In this dismantling and construction test, the technical demonstration objective is three-fold: - The capacity to lay down compressible arch segments and support (by bolts and mesh) the rock after the lining removal, - The capacity to excavate and line the drift crossing, - The structural / geomechanical behavior (evolution with time) of the rock and lining compared with that of 'neighboring' zones. This paper provides a timeline of the tests. Should the results obtained deliver some positive perspectives of technical feasibility (and convincing operational safety) Andra will incorporate this dismantling/construction solution in the 'design freeze' of the DGR underground infrastructures. The positive outcomes of this technical test campaign will also provide 'elements of proof' for the instruction of the Cigeo licensing (a process likely to take place between 2020 and 2024) by the French Nuclear Safety Authority (ASN). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenges of Repository Operation in an Existing Mine - 19339

A generally accepted principle related to long term management of radioactive waste/ spent fuel is the isolation in a geological repository. In Germany, the disposal operation of low-level waste (LLW) and intermediate-level waste (ILW) started in the Asse II mine in 1967 and in the former German Democratic Republic in the Morsleben repository in 1971. After the German reunification, the responsibility for the existing sites changed several times until the Bundesgesellschaft fuer Endlagerung (BGE) became new license holder for both sites in 2017. The BGE is responsible to carry out the operative tasks of searching for a high-level waste (HLW) repository, the planning and construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository. Nevertheless, the challenges of repository operation in an existing mine have not changed in all these years, as the regulatory framework is mainly written for Nuclear Power Plants (NPPs) and is difficult to adapt for a repository mine. In particular, conditions in a mine are substantially different from 'clean' above-ground nuclear installations. Dust due to mining activities, relatively high temperatures, and a corrosive atmosphere in a salt mine might be present. Therefore, the usability of the repository for several decades during the different operational phases, i.e. planning, construction, emplacement, and closure, can only be ensured by continuous maintenance. Furthermore, the atomic law is applicable for above-ground facilities and the mining law for mines of every description. The difficulty of geological repositories is to ensure that both laws are going to be applied above and below ground with no regulatory framework tailored especially for such sites. A special case is the Asse II mine where the mining law was applied from the very beginning, before the atomic law needed to be established later on and now requires the retrieval of the radioactive waste before decommissioning. In this presentation, similarities and differences in the legal framework of the repositories in the responsibility of BGE and some operational experiences throughout the years are described. This applies to the radiation protection regime, the excavation ratio, the host rock stability and the backfilling concepts of the mining areas. Further challenges arise from the demonstration of long term safety according to the state-of-the-art of science and technology for either existing repositories/ mines or those under construction or planned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synthesis of Sensor Fish Data for Assessment of Fish Passage Conditions at Turbines, Spillways, and Bypass Facilities – Phase 1: The Dalles Dam Spillway Case Study

This report summarizes the characterization of spillway passage conditions at The Dalles Dam in 2006 and the effort to complete a comprehensive database for data sets from The Dalles Dam spillway Sensor Fish and balloon-tagged live fish experiments. Through The Dalles Dam spillway case study, Pacific Northwest National Laboratory (PNNL) researchers evaluated the database as an efficient means for accessing and retrieving system-wide data for the U.S Army Corps of Engineers (USACE).

13 HYDRO ENERGY↗

Remediation of the FGMSP at Sellafield: The First Transfer of Bulk Sludge - 17133

The very first bulk transfers of radioactive sludge have commenced from one of the most hazardous nuclear plants in Europe, using equipment and systems researched, designed, installed and commissioned by Jacobs as part of the ACKtiv alliance. Sellafield is a nuclear fuel reprocessing and decommissioning site, close to the village of Seascale on the coast of the Irish Sea in Cumbria, England. Sellafield incorporates the original nuclear reactor site at Windscale, which is currently undergoing decommissioning, and dismantling, and Calder Hall, the world's first nuclear power generating reactor. The first nuclear facilities were built in the 1940's.The First Generation Magnox Storage Pond (FGMSP) dates back to the 1950's as part of the UK's expanding nuclear programme and was constructed to store, cool and prepare used Magnox nuclear fuel for recycling into new fuel. It urgently needs to be emptied of 1500 cubic metres of radioactive sludge. In this paper we describe the work undertaken by Jacobs to deliver a very challenging programme of work to provide the capability to remove sludge from the pond. The FGMSP Retrievals Project was awarded in March 2007 to supply equipment and services for the removal of sludge and miscellaneous waste from the First Generation Magnox Storage Pond at Sellafield. The Project is being executed by ACKtiv Nuclear (Jacobs, Carillion and Atkins) of which Jacobs is a 40% stakeholder. ACKtiv Nuclear is a mature Joint Venture and has been operating continuously and successfully since 2002, the oldest JV still in operation on Sellafield Site. The roots of the JV can be traced back to the 1980's. The Project covers all project phases from front-end engineering through detailed design, procurement, installation and commissioning support. The Project places huge emphasis on off-Site testing and has several facilities for both installation and integrated testing. This proves equipment prior to installation in a radioactive environment. The Project has achieved success and recognition including winning the 2014 and 2015 Sellafield Business Excellence awards, as well as numerous internal Jacobs awards. The Project achieved a major decommissioning milestone in March 2016. Since the installation of a 31 m pipe-bridge in 2012, using a 1200 te mobile crane surrounded by several other facilities with nuclear inventory, the Project has successfully installed the sludge retrieval and effluent system into the FGMSP. This 4 year programme of work included 2 booster pump platforms, sludge recovery tooling, hoses, umbilicals and a deluge skip wash box which were all trialled and proven off-Site prior to installation in the pond. This milestone to commence transfer of sludge to modern stainless steel containment is a major step forward in the hazard reduction of the facility.The presentation will cover the installation of the pond de-sludging equipment, the innovations deployed that ensured that the milestone was achieved under budget and ahead of schedule, as well the benefits to the facility, the Site and the nuclear industry. It will also examine the challenges that needed to be overcome such as high dose, contamination, limited working times and space constraints. The presentation will describe why the work is of national Importance and conclude with the achievement of commencement of bulk sludge transfer to a modern facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In situ X-ray ptychography imaging of high-temperature CO{sub 2} acceptor particle agglomerates

Imaging nanoparticles under relevant reaction conditions of high temperature and gas pressure is difficult because conventional imaging techniques, like transmission electron microscopy, cannot be used. Here we demonstrate that the coherent diffractive imaging technique of X-ray ptychography can be used for in situ phase contrast imaging in structure studies at atmospheric pressure and elevated temperatures. Lithium zirconate, a candidate CO{sub 2} capture material, was studied at a pressure of one atmosphere in air and in CO{sub 2}, at temperatures exceeding 600 °C. Images with a spatial resolution better than 200 nm were retrieved, and possibilities for improving the experiment are described.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

AEOLUS: A MARKOV CHAIN MONTE CARLO CODE FOR MAPPING ULTRACOOL ATMOSPHERES. AN APPLICATION ON JUPITER AND BROWN DWARF HST LIGHT CURVES

Deducing the cloud cover and its temporal evolution from the observed planetary spectra and phase curves can give us major insight into the atmospheric dynamics. In this paper, we present Aeolus, a Markov chain Monte Carlo code that maps the structure of brown dwarf and other ultracool atmospheres. We validated Aeolus on a set of unique Jupiter Hubble Space Telescope (HST) light curves. Aeolus accurately retrieves the properties of the major features of the Jovian atmosphere, such as the Great Red Spot and a major 5 μm hot spot. Aeolus is the first mapping code validated on actual observations of a giant planet over a full rotational period. For this study, we applied Aeolus to J- and H-band HST light curves of 2MASS J21392676+0220226 and 2MASS J0136565+093347. Aeolus retrieves three spots at the top of the atmosphere (per observational wavelength) of these two brown dwarfs, with a surface coverage of 21% ± 3% and 20.3% ± 1.5%, respectively. The Jupiter HST light curves will be publicly available via ADS/VIZIR.

79 ASTRONOMY AND ASTROPHYSICS↗