Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Division”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Composing, Analyzing and Validating Software Models

This research has been conducted at the Computational Sciences Division of the Information Sciences Directorate at Ames Research Center (Automated Software Engineering Grp). The principle work this summer has been to review and refine the agenda that were carried forward from last summer. Formal specifications provide good support for designing a functionally correct system, however they are weak at incorporating non-functional performance requirements (like reliability). Techniques which utilize stochastic Petri nets (SPNs) are good for evaluating the performance and reliability for a system, but they may be too abstract and cumbersome from the stand point of specifying and evaluating functional behavior. Therefore, one major objective of this research is to provide an integrated approach to assist the user in specifying both functionality (qualitative: mutual exclusion and synchronization) and performance requirements (quantitative: reliability and execution deadlines). In this way, the merits of a powerful modeling technique for performability analysis (using SPNs) can be combined with a well-defined formal specification language. In doing so, we can come closer to providing a formal approach to designing a functionally correct system that meets reliability and performance goals.

Sheldon, Frederick T.↗

Use of ERTS-1 DCS in the management and control of water resources systems

The ERTS-1 experimental hydrologic Data Collection Platform System that has been established at the New England Division (NED), the reasons for getting involved with the experiment, some of the initial problems associated with the data collection hardware, and a preliminary conclusion based on operating experiences are reviewed. The New England Region includes the states of Maine, New Hampshire, Vermont, Massachusetts, Rhode Island and Connecticut. The entire area consists of approximately 97,000 sq. km. (60,000 square miles), half of which is in the state of Maine. The limits of the NED are all of Maine, New Hampshire and Vermont to the western limits of the Connecticut River basin, Massachusetts, Connecticut to the western edge of the Housatonic River basin and Rhode Island. All reservoirs have flood control as a primary purpose. Other uses include water supply, recreation and low flow augmentation. However, none of the reservoirs are presently operated for hydroelectric power, navigation, or irrigation purposes. Basically then, flood control regulation is NED's primary concern.

Finegan, J. W., Jr.↗

Next Generation Exercise Device (NGED): Advancing Exercise Capabilities for Future Space Missions Through Biomechanical Modeling

BACKGROUND As space exploration extends to long-duration missions on the Moon and Mars, maintaining astronaut health and fitness becomes increasingly critical. The Next Generation Exercise Device (NGED), developed and tested by the HumanWorks Lab in NASA Johnson Space Center's (JSC) Software, Robotics, and Simulation Division, aims to address this challenge through innovative approaches. This study presents the development and evaluation of an NGED system, focusing on its adaptability to various mission scenarios, including prospective use in a Lunar Pressurized Rover (LPR). Central to this project is the application of biomechanical modeling to optimize exercise efficacy and safety in microgravity and partial gravity environments. The project is a collaborative effort with the Human Health and Performance group at Johnson Space Center, ensuring a comprehensive approach to astronaut well-being that integrates biomechanical principles with practical exercise solutions. The NGED represents the next generation of exercise capabilities for missions in space, on the Moon and Mars, with a specific focus on applications such as the LPR. METHODS AND RESULTS Data collection for NGED development was conducted with two motor-driven Beyond Power Voltra I [1] systems and a custom test structure to allow placement of the cable-based devices on the ground, at shoulder height, and overhead. The collection was performed in JSC’s Prototype Immersive Technology (PIT) Lab, utilizing an OptiTrack motion capture system and AMTI force platform, to enable detailed biomechanical analysis via OpenSim [2,3]. Motion capture data were collected for three subjects representing different body types and statures. The marker set used was an enhanced version of the full-body Plug-in Gait marker set [4], with additional markers strategically placed for the primary objective of informing exercise volume requirements. Subjects performed a series of 17 exercises, carefully selected to engage various muscle groups, including novel spaceflight exercises such as skiing (ergometer style), lateral pulldowns, wood chops, triceps extensions, and flies, with load variations ranging from 10 to 90 pounds to maintain kinematic form. This comprehensive approach allowed for a thorough evaluation of the NGED's performance across a wide range of motions and loads. The biomechanical modeling and analysis were conducted using a modified OpenSim Full Body Rajagopal Model [4,5] and also scaled to the maximum and minimum anthropometry provided in NASA-STD-3001 [6]. Volumetric convex hulls were generated based on model marker trajectories and aggregated into geometric assemblies. These can be placed in models of vehicle designs to assess fit to protect for exercise as well as to adapt NGED exercise to fit available space. Preliminary findings from the collection indicate that the NGED prototype demonstrates significant adaptability across varying user anthropometrics and exercise types. The device showed consistent performance in load-bearing exercises, with subjects able to perform exercises effectively while maintaining proper biomechanical form. CONCLUSION NGED represents a forward-looking advancement in exercise capabilities for future space missions. In the future, this system can be used to capture valuable metrics (e.g., isometric mid-thigh pull for force output measurements, assessments of postural muscle strength, overall isometric strength). Its versatility in accommodating various exercises and user physiques, coupled with the ability to provide targeted biomechanical loading, makes it a promising approach for maintaining astronaut health during long-duration missions to the Moon and Mars. Future work will focus on refining the NGED based on initial biomechanical findings, leveraging the detailed insights provided by motion capture and analysis techniques. Particular emphasis will be placed on optimizing its use within the confined spaces of a LPR and other space habitats. This work contributes significantly to NASA's goals of supporting human health and performance in deep space exploration, paving the way for sustainable long-term presence beyond Low Earth Orbit through advanced, biomechanically-informed exercise solutions.

C Wang↗

Assessment of the Mechanical Stress Improvement Process for Mitigating Primary Water Stress Corrosion Cracking in Nickel Alloy Butt Welds in Piping Systems Approved for Leak-Before-Break

In recent years, operating experience has shown that Alloy 82/182/600 materials used in reactor coolant system (RCS) pressure boundaries of pressurized water reactors (PWRs) are susceptible to primary water stress corrosion cracking (PWSCC). Cracking can initiate at the inside surface of these materials, in part, because of tensile residual stresses introduced by welding. These materials are present in piping systems that were approved by the U.S. Nuclear Regulatory Commission (NRC) for leak before-break (LBB) before PWSCC was found in RCS dissimilar metal butt welds. The identification of PWSCC led to concerns regarding the potential effect of this degradation on existing LBB analyses. In response to these concerns, the NRC Office of Nuclear Regulatory Research initiated a program entitled, “PWSCC in Leak-Before-Break Systems,” and a follow-on program entitled, “Degradation in Extremely Low Probability of Rupture (xLPR) Systems.” Under these programs, Pacific Northwest National Laboratory (PNNL) is assessing the various strategies being used by industry to manage potential or existing PWSCC in susceptible welds in piping systems approved for LBB. The commercial nuclear power industry has implemented strategies to manage potential or existing PWSCC at Alloy 82/182 dissimilar metal welds (DMW) in PWRs. One general strategy consists of management by a combination of mitigation plus inspection, where several mitigation techniques have been used by industry. The other general strategy is to manage potential PWSCC by inspection alone. At the request of the NRC, the American Society of Mechanical Engineers (ASME) took actions to develop improvements to the existing Code requirements to address the potential for PWSCC in Class 1 PWR piping butt welds fabricated with Alloy 82/182 weld materials. The ASME developed Code Case N-770, “Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities, Section XI, Division 1.” It was realized that the Code Case needed to be revised to address specific examinations such as welds with a design life of less than 10 years and post-weld preservice surface examinations. In general, the revised Code Case (N-770-1) has requirements for inspection of unmitigated as well as mitigated Alloy 82/182 RCS butt welds. As such, specific inspection requirements for welds mitigated by the Mechanical Stress Improvement Process (MSIP®), the subject of this technical letter report (TLR), are contained in the Code Case. The NRC incorporated ASME Code Case N-770-1 by reference into §50.55a (76 FR 36232, p. 36278) in June 2011.

MSIP↗

Suppressing Ordering in Equiatomic Fe-Co via Laser Powder Bed Fusion

Neutron and electron diffraction was employed to evaluate the effectiveness of thermal management strategies in suppressing the formation of the equilibrium-ordered B2 (CsCl) phase in equiatomic binary Fe-Co specimens fabricated by laser powder bed fusion additive manufacturing. Specimens with a tensile dogbone geometry were fabricated using various combinations of process parameters (laser power and raster speed) and thermal management strategies (no support struts, struts only in the top gauge section, and struts throughout the gauge section). Diffraction results demonstrate that the rapid solidification during PBF-L effectively minimized B2 formation, with laser power and effective scan velocity having no significant impact on the degree of ordering. Furthermore, the inclusion of support struts in the top grip region had no perceivable impact on ordering, whereas specimens with support struts in the gauge region exhibited no detectable ordering. Results are discussed in the context of thermal finite element analysis predictions.

Laser Material Processing↗

Maui Smart Grid Demonstration Project Managing Distribution System Resources for Improved Service Quality and Reliability, Transmission Congestion Relief, and Grid Support Functions

The Maui Smart Grid Project (MSGP) is under the leadership of the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii at Manoa. The project team includes Maui Electric Company, Ltd. (MECO), Hawaiian Electric Company, Inc. (HECO), Sentech (a division of SRA International, Inc.), Silver Spring Networks (SSN), Alstom Grid, Maui Economic Development Board (MEDB), University of Hawaii-Maui College (UHMC), and the County of Maui. MSGP was supported by the U.S. Department of Energy (DOE) under Cooperative Agreement Number DE-FC26-08NT02871, with approximately 50% co-funding supplied by MECO. The project was designed to develop and demonstrate an integrated monitoring, communications, database, applications, and decision support solution that aggregates renewable energy (RE), other distributed generation (DG), energy storage, and demand response technologies in a distribution system to achieve both distribution and transmission-level benefits. The application of these new technologies and procedures will increase MECO’s visibility into system conditions, with the expected benefits of enabling more renewable energy resources to be integrated into the grid, improving service quality, increasing overall reliability of the power system, and ultimately reducing costs to both MECO and its customers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EGRET observations of the Vela pulsar, PSR0833-45

During the all sky survey (May 1991 to November 1992) of the Compton Gamma Ray Observatory, the Vela pulsar PSR0833-45 was in the field of view of the Energetic Gamma Ray Experiment Telescope (EGRET) in ten separate viewing periods. The pulsar was detected in each one. The average intensity from 100 MeV to 2GeV was (7.8 +/- 1.0) x 10(exp -6) photons /sq cm/s, which indicates that the pulsar in the years 1991/92 was in a state comparable to the low fluxes observed in 1977-1980. No significant changes in intensity were detected during the EGRET observations. The total spectrum of PSR0833-45 measured by EGRET can be described by a power-law with index -1.70 +/- 0.02 over the range 30 MeV to 2 GeV. The extrapolation of this spectrum into the 3-30 MeV range agrees with the observations by COMPTEL. Above 2-4 GeV EGRET detects a strong spectral break. The lightcurves obtained show a familiar structure in the phase histogram: two peaks separated by 0.424 +/- 0.002 in phase with considerable emission in the phase interval between the peaks. The first gamma ray peak maximum trails the single radio peak maximum by 10.54 +/- 0.09 ms (= 0.118 +/- 0.001 in phase). The widths of the emission peaks (FWHM) are 2.7 ms for the first peak (0.03 phase) and 4.1 ms for the second peak (0.05 phase). The widths are approximately constant below a GeV, but show a tendency to become narrower at higher energies. The statistics available for the Vela observations allow for a division of the lightcurve into eight phase intervals. The emission peak cores (central FWHM) with leading and trailing wings and two interval regions were defined and spectra were derived for all parts of the lightcurve. The energy spectra for the eight phase intervals show significant differences: the first peak (approximately E(exp -1.81 +/- 0.04)) is somewhat softer than the second peak (approximately E(exp -1.71 +/- 0.03)); the wings attached to each peak show softer spectra than the core of the peaks; the interval emission has the hardest spectrum (approximately E(exp -1.52 +/- 0.03)).

Kanbach, G.↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

From Lift-Off to Light-Off

Shuttle's propellant measurement system is produced by Simmonds Precision. Company has extensive experience in fuel management systems and other equipment for military and commercial aircraft. A separate corporate entity, Industrial Controls Division was formed due to a number of non-aerospace spinoffs. One example is a "custody transfer" system for measuring and monitoring liquefied natural gas (LNG). LNG is transported aboard large tankers at minus 260 degrees Fahrenheit. Value of a single shipload may reach $15 million. Precision's LNG measurement and monitoring system aids accurate financial accounting and enhances crew safety. Custody transfer systems have been provided for 10 LNG tankers, built by Owing Shipbuilding. Simmonds also provided measurement systems for several liquefied petroleum gas (LPG) production and storage installations. Another spinoff developed by Simmonds Precision is an advanced ignition system for industrial boilers that offers savings of millions of gallons of fuel, and a computer based monitoring and control system for improving safety and reliability in electrical utility applications. Simmonds produces a line of safety systems for nuclear and non-nuclear electrical power plants.

Source record↗

Measured Thermal and Fast Neutrons Fluence Rates for ATF-1 Holders During ATR Cycle 166B

This report contains the thermal (2200 m/s) and fast (E>lMeV) neutron fluence rate data for the ATF-1 holders located in core for ATR Cycle 166B which were measured by the Radiation Measurements Laboratory (RML) as requested by the Power Reactor Programs (ATR Experiments) Radiation Measurements Work Order. This report contains measurements of the fluence rates corresponding to the particular elevations relative to the 80-ft. core elevation. The data in this report consist of (1) a table of the ATR power history and distribution, (2) a hard copy listing of all thermal and fast neutron fluence rates, and (3) plots of both the thermal and fast neutron fluence rates. All "BR" holder monitor wires for this cycle are 56.375 inches long. This length allows measurements from 31.17 inches above core midplane to 19.81 inches below core midplane. The distance from the end of the wires to the first count position was 4.25 inches for all wires counted from this cycle. The monitors were located in an outward small I-holes,1-22 and 1-23. Thermal neutron fluence was determined based on the activation of the CoAl wires and resonance corrections determined in the irradiation of Cycle 152A when the RML measured cadmium-covered as well as bare neutron monitors in the Southwest, Southeast, and H positions at the Center lobe to determine the division in neutron energy between epithermal and thermal neutrons. For more information please refer to letter “Radiation Measurements Laboratory measurements of in core ATR physics testing during cycle 152A. The measured values documented in RML procedure, “ACMM-3600, Flux Monitoring,” will be used indefinitely until further measurements supersede the current values. Fast neutron fluence was determined using the activation of nickel wires. Typically, a fission spectrum averaged cross section (E>1 MeV) is used as determined in detailed measurements described in “ATR Neutron Spectral Characterization,” which gives an effective cross section of 97 mb for the small I-holes. However, those measurements were performed with unfueled experiments. The fast fluence values reported here use a perturbed 114 mb effective>1 MeV spectrum averaged cross section for the small I-holes based on MCNP simulations for a previous fueled experiment in the1-24 position. Refer to “LWR- ATR Irradiation Measured Thermal and Fast Neutron Fluence Rates ATR CYCLE 133A 04/19/04 thru 05/17/04” for more information.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Consideration for the application of artificial neural networks to criticality code validation - 14270

The artificial neural network (ANN) is a consistent example for non-parametric parameter estimation and regression, with powerful universal approximation properties, that is distribution independent. ANN application to criticality code validation centers on aligning mathematical relationships between code validation parameters and neural network prediction for those parameter values. Two specific goals are: (1) an appropriate ANN architecture to determine validation parameter values, and (2) bootstrapping individual ANNs as a 'Prediction Interval' (PI) technique to estimate the Calculation Margin and Upper Subcritical Limit. The individual ANN workflow is segregated into Training, Validation (network), and Testing Sets, where the network predictive properties and performance are expressed in the latter set. The Bootstrap ANN replicates a large set of individual ANNs (taken from the original data distribution) where (1-α/2)100% PI estimates can be determined. Results from the ANN method are compared to a variety of validation examples: a 'toy example' from ANSI/ANS-8.24, Appendix D, a variety of methods noted in a Nuclear Criticality Safety Division 2009 paper, and several validation campaigns for highly enriched uranium and plutonium systems. The ANN method is robust and can be applied to single or multivariate inputs. A trained ANN can provide both an average estimate (e.g., single value) and an estimate over a range of independent variable values where the kUSL can be formed in a regression relationship suitable for extrapolation. The input dependence has been tested, ranging from 15 to over 400 sample size distributions. An expanded Shapiro-Wilk test (for sample sizes up to 5000) was implemented to confirm that the ANN method is transparent to distribution function. The Principle Component Analysis method was applied as an input preprocessing step embedded within the ANN in order to reduce dimensionality and correlation for multivariable inputs. This can potentially aid in determining accurate margins over applying arbitrary margins. The automatic optimization of the Bootstrap ANN PI is left for future consideration. (authors)

42 ENGINEERING↗

Ultraviolet, visible, and gravity astrophysics: A plan for the 1990's

NASA's Office of Space Science and Applications (OSSA) receives advice on scientific strategy and priorities from the U.S. National Academy of Sciences. Guidance to the OSSA Astrophysics Division, in particular, is provided by dedicated academy committees, ad hoc study groups, and, at ten-year intervals, by broadly mandated astronomy and astrophysics survey committees charged with making recommendations for the coming decade. Many of the academy's recommendations have important implications for the conduct of ultraviolet and visible-light astronomy from space. Moreover, these areas are now poised for an era of rapid growth. Through technological progress, ultraviolet astronomy has already risen from a novel observational technique four decades ago to the mainstream of astronomical research today. Recent developments in space technology and instrumentation have the potential to generate comparably dramatic strides in observational astronomy within the next ten years. In 1989, the Ultraviolet and Visible Astrophysics Branch of the OSSA Astrophysics Division recognized the need for a new, long-range plan that would implement the academy's recommendations in a way that yielded the most advantageous use of new technology. NASA's Ultraviolet, Visible, and Gravity Astrophysics Management Operations Working Group was asked to develop such a plan for the 1990's. Since the branch holds programmatic responsibility for space research in gravitational physics and relativity, as well as for ultraviolet and visible-light astrophysics, missions in those areas were also included. The working group met throughout 1989 and 1990 to survey current astrophysical problems, assess the potential of new technologies, examine prior academy recommendations, and develop the implementation plan. The present report is the product of those deliberations. Key astrophysical questions to be addressed cover topics such as the structure and evolution of the early universe, energetics of active galactic nuclei, stellar winds in massive stars, sources powered by accretion, composition and state of the interstellar medium, nature of the galactic halo, chromospheric activity in cool stars, and formation of stars and planetary systems. This document provides a review of these questions, program concerns, and the recommended implementation plan for the 1990's.

Source record↗

ON THE POPULATIONS OF RADIO GALAXIES WITH EXTENDED MORPHOLOGY AT z < 0.3

Extended extragalactic radio sources have traditionally been classified into Fanaroff and Riley (FR) I and II types, based on the ratio r{sub s} of the separation S between the brightest regions on either sides of the host galaxy and the total size T of the radio source (r{sub s} {identical_to} S/T). In this paper, we examine the distribution of various physical properties as a function of r{sub s} of 1040 luminous (L {approx}> L{sub *}) extended radio galaxies (RGs) at z < 0.3 selected with well-defined criteria from the SDSS, NVSS, and FIRST surveys. About 2/3 of the RGs are lobe dominated (LD) and 1/3 have prominent jets. If we follow the original definition of the FR types, i.e., a division based solely on r{sub s} , FR I and FR II RGs overlap in their host galaxy properties. However, the rare LD sources with r{sub s} {approx}> 0.8 and [O III] {lambda}5007 line luminosity >10{sup 6} L{sub sun} are markedly different on average from the rest of the RGs, in the sense that they are hosted in lower mass galaxies, live in relatively sparse environments, and likely have higher accretion rates onto the central supermassive black hole (SMBH). Thus, these high emission line luminosity, high-r{sub s} LD RGs, and the rest of RGs form a well-defined dichotomy. Motivated by the stark differences in the nuclear emission line properties of the RG subsamples, we suggest that the accretion rate onto the SMBH may play the primary role in creating the different morphologies. At relatively high accretion rates, the accretion system may produce powerful jets that create the 'classical double' morphology (roughly corresponding to the LD sources with r{sub s} {approx}> 0.8 and emission lines); at lower accretion rates, the jets from a radiatively inefficient accretion flow generate radio lobes without apparent 'hot spots' at the edge (corresponding to the majority of LD sources). At slightly lower accretion rates and in galaxies with dense galactic structure, sources with prominent jets result. It is possible that while the high accretion rate systems could affect sub-Mpc scale environments, the jets from lower accretion rate systems may efficiently suppress activity within the host galaxies.

79 ASTRONOMY AND ASTROPHYSICS↗

Final technical report for: Insertional Mutagenesis of Brachypodium distachyon DE-AI02-07ER64452

Several bioenergy grasses are poised to become a major source of energy in the United States. Despite their increasing importance, we know little about the basic biology underlying the traits that control the utility of grasses as energy crops. Better knowledge of grass biology (e.g. identification of the genes that control cell wall composition, plant architecture, cell size, cell division, reproduction, nutrient uptake, carbon flux, etc.) could be used to design rational strategies for crop improvement and shorten the time required to domesticate these species. The use of an appropriate model system is an efficient way to gain this knowledge. Brachypodium distachyon is a small annual grass with all the attributes needed to be a modern model organism including simple growth requirements, fast generation time, small stature, small genome size and self-fertility. These attributes led to the recommendation in the DOE’s “Breaking the Biological Barriers to Cellulosic Ethanol: A Joint Research Agenda” report to propose developing and using B. distachyon as a model for energy crops to accelerate their domestication. Strategic investments (e.g. genome sequencing) in B. distachyon by the DOE are now bearing fruit and B. distachyon is being used as a model grass by hundreds of laboratories worldwide. Sequence indexed insertional mutants are an extremely powerful tool for both forward and reverse genetics. They allow researchers to order mutants in any gene tagged in the collection by simply emailing a request. The goal of this project was to create a collection of sequence indexed insertional mutants (T-DNA lines) for the model grass Brachypodium distachyon in order to facilitate research by the scientific community. During the course of this grant we created a collection of 23,649 B. distachyon T-DNA lines and identified 26,112 unique insertion sites. The collection can be queried through the project website (http://jgi.doe.gov/our-science/science-programs/plant-genomics/brachypodium/brachypodium-t-dna-collection/) and through the Phytozome genome browser (http://phytozome.jgi.doe.gov/pz/portal.html). The collection has been heavily utilized by the research community and, as of October 23, 2015, 223 orders for 12,069 seeds packets have been filled. In addition to creating this resource, we also optimized methods for transformation and sequencing DNA flanking insertion sites.

09 BIOMASS FUELS↗

Dynamic cell culture system: a new cell cultivation instrument for biological experiments in space

The prototype of a miniaturized cell cultivation instrument for animal cell culture experiments aboard Spacelab is presented (Dynamic cell culture system: DCCS). The cell chamber is completely filled and has a working volume of 200 microliters. Medium exchange is achieved with a self-powered osmotic pump (flowrate 1 microliter h-1). The reservoir volume of culture medium is 230 microliters. The system is neither mechanically stirred nor equipped with sensors. Hamster kidney (Hak) cells growing on Cytodex 3 microcarriers were used to test the biological performance of the DCCS. Growth characteristics in the DCCS, as judged by maximal cell density, glucose consumption, lactic acid secretion and pH, were similar to those in cell culture tubes.

NASA Program Flight↗

Design and development of permanent magnet based focusing lens for J-Band Klystron

Applying permanent magnet technology to beam focusing in klystrons can reduce their power consumption and increase their reliability of operation. Electromagnetic design of the beam focusing elements, for high frequency travelling wave tubes, is very critical. The magnitude and profile of the magnetic field need to match the optics requirement from beam dynamics studies. The rise of the field from cathode gun region to the uniform field region (RF section) is important as the desired transition from zero to peak axial field must occur over a short axial distance. Confined flow regime is an optimum choice to minimize beam scalloping but demands an axial magnetic field greater than 2 - 3 times the Brillouin flow field. This necessitates optimization in the magnet design achieve high magnetic field within given spatial constraints. Electromagnetic design and simulations were done using 3D Finite element method (FEM) analysis software. A permanent magnet based focusing lens for a miniature J-Band klystron has been designed and developed at Control Instrumentation Division, BARC. This paper presents the design, simulation studies, beam transmission and RF tests results for J Band klystron with permanent magnet focusing lens. (author)

43 PARTICLE ACCELERATORS↗

CDMA with interference cancellation for multiprobe missions

Code division multiple-access spread spectrum has been proposed for use in future multiprobe/multispacecraft missions. This article considers a general parallel interference-cancellation scheme that significantly reduces the degradation effect of probe (user) interference but with a lesser implementation complexity than the maximum-likelihood technique. The scheme operates on the fact that parallel processing simultaneously removes from each probe (user) the total interference produced by the remaining most reliably received probes (users) accessing the channel. The parallel processing can be done in multiple stages. The proposed scheme uses tentative decision devices with different optimum thresholds at the multiple stages to produce the most reliably received data for generation and cancellation of probe/spacecraft interference. The one-stage interference cancellation was analyzed for two types of tentative decision devices, namely, hard and null zone decisions. Simulation results are given for one- and two-stage interference cancellation for equal as well as unequal received power probes.

Divsalar, D.↗