Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Maturing Technologies for Stirling Space Power Generation

Stirling Radioisotope Power Systems (RPS) are being developed as an option to provide power on future space science missions where robotic spacecraft will orbit, flyby, land or rove. A Stirling Radioisotope Generator (SRG) could offer space missions a more efficient power system that uses one fourth of the nuclear fuel and decreases the thermal footprint of the current state of the art. The RPS Program Office, working in collaboration with the U.S. Department of Energy (DOE), manages projects to develop thermoelectric and dynamic power systems, including Stirling Radioisotope Generators (SRGs). The Stirling Cycle Technology Development (SCTD) Project, located at Glenn Research Center (GRC), is developing Stirling-based subsystems, including convertors and controllers. The SCTD Project also performs research that focuses on a wide variety of objectives, including increasing convertor temperature capability to enable new environments, improving system reliability or fault tolerance, reducing mass or size, and developing advanced concepts that are mission enabling. Research activity includes maturing subsystems, assemblies, and components to prepare them for infusion into future convertor and generator designs. The status of several technology development efforts are described here. As part of the maturation process, technologies are assessed for readiness in higher-level subsystems. To assess the readiness level of the Dual Convertor Controller (DCC), a Technology Readiness Assessment (TRA) was performed and the process and results are shown. Stirling technology research is being performed by the SCTD Project for NASA's RPS Program Office, where tasks focus on maturation of Stirling-based systems and subsystems for future space science missions.

High-Temperature Linear Alternator↗

Modular Zero Energy Ready Homes: Bright Built - Maine

Kaplan Thompson Architects (KTA) has specialized in sustainable, energy-efficient buildings, and they have designed several custom, zero-energy homes in New England. These zero-energy projects have generally been high-end, custom homes with budgets that could accommodate advanced energy systems. In an attempt to make zero energy homes more affordable and accessible to a larger demographic, KTA explored modular construction as way to provide high-quality homes at lower costs. In mid-2013, KTA formalized this concept when they launched BrightBuilt Home (BBH). The BBH mission is to offer "a line of architect-designed, high-performance homes that are priced to offer substantial savings off the lifetime cost of a typical home and can be delivered in less time." For the past two years, CARB has worked with BBH and Keiser Homes (the primary modular manufacturer for BBH) to discuss challenges related to wall systems, HVAC, and quality control. In Spring of 2014, CARB and BBH began looking in detail on a home to be built in Lincolnville, ME by Black Bros. Builders. This report details the solution package specified for this modular plan and the challenges that arose during the project.

air sealing↗

NASA TEERM Principal Center Non-Chrome Projects

Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center Mission is to identify and validate environmental technologies through joint activities that enhance mission readiness and reduce risk while minimizing duplication and associated costs.

Rothgeb, Matthew↗

Development of a Thermal Spray, Redox Stable, Ceramic Anode for Metal Supported SOFC

In this program, GE global research and GE fuel cells in Malta conducted thermal spray optimization experiments, initially focusing on a well-established ceramic anode formulation, lanthanum strontium titanate combined with gadolinium doped ceria. Powder engineering work was conducted both internally and with vendors to develop repeatable, stable, and flowable thermal spray feedstocks. Agglomerate sintering was conducted in the last phase of the project, building on earlier program work, and was used to increase run stability during the longer scaled up runs for the 410 cm 2 cells. Further powder engineering would be needed to fully design a powder ready for full scale manufacturing. During preliminary work on the LST-GDC electrodes, GE demonstrated 100 cm 2 stacks enduring multiple redox cycles with limited impact. Another key finding on the project was the identification of process conditions for two component ceramic anode thermal spray without the formation of phase impurities which were present in all early work on the program. GE global research and West Virginia University screened a large number of ceramic anode formulations, focused on identifying materials with ideal materials properties for use in SOFC anodes. In addition, synthetic scaling research was conducted to increase powder synthesis batch size several orders of magnitude during the course of project work. West Virginia University was able to show button cells using two component ceramic anodes which produced > 890 mW/cm 2 and even a single component SOFC button demonstrating > 1 W/cm 2 performance. These button cell tests show the great potential of these redox stable materials. Down-selected ceramic anode formulations were combined with the optimized thermal spray process methods to first demonstrate multiple groups of 100 cm 2 SOFC stacks able to achieve the power density goals for the project. GE research also quickly investigated the performance of a subset of these formulations on long term degradation tests and assessed their performance on simulated natural gas reformate. In the final phase of the program, scaling activities were employed to translate from the 100cm2 process up to 410 cm 2 . Two large format 10-cell stack tests were completed, and one of these stacks produced 0.987 kW which is one of the highest power demonstrations of ceramic anode, metal support, SOFC technology known to GE. These ceramic anode stacks had been produced with all other materials in the stack held constant, demonstrating the flexibility of the thermal spray process in scaling to very large electrode size.

30 DIRECT ENERGY CONVERSION↗

Staying Current: A Community Readiness Framework for Marine Energy Applied to River Current Energy in Alaska

Marine energy-including wave, tidal, and river current energy-can provide a local energy source for rural and remote communities. Marine energy has the potential to bolster self-sufficiency and create economic opportunities while preserving ecological integrity. Communities may be interested in deploying, testing, and advancing these early-stage technologies to meet their needs. However, limited capacity, workforce constraints, and other barriers can challenge development. To better understand a community's interest in and preparedness for marine energy, we developed a suite of 150 'metrics of readiness.' Organized across seven categories-technical, social, environmental, strategic, governance, economic, financial-and 29 subcategories, the metrics provide a holistic perspective beyond the technical aspects of an energy device. We conducted a desktop application of the metrics of readiness for Igiugig, Alaska. The metrics were applied retrospectively for two points in time: before (2009) and after (2018) in-stream testing of a river current energy device. By documenting changes among categories and subcategories of the metrics, our results show the evolving nature of community readiness for river current energy. They also illustrate how our interdisciplinary framework captures the investment in environmental effects research and commitment to strategic planning that occurred in Igiugig. In future applications, we envision the framework could be used to foster public engagement in marine energy, collaborate with communities in project development, shape capacity building activities, prioritize investments, and inform research needs. While our study focuses on enabling river current energy in Alaska, the metrics of readiness have the potential to inform implementation of other renewable technologies with communities in new geographies.

13 HYDRO ENERGY↗

TEAMER: Supporting model output files for Environmental Compliance Framework for Floating Tidal Turbines, Cook Inlet, AK

Orbital Marine Power (Orbital) is seeking to deploy their floating tidal technology in US waters and has considered the possibility of deploying in temperate waters including the Pacific Northwest (PNW) and the Western Passage, Maine. It has become apparent that some of the most promising tidal sites in the US are located in high latitudes, within the State of Alaska. Within the state, the most likely sites for grid-scale tidal energy are in Cook Inlet, with the largest city (Anchorage) located on the shores, ready and able to absorb the electrical output of a commercial scale tidal development. Through the TEAMER project, Pacific Northwest National Laboratory (PNNL) developed a framework to select environmentally compliant sites partially based on hydrodynamic model output. This uploaded dataset summarizes the key hydrodynamic model output files discussed in the TEAMER project report. Please unzip the file to see actual data files and the ReadMe file. This project is part of the TEAMER RFTS 4 (request for technical support) program.

16 TIDAL AND WAVE POWER↗

Composite Cathode Architectures Made By Freeze-Casting for All Solid State Lithium Batteries (CRADA Final Report)

As part of a Battery 500 seedling project, MBRDNA partnered with LBNL and Montana State University (MSU) to develop solid-state batteries based on an Al-substituted LLZO (Li 7 La 3 Zr 2 O 12 ) ceramic ion-conductor. All solid-state lithium batteries are attractive contenders for use as power sources for electric vehicles because of their potential for better safety and higher energy density than state-of-the-art lithium-ion batteries, although they are still at early stages of development. Al-substituted LLZO is one of the most promising solid electrolytes for battery applications based on high ionic conductivity, a wide operating voltage window, and apparent stability vs. reduction by lithium. However, difficulties with processing thin (< 20 $\textit{um}$ and dense LLZO membranes have hampered development of devices based on this material. It is non-compressible and must be sintered at high temperatures to densify components. It is also difficult to maintain contact between the active cathode material and LLZO in the composite cathodes, which is critical for successful operation. This research project aimed to use novel processing methods to overcome these issues. The end result was the first ever-reported truly all solid-state battery based on LLZO operating at room temperature without application of exogenous pressure. During the course of the project, we also identified a number of issues that need to be addressed to improve the technology readiness level of this battery.

25 ENERGY STORAGE↗

Presolar Grains as Tracers of Nebular Processes

This grant provided two years of funding to investigate the abundances of presolar diamond, SiC, and graphite in primitive chondritic meteorites. The original proposal was for a three-year study, but two years of funding were awarded. The proposed work plan for the first year included preparation of acid residues for two meteorites and noble-gas measurements on those residues and residues of two other meteorites that had been previously prepared. The meteorites to be measured were Acfer 003, Adrar 214, RC075, and Axtell. In the second year, the plan called for measuring Renazzo and Murchison, and beginning chemical processing on another set of meteorites, including Murray, which were to be measured in the third year. All of the meteorites listed above have been measured and the results were presented in three abstracts. The project is continuing under follow-on grants and one of two planned major papers is almost ready for submission.

Huss, Gary R.↗

Design Improvements and X-Ray Performance of a Time Projection Chamber Polarimeter for Persistent Astronomical Sources

The design of the Time-Projection Chamber (TPC) Polarimeter for the Gravity and Extreme Magnetism Small Explorer (GEMS) was demonstrated to Technology Readiness Level 6 (TRL-6)3 and the flight detectors fabricated, assembled and performance tested. A single flight detector was characterized at the Brookhaven National Laboratory Synchrotron Light Source with polarized X-rays at 10 energies from 2.3-8.0 keV at five detector positions. The detector met all of the GEMS performance requirements. Lifetime measurements have shown that the existing flight design has 23 years of lifetime4, opening up the possibility of relaxing material requirements, in particular the consideration of the use of epoxy, to reduce risk elsewhere. We report on design improvements to the GEMS detector to enable a narrower transfer gap that, when operated with a lower transfer field, reduces asymmetries in the detector response. In addition, the new design reduces cost and risk by simplifying the assembly and reducing production time. Finally, we report on the performance of the narrow-gap detector in response to polarized and unpolarized X-rays.

GEMS↗

EVA Suit Studies: Human Forward Contamination Project

Background: NASA Strategic Knowledge Gap B5: Forward Contamination for Mars. Issue: we have knowledge gaps!: Whether / how microbes are released from crewed pressure systems. Why do we care?: Informs Mars operational concepts - How to protect the science; Informs architecture decisions - How “open” Environmental Control and Life Support (ECLS) systems are; Informs landing site selection decisions - How close we can land / operate to where life may be present. Project goal: get some data to fill in these gaps: Data will help determine whether we’re ready to go to Mars, or if we need to change our systems or operational designs.

Rucker, Michelle↗

Low-energy Trajectories From Geosynchronous Transfer Orbits to Lunar Libration Orbits

The ability to reduce the cost of space missions beyond Earth orbit by leveraging innovative concepts is of great interest in the field of spaceflight. In this paper, the trajectory design for a mission from an inclined geosynchronous transfer orbit (GTO) to an Earth-Moon L2 Halo orbit is presented. The mission scenario for this investigation involves the use of a small satellite launched in a rideshare configuration and the use of a low-energy transfer to reach the target orbit. As a consequence of choosing a rideshare launch, the mission scenario entails critical uncertainties on the time of launch and injection parameters of the spacecraft, which could complicate the insertion into a low-energy transfer. Thus, the goal of the project is to develop a robust design methodology to deal with the launch uncertainties and assess launch readiness at any time of the year.

Wilson, Roby↗

Making Better Use of Satellite Data: The Satellite Needs Working Group

The U.S. Group on Earth Observations (USGEO) initiated in 2016 the Satellite Needs Working Group (SNWG) to identify and communicate the Earth observation needs of U.S. federal agencies. The SNWG identifies such needs through a biennial survey followed by interviews and follow-up discussions by the satellite Earth data providers of the U.S. Government: the National Aeronautics and Space Administration (NASA), the National Oceanic and Atmospheric Administration (NOAA), and the U.S. Geological Survey (USGS). Solutions and services are identified that leverage current or upcoming satellite missions to meet the identified needs; implementation of services that are estimated to significantly increase the level of satisfaction of multiple U.S. agencies are funded by NASA. The SNWG process has resulted in the implementation of numerous services that have impacted operations of not only U.S. agencies but of academic and international institutions as well. Notable examples include the Harmonized Landsat Sentinel-2 project that leverages European Space Agency (ESA) and NASA satellite assets to generate a global, analysis-ready, surface reflectance product with a temporal resolution of two days; the Airborne Data Management Group that curates and provides access to relevant resources, information and data from existing and past NASA field campaigns; and the Dynamic Surface Water Extent product which consists of harmonized but independent water extents derived from both from optical and radar data. These and other products are hosted at the NASA Distributed Active Archive Centers (DAACs) for free and open access. The SNWG Management Office at NASA’s Interagency Implementation and Advanced Concepts Team (IMPACT) manages the implementation of selected solutions and, importantly, NASA’s response to the needs of federal agencies through a Stakeholder Engagement Program. The impact of implemented services and solutions is hampered without efforts to build capacity around the use of the services. The Stakeholder Engagement Program ensures relevant training and outreach to SNWG agencies in collaboration with each solution implementation team.

remote sensing↗

Young Leaders Workforce Training Program Overview and Impact

To support the Government of Colombia's plans to transform its power sector, the U.S. Agency for International Development (USAID) has assembled a cross-organizational team to develop and deliver a comprehensive workforce training program for young energy sector leaders in Colombia designed to enhance the efficient integration of growing volumes of variable renewable energy (VRE) to the energy sector. The team - which includes USAID's Colombia Mission, the National Renewable Energy Laboratory (NREL), USAID's Scaling Up Renewable Energy (SURE) program implemented by Tetra Tech, and the U.S. Energy Association (USEA) - collaboratively developed a series of seven capacity building modules designed to ready Colombia's energy sector workforce to participate in the construction, operation, and grid integration of VRE projects, such as wind and solar. This brochure highlights the program's objectives, results, and impacts to date.

Colombia↗

“Just Do It” Mission Operations Training in a COVID World

“No”- “not”- “can’t do it” – these words don’t fly in M2020 Mission Operations. The M2020 Surface Mission Operations Team trained for landing the Perseverance Rover under COVID-19 remote work/mandatory stay-at-home conditions. Training activities included presenting Flight Schools to the team via video conferencing, training COVID personal safety requirements to on-premises staff, and constantly updating and communicating COVID restrictions to the team as safety requirements changed. This paper explores the impact of COVID on the Mission System Training for M2020 Mission Operations. The layers of COVID, aptly named the “COVID Tax” by team management, affected project roles, communications, personnel interactions, operations facility usage and training exercises practiced by the team. Flight Schools and Operational Readiness Tests (ORTs) are driving forces behind the surface mission operations training. These activities work hand-in-hand to prepare the team for landing day, surface operations that transition from cruise to nominal operations, and nominal operations. Under normal training conditions, Flight Schools and ORTs are only concerned with tactical operations for the Uplink (Command) Downlink (Analysis) and Campaign Implementation (Planning) Teams of scientists and system engineers. Due to COVID, and the necessity to maintain physical distance between people, training for the landing team needed to include the new category of COVID personal safety. COVID also necessitated remote teams and video conferencing of the entirety of Flight Schools. This reliance on distance learning had not been done on previous missions. We will explore the advantages and disadvantages of video conferencing as a training platform; training effectiveness in communicating and practicing the multiple changes to the COVID safety protocols; and the timing in which we received and responded to COVID directives. Additionally, this paper will review the practical measures taken by the on-premises team and how the team adapted during the readiness tests, landing, and early mission operations, as well as how the team responded to the post-vaccine ramping down of COVID Protocols. The M2020 Surface Mission Operations Team responded very well to the challenges of COVID. All pre-landing operational and COVID-related training was completed. Post-landing COVID Training was provided as needed to new on-premises personnel. Training presented on COVID for the first operational readiness test (ORT) consisted of 2.5 hours of training. Each ORT had COVID Training. A person who had participated in all of the ORTs from September 2020 – February 2021 would have received over 7 hours of COVID Training. By ORT-12 (approximately 8 weeks after the first ORT), the Training team consolidated the original COVID training to a one-hour COVID Basic Training course, with additional recommended training. The Basic training course was updated after landing, as vaccines became available. COVID Training had multiple Flight Schools in the self-directed Blackboard Learning system, as well as a Quick Reference Wiki for Onboarding of new on-premises personnel and keeping on-premises personnel up-to-date. COVID Training covered many topics including practical methods of 6-foot distancing, how to interact with an IT professional when help was needed at a workstation, and challenging indoor meal-eating protocols. COVID Training continued to be updated, as the lab and the project respond to the virus variants and federal, state and local ordinances.

Rosette, Theresa↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

The Impact of CCS Readiness on the Evolution of China's Electric Power Sector

In this study, GCAM-China is exercised to examine the impact of CCS availability on the projected evolution of China’s electric power sector under the Paris Increased Ambition policy scenario developed by Fawcett et al. based on the Intended Nationally Determined Contributions (INDCs) submitted under the COP-21 Paris Agreement. This policy scenario provides a backdrop for understanding China’s electric generation mix over the coming century under several CCS availability scenarios: CCS is fully available for commercial-scale deployment by 2025; by 2050; by 2075; and CCS is unavailable for use in meeting the modelled mitigation targets through 2100. Without having CCS available, the Chinese electric power sector turns to significant use of nuclear, wind, and solar to meet growing demands and emissions targets, at a cost. Should large-scale CCS deployment be delayed in China by 25 years, the modeled per-ton cost of climate change mitigation is projected to be roughly $420/tC (2010 US dollars) by 2050, relative to $360/tC in the case in which CCS is available to deploy by 2025, a 16% increase. Once CCS is available for commercial use, mitigation costs for the two cases converge, equilibrating by 2085. However, should CCS be entirely unavailable to deploy in China, the mitigation cost spread, compared to the 2025 case, doubles by 2075 ($580/tC and $1130/tC respectively), and triples by 2100 ($1050/tC vs. $3200/tC). However, while delays in CCS availability may have short-term impacts on China’s overall per-ton cost of meeting the emissions reduction target evaluated here, as well as total mitigation costs, the carbon price is likely to approach the price path associated with the full CCS availability case within a decade of CCS deployment. Having CCS available before the end of the century, even under the delays examined here, could reduce the total amount of nuclear and renewable energy that must deploy, reducing the overall cost of meeting the emissions mitigation targets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Re-Envisioning RCx: Achieving Max Potential HVAC Controls Retrofits through Modernized BAS Hardware and Software

Most existing buildings have sub-optimal heating, ventilation, and air conditioning (HVAC) controls, resulting in wasted energy and occupant discomfort. Retro-commissioning (RCx) addresses many of these issues, but it is a lengthy and highly customized process. Limited capabilities of existing building automation system hardware restricts the scope of most RCx projects. Incentive programs consider building automation system (BAS) hardware retrofits to be high-capital investments and do not allow them in typical RCx programs. This paper describes work that the authors are leading to facilitate technical and market innovation in the BAS industry to unlock large savings in existing commercial buildings through deep retrofits of BAS hardware and software. California and New York research projects are demonstrating BAS retrofits leveraging the American Society of Heating, Refrigeration, and Air Conditioning Engineers’ (ASHRAE) new Guideline 36 high performance sequences of operation to achieve greater than 20 percent whole building energy savings, while saving costs and reducing risk through streamlined processes and standardization across BAS manufacturer product lines and across implementation practices. This paper describes market barriers that impede achieving deep savings from BAS retrofits in custom incentive and traditional RCx programs and presents a new maximum potential BAS retrofit model that addresses these barriers. The new model leverages the authors’ efforts in market enablement through open standards, BAS industry partnerships, and tools for cost-effective scaling that includes tools for project screening, savings calculations, and measurement and verification (M&V). This approach is widely applicable and will be ready for at-scale implementation within two years.

Paliaga, Gwelen↗