Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Experimental investigation of wood combustion in a fixed bed with hot air

Highlights: • Upward combustion is a new combustion concept with ignition by hot primary air. • Upward combustion has three stages: short drying, rapid devolatilization and char combustion. • Variation of fuel moisture and inert content have little influence on the combustion. • Experimental comparison between conventional and upward combustion is presented. - Abstract: Waste combustion on a grate with energy recovery is an important pillar of municipal solid waste (MSW) management in the Netherlands. In MSW incinerators fresh waste stacked on a grate enters the combustion chamber, heats up by radiation from the flame above the layer and ignition occurs. Typically, the reaction zone starts at the top of the waste layer and propagates downwards, producing heat for drying and devolatilization of the fresh waste below it until the ignition front reaches the grate. The control of this process is mainly based on empiricism. MSW is a highly inhomogeneous fuel with continuous fluctuating moisture content, heating value and chemical composition. The resulting process fluctuations may cause process control difficulties, fouling and corrosion issues, extra maintenance, and unplanned stops. In the new concept the fuel layer is ignited by means of preheated air (T > 220 °C) from below without any external ignition source. As a result a combustion front will be formed close to the grate and will propagate upwards. That is why this approach is denoted by upward combustion. Experimental research has been carried out in a batch reactor with height of 4.55 m, an inner diameter of 200 mm and a fuel layer height up to 1 m. Due to a high quality two-layer insulation adiabatic conditions can be assumed. The primary air can be preheated up to 350 °C, and the secondary air is distributed via nozzles above the waste layer. During the experiments, temperatures along the height of the reactor, gas composition and total weight decrease are continuously monitored. The influence of the primary air speed, fuel moisture and inert content on the combustion characteristics (ignition rate, combustion rate, ignition front speed and temperature of the reaction zone) is evaluated. The upward combustion concept decouples the drying, devolatilization and burnout phase. In this way the moisture and inert content of the waste have almost no influence on the combustion process. In this paper an experimental comparison between conventional and reversed combustion is presented.

09 BIOMASS FUELS↗

Remaining Useful Strength (RUS) Prediction of SiCf-SiCm Composite Materials Using Deep Learning and Acoustic Emission

Prognosis techniques for prediction of remaining useful life (RUL) are of crucial importance to the management of complex systems for they can lead to appropriate maintenance interventions and improvements in reliability. While various data-driven methods have been introduced to predict the remaining useful life (RUL) of machinery systems or batteries, no research has been reported on the remaining useful strength (RUS) prediction of silicon carbide fiber reinforced silicon carbide matrix (SiCf-SiCm) materials with pivotal role in its potential usage as a structural material in nuclear reactors and turbine engines. Knowledge of its degradation process is of the utmost importance to the manufacturers. For this purpose, two approaches based on the machine-learning techniques of random-forest (RF) and convolutional neural network (CNN) are proposed to predict the RUS of SiCf-SiCm using only acoustic emission (AE) signals generated during the material’s stress applying process. Experimental results show that the CNN models achieved better predictive performance than the RF models but the latter with expert-engineered features achieves better prediction for AE signals in the early stage of degradation. Additionally, our results demonstrate that both models can correctly predict the SiCf-SiCm RUS as evaluated by our robust testing method from which the best average root mean square error (RMSE) and Pearson correlation coefficient of 3.55 ksi units and 0.85 were obtained.

36 MATERIALS SCIENCE↗

The Conceptual Design of an Integrated Nuclearhydrogen Production Plant Using the Sulfur Cycle Water Decomposition System

A hydrogen production plant was designed based on a hybrid electrolytic-thermochemical process for decomposing water. The sulfur cycle water decomposition system is driven by a very high temperature nuclear reactor that provides 1,283 K helium working gas. The plant is sized to approximately ten million standard cubic meters per day of electrolytically pure hydrogen and has an overall thermal efficiently of 45.2 percent. The economics of the plant were evaluated using ground rules which include a 1974 cost basis without escalation, financing structure and other economic factors. Taking into account capital, operation, maintenance and nuclear fuel cycle costs, the cost of product hydrogen was calculated at $5.96/std cu m for utility financing. These values are significantly lower than hydrogen costs from conventional water electrolysis plants and competitive with hydrogen from coal gasification plants.

Farbman, G. H.↗

Development of Analysis Methods that Integrate Numeric and Textual Equipment Reliability Data

Within the Light Water Reactor Sustainability (LWRS) program, the Risk-Informed Systems Analysis (RISA) Pathway is performing collaborative research on the development and deployment of technologies designed to assist operating nuclear power plants (NPPs) to reduce operating costs improve plant reliability and availability. One of the RISA research areas is focusing on the development of methods and tools designed to optimize plant operations (e.g., maintenance/replacement schedules, optimal maintenance postures for plant structures, systems, and components [SSCs]) in a manner that is more cost effective than current approaches and makes better use of available SSC health data. The Risk-Informed Asset Management (RIAM) project targets this research area by creating a direct bridge between component equipment reliability (ER) data and system engineer decision making regarding maintenance activity scheduling and component aging management. In this respect, one challenge that NPP system engineers are facing is that the amount of ER data being continuously generated is not only extremely large in size, but it comes in different forms: textual (e.g., condition or maintenance reports) and numeric (e.g., generated by monitoring systems). All these data elements provide them with valuable insights and information regarding: 1) the discovery of anomalous behaviors or degradation trends, 2) the identification of the possible causes behind such behaviors/trends, and 3) the prediction of their direct consequences. However, several challenges have proved to be roadblocks to this process. While some of these challenges are technical in nature (i.e., data are often distributed over several physical servers/databases), others are conceptual in nature: data elements come in different formats (e.g., numeric or textual), and measured values have different scales (e.g., vibration spectra and oil temperature). The activities performed by the RIAM project during FY23 directly tackles the need to simultaneously integrate the analysis of ER data in all its forms, numeric and textual. Note that such task has never been performed before due to the complexity of the systems under consideration but, most importantly, because of the technical challenges behind the harmonization of ER data formats and the lack of adequate computational methods to analyze them. Our approach borrows ideas and concepts from the medical field where integration of several data sources is vital to assist medical practitioners to perform correct diagnosis and indicate optimal treatments. In our view a NPP asset is equivalent to a patient in a medical context. The main difference is the complexity of a human body is a magnitude more complex when compared to typical assets commonly present in NPPs (e.g., centrifugal pumps, or motor operated valves). This simplifies our first requirement when analyzing heterogenous ER data formats: to put data into “context”. Context is here intended as the additional piece of information that is needed by ER data analysis tools to understand what these data elements are referring to, i.e., which king of knowledge they are generating. In our context, this knowledge can be translated into models that capture the form and functional architecture of assets/systems, their dependencies, and how they interact. These models actually emulate the knowledge that that NPP system engineers possess about assets and systems; this is their key of success when analyzing ER data, their challenge is ability to handle large amount of data. Here, we employ model-based system engineering (MBSE) models of systems and assets to represent and capture their architecture and functional, i.e. cause-effect, relations. Then, ER data elements are processed by identifying first of all which elements of the developed MBSE elements they are referring to. For numeric ER data this task is fairly easy since it is possible to precisely pinpoint what MBSE elements the corresponding sensor are observing (e.g., bearing temperature of a centrifugal pump). Task is much harder for textual data since the information contained in issue or maintenance reports needs to “be understood” by a computational tool. Here we called this process as “knowledge extraction”. Once again, we borrow the experience in the medical field where methods to extract knowledge from textual data have been developed in the past decade. The missing element for us is the availability of a complete dictionary of NPP related concepts (in addition to the MBSE models presented earlier) that can put “text into context”. In FY23, such dictionary has been developed along with all the computational elements required for knowledge extraction. Lastly, once numeric and textual ER data elements have been processed and “understood”, then the last step is the discovery of possible cause-effect relations among them. This is performed by observing if a logical connection through the MBSE models exists, and if the

97 MATHEMATICS AND COMPUTING↗

Framework for Structural Online Health Monitoring of Aging and Degradation of Secondary Systems due to some Aspects of Erosion

This report describes the current state of research related to critical aspects of erosion and selected aspects of degradation of secondary components in nuclear power plants. The report also proposes a framework for online health monitoring of aging and degradation of secondary components. The framework consists of an integrated multi-sensor modality system which can be used to monitor different piping configurations under different degradation conditions. The report analyses the currently known degradation mechanisms and available predictive models. Based on this analysis, the structural health monitoring framework is proposed. The Light Water Reactor Sustainability Program began to evaluate technologies that could be used to perform online monitoring of piping and other secondary system structural components in commercial NPPs. These online monitoring systems have the potential to identify when a more detailed inspection is needed using real-time measurements, rather than at a pre-determined inspection interval. This transition to condition-based, risk informed automated maintenance will contribute to a significant reduction of operations and maintenance costs that account for the majority of nuclear power generation costs. There is unanimous agreement between industry experts and academic researchers that identifying and prioritizing inspection locations in secondary piping systems (for example, in raw water piping or diesel piping) would eliminate many excessive in-service inspections. The proposed structural health monitoring framework takes aim at answering this challenge by combining long-range guided wave technologies with other monitoring techniques, which can significantly increase the inspection length and pinpoint the locations that degraded the most. More widely, the report suggests research efforts aimed at developing, validating, and deploying online corrosion monitoring techniques for complex geometries, which are pervasive in NPPs.

47 OTHER INSTRUMENTATION↗

Light Water Reactor Sustainability Program Potential to Extend the Range of Established Online Monitoring Technologies, Such as Guided Waves in Nuclear Power Plant Systems

The Light Water Reactor Sustainability Program began to evaluate technologies that could be used to perform online monitoring of piping and other secondary system structural components in commercial NPPs. These online monitoring systems have the potential to identify when a more detailed inspection is needed using real-time measurements, rather than at a pre-determined inspection interval. This transition to condition-based, risk informed automated maintenance will contribute to a significant reduction of operations and maintenance costs that account for most nuclear power generation costs. This report describes the current state of research related to ultrasonic guided wave testing and its application to defect detection in commercial nuclear power plants. The report analyses the applicability of the guided wave technology to secondary piping systems and also study the potential for expanding the range of guided wave technology to include bent piping and other piping components. The ultrasonic guided waves can inspect long stretches of straight piping, however more complex geometries such as elbows, welds, and tees are causing spurious reflections and coherent noise which significantly decrease the sensitivity of the technique. The report analyses two approaches to suppression of coherent noise in guided wave systems: advanced signal processing and pattern recognition based on independent component analysis and blind source separation and hardware-based technique of piezoelectric paint which can be used to facilitate the propagation of mechanical stress waves through piping. It is demonstrated on simulated guided wave data that the independent component analysis is capable of separating different coherent noise components and segregating them from useful signal. The piezoelectric paint approach seem to be a viable alternative to the signal processing methods, however it requires significantly more complicated logistics and initial financial outlay. The future efforts will be concentrated on applying the independent component analysis to real-world guided wave data recorded by the guided wave monitoring system installed on the shell of the low-pressure feedwater heater 13A at Exelon Corporation’s Braidwood Nuclear Generating Station. Also, the joint EPRI-INL research efforts will focus on experimental evaluation of piezoelectric paint as a technique to extend the range of guided wave technology.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

FRAMEWORK FOR STRUCTURAL ONLINE HEALTH MONITORING OF AGING AND DEGRADATION OF SECONDARY PIPING SYSTEMS DUE TO SOME ASPECTS OF EROSION

This paper describes the current state of research related to critical aspects of erosion and selected aspects of degradation of secondary components in nuclear power plants (NPPs). The paper also proposes a framework for online health monitoring of aging and degradation of secondary components. The framework consists of an integrated multi-sensor modality system, which can be used to monitor different piping configurations under different degradation conditions. The report analyses the currently known degradation mechanisms and available predictive models. Based on this analysis, the structural health monitoring framework is proposed. The Light Water Reactor Sustainability Program began to evaluate technologies that could be used to perform online monitoring of piping and other secondary system structural components in commercial NPPs. These online monitoring systems have the potential to identify when a more detailed inspection is needed using real time measurements, rather than at a pre-determined inspection interval. This transition to condition-based, risk-informed automated maintenance will contribute to a significant reduction of operations and maintenance costs that account for the majority of nuclear power generation costs. Furthermore, of the operations and maintenance costs in U.S. plants, approximately 80% are labor costs. To address the issue of rising operating costs and economic viability, in 2017, companies that operate the national nuclear energy fleet started the Delivering the Nuclear Promise Initiative, which is a 3 year program aimed at maintaining operational focus, increasing value, and improving efficiency. There is unanimous agreement between industry experts and academic researchers that identifying and prioritizing inspection locations in secondary piping systems (for example, in raw water piping or diesel piping) would eliminate many excessive in-service inspections. The proposed structural health monitoring framework takes aim at answering this challenge by combining long range guided wave technologies with other monitoring techniques, which can significantly increase the inspection length and pinpoint the locations that degraded the most. More widely, the report suggests research efforts aimed at developing, validating, and deploying online corrosion monitoring techniques for complex geometries, which are pervasive in NPPs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Survey of prospective techniques for molten salt reactor feed monitoring

Safeguards verification measurements of nuclear material content in fresh fuel salt for liquid-fueled molten salt reactors (MSRs) are likely to be required as part of nuclear material accountancy for International Atomic Energy Agency safeguards. Here, this paper presents a comprehensive review and evaluation of 18 potential candidate techniques to quantify total uranium and 235 U for input accountancy measurements for liquid-fueled MSRs. As part of an overall screening and down-selection effort to identify the most promising techniques for further development for an MSR feed monitoring system, this paper defines eight figures of merit (FOMs): reasonably achievable measurement uncertainty, measurement time required, capital cost, burden upon the facility operator, maintenance intensity, technological maturity, human capital requirements for operation, and whether the technique introduces a path for potential material removal. Each candidate technique is then evaluated across these FOMs to identify the techniques with the highest potential for future development for fresh fuel accountancy measurements in MSRs. Our findings indicate that no single technique or combination thereof currently has the requisite technological maturity for immediate implementation in nuclear material accountancy at a liquid-fueled MSR facility. While several promising techniques are identified, there is a critical lack of experimental data for most systems in the context of molten salt applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Comparison of Options for a Pilot Plant Fusion Nuclear Mission

A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant, following a path similar to the approach adopted for the commercialization of fission. The pilot plant mission encompassed component test and fusion nuclear science missions plus the requirement to produce net electricity with high availability in a device designed to be prototypical of the commercial device. Three magnetic configuration options were developed around this mission: the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS). With the completion of the study and separate documentation of each design option a question can now be posed; how do the different designs compare with each other as candidates for meeting the pilot plant mission? In a pro/con format this paper will examine the key arguments for and against the AT, ST and CS magnetic configurations. Key topics addressed include: plasma parameters, device configurations, size and weight comparisons, diagnostic issues, maintenance schemes, availability influences and possible test cell arrangement schemes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Neutronics for diagnostics in ITER - Paper 121

ITER, currently under construction in the south of France, will be the first tokamak producing large amounts of neutrons and having a fusion energy gain factor, which is the ratio between the fusion power produced and the input power necessary to maintain the plasma, greater than 10. ITER will be able to generate 500 MW of fusion power, from which 400 MW are 14.1 MeV neutrons from the Deuterium-Tritium fusion reactions in the thermonuclear plasma. For such nuclear machine neutronics are of paramount importance, being a design driver for many of its components, in particular its Ports and its numerous Diagnostics, for which the influence of neutronics is especially important in three main areas: - Shielding: there is a strong need to provide nuclear shielding to areas where human access is foreseen for maintenance. Also, to minimize any impact in the primary shielding components (blankets) in order to avoid significant increases in the heating of the Vacuum Vessel (VV) and Superconductive Coils. - Sensors and diagnostic components: most of the diagnostics have sensitive components that need to be shielded against radiation to survive. Efficient shielding is not always possible, and the radiation levels are usually the decisive factor for selecting the most appropriate component. - Neutron measurements: a large set of neutron diagnostics will be implemented to measure the neutron production and its emissivity profile. Although the scale and performance of ITER will not be very far from a commercial reactor, it is ultimately an experiment to improve the understanding of reactor-grade tokamak plasmas and their effect on plasma facing components. To accomplish this task, large efforts are being dedicated to design over 45 different diagnostics systems. This paper gives an overview of the main activities related to neutronics within the ITER Diagnostics Division. They include the neutron streaming problems in the Ports and the common neutronics issues of the diagnostics housed inside them, as well as the challenges of the in vessel diagnostics. Also the special calculations needed for the neutron diagnostics. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Multiphysics analysis of liquid metal annular linear induction pumps: A project overview

Liquid metal-cooled fission reactors are both moderated and cooled by a liquid metal solution. These reactors are typically very compact and they can be used in regular electric power production, for naval and space propulsion systems or in fission surface power systems for planetary exploration. The coupling between the electromagnetics and thermo-fluid mechanical phenomena observed in liquid metal thermo-magnetic systems for nuclear and space applications gives rise to complex engineering magnetohydrodynamics and numerical problems. It is known that electromagnetic pumps have a number of advantages over rotating mechanisms: absence of moving parts, low noise and vibration level, simplicity of flow rate regulation, easy maintenance and so on. However, while developing annular linear induction pumps, we are faced with a significant problem of magnetohydrodynamic instability arising in the device. The complex flow behavior in this type of devices includes a time-varying Lorentz force and pressure pulsation due to the time-varying electromagnetic fields and the induced convective currents that originates from the liquid metal flow, leading to instability problems along the device geometry. The determinations of the geometry and electrical configuration of liquid metal thermo-magnetic devices give rise to a complex inverse magnetohydrodynamic field problem were techniques for global optimization should be used, magnetohydrodynamics instabilities understood –or quantified- and multiphysics models developed and analyzed. Lastly, we present a project overview as well as a few computational models developed to study liquid metal annular linear induction pumps using first principles and the a few results of our multi-physics analysis.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Demonstration and Evaluation of an Advanced Integrated Operations Concept for Hybrid Control Rooms

The U.S. nuclear industry has an urgent need to reduce operations and maintenance costs to remain economically competitive in today’s energy market. Measures to improve efficiency in operations will need to leverage technology in a way that safely transforms how plants are operated. This work describes the Evaluation of an integrated operations concept that draws together data from existing Instrumentation and Control (I&C) infrastructure, upgraded I&C systems, new sensors, and field technologies such as computer-based procedures to provide operators with centralized, streamlined instructions. The concept was developed to allow for an operator to remotely supervise many plant activities and to dramatically streamline plant operations and maintenance. This describes the methods, results, and design recommendations for the concept based on an operator workshop to evaluate the concept.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Gamma Source Verification for GAMSRC and GAMSOR

Nuclear reactors that rely upon the fission reaction have two modes of thermal energy deposition in the reactor system: neutron absorption and gamma absorption. The gamma rays are typically generated by neutron capture reactions or during the fission process which means the primary driver of energy production is of course the neutron interactions. The GAMSOR program was first built in the mid 1980s to properly account for the gamma heating in an operating reactor core on core internals. The GAMSOR code is sequence of DIF3D calculations to compute the neutron and gamma flux and combine them to define both the neutron and gamma heating throughout the modeled domain. The goal of this manuscript is to present the software verification of GAMSOR. The first step of the GAMSOR sequence of calculations involves of a modified version of DIF3D (called DIF3D-GAMSOR) which generates a gamma source distribution for the follow-on DIF3D gamma transport calculation (step 2). This modified version of DIF3D increases the burden of maintenance and verification work on GAMSOR as one must reverify the DIF3D capabilities which is undesirable. Because the calculation of the gamma source is the only unique aspect of GAMSOR beyond the regular DIF3D capabilities, that part was put in a standalone code called GAMSRC such that one can use the verified DIF3D code in step 1 followed by GAMSRC to carry out the same GAMSOR calculation step. As a consequence, this manuscript is focused on verification of the gamma source files generated by GAMSRC. The verification of the modified version of DIF3D (DIF3D-GAMSOR) will be done less rigorously in that it will be verified that it produces the same output that GAMSRC does and thus GAMSRC is equivalent to GAMSOR on the problems studied here. Hand calculations and independent numerical calculations of the gamma source generation are used for the verification work. This work follows the same methodology of GAMSRC. As expected, the results agree well with those calculated by GAMSRC as will be shown.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Study on the Comparison of International WTS for Integrated Management of Radioactive Waste - 19034

Domestic radioactive waste is generated by nuclear power plants, the Korea Atomic Energy Research Institute and KEPCO Nuclear Fuel Company. These nuclear energy agencies have their own waste tracking system. To track waste more efficiently, it is necessary to build an integrated tracking system from the viewpoint of the final disposer. As for the korea Atomic Energy Research Institute, the decommissioning waste due to the decommissioning of research reactors No. 1 and 2, and the low and intermediate-level radioactive waste, generated by the operation of the High Flux Advanced Neutron Application Reactor(HANARO), account for the most. The solid waste from each facility and laboratory is sorted and collected according to radiation levels and the contents. For starters, according to the contents, the waste is divided into combustible, noncombustible compressible and non-compressible waste. The combustible waste, generated by the Korea Atomic Energy Research Institute, is treated according to the low and intermediate-level radioactive waste delivery regulation of the Nuclear Safety and Security Commission and the acceptance criteria of the disposal facility. KEPCO Nuclear Fuel Company is making the nuclear fuel used in nuclear power plants. Radioactive waste is generated in the nuclear fuel manufacturing process, and it is classified into 8 types of waste according to the solid waste management procedure. Most of the radioactive waste, generated while KEPCO Nuclear Fuel Company processes the light-water reactor and heavy-water reactor nuclear fuel, is classified as low and intermediate-level radioactive waste. The radioactive liquid waste, generated in the radiation controlled area in nuclear fuel processing facilities, is divided into low-concentration liquid waste and high-concentration liquid waste. The miscellaneous solids, generated in the Hanbit NPP of Korea Hydro and Nuclear Power Co., Ltd., are classified in consideration of the physical properties, density and amount of the waste, and substances subject to restricted disposal. This paper investigated information on the structure, functions and maintenance of the systems implemented and operated by individual countries and IAEA, and the types of managed data, and analyzed the detailed configuration of the system and the characteristics of DBMS (Data Base Management System), and discovered during the analysis process the information on the waste management in each country or institution. This paper investigated the classification standards and treatment methods according to the characteristics of the radioactive substances handled by each agency. These classification and treatment methods can be applied to the database when the radioactive waste tracking system is implemented in the future. Also, this paper analyzed the radioactive waste tracking system of each country. Most overseas waste tracking systems are configured based on the ORACLE DBMS. The ORACLE DBMS is highly secure, and can manage large-scale databases. Also, Germany's ReVK and US IWTS are using the Bar-Code system that can track and manage all waste data, generated during decommissioning or transportation, in real time, and the real-time tracking system of web-based US CID can simply create and output reports quickly. If the advantages of overseas waste tracking systems are added to the domestic integrated waste tracking system, more efficient and safer management of radioactive waste will be possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Damage Assessment Technologies for Prognostics and Proactive Management of Materials Degradation (PMMD)

There are approximately 440 operating reactors in the global nuclear power plant (NPP) fleet with an average age greater than 20 years and design lives of 30 or 40 years. The United States is currently implementing license extensions of 20 years on many plants, and consideration is now being given to the concept of "life-beyond-60", license extension from 60 to 80 years and potentially longer. In almost all countries with NPPs, authorities are looking at some form of license renewal program. In support of NPP license renewal over the past decade, various national and international programs have been initiated. This paper discusses stressor-based prognostics and its role as part of emerging trends in Proactive Management of Materials Degradation (PMMD) applied to nuclear power plant structures, systems and components (SSC). The paper concisely explains the US Nuclear Regulatory Commission’s (NRC) program in PMMD, the basic principles of PMMD and its relationship to advanced diagnostics and prognostics. It then provides an assessment of the state of maturity for diagnostic and prognostic technologies, including NDE and related technologies for damage assessment, and the current trend to move from condition-based maintenance to on-line monitoring for advanced diagnostics and stressor-based prognostics. This development in technology requires advances in sensors; better understanding of what and how to measure within a nuclear power plant; enhanced data interrogation, communication and integration; new prediction models for damage/aging evolution; system integration for real-world deployments and quantification of uncertainties in what are inherently ill-posed problems. Stressor-based analysis is based upon understanding which stressor characteristics (e.g., pressure transients) provide a percussive indication that can be used for mapping subsequent damage due to a specific degradation mechanism. The resulting physical damage and the associated decrease in asset performance start with the application of a stressor to the component. The design engineer sets the desired operational stressor intensity level so that the degradation in the physical state of the component occurs slowly enough for the equipment to last for its required design life. In general, when the design limit of a stressor is exceeded (during operation), the component life expectancy starts to shorten. Conversely, careful control of operational parameters can enable extension of component life beyond that normally expected. For systems which were conservatively designed (such as nuclear power plants), the premise of the prognostic methodology is that a relationship can be derived that will allow a much more accurate projection of the remaining useful life. This is achieved by focusing on trending the stressor characterics rather than trending a performance metric. In this trend analysis example, the slope of the trended parameter is thought to give a measure of the degradation rate of the component performance. This is assumed to be a function of the rate of decline in the physical integrity of the equipment. Experience from measurements has shown this assumption to be true if one accounts for the nonlinearity which can occur between physical attributes and their effects on performance.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗