Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

A Comparison of the Results from General Tank Tests of 1/6- and 1/12-full-size Models of the British Singapore IIC Flying Boat

A 1/6-full-size model of the hull of the British Singapore IIC flying boat was tested in the NACA tank. The results are given in the form of charts and are compared with the results of previous tests made in the NACA tank of a 1/12-full-size model, published in NACA T.N. No. 580, and with the results of tests made in the British R.A.E. tank of another 1/6-full-size model of the same hull. When the data from the tests of the 1/6- and 1/12-full-size models were compared on the basis of Froude's law of comparison, differences were found. This fact supported the belief that the small scale of the model and the use of a model that was too small to suit the equipment of the NACA tank had caused the results of the tests of the 1/12-full-size model to be less reliable than the results of the tests of the 1/6-full-size model. The results of the tests of the two models agreed sufficiently well to show that test of a small model, if made meticulously and with suitable equipment, may give useable results, but that a larger model should be used whenever feasible. The results of the NACA tests of the 1/6-full-size model were found to be in good agreement with the R.A.E. tests of a model of the same size.

Truscott, Starr↗

Advanced Stirling Convertor Testing at NASA Glenn Research Center

The NASA Glenn Research Center (GRC) has been testing high-efficiency free-piston Stirling convertors for potential use in radioisotope power systems (RPSs) since 1999. The current effort is in support of the Advanced Stirling Radioisotope Generator (ASRG), which is being developed by the U.S. Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC), Sunpower, Inc., and the NASA GRC. This generator would use two high-efficiency Advanced Stirling Convertors (ASCs) to convert thermal energy from a radioisotope heat source into electricity. As reliability is paramount to a RPS capable of providing spacecraft power for potential multi-year missions, GRC provides direct technology support to the ASRG flight project in the areas of reliability, convertor and generator testing, high-temperature materials, structures, modeling and analysis, organics, structural dynamics, electromagnetic interference (EMI), and permanent magnets to reduce risk and enhance reliability of the convertor as this technology transitions toward flight status. Convertor and generator testing is carried out in short- and long-duration tests designed to characterize convertor performance when subjected to environments intended to simulate launch and space conditions. Long duration testing is intended to baseline performance and observe any performance degradation over the life of the test. Testing involves developing support hardware that enables 24/7 unattended operation and data collection. GRC currently has 14 Stirling convertors under unattended extended operation testing, including two operating in the ASRG Engineering Unit (ASRG-EU). Test data and high-temperature support hardware are discussed for ongoing and future ASC tests with emphasis on the ASC-E and ASC-E2.

Wilson, Scott D.↗

Aerospace reliability applied to biomedicine.

An analysis is presented that indicates that the reliability and quality assurance methodology selected by NASA to minimize failures in aerospace equipment can be applied directly to biomedical devices to improve hospital equipment reliability. The Space Electric Rocket Test project is used as an example of NASA application of reliability and quality assurance (R&QA) methods. By analogy a comparison is made to show how these same methods can be used in the development of transducers, instrumentation, and complex systems for use in medicine.

Lalli, V. R.↗

Environmental exposure effects on composite materials for commercial aircraft

The data base for composite materials' properties as they are affected by the environments encountered in operating conditions, both in flight and at ground terminals is expanded. Absorbed moisture degrades the mechanical properties of graphite/epoxy laminates at elevated temperatures. Since airplane components are frequently exposed to atmospheric moisture, rain, and accumulated water, quantitative data are required to evaluate the amount of fluids absorbed under various environmental conditions and the subsequent effects on material properties. In addition, accelerated laboratory test techniques are developed are reliably capable of predicting long term behavior. An accelerated environmental exposure testing procedure is developed, and experimental results are correlated and compared with analytical results to establish the level of confidence for predicting composite material properties.

Gibbons, M. N.↗

Internet Access to Spacecraft

The Operating Missions as Nodes on the Internet (OMNI) project at NASA's Goddard Space flight Center (GSFC), is demonstrating the use of standard Internet protocols for spacecraft communication systems. This year, demonstrations of Internet access to a flying spacecraft have been performed with the UoSAT-12 spacecraft owned and operated by Surrey Satellite Technology Ltd. (SSTL). Previously, demonstrations were performed using a ground satellite simulator and NASA's Tracking and Data Relay Satellite System (TDRSS). These activities are part of NASA's Space Operations Management Office (SOMO) Technology Program, The work is focused on defining the communication architecture for future NASA missions to support both NASA's "faster, better, cheaper" concept and to enable new types of collaborative science. The use of standard Internet communication technology for spacecraft simplifies design, supports initial integration and test across an IP based network, and enables direct communication between scientists and instruments as well as between different spacecraft, The most recent demonstrations consisted of uploading an Internet Protocol (IP) software stack to the UoSAT- 12 spacecraft, simple modifications to the SSTL ground station, and a series of tests to measure performance of various Internet applications. The spacecraft was reconfigured on orbit at very low cost. The total period between concept and the first tests was only 3 months. The tests included basic network connectivity (PING), automated clock synchronization (NTP), and reliable file transfers (FTP). Future tests are planned to include additional protocols such as Mobile IP, e-mail, and virtual private networks (VPN) to enable automated, operational spacecraft communication networks. The work performed and results of the initial phase of tests are summarized in this paper. This work is funded and directed by NASA/GSFC with technical leadership by CSC in arrangement with SSTL, and Vytek Wireless.

Rash, James↗

Results of metallographical diagnostic examination of Navy half-watt thermoelectric converters degraded by accelerated tests

To verify the 15-year reliability of the Navy half-watt radioisotope thermoelectric generator (RTG), bismuth-telluride thermoelectric converters were submitted to testing at high temperatures which accelerated the degradation and caused failure of the converters. Metallographic diagnostic examination of failed units verified failure mechanisms. Results of diagnostic examinations are presented.

Rosell, F. E., Jr.↗

Some ideas and opportunities concerning three-dimensional wind-tunnel wall corrections

Opportunities for improving the accuracy and reliability of wall corrections in conventional ventilated test sections are presented. The approach encompasses state-of-the-art technology in transonic computational methods combined with the measurement of tunnel-wall pressures. The objective is to arrive at correction procedures of known, verifiable accuracy that are practical within a production testing environment. It is concluded that: accurate and reliable correction procedures can be developed for cruise-type aerodynamic testing for any wall configuration; passive walls can be optimized for minimal interference for cruise-type aerodynamic testing (tailored slots, variable open area ratio, etc.); monitoring and assessment of noncorrectable interference (buoyancy and curvature in a transonic stream) can be an integral part of a correction procedure; and reasonably good correction procedures can probably be developd for complex flows involving extensive separation and other unpredictable phenomena.

Rubbert, P. E.↗

Qualification testing of flat-plate photovoltaic modules

The placement of photovoltaic modules in various applications, in climates and locations throughout the world, results in different degrees and combinations of environmental and electrical stress. Early detection of module reliability deficiencies via laboratory testing is necessary for achieving long, satisfactory field service. This overview paper describes qualification testing techniques being used in the US Department of Energy's flat-plate terrestrial photovoltaic development program in terms of their significance, rationale for specified levels and durations, and test results.

Hoffman, A. R.↗

The Role of Analysis and Testing in the Service Life Assessment of Ion Engines

Experience from tests and flights and engineering analysis represent the two sources of information on which to base conclusions on the reliability or failure risk of aerospace flight systems. It is rarely feasible to establish high reliability at high confidence by testing aerospace flight systems or components. The limitations of testing in evaluating failure risk are discussed and an alternate statistical approach which relies on both test experience and analysis to quantitatively assess reliability is outlined. The implementation of this methodology in the service life assessment of ion thrusters is discussed and examples of failure modes being addressed in the NASA Solar Electric Propulsion Technology Application Readiness (NSTAR) program are given.

Ion↗

Software reliability growth models dominated by randomness

The Jelinski-Moranda and Geometric models for software reliability failed the consistency test which was proposed. These models were challenged to take data which comes from a process which they have correctly modeled and to make predictions about the reliability of that process. It was found that either model, given data precisely from a process it correctly models, will usually fail to make good predictions. These problems are attributed to randomness in the data used as input to the models and a remedy is indicated for this lack of robustness, namely replication of data.

Shen, Wenhui↗

Compilation, design tests: Energetic particles Satellite S-3 including design tests for S-3A, S-3B and S-3C

A compilation of engineering design tests which were conducted in support of the Energetic Particle Satellite S-3, S-3A, and S-3b programs. The purpose for conducting the tests was to determine the adequacy and reliability of the Energetic Particles Series of satellites designs. The various tests consisted of: (1) moments of inertia, (2) functional reliability, (3) component and structural integrity, (4) initiators and explosives tests, and (5) acceptance tests.

Ledoux, F. N.↗

Igniter Testing and Development for Liquid Oxygen/Liquid Methane (LOX/LCH4) and Liquid Oxygen/Gaseous Hydrogen (LOX/GH2) Injectors

In support of NASA's efforts to advance methane technology for future exploration missions, two different igniter concepts were developed and tested at NASA's Marshall Space Flight Center for ignition of oxygen/methane propellants. The first type of igniter, an impinging injection, spark-initiated torch igniter (impinging igniter), used traditional spark plug technology to produce a small, but very intense, pulsed plasma as the ignition source. The second type of igniter, a microwave-generated plasma igniter (microwave igniter), used a microwave magnetron to produce a continuous, larger-volume plasma as the ignition source. Two new designs for both types of igniters were leveraged off past oxygen/methane igniter designs that were tested at MSFC and documented in a 2008 JANNAF paper. In this most recent work, the two new igniters were to be tested at the component level as well as inside a liquid oxygen/liquid methane (LOX/LCH4) 40-element swirl coaxial injector. Although the microwave igniter achieved ignition in every test, it encountered technical difficulties that prevented it from being tested with the injector. The impinging igniter required several design iterations as well as testing at different mixture ratios and mass flow rates before reliable operation with minimal ignition delay was achieved. The final design of the impinging igniter was successfully tested in the LOX/LCH4 injector. The same igniter was later re-configured and component-tested to demonstrate reliable ignition of oxygen/hydrogen propellants. Future tests of the impinging igniter will include ignition of a LOX/hydrogen two-stage swirl injector, which is one of several injector concepts being tested in the Lunar Lander Descent Engine Test Bed at MSFC. All igniter and injector tests have been funded by the Propulsion & Cryogenics Advanced Development project managed by Glenn Research Center and sponsored by NASA s Exploration Technology Development Program.

Osborne, Robin J.↗

Developing Reliable Life Support for Mars

A human mission to Mars will require highly reliable life support systems. Mars life support systems may recycle water and oxygen using systems similar to those on the International Space Station (ISS). However, achieving sufficient reliability is less difficult for ISS than it will be for Mars. If an ISS system has a serious failure, it is possible to provide spare parts, or directly supply water or oxygen, or if necessary bring the crew back to Earth. Life support for Mars must be designed, tested, and improved as needed to achieve high demonstrated reliability. A quantitative reliability goal should be established and used to guide development t. The designers should select reliable components and minimize interface and integration problems. In theory a system can achieve the component-limited reliability, but testing often reveal unexpected failures due to design mistakes or flawed components. Testing should extend long enough to detect any unexpected failure modes and to verify the expected reliability. Iterated redesign and retest may be required to achieve the reliability goal. If the reliability is less than required, it may be improved by providing spare components or redundant systems. The number of spares required to achieve a given reliability goal depends on the component failure rate. If the failure rate is under estimated, the number of spares will be insufficient and the system may fail. If the design is likely to have undiscovered design or component problems, it is advisable to use dissimilar redundancy, even though this multiplies the design and development cost. In the ideal case, a human tended closed system operational test should be conducted to gain confidence in operations, maintenance, and repair. The difficulty in achieving high reliability in unproven complex systems may require the use of simpler, more mature, intrinsically higher reliability systems. The limitations of budget, schedule, and technology may suggest accepting lower and less certain expected reliability. A plan to develop reliable life support is needed to achieve the best possible reliability.

life support↗

Software development predictors, error analysis, reliability models and software metric analysis

The use of dynamic characteristics as predictors for software development was studied. It was found that there are some significant factors that could be useful as predictors. From a study on software errors and complexity, it was shown that meaningful results can be obtained which allow insight into software traits and the environment in which it is developed. Reliability models were studied. The research included the field of program testing because the validity of some reliability models depends on the answers to some unanswered questions about testing. In studying software metrics, data collected from seven software engineering laboratory (FORTRAN) projects were examined and three effort reporting accuracy checks were applied to demonstrate the need to validate a data base. Results are discussed.

Basili, Victor↗

Technical Challenges in Reliable Microelectronics Packaging of Microelectromechanical Systems (MEMS) for Space Applications

MEMS have shown a significant promise in the last decade for a variety of applications such as air-bag, pressure sensors, accelerometer, microgyro, chemical sensors, artificial nose, etc. Standard semiconductor microelectronics packaging needs the integrated circuits (IC) to be protected from the harsh environment, and provide electrical communication with the other parts of the circuit, facilitate thermal dissipation efficiently, and impart mechanical strength to the silicon die. Microelectronics packaging involves wafer dicing, bonding, lead attachment, encapsulation to protect from the environment, electrical integrity, and package leak tests to assure the reliable IC packaging technology. Active elements or microstructures in MEMS devices often interfaces with the hostile environment where packaging leak tests and testing of such devices using chemical and mechanical parameters will be very difficult and expensive. Packaging of MEMS is significantly complex as they serve to protect from the environment and microstructures interact with the same environment to measure or affect the desired physical or chemical parameters. The most of the silicon circuitry is sensitive to temperature, moisture, magnetic field, light, and electromagnetic interference. The package must then protect the on-board silicon circuitry while simultaneously exposing the microsensor to the effect it measures to assure the packaging technology of MEMS. MEMS technology has a major application in developing a microspacecraft for space systems provided reliability of MEMS packaging technology is sufficiently addressed. This MEMS technology would eventually miniaturize many of the components of the spacecraft to reach the NASA's goal by building faster, cheaper, better, smaller spacecraft to explore the space more effectively. This paper discusses the latest developments in the MEMS technology and challenging technical issues in the packaging of hermetically sealed and non-hermetically sealed MEMS sensor devices for microspacecraft applications.

Ramesham, Rajeshuni↗

The ATS F&G systems reliability program.

Assurance of reliability, quality, and proper testing requires a large coordinating effort and a means for connecting the various areas involved. All parts used on the spacecraft are required to meet strict specifications and consequently must be approved by the systems reliability manager. The parts program has access to a computer data bank into which all information concerning nonstandard parts approval requests has been stored. Through the data bank, the system collects and distributes timely information concerning quality and reliability to all departments that may be concerned.

Doyle, H.↗