Search NASA⌕ Search

SEARCH · Search NASA

Results for “Relocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Purification of ultra-high saline and contaminated water by multi-stage ion concentration polarization (ICP) desalination

A water stream is passed between two juxtaposed similar ion exchange membranes (AEMs or CEMs), forming an ion depletion and ion enrichment zones when an electric field is applied. As cations are selectively transferred through the CEMs, for example, anions are relocated in order to achieve electro-neutrality, resulting in the concentration drop (increase) in ion depletion (enrichment) zone. Trifurcation of the output channel allows collection of concentrated, dilute and intermediate streams, with the intermediate stream serving as input to the next stage of a serialized implementation.

Kim, Bumjoo↗

Separate-Effects Validation Experiments for Models of Fracture in Ceramic Nuclear Fuel

A number of advances have recently been made in modeling fracture initiation and propagation in ceramic light water reactor (LWR) fuel. These include the use of techniques such as peridynamics, the extended finite element method (XFEM), the discrete element method (DEM), and phase field fracture. Improved predictions of fracture in LWR fuel can benefit fuel performance simulations in a number of ways, with important implications for radial relocation, pellet-cladding mechanical interactions, and fragmentation during accident conditions. Although these modeling approaches appear promising, to-date most of their applications have been to fresh fuel. A major limitation in applying these approaches with confidence to a wider variety of conditions, such as fragmentation of high-burnup fuel, is that there is very limited data that can be directly used to validate the results of these fracture models. While fracture patterns are available from cross-sections of numerous irradiated fuel rods, the fuel rods have typically been subjected to complex irradiation histories. To validate models of fracture propagation, focused experiments that give snapshots of the initiation and propagation of fracture under well characterized prototypical reactor conditions are needed. Under a multi-institutional U.S. Department of Energy Integrated Research Project (IRP), three separate-effects validation experiments are underway to provide information on the propagation of cracks in LWR fuel under controlled conditions. The primary challenge in developing such an experiment is in providing conditions that result in a radial temperature distribution that is prototypical of LWR in-reactor conditions. Two out-of-reactor experiments are being planned that employ very different approaches to achieve such a temperature distribution. The first of these achieves this by employing a combination of inductive and resistive electrical heating to generate volumetric heating. The second experiment involves slowly heating a pellet in a metal rod to a high temperature, and then quenching that rod in a cold bath. The quenching process generates a temperature profile approximating that in an LWR fuel rod for a moment, but has a very different temperature history from the LWR. Finally, an experiment is being planned for the Idaho National Laboratory TREAT reactor that will use nuclear fission as a heat source, and which will employ a metal heat sink to replicate the thermal conditions provided by coolant in an LWR. These experiments all have their advantages and drawbacks, with varying levels of ability to reproduce actual LWR conditions and varying ability to use instruments to monitor quantities of interest over the course of the experiment that can be used to validate fracture models. For that reason, these different experimental approaches are complimentary to each other, and the combined results are expected to significantly improve confidence in the ability of computational models to simulate fracture in ceramic nuclear fuel.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Separate Effects Testing in TREAT for ATF Fuels

This work performed examinations on high burnup UO2 from commercial power plant with the intention of better understanding fission gas and fragmentation behavior. Fuel fragmentation, relocation, and dispersal (FFRD) is a major factor in fuel lifetime limits imposed on UO2 by regulators, both domestic and foreign, and is a major area of interest by industry groups (e.g., Electric Power Research Institute, [EPRI]). The characterization of the fuel focused on the differences in porosity between the high burnup (rim) zone, the dark (intermediate) zone, and center zones of the fuel as well as the fission gas content of each region. Work involved thermal treatments to analyze fission gas and high resolution microscopy techniques to investigate pore structure.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Optimization-Based Strategy for SAV Fleet Repositioning

With the emergence of autonomous technology, shared autonomous vehicles (SAVs) will potentially be the prevalent transportation mode for urban mobility. On one hand, relying on SAV fleets can provide several operational benefits. On the other hand, SAVs can increase travel distance and add congestion due to unoccupied trips such as pickup and repositioning trips. One important aspect for a SAV fleet's success is to serve the incoming requests at reasonably low waiting time. This is achieved by an adequate fleet size that is spatially distributed thoughtfully so that incoming requests can be served by a nearby vehicle. Unfortunately, it is challenging to keep a satisfactory spatial distribution of vehicles due to imbalances in the origin and destination patterns of incoming requests. This paper focuses on the impact of SAV relocation on traveler wait times using a novel optimization-based algorithm for repositioning. POLARIS, an agent-based tool, is used for a case study of Bloomington, Illinois to quantify the benefits of allowing SAV repositioning. On average, the wait times were around 20% lower with repositioning for all adequate fleet sizes. SAVs were available more uniformly across the region's zones, and proportional to trip-making at different times of day. In addition, enabling repositioning led to a higher share of demands being served. These benefits, however, are achieved at the expense of 6% added vehicles miles traveled.

Agent-Based Simulation↗

Experiment Assembly and Testing in Hot Cell in Support of Advanced Fuels Irradiation Testing

Follow-on experimentation of irradiated nuclear fuel is critical to understanding fuel behavior at different stages of the fuel lifecycle. Transient experiments using fuel with high burnup can enlarge understanding of fuel fragmentation, relocation and dispersal under various reactor accident situations. Assembling experiments with such fuel requires remote operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Methods and systems for evaluating and improving distribution-grid observability

This document describes systems and techniques for evaluating and improving distribution-grid observability. These systems and techniques allow engineers to quantify the observability of a distribution grid, which represents an ability to combine actual measurements and various types of computations (e.g., analytics, estimators, forecasters), from a system model. Distribution engineers can also identify islands of observability where operating parameters, including voltages, currents, and power flows, can be determined from available sensor readings. By exclusion, distribution engineers can similarly identify areas of the distribution grid with observability deficiencies that may require additional instrumentation to maintain proper operation. Distribution engineers, using an iterative or automated process, can determine the observability of the system model with new or relocated sensors to generate a sensor allocation plan. The sensor allocation plan can indicate the number and location of sensors to either maximize observability for a fixed sensor cost or minimize sensor cost for predetermined observability.

Reiman, Anthony P.↗

RELAP5-3D British and SI Unit Conversion Task

The RELAP5-3D code uses conversion factors throughout the code to convert values between British and SI units. Conversion factors are typically in each of the separate routines that perform unit conversion. This results in inconsistent unit conversion and increases the likelihood of errors being introduced in the conversion factors. Unit conversion factors were relocated to a centralized module so that these values are only entered in one location. The unit conversion values were then replaced in the various locations with a unit conversion variable. The code was tested using the verification test set after making these changes and the results were analyzed. As expected, all the cases that use British input were found to have changed. In addition, three other cases changed due to changes in conversion factors.

97 MATHEMATICS AND COMPUTING↗

Combined TREAT-LOC & SATS Integral LOCA Experiment Plan

The Transient Reactor Test Facility (TREAT) loss-of-coolant (LOC) and highburnup (HBu) experiment series, along with the Severe Accident Test Station (SATS) HBu experiment series, are integral LOC accident (LOCA) experiments planned under the Department of Energy (DOE) Advanced Fuels Campaign (AFC) program, which aims to support burnup extension needs by addressing identified R&D priorities in order to achieve an improved understanding of fuel fragmentation, relocation, and dispersal (FFRD) of HBu fuel during LOCA events. Priorities have been identified by the Electric Power Research Institute (EPRI)’s Collaborative Research on Advanced Fuel Technologies (CRAFT) Fuel Performance and Testing Technical Experts Group (FPTTEG). The data produced under this plan will be used to further validate and confirm existing models and inform future R&D and model development. The experimental program was specifically developed to address data gaps and opportunities identified via detailed review of the existing public knowledge base on LOCA FFRD, as well as reviewing specific experimental development activities regarding prototypic LOCA conditions for light-water reactor (LWR) systems. The test program relies on a unique combination of in- and out-of-pile experimental approaches to provide a clear tieback to the existing integral and semi-integral LOCA experiment database, using state-of-the-art facilities. More importantly, the program will systematically investigate the impacts of prototypic HBu fuel/cladding thermomechanical behaviors under postulated LWR LOCA conditions not yet fully investigated. These conditions correspond with prototypic decay-energy heatup (DEH) and stored-energy heatup (SEH) conditions. First, TREAT’s unique capability will enable the first evaluation of the impact of SEH conditions on HBu fuels. The test program will emphasize the development of an improved mechanistic understanding of key phenomena through independent experimental systems, development of a database to support fuel performance modeling tools, world-leading advanced materials characterization, and the most advanced approach to in situ diagnostics ever deployed to evaluate FFRD. The results will represent a significant leap forward in evaluating prototypic conditions and novel data to support modeling development and validation, as well as to inform the technical basis for LOCA-induced FFRD.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Power Radiofrequency Operation of the Radiofrequency Quadrupoles in the Spallation Neutron Source

The Spallation Neutron Source (SNS) recently took delivery of a third Radiofrequency Quadrupole (RFQ03) that will ultimately be installed on the front-end (FE) of the SNS Linac. The first RFQ (RFQ01) operated in the SNS FE for more than a decade before being replaced with the second RFQ (RFQ02). RFQ01 was relocated to the Beam Test Facility (BTF) where it operated for five more years. The RFQ02 was initially installed in the BTF for high power testing and used with H- beam for BTF operation. It replaced RFQ01 in the SNS FE in 2017 and has been operating for beam production since then. There are some differences between the three RFQs. RFQ01 has a square cross-section with pi-mode stabilizing loops (PISLs) with the structure being fabricated using two layers of materials, GlidCop outside and OFHC inside. RFQ02 and RFQ03 has an octagonal cross-section with end-wall stabilizer rods and was fabricated using OFHC only. RFQ01 suffered some field flatness distortion incidents that resulted in degradation in beam transmission efficiency and required RF tuning. RFQ02 has performed well but had a melted RF seal in the high energy end wall, that was ultimately mitigated by a redesign of the end flange seals. The SNS decided to order RFQ03 that has a design that followed that of RFQ02 closely, but end-wall contacts were modified to prevent RF seal failure. This report presents the testing, installation, high power RF operation, and design improvements of the RFQ03.

Ren, Haitao↗

Burnt Mountain Alaska RTG Extraction, Transport and Disposal Project - 17359

The Air Force Technical Applications Center (AFTAC), headquartered at Patrick Air Force Base (AFB), Florida, removed excess nuclear material from one of the center's seismic arrays on Burnt Mountain, Alaska, after nearly 15 years of un-operability, and transferred it to a the low-level waste disposal facility at the Nevada National Security Site (NNSS). Ten radioisotope thermoelectric generators (RTGs), were used as a power source by AFTAC at its array 97 kilometers (60 miles) north of the Arctic Circle. Originally placed on Burnt Mountain in 1973, the first RTG was installed to power a single seismometer. Twelve years later, due to the increase in communications equipment and demand for additional power, nine more RTGs were placed at the site. For the next 17 years, the RTGs were operated and maintained by AFTAC's Detachment 460 based at Eielson AFB near Fairbanks, Alaska, and were used because of their high reliability and low maintenance requirements to determine if regional seismic activity was caused by nuclear explosions or naturally-occurring events such as earthquakes, volcanic activity, etc. AFTAC's primary mission is to verify compliance with nuclear test ban treaties. In 1992, a tundra fire encroached on the Burnt Mountain site and damaged some of the data cables. Despite the fact the fire did not impact the generators themselves, it raised public concern among nearby inhabitants about the safety of using radioactive material as a power source at the station. The Air Force, in coordination with multiple agencies and mission partners, made the decision to remove the RTGs and relocate them to NNSS for permanent disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Area Initiative's Port Granby Project: From Planning to Execution - 17451

The Port Hope Area Initiative's Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of some 450,000 m{sup 3} of LLRW and marginally contaminated soil from the former Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Presented is an overview of the Port Granby Project and a description of the planning needed to execute the project successfully. A comprehensive suite of approximately 40 pre-construction submittals were developed and submitted for review and approval by Canadian Nuclear Laboratories (CNL), the project authority. Importantly, comprehensive training programs were developed and implemented to ensure all project staff fully understood the scope of the planning documents (covering such things as Quality Control, Environmental Monitoring, Radiation Protection, Dust Management, Noise, Radiation Protection etc.) and possess the appropriate competencies for completing the work to which they have been assigned. The effective planning that has been invested in the Port Granby project, from initial design to project planning and implementation, has allowed this complex project to proceed with minimal difficulty. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Legacy of Taiwan Lanyu LLW Interim Storage Site - 17491

The Lanyu (Orchid Island) LLW (Low Level Waste) interim storage facility for the Taiwan LLW is located on Lanyu Island off the coast of Taiwan (Republic of China). It is perhaps the only outdoor LLW interim storage facility in the world. The shipment of LLW to the Lanyu LLW interim storage facility began in May 1982 and ceased in June 1995 after strong opposition from the local aboriginal Yamei tribe people. Since the shipment of LLW to the Lanyu LLW storage facility ceased in 1995, the LLW in Taiwan has been stored temporarily at the indoor facilities at the Taipower (Taiwan Electric Power Company) three operating NPPs (nuclear power plants) and the INER (Institute of Nuclear Energy Research). The current Taiwan government has recently begun to lay out a multi-faceted plan to address the Lanyu LLW interim storage facility and evaluate different options of relocating Lanyu LLW to other possible sites. However, many challenges remain, notably the site selection for the LLW final disposal site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Portable positional scanning lane

A positional lane scanner and method therefor includes a positional lane cargo scanning structure having a first frame portion, a second frame portion, and a top frame portion connected to define a passage lane for a cargo vessel. The first and second frame portions are located on opposite sides and cargo vessels pass therebetween. The first and second frame portions, or both, include a first housing portion and a scanning device mounted within the first housing portion. A lifting member is provided on the top frame portion facing outward, or if the lifting means is on a transport vehicle, such as a reach spreader, a pair of lifting beams may be arranged on the transport vehicle. The lift member removably connects with a boom portion of the transport vehicle for positioning and relocating the scanning structure to be disposed adjacent a cargo vessel lane.

Stihel, Gregory C.↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Cleanup at the Y-12 Nuclear Security Complex - 18304

The Y-12 National Security Complex (Y-12) is one of the nation's most important national security assets. The facility played a key role in producing the world's first atomic bomb during the Manhattan Project and since World War II has been a vital contributor to America's nuclear deterrent capability. Historically, mercury was used extensively in operations at Y-12 in connection with production of components for nuclear weapons. During peak usage - from 1950 to 1963 - approximately 11 million kilograms of mercury were used. Over the years, large quantities of mercury - as much as 330,000 kilograms -- were lost within buildings and to soil and surface water. Today, mercury is considered the greatest environmental risk on the Oak Ridge Reservation and mercury cleanup is a high priority for the Department of Energy's Oak Ridge Office of Environmental Management (OREM). Remediation of Y-12 and East Fork Poplar Creek (EFPC) to mitigate the mercury risk is based on a phased, adaptive management approach. The approach to address surface water includes treatment actions in the short term and research and technology development to evaluate longer-term solutions in the downstream environment. A number of formidable challenges must be addressed in order to assure safe, effective cleanup of mercury contamination at Y-12 and in EFPC. In the long term, understanding how mercury moves in the EFPC system is essential to the development of new technologies and remedial options and strategies for mercury contamination in the creek. OREM has developed and is currently executing a Mercury Technology Development Plan to address these long term needs. As a major component of the short term actions, UCOR has completed the design of the Outfall 200 Mercury Treatment Facility. Outfall 200 is the point at which the west end Y-12 storm drain system discharges to Upper East Fork Poplar Creek (UEFPC). Outfall 200 is consistently the largest single source of mercury to UEFPC. Construction and operation of this facility is critical to reduce mercury in UEFPC, and operation of this facility will be required before demolition of mercury contaminated facilities can begin. Once operational, the Mercury Treatment Facility will have a treatment capacity of 3,000 gallons per minute (gpm), a storm water capture rate of 40,000 gpm, and two million gallons of storm water storage capacity. The headworks with transfer pipeline is designed to capture flow from Outfall 200 and move it to the treatment facility. A contract for construction of the Outfall 200 Mercury Treatment Facility is expected to be awarded in 2018. Early site preparation began in 2017. The early site preparation scope includes utilities relocation, small structure demolition and creek bank secant wall installation. Initial operation of the Mercury Treatment Facility is planned for 2022. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving the Vision: An Update on Cleanup, Closure, and Reindustrialization of the East Tennessee Technology Park - 18401

URS-CH2M Oak Ridge LLC (UCOR) is responsible for cleanup of the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Formerly known as the K-25 site, the facility enriched uranium for major defense nd energy programs for more than 40 years. The site's industrial processes - largely the gaseous diffusion method used for enriching uranium - left behind radioactive, chemical and industrial contaminants in soils and structures. Cleanup of the environmental legacies enables DOE's goal for converting ETTP into a private sector industrial park. Return of the restored site to the community will attract new industries to the region, creating jobs and growing the economy. The central elements to achieve DOE's vision for the site are 1) Cleanup, 2) Closure, and 3) Reindustrialization. Cleanup entails completion of all demolition activities and remedial actions consistent with the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) agreements. Closure leaves facilities and infrastructure in a condition that enables transfer of the site to non-federal entities and reduces DOE's long-term stewardship costs. Closure activities include: - Infrastructure stabilization (site utilities, roads, stormwater, etc.); - Disposal or transfer of government property; - Relocation of most DOE contractors and support functions offsite; - Transfer of the majority of the site property to non-federal entities for redevelopment. Reindustrialization enables DOE's vision for the site as a multi-use private sector industrial park, reducing DOE's costs and enhancing the local economy. Transfer to the private sector will be accomplished through the Community Reuse Organization of East Tennessee (CROET), which will serve as the Park Manager. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative Project Update - 19146

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. With funding of $1.28 billion CAD it is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from various locations within the community. The Port Granby Project will relocate approximately 450,000 cubic metres of historic low-level radioactive waste and marginally contaminated soils, located at an existing waste management facility on the shoreline of Lake Ontario, to a new engineered aboveground mound being built about a kilometre north of the current site. This paper will provide an update on both projects with an emphasis on successes to date and challenges yet be faced. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Verification for the Remediation of LLRW at the Port Granby Project - 19210

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) that Canadian Nuclear Laboratory (CNL) is using to manage long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure and excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) which accepted waste until the 1980's to the newly constructed LTWMF. The PGWMF contains an estimated 450,000 cubic meters of LLRW deposited in unmarked and unlined trenches throughout the southern portion of the site that borders Lake Ontario. Project requirements include excavating contaminated material, verifying that the trench bottoms are below action levels using Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance, and final restoration. This paper describes challenges of meeting remediation verification requirements using traditional field and laboratory confirmation methods in areas of deep trench areas located in rugged terrain with ponded water and mud and presents a process that has expedited the traditional MARSSIM method for verification with greater productivity, and with enhanced safety and reliability as compared to the use of traditional methods alone. This enhanced process has been successfully employed for in-situ verification so that the excavated area can be backfilled and returned to a vegetative state. This enhanced process has been examined by federal regulatory staff through the course of their onsite audits and outcomes from these examinations have all been positive. The method involves a visual inspection and traditional walkover of the area to identify any areas with radiation measurements above the region's background followed by a full area survey performed using Wood's proprietary Orion ScanPlotSM system. The ScanPlotSM data is evaluated, mapped and overlaid on top of an aerial image of the surveyed area allowing remaining radiological material at surface or near surface to be quickly and easily identified for removal. Field staff then collect soil samples from evenly distributed points within the surveyed area and field screen the samples using an X-ray fluorescence (XRF) analysis for the three primary contaminates of potential concern (CoPCs) (arsenic, uranium and lead) that are indicative of the historical contamination. Samples passing XRF field screening are packaged and sent to a local laboratory for a full suite of analyses and checked against the CoPC list to assess whether the soil matches the profile for nearby native soils and passes the remediation goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗