Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

IMPaCT - Integration of Missions, Programs, and Core Technologies

IMPaCT enables comprehensive information on current NASA missions, prospective future missions, and the technologies that NASA is investing in, or considering investing in, to be accessed from a common Web-based interface. It allows dependencies to be established between missions and technology, and from this, the benefits of investing in individual technologies can be determined. The software also allows various scenarios for future missions to be explored against resource constraints, and the nominal cost and schedule of each mission to be modified in an effort to fit within a prescribed budget.

Balacuit, Carlos P.↗

NASA Tech Briefs, June 2014

Topics include: Real-Time Minimization of Tracking Error for Aircraft Systems; Detecting an Extreme Minority Class in Hyperspectral Data Using Machine Learning; KSC Spaceport Weather Data Archive; Visualizing Acquisition, Processing, and Network Statistics Through Database Queries; Simulating Data Flow via Multiple Secure Connections; Systems and Services for Near-Real-Time Web Access to NPP Data; CCSDS Telemetry Decoder VHDL Core; Thermal Response of a High-Power Switch to Short Pulses; Solar Panel and System Design to Reduce Heating and Optimize Corridors for Lower-Risk Planetary Aerobraking; Low-Cost, Very Large Diamond-Turned Metal Mirror; Very-High-Load-Capacity Air Bearing Spindle for Large Diamond Turning Machines; Elevated-Temperature, Highly Emissive Coating for Energy Dissipation of Large Surfaces; Catalyst for Treatment and Control of Post-Combustion Emissions; Thermally Activated Crack Healing Mechanism for Metallic Materials; Subsurface Imaging of Nanocomposites; Self-Healing Glass Sealants for Solid Oxide Fuel Cells and Electrolyzer Cells; Micromachined Thermopile Arrays with Novel Thermo - electric Materials; Low-Cost, High-Performance MMOD Shielding; Head-Mounted Display Latency Measurement Rig; Workspace-Safe Operation of a Force- or Impedance-Controlled Robot; Cryogenic Mixing Pump with No Moving Parts; Seal Design Feature for Redundancy Verification; Dexterous Humanoid Robot; Tethered Vehicle Control and Tracking System; Lunar Organic Waste Reformer; Digital Laser Frequency Stabilization via Cavity Locking Employing Low-Frequency Direct Modulation; Deep UV Discharge Lamps in Capillary Quartz Tubes with Light Output Coupled to an Optical Fiber; Speech Acquisition and Automatic Speech Recognition for Integrated Spacesuit Audio Systems, Version II; Advanced Sensor Technology for Algal Biotechnology; High-Speed Spectral Mapper; "Ascent - Commemorating Shuttle" - A NASA Film and Multimedia Project DVD; High-Pressure, Reduced-Kinetics Mechanism for N-Hexadecane Oxidation; Method of Error Floor Mitigation in Low-Density Parity-Check Codes; X-Ray Flaw Size Parameter for POD Studies; Large Eddy Simulation Composition Equations for Two-Phase Fully Multicomponent Turbulent Flows; Scheduling Targeted and Mapping Observations with State, Resource, and Timing Constraints;

Source record↗

SPHERES: Synchronized, Position, Hold, Engage, Reorient, Experimental Satellites: SPHERES/Astrobee Working Group (SAWG)

SPHERES/Astrobee Working Group (SAWG) Quarterly meeting. Membership includes MIT, FIT, AFS, DARPA, CASIS, SJSU, and NASA (HQ, KSC, JSC, MSFC, and ARC)Face-to-Face, twice a year Purpose: Information sharing across the SPHERES community Program office shares National Lab Facility availability Status of resources (batteries, CO2 tanks, etc.), Overall Calendar (scheduled Test Sessions, up mass return), and Updates on new PD, Investigations, and ISS infrastructure. Provide the SPHERES community (PD, investigators, etc.) with up-to-date information to determine opportunities to use the NL Facility Discuss proposed changes updates to SPHERES Nat Lab which may be required to support a specific activity or research. Discuss specific support requests made to the ISS Office.

Benavides, Jose↗

SPHERES: Synchronized, Position, Hold, Engage, Reorient, Experimental Satellites

SPHERES/Astrobee Working Group (SAWG) Quarterly meeting. Membership includes MIT, FIT, AFS, DARPA, CASIS, SJSU, and NASA (HQ, KSC, JSC, MSFC, and ARC) Face-to-Face, twice a year. The purpose is information sharing across the SPHERES community. Program office shares National Lab facility availability. Status of resources (batteries, CO2 tanks, etc.), overall calendar (scheduled Test Sessions, upmass return), and updates on new PD, investigations, and ISS infrastructure. Provide the SPHERES community (PD, investigators, etc.) with up-to-date information to determine opportunities to use the National Lab facility. Discuss proposed changes and updates to SPHERES National Lab which may be required to support a specific activity or research. Discuss specific support requests made to the ISS Office.

SPHERES satellites↗

SPHERES/Astrobee Working Group (SAWG) Quarterly Meeting

SPHERES Astrobee Working Group (SAWG) Quarterly meeting. Membership includes MIT, FIT, AFS, DARPA, CASIS, SJSU, and NASA (HQ, KSC, JSC, MSFC, and ARC). Face-to-Face, twice a year Purpose: Information sharing across the SPHERES community. Program office shares National Lab Facility availability. Status of resources (batteries, CO2 tanks, etc.), Overall Calendar (scheduled Test Sessions, upmassreturn), and Updates on new PD, Investigations, and ISS infrastructure. Provide the SPHERES community (PD, investigators, etc.) with up-to-date information to determine opportunities to use the NL Facility. Discuss proposed changes updates to SPHERES Nat Lab which may be required to support a specific activity or research. Discuss specific support requests made to the ISS Office

Benavides, Jose V.↗

Use of collaboration software to improve nuclear power plant outage management

Nuclear Power Plant (NPP) refueling outages create some of the most challenging activities the utilities face in both tracking and coordinating thousands of activities in a short period of time. Other challenges, including nuclear safety concerns arising from atypical system configurations and resource allocation issues, can create delays and schedule overruns, driving up outage costs. Today the majority of the outage communication is done using processes that do not take advantage of advances in modern technologies that enable enhanced communication, collaboration and information sharing. Some of the common practices include: runners that deliver paper-based requests for approval, radios, telephones, desktop computers, daily schedule printouts, and static whiteboards that are used to display information. Many gains have been made to reduce the challenges facing outage coordinators; however; new opportunities can be realized by utilizing modern technological advancements in communication and information tools that can enhance the collective situational awareness of plant personnel leading to improved decision-making. Ongoing research as part of the Light Water Reactor Sustainability Program (LWRS) has been targeting NPP outage improvement. As part of this research, various applications of collaborative software have been demonstrated through pilot project utility partnerships. Collaboration software can be utilized as part of the larger concept of Computer-Supported Cooperative Work (CSCW). Collaborative software can be used for emergent issue resolution, Outage Control Center (OCC) displays, and schedule monitoring. Use of collaboration software enables outage staff and subject matter experts (SMEs) to view and update critical outage information from any location on site or off.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

River Protection Project System Plan, Rev. 8 - 18661

The River Protection Project System Plan comprises a set of scenarios that evaluate options for safely treating the high-level radioactive waste stored in underground tanks at the DOE Hanford Site. It establishes a baseline case, used for communicating the DOE's strategy to various stakeholders, as well as ten alternative scenarios that evaluate initiatives to potentially accelerate cleanup and/or address risks. The scenarios were modeled using TOPSim, a custom flowsheet simulator that includes chemistry and mass transfer elements used to estimate operating durations and completion dates, quantities of waste treated through various processes, as well as the time required to complete treatment. The TOPSim results are aligned to a resource-loaded Oracle{sup R} Primavera P6 schedule to estimate the life cycle cost of the cleanup mission. This paper will outline the results of the System Plan, Rev. 8 modeling effort. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a Reduced 240-Bus WECC Dynamic Model for Frequency Response Study of High Renewable Integration

The ongoing changes in the generation resource mix, driven by the rapid adoption of inverter-based resources (IBR) as well as the early retirement of synchronous generators, are bringing new challenges to the planning and operation of bulk electric power systems. Consequently, there is an increasing need to understand, design, and quantify the reliability service provision from IBRs by performing integrated scheduling and dynamic simulations. However, test systems that have consistent scheduling and dynamic models rarely exist largely because of the decoupled nature of the two simulations on a synchronous generator-dominated system. This paper develops the dynamic model of a reduced Western Electricity Coordinating Council (WECC) system. In conjunction with the existing scheduling model, it is suitable for integrating scheduling and dynamic simulations. The reduced 240-bus WECC model reflects the generation resource mix of the Western Interconnection as of 2018. Moreover, the developed dynamic model is validated against field frequency events measured by FNET/GridEye and preserves the dominant inter-area oscillation mode in WECC.

dynamic simulation↗

Developing scheduling benchmark tests for the Space Network

A set of benchmark tests were developed to analyze and measure Space Network scheduling characteristics and to assess the potential benefits of a proposed flexible scheduling concept. This paper discusses the role of the benchmark tests in evaluating alternative flexible scheduling approaches and defines a set of performance measurements. The paper describes the rationale for the benchmark tests as well as the benchmark components, which include models of the Tracking and Data Relay Satellite (TDRS), mission spacecraft, their orbital data, and flexible requests for communication services. Parameters which vary in the tests address the degree of request flexibility, the request resource load, and the number of events to schedule. Test results are evaluated based on time to process and schedule quality. Preliminary results and lessons learned are addressed.

Moe, Karen L.↗

ASPEN Version 3.0

The Automated Scheduling and Planning Environment (ASPEN) computer program has been updated to version 3.0. ASPEN is a modular, reconfigurable, application software framework for solving batch problems that involve reasoning about time, activities, states, and resources. Applications of ASPEN can include planning spacecraft missions, scheduling of personnel, and managing supply chains, inventories, and production lines. ASPEN 3.0 can be customized for a wide range of applications and for a variety of computing environments that include various central processing units and random access memories.

Rabideau, Gregg↗

Scheduling NASA's Deep Space Network: Priorities, Preferences, and Optimization

NASA's Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. Growth in mission demand, both in number of spacecraft and in data return, has led to increased loading levels on the network, and actual demand frequently exceeds network capacity. The DSN scheduling process involves peer-to-peer collaborative negotiation, which consumes significant time and resources in order to reach a baseline version of the schedule, and then to manage and agree to changes. Process delays are exacerbated by the high level of oversubscription experienced by the DSN: it is not unusual for the scheduling process to start with 20-40\% more requested time can be accommodated on the available antennas. The other NASA networks make use of a static mission priority list to address a similar problem: missions are ranked in priority order, then the schedule is populated by priority from highest to lowest. Such a mechanism would not work for DSN due to the heterogeneity of the mission set, and to the time-varying mission requirements with mission phase. This paper describes an alternative approach for the DSN that addresses key problems inherent in the current process --- oversubsubscription and how to "fairly'" reduce it to a manageable level. The main characteristics of the new approach are the use of loading-based limits based on balancing requested time, along with priorities and user preferences as the basis for optimization criteria that can be used by new algorithms.

Johnston, Mark D↗

Hydropower Flexibility and Environmental Tradeoffs Analysis

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordinating multiple tools, including water resources, ecological, and technical and economic power grid modeling, informs dam water releases. The case study, the Columbia River Basin multipurpose reservoir project, is operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. We integrated a production cost model, a water resource model, and decades of tribal knowledge to analyze the fish-friendly way of operating Columbia hydropower scheduling and grid impacts. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

Columbia River↗

HCPerf: Driving Performance-Directed Hierarchical Coordination for Autonomous Vehicles

The rapid development of autonomous driving poses new research challenges to the on-vehicle computing system. In particular, the execution time of autonomous driving tasks highly depends on the specific driving environment. For instance, the execution time of configurable sensor fusion increases significantly as the scene becomes complex, which leads to end-to-end deadline misses from sensing to control and may cause accidents. Thus, a framework that can effectively utilize the system resources to guarantee the end-to-end deadlines of autonomous driving tasks as well as effectively prioritize the responsiveness and throughput of the control commands is crucial for autonomous driving. In this paper, we propose HCPerf, a performance-directed hierarchical coordination framework that intelligently coordinates the autonomous driving tasks with high execution time variation and complex dependencies according to the driving performance in real-time. Specifically, HCPerf mainly consists of two coordinators. The internal coordinator intelligently schedules the tasks according to the driving performance of the vehicle in order to help them meet the end-to-end deadlines while well prioritizing the responsiveness and throughput of the control commands. At the same time, the external coordinator dynamically tunes the rates of tasks according to the schedulability in order to efficiently utilize the system resource. We conduct extensive experiments on both simulation and hardware testbeds with the representative autonomous driving application. The results show that HCPerf can effectively improve the driving performance by 7.69%-45.94% in different driving scenarios.

Ma, Jialiang↗

Design and Scheduling of Microgrids using Benders Decomposition

The distribution feeder laterals in a distribution feeder with relatively high PV generation as compared to the load can be operated as microgrids to achieve reliability, power quality and economic benefits. However, renewable resources are intermittent and stochastic in nature. A novel approach for sizing and scheduling an energy storage system and microturbine for reliable operation of microgrids is proposed. The size and schedule of an energy storage system and microturbine are determined using Benders' decomposition, considering PV generation as a stochastic resource.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-core processing and scheduling performance in CMS

Commodity hardware is going many-core. We might soon not be able to satisfy the job memory needs per core in the current single-core processing model in High Energy Physics. In addition, an ever increasing number of independent and incoherent jobs running on the same physical hardware not sharing resources might significantly affect processing performance. It will be essential to effectively utilize the multi-core architecture. CMS has incorporated support for multi-core processing in the event processing framework and the workload management system. Multi-core processing jobs share common data in memory, such us the code libraries, detector geometry and conditions data, resulting in a much lower memory usage than standard single-core independent jobs. Exploiting this new processing model requires a new model in computing resource allocation, departing from the standard single-core allocation for a job. The experiment job management system needs to have control over a larger quantum of resource since multi-core aware jobs require the scheduling of multiples cores simultaneously. CMS is exploring the approach of using whole nodes as unit in the workload management system where all cores of a node are allocated to a multi-core job. Whole-node scheduling allows for optimization of the data/workflow management (e.g. I/O caching, local merging) but efficient utilization of all scheduled cores is challenging. Dedicated whole-node queues have been setup at all Tier-1 centers for exploring multi-core processing workflows in CMS. We present the evaluation of the performance scheduling and executing multi-core workflows in whole-node queues compared to the standard single-core processing workflows.

Hernandez, J. M.↗

Should’ve Could’ve: Progress in the Systems Engineering of the Mars2020 On-Board Planner

Mars rover operations has traditionally controlled behavior using meticulously compiled, so-called “Master” sequences that enforce deterministic timing and ordering of activities. While the approach is effective at managing risk and complexity, it can also be inefficient. Extended operations of the Mars2020 rover envisions a fundamentally different scheduling and execution approach. Atomic activities are constrained by mission operators in time, resource usage, and a structure of dependencies. The rover flight software will create and re-create schedules, responding to available energy, data volume, actual activity durations and execution status, observed temperatures, and other on-board state. Schedules are expected to change substantially in the course of execution. The solution space is prohibitively large and probabilistic in nature. A range of emergent behavior is accessible depending on the interaction between actual on-board state and a given formulation of constraints. For years, the specification and implementation of this capability have been considered and refined, as testing and analysis have mapped the contours of the system. Many concepts that could have been adopted were rejected, and in some cases, emergent properties have been exposed and beaten back with approaches to steer the behavior. This paper discusses some of the design history and underlying reasoning in the systems engineering of the first autonomous activity planner on Mars.

Kuhn, Stephen R↗

The Application of Lean Thinking Principles and Kaizen Practices for the Successful Development and Implementation of the Ares I-X Flight Test Rocket and Mission

On October 28, 2009 the Ares I-X flight test rocket launched from Kennedy Space Center and flew its suborbital trajectory as designed. The mission was successfully completed as data from the test, and associated development activities were analyzed, transferred to stakeholders, and well documented. Positive lessons learned from Ares I-X were that the application of lean thinking principles and kaizen practices are effective in streamlining development activities. Ares I-X, like other historical rocket development projects, was hampered by technical, cost, and schedule challenges and if not addressed boldly could have resulted in cancellation of the test. The mission management team conducted nine major meetings, referred to as lean events, across its elements to assess plans, procedures, processes, requirements, controls, culture, organization, use of resources, and anything that could be changed to optimize schedule or reduce risk. The preeminent aspect of the lean events was the focus on value added activities and the removal or at least reduction in non-value activities. Trained Lean Six Sigma facilitators assisted the Ares I-X developers in conducting the lean events. They indirectly helped formulate the mission s own unique methodology for assessing schedule. A core team was selected to lead the events and report to the mission manager. Each activity leveraged specialized participants to analyze the subject matter and its related processes and then recommended alternatives and solutions. Stakeholders were the event champions. They empowered and encouraged the team to succeed. The keys to success were thorough preparation, honest dialog, small groups, adherence to the Ares I-X ground rules, and accountability through disciplined reporting and tracking of actions. This lean event formula was game-changing as demonstrated by the success of Ares I-X. It is highly recommended as a management tool to help develop other complex systems efficiently. The key benefits for Ares I-X were obtaining unambiguous schedule margin, defining enabling options for risk reduction, and most importantly a stronger more unified team.

Askins, B. R.↗