Search NASA⌕ Search

SEARCH · Search NASA

Results for “SATELLITE MANEUVER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

A method of testing attitude control systems during the development phase

A technique, utilized on the Space Telescope Program, and used for testing satellite attitude pointing and control systems during the engineering and development phases is presented. The technique verifies the hardware models used in design phase computer simulations, verifies the interface between the flight hardware and flight software, and uncovers hardware/software switching or mode logic problems. The testing is accomplished in two phases: a dynamic hardware simulator phase using hardware electronic simulators and an electronic vehicle motion simulator; and a second real hardware phase utilizing engineering model gyros and reaction wheels on an airbearing table. Both phases use an engineering model of the flight computer, flight algorithms and software, and a breadboard data management and computer hardware interface for timing simulations. The purpose of each test and the test phases are described, and examples of closed loop test results for both attitude hold and maneuvering models are given.

Besonis, A.↗

An Update on the Effectiveness of Postmission Disposal in LEO

The commonly‐adopted orbital debris mitigation measures were developed to reduce the growth of the future debris population. A major component in debris mitigation is post-mission disposal (PMD). The key PMD element for LEO satellites is the 25‐year rule. It is intended to limit the long‐term presence of rocket bodies (R/Bs) and spacecraft (S/C), as well as mission-related debris, in the environment. The effectiveness of PMD has been demonstrated and documented since the development of mitigation measures began in the 1990s. This paper summarizes an updated study, based on the current environment, using the NASA LEGEND model. The study focused on the > or = 10 cm population in LEO. The historical simulation covered 1957 through 2011 and followed the recorded launches and known breakup events. The future projection was carried out for 200 years. An eight‐year launch traffic, 2004 - 2011, was repeated during the projection period. An eight‐year mission lifetime was assumed for future S/C. No stationkeeping and no collision avoidance maneuver were implemented. Only objects 10 cm and larger were included in collision consideration. No explosion was allowed for R/Bs and S/C launched after 2011. The 25‐year PMD rule success rates were set at 0%, 10%, 50%, 75%, and 95%, respectively, for the 5 study scenarios. Results of the simulations were analyzed to quantify the differences among the different compliance rates. As expected, the 0% PMD projection followed a rapid and non‐linear increase in the next 200 years. The LEO population, on average, more than tripled at the end of the simulations. With a 50% compliance of the 25‐year rule, the population growth was reduced approximately by half. However, even with a 95% compliance of the 25‐year rule, the LEO debris population would still increase by an average of more than 50% in 200 years. These simulation results provide an updated assessment of the effectiveness of the 25‐year rule. It is the first and the most cost‐effective defense against future population growth. In addition, the results also confirm the instability of the LEO population and lay the foundation for the need to consider environment remediation in the future.

Liou, J.-C.↗

Aerocapture Design Study for a Titan Polar Orbiter

In 2014 a team at NASA Goddard Space Flight Center (GSFC) studied the feasibility of using active aerocapture to reduce the chemical Delta V requirements for inserting a small scientific satellite into Titan polar orbit. The scientific goals of the mission would be multi-spectral imaging and active radar mapping of Titan's surface and subsurface. The study objectives were to: (i) identify and select from launch window opportunities and refine the trajectory to Titan; (ii) study the aerocapture flight path and refine the entry corridor; (iii) design a carrier spacecraft and systems architecture; (iv) develop a scientific and engineering plan for the orbital portion of the mission. Study results include: (i) a launch in October 2021 on an Atlas V vehicle, using gravity assists from Earth and Venus to arrive at Titan in January 2031; (ii) initial aerocapture via an 8-km wide entry corridor to reach an initial 350X6000 km orbit, followed by aerobraking to reach a 350X1500 km orbit, and a periapse raise maneuver to reach a final 1500 km circular orbit; (iii) a three-part spacecraft system consisting of a cruise stage, radiator module, and orbiter inside a heat shield; (iv) a 22-month mission including station keeping to prevent orbital decay due to Saturn perturbations, with 240 Gb of compressed data returned. High-level issues identified include: (i) downlink capability - realistic downlink rates preclude the desired multi-spectral, global coverage of Titan's surface; (ii) power - demise of the NASA ASRG (Advanced Stirling Radioisotope Generator) program, and limited availability at present of MMRTGs (Multi-Mission Radioisotope Generators) needed for competed outer planet missions; (iii) thermal - external radiators must be carried to remove 4 kW of waste heat from MMRTGs inside the aeroshell, requiring heat pipes that pass through the aeroshell lid, compromising shielding ability; (iv) optical navigation to reach the entry corridor; (v) the NASA requirement of continuous critical event coverage for the orbiter, especially during the peak heating of the aerocapture when the radio link will be broken. In conclusion, although Titan aerocapture allows for considerable savings in propellant mass, this comes at a cost of increased mission complexity. Further architecture study and refinement is required to reduce high-level mission risks and to elucidate the optimum architecture.

Nixon, Conor A.↗

Initial Calibration Activities and Performance Assessments of NOAA-20 VIIRS

The second VIIRS instrument was launched on-board the NOAA-20 (formerly JPSS-1) satellite onNovember 18, 2017. It was designed and built with the same performance requirements as the first VIIRSon-board the S-NPP launched on October 28, 2011. Currently, the NOAA-20 is orbiting the Earth in thesame plane as the S-NPP but separated in time and space by 50 minutes. The VIIRS observations are made in22 spectral bands, including a day-night band (DNB) that cover wavelengths from visible to long-waveinfrared. The sensor's on-orbit calibration is provided by a set of on-board calibrators (OBCs), which includea solar diffuser (SD), a solar diffuser stability monitor (SDSM), and a blackbody (BB). After turn-on, theVIIRS instrument conducted a series of post-launch testing (PLT) and intensive calibration and validation(ICV) activities, including those performed via spacecraft maneuvers, designed to verify and establishinstrument on-orbit calibration performance baseline. This paper provides an overview of NOAA-20 VIIRSICV activities and an assessment of its initial on-orbit performance with a focus on several key calibrationparameters, such as the detector response (or gain), dynamic range, and signal-to-noise ratio (SNR). Variousissues identified and lessons learned from initial instrument operation and calibration are also discussed insupport of long-term monitoring (LTM) of NOAA-20 VIIRS calibration and data quality.

Calibration↗

Surge Pressure Mitigation in the Global Precipitation Measurement Mission Core Propulsion System

The Global Precipitation Measurement (GPM) mission is an international partnership between NASA and JAXA whose Core spacecraft performs cutting-edge measurements of rainfall and snowfall worldwide and unifies data gathered by a network of precipitation measurement satellites. The Core spacecraft's propulsion system is a blowdown monopropellant system with an initial hydrazine load of 545 kg in a single composite overwrapped propellant tank. At launch, the propulsion system contained propellant in the tank and manifold tubes upstream of the latch valves, with low-pressure helium gas in the manifold tubes downstream of the latch valves. The system had a relatively high beginning-of- life pressure and long downstream manifold lines; these factors created conditions that were conducive to high surge pressures. This paper discusses the GPM project's approach to surge mitigation in the propulsion system design. The paper describes the surge testing program and results, with discussions of specific difficulties encountered. Based on the results of surge testing and pressure drop analyses, a unique configuration of cavitating venturis was chosen to mitigate surge while minimizing pressure losses during thruster maneuvers. This paper concludes with a discussion of overall lessons learned with surge pressure testing for NASA Goddard spacecraft programs.

Pressure↗

NASA Tech Briefs, June 2008

Topics covered include: Charge-Control Unit for Testing Lithium-Ion Cells; Measuring Positions of Objects Using Two or More Cameras; Lidar System for Airborne Measurement of Clouds and Aerosols; Radiation-Insensitive Inverse Majority Gates; Reduced-Order Kalman Filtering for Processing Relative Measurements; Spaceborne Processor Array; Instrumentation System Diagnoses a Thermocouple; Chromatic Modulator for a High-Resolution CCD or APS; Commercial Product Activation Using RFID; Cup Cylindrical Waveguide Antenna; Aerobraking Maneuver (ABM) Report Generator; ABM Drag_Pass Report Generator; Transformation of OODT CAS to Perform Larger Tasks; Visualization Component of Vehicle Health Decision Support System; Mars Reconnaissance Orbiter Uplink Analysis Tool; Problem Reporting System; G-Guidance Interface Design for Small Body Mission Simulation; DSN Scheduling Engine; Replacement Sequence of Events Generator; Force-Control Algorithm for Surface Sampling; Tool for Merging Proposals Into DSN Schedules; Micromachined Slits for Imaging Spectrometers; Fabricating Nanodots Using Lift-Off of a Nanopore Template; Making Complex Electrically Conductive Patterns on Cloth; Special Polymer/Carbon Composite Films for Detecting SO2; Nickel-Based Superalloy Resists Embrittlement by Hydrogen; Chemical Passivation of Li+-Conducting Solid Electrolytes; Organic/Inorganic Polymeric Composites for Heat-Transfer Reduction; Composite Cathodes for Dual-Rate Li-Ion Batteries; Improved Descent-Rate Limiting Mechanism; Alignment-Insensitive Lower-Cost Telescope Architecture; Micro-Resistojet for Small Satellites; Using Piezoelectric Devices to Transmit Power through Walls; Miniature Latching Valve; Apparatus for Sampling Surface Contamination; Novel Species of Non-Spore-Forming Bacteria; Chamber for Aerosol Deposition of Bioparticles; Hyperspectral Sun Photometer for Atmospheric Characterization and Vicarious Calibrations; Dynamic Stability and Gravitational Balancing of Multiple Extended Bodies; Simulation of Stochastic Processes by Coupled ODE-PDE; Cluster Inter-Spacecraft Communications; Genetic Algorithm Optimizes Q-LAW Control Parameters; Low-Impact Mating System for Docking Spacecraft; Non-Destructive Evaluation of Materials via Ultraviolet Spectroscopy; Gold-on-Polymer-Based Sensing Films for Detection of Organic and Inorganic Analytes in the Air; and Quantum-Inspired Maximizer.

Source record↗

Effectiveness of Redundant Communications Systems in Maintaining Operational Control of Small Unmanned Aircraft

NASA has been researching prototype technologies for an Unmanned Aircraft System (UAS) Traffic Management (UTM) system to facilitate enabling of safe and efficient civilian low-altitude airspace and UAS operations, in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for beyond visual line-of-sight (BVLOS) operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 will build on the earlier TCLs and focus on technologies and requirements for operations in higher-density urban areas for tasks such as news gathering, package delivery and for managing large-scale contingencies. This paper describes a communications test conducted in TCL3 and discusses insights gained from the test. In the test, operators were directed to equip UAS with redundant Command and Control (C2) communications systems, send a maneuver command to Unmanned Aircraft (UA) via the primary system, then verify execution of the sent command. This exercise was repeated with each redundant system. The test was designed to assess effectiveness of redundant C2 systems in maintaining operational control of UA. Several UAS were configured with varying arrangements to achieve redundancy, including two identical radio modems using the same frequency band, WiFi and Long-Term Evolution (LTE) cellular modems, etc. From the test, digital data such as time maneuver command sent, time maneuver verified, etc., were collected. Descriptions of methods to detect loss of C2 communications and contingency steps for such event were collected and assessed. The final paper will include a detailed analysis of the collected data leading to the following insights. First, effectiveness of redundant C2 systems depends on several factors, such as operational environment and communications service availability. For example, use of two identical point-to-point radio to connect operator and UA on the same frequency band can be effective in mitigating radio malfunction when operating in an environment where possibility of Radio Frequency (RF) interference is low, such as over open plains. However, the same arrangement may not be effective where high level of RF transmissions in broad spectrum ranges can be expected, such as over or near urban areas. For redundant systems that consist of external communications services, such as cellular and satellite communications network, redundancy is maintained only in the areas where more than one services are available. Therefore, UAS operators should have the means to plan for and monitor the performance of external communications services they are relying on to control UA. Second, communications performance needs, such as the minimum data transfer rate and the maximum tolerable latency, should be assessed to reflect the potential hazard that can come from loss of UA control. For example, UA operations over desolate area pose less hazard to people than operations over densely populated area and performance need for the former would be less than the latter.

Jung, Jaewoo↗

A Closed-Loop Hardware Simulation of Decentralized Satellite Formation Control

In recent years, there has been significant interest in the use of formation flying spacecraft for a variety of earth and space science missions. Formation flying may provide smaller and cheaper satellites that, working together, have more capability than larger and more expensive satellites. Several decentralized architectures have been proposed for autonomous establishment and maintenance of satellite formations. In such architectures, each satellite cooperatively maintains the shape of the formation without a central supervisor, and processing only local measurement information. The Global Positioning System (GPS) sensors are ideally suited to provide such local position and velocity measurements to the individual satellites. An investigation of the feasibility of a decentralized approach to satellite formation flying was originally presented by Carpenter. He extended a decentralized linear-quadratic-Gaussian (LQG) framework proposed by Speyer in a fashion similar to an extended Kalman filter (EKE) which processed GPS position fix solutions. The new decentralized LQG architecture was demonstrated in a numerical simulation for a realistic scenario that is similar to missions that have been proposed by NASA and the U.S. Air Force. Another decentralized architecture was proposed by Park et al. using carrier differential-phase GPS (CDGPS). Recently, Busse et al demonstrated the decentralized CDGPS architecture in a hardware-in-the-loop simulation on the Formation Flying TestBed (FFTB) at Goddard Space Flight Center (GSFC), which features two Spirent Cox 16 channel GPS signal generator. Although representing a step forward by utilizing GPS signal simulators for a spacecraft formation flying simulation, only an open-loop performance, in which no maneuvers were executed based on the real-time state estimates, was considered. In this research, hardware experimentation has been extended to include closed-loop integrated guidance and navigation of multiple spacecraft formations using GPS receivers and real-time vehicle telemetry. A hardware closed-loop simulation has been performed using the decentralized LQG architecture proposed by Carpenter in the GPS test facility at the Center for Space Research (CSR). This is the first presentation using this type of hardware for demonstration of closed-loop spacecraft formation flying.

Ebimuma, Takuji↗

Attitude Accuracy Study for the Earth Observing System (EOS) AM-1 Spacecraft

Earth Observing System (EOS) spacecraft will take measurements of the Earth's clouds, oceans, atmosphere, land, and radiation balance. These EOS spacecraft are part of the National Aeronautics and Space Administration's Mission to Planet Earth, and consist of several series of satellites, with each series specializing in a particular class of observations. This paper focuses on the EOS AM-1 spacecraft, which is the first of three satellites constituting the EOS AM series (morning equatorial crossing) and the initial spacecraft of the EOS program. EOS AM-1 has a stringent onboard attitude knowledge requirement, of 36/41/44 arc seconds (3 sigma) in yaw/roll/pitch, respectively. During normal mission operations, attitude is determined onboard using an extended Kalman sequential filter via measurements from two charge coupled device (CCD) star trackers, one Fine Sun Sensor, and an Inertial Rate Unit. The attitude determination error analysis system (ADEAS) was used to model the spacecraft and mission profile, and in a worst case scenario with only one star tracker in operation, the attitude uncertainty was 9.7/ll.5/12.2 arc seconds (3 sigma) in yaw/roll/pitch. The quoted result assumed the spacecraft was in nominal attitude, using only the 1-rotation per orbit motion of the spacecraft about the pitch axis for calibration of the gyro biases. Deviations from the nominal attitude would show greater attitude uncertainties, unless calibration maneuvers which roll and/or yaw the spacecraft have been performed. This permits computation of the gyro misalignments, and the attitude knowledge requirement would remain satisfied.

Lesikar, James D., II↗

NASA CARA Prelaunch Analysis and Process

NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.

conjunction assessment↗

NASA CARA Prelaunch Analysis and Process

NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.

conjunction assessment↗

Reusable Reentry Satellite (RRS) system design study

The Reusable Reentry Satellite (RRS) is intended to provide investigators in several biological disciplines with a relatively inexpensive method to access space for up to 60 days with eventual recovery on Earth. The RRS will permit totally intact, relatively soft, recovery of the vehicle, system refurbishment, and reflight with new and varied payloads. The RRS is to be capable of three reflights per year over a 10-year program lifetime. The RRS vehicle will have a large and readily accessible volume near the vehicle center of gravity for the Payload Module (PM) containing the experiment hardware. The vehicle is configured to permit the experimenter late access to the PM prior to launch and rapid access following recovery. The RRS will operate in one of two modes: (1) as a free-flying spacecraft in orbit, and will be allowed to drift in attitude to provide an acceleration environment of less than 10(exp -5) g. the acceleration environment during orbital trim maneuvers will be less than 10(exp -3) g; and (2) as an artificial gravity system which spins at controlled rates to provide an artificial gravity of up to 1.5 Earth g. The RRS system will be designed to be rugged, easily maintained, and economically refurbishable for the next flight. Some systems may be designed to be replaced rather than refurbished, if cost effective and capable of meeting the specified turnaround time. The minimum time between recovery and reflight will be approximately 60 days. The PMs will be designed to be relatively autonomous, with experiments that require few commands and limited telemetry. Mass data storage will be accommodated in the PM. The hardware development and implementation phase is currently expected to start in 1991 with a first launch in late 1993.

Source record↗

A real-time algorithm for integrating differential satellite and inertial navigation information during helicopter approach

A real-time, high-rate precision navigation Kalman filter algorithm is developed and analyzed. This Navigation algorithm blends various navigation data collected during terminal area approach of an instrumented helicopter. Navigation data collected include helicopter position and velocity from a global position system in differential mode (DGPS) as well as helicopter velocity and attitude from an inertial navigation system (INS). The goal of the Navigation algorithm is to increase the DGPS accuracy while producing navigational data at the 64 Hertz INS update rate. It is important to note that while the data was post flight processed, the Navigation algorithm was designed for real-time analysis. The design of the Navigation algorithm resulted in a nine-state Kalman filter. The Kalman filter's state matrix contains position, velocity, and velocity bias components. The filter updates positional readings with DGPS position, INS velocity, and velocity bias information. In addition, the filter incorporates a sporadic data rejection scheme. This relatively simple model met and exceeded the ten meter absolute positional requirement. The Navigation algorithm results were compared with truth data derived from a laser tracker. The helicopter flight profile included terminal glideslope angles of 3, 6, and 9 degrees. Two flight segments extracted during each terminal approach were used to evaluate the Navigation algorithm. The first segment recorded small dynamic maneuver in the lateral plane while motion in the vertical plane was recorded by the second segment. The longitudinal, lateral, and vertical averaged positional accuracies for all three glideslope approaches are as follows (mean plus or minus two standard deviations in meters): longitudinal (-0.03 plus or minus 1.41), lateral (-1.29 plus or minus 2.36), and vertical (-0.76 plus or minus 2.05).

Hoang, TY↗

A Real-Time Algorithm for Integrating Differential Satellite and Inertial Navigation Information During Helicopter Approach

A real-time, high-rate precision navigation Kalman filter algorithm is developed and analyzed. This navigation algorithm blends various navigation data collected during terminal area approach of an instrumented helicopter. Navigation data collected include helicopter position and velocity from a global position system in differential mode (DGPS) as well as helicopter velocity and attitude from an inertial navigation system (INS). The goal of the navigation algorithm is to increase the DGPS accuracy while producing navigational data at the 64 Hertz INS update rate. It is important to note that while the data was post flight processed, the navigation algorithm was designed for real-time analysis. The design of the navigation algorithm resulted in a nine-state Kalman filter. The Kalman filter's state matrix contains position, velocity, and velocity bias components. The filter updates positional readings with DGPS position, INS velocity, and velocity bias information. In addition, the filter incorporates a sporadic data rejection scheme. This relatively simple model met and exceeded the ten meter absolute positional requirement. The navigation algorithm results were compared with truth data derived from a laser tracker. The helicopter flight profile included terminal glideslope angles of 3, 6, and 9 degrees. Two flight segments extracted during each terminal approach were used to evaluate the navigation algorithm. The first segment recorded small dynamic maneuver in the lateral plane while motion in file vertical plane was recorded by the second segment. The longitudinal, lateral, and vertical averaged positional accuracies for all three glideslope approaches are as follows (mean +/- two standard deviations in meters): longitudinal (-0.03 +/- 1.41), lateral (-1.29 +/- 2.36), and vertical (-0.76 +/- 2.05).

Hoang, Ty↗

Analysis of the flight dynamics of the Solar Maximum Mission (SMM) off-sun scientific pointing

Algorithms are presented which were created and implemented by the Goddard Space Flight Center's (GSFC's) Solar Maximum Mission (SMM) attitude operations team to support large-angle spacecraft pointing at scientific objectives. The mission objective of the post-repair SMM satellite was to study solar phenomena. However, because the scientific instruments, such as the Coronagraph/Polarimeter (CP) and the Hard X ray Burst Spectrometer (HXRBS), were able to view objects other than the Sun, attitude operations support for attitude pointing at large angles from the nominal solar-pointing attitudes was required. Subsequently, attitude support for SMM was provided for scientific objectives such as Comet Halley, Supernova 1987A, Cygnus X-1, and the Crab Nebula. In addition, the analysis was extended to include the reverse problem, computing the right ascension and declination of a body given the off-Sun angles. This analysis led to the computation of the orbits of seven new solar comets seen in the field-of-view (FOV) of the CP. The activities necessary to meet these large-angle attitude-pointing sequences, such as slew sequence planning, viewing-period prediction, and tracking-bias computation are described. Analysis is presented for the computation of maneuvers and pointing parameters relative to the SMM-unique, Sun-centered reference frame. Finally, science data and independent attitude solutions are used to evaluate the large-angle pointing performance.

Pitone, D. S.↗

Analysis of the flight dynamics of the Solar Maximum Mission (SMM) off-sun scientific pointing

Algorithms are presented which were created and implemented by the Goddard Space Flight Center's (GSFC's) Solar Maximum Mission (SMM) attitude operations team to support large-angle spacecraft pointing at scientific objectives. The mission objective of the post-repair SMM satellite was to study solar phenomena. However, because the scientific instruments, such as the Coronagraph/Polarimeter (CP) and the Hard X-ray Burst Spectrometer (HXRBS), were able to view objects other than the Sun, attitude operations support for attitude pointing at large angles from the nominal solar-pointing attitudes was required. Subsequently, attitude support for SMM was provided for scientific objectives such as Comet Halley, Supernova 1987A, Cygnus X-1, and the Crab Nebula. In addition, the analysis was extended to include the reverse problem, computing the right ascension and declination of a body given the off-Sun angles. This analysis led to the computation of the orbits of seven new solar comets seen in the field-of-view (FOV) of the CP. The activities necessary to meet these large-angle attitude-pointing sequences, such as slew sequence planning, viewing-period prediction, and tracking-bias computation are described. Analysis is presented for the computation of maneuvers and pointing parameters relative to the SMM-unique, Sun-centered reference frame. Finally, science data and independent attitude solutions are used to evaluate the larg-angle pointing performance.

Pitone, D. S.↗

N20 VIIRS RSB Calibration Algorithms and Results: Collection 2.0

The NOAA-20 (N20) satellite, previously the Joint Polar Satellite System-1 satellite, was launched on November 18, 2017. One of the five major scientific instruments aboard the satellite is the Visible Infrared Imaging Radiometer Suite (VIIRS). VIIRS scans the Earth’s surface in 22 spectral bands, 14 of which are the reflective solar bands (RSBs) with band center wavelengths from 0.412 to 2.25μm. VIIRS regularly performs on-orbit radiometric calibration of its RSBs, primarily through the observations of the onboard solar diffuser (SD). The on-orbit change of the SD’s bidirectional reflectance distribution function, known as the H-factor, is determined by the onboard SD stability monitor (SDSM). Since the H-factor exhibits angular dependence, obtaining the H-factor along the SD to the telescope direction is a challenge for the NOAA-20 VIIRS. Recently, Collection 2.0 of the NASA Land Science Investigator-led Processing Systems (SIPS) products were released. As a part of this reprocessing effort, we made two major improvements in the N20 VIIRS RSB radiometric calibration. One is the improved SD and SDSM attenuation screen transmittance functions, obtained by using calibration data collected during both the yaw maneuver and a small portion of regular orbits, resulting in a higher quality H-factor for the SDSM view. Another is the use of the H-factor for the telescope view, derived from the H-factor for the SDSM view, by using the results for the SNPP VIIRS. In June 2019, we delivered a set of mission-long N20 VIIRS Collection 2.0 RSB radiometric calibration look-up-tables. These tables have been employed by the NASA Land SIPS group to reprocess the entire time series of the NOAA-20 VIIRS products. In this paper, we discuss the Collection 2.0 NOAA-20 VIIRS RSB calibration algorithms and results.

N20 VIIRS↗

Flight Demonstration of Novel Atmospheric Satellite Concept

The major focus of the Phase II effort described herein is to develop and demonstrate an aircraft capable of autonomously sailing (i.e., to cruise without propulsion or external assistance), and thereby prove that the dual-aircraft platform (DAP) atmospheric satellite concept is potentially viable. This sailing mode of flight was identified as the number-1 enabling technology required for the stratospheric DAP concept (also known as Stratosat) in the NIAC (NASA Innovative Advanced Concept) Phase I effort. No scientific demonstration of this technology has ever been done or documented to our knowledge. This report describes efforts to take a major step towards the sailing mode of flight capability using a single aircraft connected by cable to a moving ground vehicle which uses sufficient crosswind to cruise without propulsion while "pulling" the ground vehicle forward (i.e., without external assistance). The development of a prototype aircraft is described in terms of novel and key hardware and software elements. A specialized prototype aircraft is described, including a novel cable release mechanism, novel "lateron" control surfaces, and a highly-accurate onboard wind measurement system. Additionally, a novel means to safely connect the aircraft to the moving ground vehicle is described involving a fishing rod/reel and integrated load cell. All of these devices were designed and developed in-house and validated in flight testing. Software is developed to provide look-up tables that give the flight condition targets (i.e., 3-D position relative to ground vehicle, forward speed, aircraft orientation, etc.), based on current wind speed and direction. These tables are successfully validated in flight simulation and used onboard the aircraft. High fidelity analysis of the aircraft aerodynamics are described - required to produce accurate target sailing flight conditions. A novel wind tunnel measurement technique is developed to accurately assess the aerodynamics of the ultra-thin cable. A new specialized flight simulator is described which is utilized to develop and verify the flight software required onboard the aircraft, and to support training of pilots for flying the aircraft while tethered to a ground vehicle. The DAP flight simulator was developed within the Matlab-Simulink framework and included detailed treatment of aircraft/cable aerodynamics, cable dynamics, experimentally-derived propeller-motor thrust curves, actuator responsiveness, and realistic air turbulence. The specialized formation flight controller algorithm, developed using this flight simulator, and onboard the aircraft is described. Finally, a novel auto-tuning software is described and verified within the flight simulator that is shown to refine the sailing flight condition targets during flight using an optimization technique involving doublet maneuvers. Virtual flights using the auto-tuning software indicate that the prototype aircraft should be able to reach and hold sailing conditions despite moderate levels of turbulence provided there is sufficient mean wind available. An overview of the flight testing program is provided. Hundreds of short flights were conducted, primarily using a “dead” short runway at Deland Municipal Airport which permitted use of a moving ground vehicle. Additional flight tests at Space Florida’s Shuttle Landing Facility are also described. First year results from these tests in which the aircraft is controlled manually, demonstrated that excessive flight testing would be required for a pilot to learn to sail with visual cues. However, second year results from autonomous flight these tests included successful demonstration of the closed-loop autonomous formation flight capability (i.e., autonomously determine, reach, and hold the required 3-D location relative to the ground vehicle required for sailing). The next step of using the auto-tune software to autonomously refine the aircraft orientation targets to finally achieve sailing remains the primary goal of future work.

Flight↗