Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Planning, scheduling, and control for automatic telescopes

This paper presents an argument for the appropriateness of Entropy Reduction Engine (ERE) technology to the planning, scheduling, and control components of Automatic Photoelectric Telescope (APT) management. The paper is organized as follows. In the next section, we give a brief summary of the planning and scheduling requirements for APTs. Following this, in section 3, we give an ERE project precis, couched primarily in terms of project objectives. Section 4 gives a sketch of the match-up between problem and technology, and section 5 outlines where we want to go with this work.

Drummond, Mark↗

Scheduling revisited workstations in integrated-circuit fabrication

The cost of building new semiconductor wafer fabrication factories has grown rapidly, and a state-of-the-art fab may cost 250 million dollars or more. Obtaining an acceptable return on this investment requires high productivity from the fabrication facilities. This paper describes the Photo Dispatcher system which was developed to make machine-loading recommendations on a set of key fab machines. Dispatching policies that generally perform well in job shops (e.g., Shortest Remaining Processing Time) perform poorly for workstations such as photolithography which are visited several times by the same lot of silicon wafers. The Photo Dispatcher evaluates the history of workloads throughout the fab and identifies bottleneck areas. The scheduler then assigns priorities to lots depending on where they are headed after photolithography. These priorities are designed to avoid starving bottleneck workstations and to give preference to lots that are headed to areas where they can be processed with minimal waiting. Other factors considered by the scheduler to establish priorities are the nearness of a lot to the end of its process flow and the time that the lot has already been waiting in queue. Simulations that model the equipment and products in one of Texas Instrument's wafer fabs show the Photo Dispatcher can produce a 10 percent improvement in the time required to fabricate integrated circuits.

Kline, Paul J.↗

Learning to integrate reactivity and deliberation in uncertain planning and scheduling problems

This paper describes an approach to planning and scheduling in uncertain domains. In this approach, a system divides a task on a goal by goal basis into reactive and deliberative components. Initially, a task is handled entirely reactively. When failures occur, the system changes the reactive/deliverative goal division by moving goals into the deliberative component. Because our approach attempts to minimize the number of deliberative goals, we call our approach Minimal Deliberation (MD). Because MD allows goals to be treated reactively, it gains some of the advantages of reactive systems: computational efficiency, the ability to deal with noise and non-deterministic effects, and the ability to take advantage of unforseen opportunities. However, because MD can fall back upon deliberation, it can also provide some of the guarantees of classical planning, such as the ability to deal with complex goal interactions. This paper describes the Minimal Deliberation approach to integrating reactivity and deliberation and describe an ongoing application of the approach to an uncertain planning and scheduling domain.

Chien, Steve A.↗

JIGSAW: Preference-directed, co-operative scheduling

Techniques that enable humans and machines to cooperate in the solution of complex scheduling problems have evolved out of work on the daily allocation and scheduling of Tactical Air Force resources. A generalized, formal model of these applied techniques is being developed. It is called JIGSAW by analogy with the multi-agent, constructive process used when solving jigsaw puzzles. JIGSAW begins from this analogy and extends it by propagating local preferences into global statistics that dynamically influence the value and variable ordering decisions. The statistical projections also apply to abstract resources and time periods--allowing more opportunities to find a successful variable ordering by reserving abstract resources and deferring the choice of a specific resource or time period.

Linden, Theodore A.↗

Generation and exploration of aggregation abstractions for scheduling and resource allocation

This paper presents research on the abstraction of computational theories for scheduling and resource allocation. The paper describes both theory and methods for the automated generation of aggregation abstractions and approximations in which detailed resource allocation constraints are replaced by constraints between aggregate demand and capacity. The interaction of aggregation abstraction generation with the more thoroughly investigated abstractions of weakening operator preconditions is briefly discussed. The purpose of generating abstract theories for aggregated demand and resources includes: answering queries about aggregate properties, such as gross feasibility; reducing computational costs by using the solution of aggregate problems to guide the solution of detailed problems; facilitating reformulating theories to approximate problems for which there are efficient problem-solving methods; and reducing computational costs of scheduling by providing more opportunities for variable and value-ordering heuristics to be effective. Experiments are being developed to characterize the properties of aggregations that make them cost effective. Both abstract and concrete theories are represented in a variant of first-order predicate calculus, which is a parameterized multi-sorted logic that facilitates specification of large problems. A particular problem is conceptually represented as a set of ground sentences that is consistent with a quantified theory.

Lowry, Michael R.↗

Software reuse in spacecraft planning and scheduling systems

The use of a software toolkit and development methodology that supports software reuse is described. The toolkit includes source-code-level library modules and stand-alone tools which support such tasks as data reformatting and report generation, simple relational database applications, user interfaces, tactical planning, strategic planning and documentation. The current toolkit is written in C and supports applications that run on IBM-PC's under DOS and UNlX-based workstations under OpenLook and Motif. The toolkit is fully integrated for building scheduling systems that reuse AI knowledge base technology. A typical scheduling scenario and three examples of applications that utilize the reuse toolkit will be briefly described. In addition to the tools themselves, a description of the software evolution and reuse methodology that was used is presented.

Mclean, David↗

Design and specification of a centralized manufacturing data management and scheduling system

As was revealed in a previous study, the Materials and Processes Laboratory's Productivity Enhancement Complex (PEC) has a number of automated production areas/cells that are not effectively integrated, limiting the ability of users to readily share data. The recent decision to utilize the PEC for the fabrication of flight hardware has focused new attention on the problem and brought to light the need for an integrated data management and scheduling system. This report addresses this need by developing preliminary designs specifications for a centralized manufacturing data management and scheduling system for managing flight hardware fabrication in the PEC. This prototype system will be developed under the auspices of the Integrated Engineering Environment (IEE) Oversight team and the IEE Committee. At their recommendation the system specifications were based on the fabrication requirements of the AXAF-S Optical Bench.

Farrington, Phillip A.↗

Coordinated scheduling for dynamic real-time systems

In this project, we addressed issues in coordinated scheduling for dynamic real-time systems. In particular, we concentrated on design and implementation of a new distributed real-time system called R-Shell. The design objective of R-Shell is to provide computing support for space programs that have large, complex, fault-tolerant distributed real-time applications. In R-shell, the approach is based on the concept of scheduling agents, which reside in the application run-time environment, and are customized to provide just those resource management functions which are needed by the specific application. With this approach, we avoid the need for a sophisticated OS which provides a variety of generalized functionality, while still not burdening application programmers with heavy responsibility for resource management. In this report, we discuss the R-Shell approach, summarize the achievement of the project, and describe a preliminary prototype of R-Shell system.

Natarajan, Swaminathan↗

A Novel Approach to Noise-Filtering Based on a Gain-Scheduling Neural Network Architecture

A gain-scheduling neural network architecture is proposed to enhance the noise-filtering efficiency of feedforward neural networks, in terms of both nominal performance and robustness. The synergistic benefits of the proposed architecture are demonstrated and discussed in the context of the noise-filtering of signals that are typically encountered in aerospace control systems. The synthesis of such a gain-scheduled neurofiltering provides the robustness of linear filtering, while preserving the nominal performance advantage of conventional nonlinear neurofiltering. Quantitative performance and robustness evaluations are provided for the signal processing of pitch rate responses to typical pilot command inputs for a modern fighter aircraft model.

Troudet, T.↗

Modeling heterogeneous processor scheduling for real time systems

A new model is presented to describe dataflow algorithms implemented in a multiprocessing system. Called the resource/data flow graph (RDFG), the model explicitly represents cyclo-static processor schedules as circuits of processor arcs which reflect the order that processors execute graph nodes. The model also allows the guarantee of meeting hard real-time deadlines. When unfolded, the model identifies statically the processor schedule. The model therefore is useful for determining the throughput and latency of systems with heterogeneous processors. The applicability of the model is demonstrated using a space surveillance algorithm.

Leathrum, J. F.↗

Hypertext-based design of a user interface for scheduling

Operations Mission Planner (OMP) is an ongoing research project at JPL that utilizes AI techniques to create an intelligent, automated planning and scheduling system. The information space reflects the complexity and diversity of tasks necessary in most real-world scheduling problems. Thus the problem of the user interface is to present as much information as possible at a given moment and allow the user to quickly navigate through the various types of displays. This paper describes a design which applies the hypertext model to solve these user interface problems. The general paradigm is to provide maps and search queries to allow the user to quickly find an interesting conflict or problem, and then allow the user to navigate through the displays in a hypertext fashion.

Woerner, Irene W.↗

Planning and scheduling for success

Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

Manzanera, Ignacio↗

Planning and scheduling the Hubble Space Telescope: Practical application of advanced techniques

NASA's Hubble Space Telescope (HST) is a major astronomical facility that was launched in April, 1990. In late 1993, the first of several planned servicing missions refurbished the telescope, including corrections for a manufacturing flaw in the primary mirror. Orbiting above the distorting effects of the Earth's atmosphere, the HST provides an unrivaled combination of sensitivity, spectral coverage and angular resolution. The HST is arguably the most complex scientific observatory ever constructed and effective use of this valuable resource required novel approaches to astronomical observation and the development of advanced software systems including techniques to represent scheduling preferences and constraints, a constraint satisfaction problem (CSP) based scheduler and a rule based planning system. This paper presents a discussion of these systems and the lessons learned from operational experience.

Miller, Glenn E.↗

Artificial intelligence techniques for scheduling Space Shuttle missions

Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.

Henke, Andrea L.↗

Design and implementation of an experiment scheduling system for the ACTS satellite

The Advanced Communication Technology Satellite (ACTS) was launched on the 12th of September 1993 aboard STS-51. All events since that time have proceeded as planned with user operations commencing on December 6th, 1993. ACTS is a geosynchronous satellite designed to extend the state of the art in communication satellite design and is available to experimenters on a 'time/bandwidth available' basis. The ACTS satellite requires the advance scheduling of experimental activities based upon a complex set of resource, state, and activity constraints in order to ensure smooth operations. This paper describes the software system developed to schedule experiments for ACTS.

Ringer, Mark J.↗

Program For Editing Graphical Displays Of Schedules

XOPPS is window-based software tool from graphics providing easy and fast "what you see is what you get" (WYSIWYG) on-screen editing capabilities. Provides area, analogous to canvas, displaying full image of schedule being edited. Canvas contains header area (for test) and schedule area (for plotting graphical representations of milestone objects in flexible time line). Written in C language.

Mulnix, Cassie L.↗

Constraint-Based Scheduling System

Report describes continuing development of software for constraint-based scheduling system implemented eventually on massively parallel computer. Based on machine learning as means of improving scheduling. Designed to learn when to change search strategy by analyzing search progress and learning general conditions under which resource bottleneck occurs.

Zweben, Monte↗