Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Plant growth modeling at the JSC variable pressure growth chamber - An application of experimental design

This paper describes the approach and results of an effort to characterize plant growth under various environmental conditions at the Johnson Space Center variable pressure growth chamber. Using a field of applied mathematics and statistics known as design of experiments (DOE), we developed a test plan for varying environmental parameters during a lettuce growth experiment. The test plan was developed using a Box-Behnken approach to DOE. As a result of the experimental runs, we have developed empirical models of both the transpiration process and carbon dioxide assimilation for Waldman's Green lettuce over specified ranges of environmental parameters including carbon dioxide concentration, light intensity, dew-point temperature, and air velocity. This model also predicts transpiration and carbon dioxide assimilation for different ages of the plant canopy.

Miller, Adam M.↗

Plans for Upcoming DGEN Aeropropulsion Research Turbofan (DART) Testing

This presentation serves as an overview of test plans for an upcoming DGEN Aeropropulsion Research Turbofan (DART) test entry at the NASA GRC AeroAcoustic Propulsion Laboratory (AAPL). The test entry includes: (1)a fan intra-stage velocity field survey, which will be compared to a Computational Fluid Dynamics (CFD) survey of DART, (2) an exploratory noise study of DART with several objectives focused on measurement projection to the far-field, source identification improvements and development of a barrier wall for isolation of various sources, (3) advancement of core/combustor noise research on DART using more extensive engine-mounted instrumentation, and (4) high-temperature pressure sensor technology-readiness-level (TRL) advancement.

Boyle, Devin K.↗

Technetium Retention in WTP LAW Glass with Recycle Flow-Sheet: DMIO Melter Testing

Melter tests were conducted to determine the retention of technetium and other volatiles in glass while processing simulated Low Activity Waste (LAW) streams through a DM10 melter equipped with a prototypical off-gas system that concentrates and recycles fluid effluents back to the melter feed. To support these tests, an existing DM10 system installed at Vitreous State Laboratory (VSL) was modified to add the required recycle loop. Based on the Hanford Tank Waste Treatment and Immobilization Plant (WTP) LAW off-gas system design, suitably scaled versions of the Submerged Bed Scrubber (SBS), Wet Electrostatic Precipitator (WESP), and TLP vacuum evaporator were designed, built, and installed into the DM10 system. Process modeling was used to support this design effort and to ensure that issues associated with the short half life of the 99m Tc radioisotope that was used in this work were properly addressed and that the system would be capable of meeting the test objectives. In particular, this required that the overall time constant for the system was sufficiently short that a reasonable approach to steady state could be achieved before the 99m Tc activity dropped below the analytical limits of detection. The conceptual design, detailed design, flow sheet development, process model development, Piping and Instrumentation Diagram (P&ID) development, control system design, software design and development, system fabrication, installation, procedure development, operator training, and Test Plan development for the new system were all conducted during this project. The new system was commissioned and subjected to a series of shake-down tests before embarking on the planned test program. Various system performance issues that arose during testing were addressed through a series of modifications in order to improve the performance and reliability of the system. The resulting system provided a robust and reliable platform to address the test objectives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research, Development, and Testing of a Master Controller with Applications to the Bronzeville Community Microgrid System

The objective of this project was to research, develop and test a Microgrid Master Controller (MMC) with applications to the Bronzeville Community Microgrid (BCM), capable of monitoring and controlling a microgrid cluster, as well as to demonstrate its performance in an environment that will closely resemble actual operation of the microgrid. During the project, a hierarchical control strategy of the MMC consisting of primary, secondary, and tertiary layers of control was developed, to operate the MMC in conjunction with the IIT microgrid controller for the coordinated operation of the microgrid cluster, including the control of DERs and facilitation of power flow between the microgrids. A detailed laboratory test plan, including methodology, test setup, test scenarios, and techniques for data gathering and analysis, was developed to verify the MMC functionalities and to validate the performance of the control algorithms under various microgrid operating conditions and potential system contingencies. The MMC underwent a thorough lab testing with more than 320 test cases assigned to 14 performance categories. The final project review and technology feasibility demonstration was held with Department of Energy (DOE) team, in the ComEd’s Grid of the Future lab. During this review, technical performance of the MMC was demonstrated in all key scenarios where the proper performance of the MMC was witnessed under a wide array of scenarios, including planned islanding, unplanned islanding, re-synchronization, load restoration, and basic dispatch in grid-connected and islanded mode. The demonstration was based on use cases focused on main microgrid capabilities and features, which further and the microgrid performance. The following cases were shown to DOE: Planned Islanding; Re-synchronization; Load Restoration; Basic Dispatch (grid-connected mode); Basic Dispatch (islanded mode); Unplanned Islanding. The outcome of this project is a viable microgrid control technology that served as a basis for further enhancement and commercialization of the utility-grade microgrid controller that will be employed for control of the BCM.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demand Response as a System Reliability Resource

The Demand Response as a System Reliability Resource project consists of six technical tasks: • Task 2.1. Test Plan and Conduct Tests: Contingency Reserves Demand Response (DR) Demonstration—a pioneering demonstration of how existing utility load-management assets can provide an important electricity system reliability resource known as contingency reserve. • Task 2.2. Participation in Electric Power Research Institute (EPRI) IntelliGrid—technical assistance to the EPRI IntelliGrid team in developing use cases and other high-level requirements for the architecture. • Task 2.3. Research, Development, and Demonstration (RD&D) Planning for Demand Response Technology Development—technical support to the Public Interest Energy Research (PIER) Program on five topics: Sub-task 1. PIER Smart Grid RD&D Planning Document; Sub-task 2. System Dynamics of Programmable Controllable Thermostats; Sub-task 3. California Independent System Operator (California ISO) DR Use Cases; Sub-task 4. California ISO Telemetry Requirements; and Sub-task 5. Design of a Building Load Data Storage Platform. • Task 2.4. Time Value of Demand Response—research that will enable California ISO to take better account of the speed of the resources that it deploys to ensure compliance with reliability rules for frequency control. • Task 2.5. System Integration and Market Research: Southern California Edison (SCE)—research and technical support for efforts led by SCE to conduct demand response pilot demonstrations to provide a contingency reserve service (known as non-spinning reserve) through a targeted sub-population of aggregated residential and small commercial customers enrolled in SCE’s traditional air conditioning (AC) load cycling program, the Summer Discount Plan. • Task 2.6. Demonstrate Demand Response Technologies: Pacific Gas and Electric (PG&E)—research and technical support for efforts led by PG&E to conduct a demand response pilot demonstration to provide non-spinning reserve through a targeted sub-population of aggregated residential customers enrolled in PG&E’s AC load curtailment program, the Smart AC™ Demand Response Program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EVAL system concept definition. Partial spacelab payload, appendices

Tables and charts are presented for experiment schematics, mission opportunities, mission timelines, crew time line and power profile. The methodology being developed to evaluate cost effective vibroacoustic test plans for a representative EVAL shuttle spacelab payload is analyzed. Statistical decision theory is used to quantitatively evaluate seven alternate test plans which include component, subassembly, or payload testing and combinations of component assembly testing.

Source record↗

LCLS-II-HE Cryomodule Testing at Fermilab

22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.

43 PARTICLE ACCELERATORS↗

Assessment of the Group 5-6 (LB C2, LB S2, LV S1) Stack Sampling Probe Locations for Compliance with ANSI/HPS N13.1 1999

This document reports on a series of tests to assess the proposed air sampling locations for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Group 5-6 exhaust stacks with respect to the applicable criteria regarding the placement of an air sampling probe. The LB-C2, LV-S1, and LB S2 exhaust stacks were tested together as a group (Test Group 5-6) because the common factor in their design is that the last significant flow disturbance upstream of the air sampling probe is a reduction in duct diameter. Federal regulations( ) require that a sampling probe be located in the exhaust stack according to the criteria of the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999, Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities. These criteria address the capability of the sampling probe to extract a sample that represents the effluent stream. The testing on scale models of the stacks conducted for this project was part of the River Protection Project—Waste Treatment Plant Support Program under Contract No. DE-AC05-76RL01830 according to the statement of work issued by Bechtel National Inc. (BNI, 24590-QL-SRA-W000-00101, N13.1-1999 Stack Monitor Scale Model Testing and Qualification, Revision 1, 9/12/2007) and Work Authorization 09 of Memorandum of Agreement 24590-QL-HC9-WA49-00001. The internal Pacific Northwest National Laboratory (PNNL) project for this task is 53024, Work for Hanford Contractors Stack Monitoring. The testing described in this document was further guided by the Test Plan Scale Model Testing the Waste Treatment Plant LB-C2, LB-S2, and LV-S1 (Test Group 5-6) Stack Air Sampling Positions (TP-RPP-WTP-594). The tests conducted by PNNL during 2009 and 2010 on the Group 5-6 scale model systems are described in this report. The series of tests consists of various measurements taken over a grid of points in the duct cross-section at the designed sampling probe locations and at five duct diameters up and downstream from the design location to accommodate potential construction variability. The tests were done only at the design sampling probe location on the scale model of LB-S2 because that ductwork was already constructed. The ANSI/HPS N13.1-1999 criteria and the corresponding results of the test series on the scale models are summarized in this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design Reliability Measurement and Evaluation

Reliability measurement by data collection and evaluation is considered. Parameters are defined and restrictions established. Reliability estimation of sub-systems and parts as a preliminary to system estimation is reviewed, and rules are established. Confidence levels of sub-systems and parts versus combined system are analyzed. Estimation planning is discussed. Tests planned for accept-reject reliability decision are very briefly considered.

RELIABILITY↗

Development of a preprototype times wastewater recovery subsystem: Appendices

This Master Test Plan outlines the test program to be performed by Hamilton Standard during the Urine Water Recovery Subsystem Program. Testing is divided into three phases: (1) design support testing; development component testing; and acceptance testing. The completion of this test program verifies the subsystem operation.

Roebelen, G. J., Jr.↗

The design, fabrication and delivery of a spacelab neutral buoyancy Instrument Pointing System (IPS) mockup

Underwater simulations of EVA contingency operations such as manual jettison, payload disconnect, and payload clamp actuation were used to define crew aid needs and mockup pecularities and characteristics to verify the validity of simulation using the trainer. A set of mockup instrument pointing system tests was conducted and minor modifications and refinements were made. Flight configuration struts were tested and verified to be operable by the flight crew. Tasks involved in developing the following end items are described: IPS gimbal system, payload, and payload clamp assembly; the igloos (volumetric); spacelab pallets, experiments, and hardware; experiment, and hardware; experiment 7; and EVA hand tools, support hardware (handrails and foot restraints). The test plan preparation and test support are also covered.

Vanvalkenburgh, C. N.↗

Design and initial testing of a one-bladed 30-meter-diameter rotor on the NASA/DOE mod-O wind turbine

The concept of a one-bladed horizontal-axis wind turbine has been of interest to wind turbine designers for many years. Many designs and economic analyses of one-bladed wind turbines have been undertaken by both United States and European wind energy groups. The analyses indicate significant economic advantages but at the same time, significant dynamic response concerns. In an effort to develop a broad data base on wind turbine design and operations, the NASA Wind Energy Project Office has tested a one-bladed rotor at the NASA/DOE Mod-O Wind Turbine Facility. This is the only known test on an intermediate-sized one-bladed rotor in the United States. The 15.2-meter-radius rotor consists of a tip-controlled blade and a counterweight assembly. A rigorous test series was conducted in the Fall of 1985 to collect data on rotor performance, drive train/generator dynamics, structural dynamics, and structural loads. This report includes background information on one-bladed rotor concepts, and Mod-O one-bladed rotor test configuration, supporting design analysis, the Mod-O one-blade rotor test plan, and preliminary test results.

Corrigan, R. D.↗

Description of an oscillating flow test program

A description of the University of Minnesota Oscillating Flow Test Program is presented. The rationale for isolating the oscillating flow effect for separate study, the objectives of the test program, and the program design criteria are presented along with a description of the test facility and the test plan. The program test domain covers almost the entire operating domain of Stirling engine heat exchangers expressed in terms of the appropriate dimensionless parameters. Phenomena important to Stirling engine performance which are not simulated in the test program are also discussed. Computer analysis results are used to predict apparatus performance.

Seume, J. R.↗

Pressure vessel burst test program - Progress paper No. 3

An updated progress report is provided on a program developed to study through test and analysis, the characteristics of blast waves and fragmentation generated by ruptured gas filled pressure vessels. Prior papers on this USAF/NASA/General Physics program were presented to the AIAA in July 1990 and June 1991. Ten pressure vessels have been burst using pneumatic pressure. Tests were designed to explore burst characteristics and used an instrumented arena. Data trends for current experiments are presented. This paper is the third progress report on the program and addresses: (1) a brief review of current methods for assessing vessel safety and burst parameters, (2) a review of pneumatic burst testing operations and testing results, including a comparison to current methods for burst assessment, and (3) a review of the basis for the current test program including planned testing.

Cain, Maurice R.↗

New insulation constructions for aerospace wiring applications

Outlined in this presentation is the background to insulation constructions for aerospace wiring applications, the Air Force wiring policy, the purpose and contract requirements of new insulation constructions, the test plan, and the test results.

Slenski, George↗

In-Space Transportation with Tethers

The annual report covers the research conducted on the following topics related to the use of spaceborne tethers for in-space transportation: ProSEDS tether modeling (current collection analyses, influence of a varying tether temperature); proSEDS mission analysis and system dynamics (tether thermal model, thermo-electro-dynamics integrated simulations); proSEDS-tether development and testing (tether requirements, deployment test plan, tether properties testing, deployment tests); and tethers for reboosting the space-based laser (mission analysis, tether system preliminary design, evaluation of attitude constraints).

Lorenzini, Enrico↗

Super NiCd Open-Circuit Storage and Low Earth Orbit (LEO) Life Test Evaluation

This presentation discusses Air Force tests performed on super NiCd cells to measure their performance under conditions simulating Low Earth Orbit (LEO) conditions. Super NiCd cells offer potential advantages over existing NiCd cell designs including advanced cell design with improved separator material and electrode making processes, but handling and storage requires active charging. These tests conclude that the super NiCd cells support generic Air Force qualifications for conventional LEO missions (up to five years duration) and that handling and storage may not actually require active charging as previously assumed. Topics covered include: Test Plan, Initial Characterization Tests, Open-Circuit Storage Tests, and post storage capacities.

Baer, Jean Marie↗

TPS In-Flight Health Monitoring Project Progress Report

Progress in the development of new thermal protection systems (TPS) is reported. New approaches use embedded lightweight, sensitive, fiber optic strain and temperature sensors within the TPS. Goals of the program are to develop and demonstrate a prototype TPS health monitoring system, develop a thermal-based damage detection algorithm, characterize limits of sensor/system performance, and develop ea methodology transferable to new designs of TPS health monitoring systems. Tasks completed during the project helped establish confidence in understanding of both test setup and the model and validated system/sensor performance in a simple TPS structure. Other progress included complete initial system testing, commencement of the algorithm development effort, generation of a damaged thermal response characteristics database, initial development of a test plan for integration testing of proven FBG sensors in simple TPS structure, and development of partnerships to apply the technology.

Kostyk, Chris↗