Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Corrective Action Decision Document/Closure Report for Corrective Action Unit 559: T-Tunnel Compressor/Blower Pad, Nevada Test Site

This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): 12-25-13, Oil Stained Soil and Concrete. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 559.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EFRT M-12 Issue Resolution: Comparison of Filter Performance at PEP and CUF Scale

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and is to be operated as part of a plan to respond to issue M12, Undemonstrated Leaching Processes. The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed-preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP1, the 19-M NaOH is added to un-concentrated waste slurry (3 to 8 wt% solids), while for leaching in UFP2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. The work described in this report presents filter flux results obtained at two different scales based on tests performed with a Hanford tank waste simulant. The tests were made at the lab-bench scale on a cold (i.e., designated for non-radioactive simulant test materials) Cells Unit Filter [CUF]) and in the Pretreatment Engineering Platform (PEP), which is a 1/4.5-scale mock-up of key PTF process equipment. One set of tests was conducted with the simulant feed (low solids), and one test was conducted at a relatively high solids concentration. The results of these tests are compared to support a scale factor for use in the WTP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Submittal of Final Post-Closure Inspection Letter Report for Corrective Action Unit 112: Area 23 Hazardous Waste Trenches, Nevada Test Site, Nevada, Revision 0, December 2007; DOE/NV--1103

This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for the period October 2006-September 2007. Quarterly inspections were conducted on December 20,2006; March 29,2007; June 13,2007; and September 27, 2007, to observe the condition of the gate, use restriction warning signs, monuments, fencing, trenches, soil covers, and monitoring well covers. The first inspection was conducted on December 20,2006. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The second inspection was conducted on March 29,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. Vegetation that was observed to be growing in several locations on the cover was the only identified concern, for which removal was recommended. Vegetation was removed on May 24,2007. The third inspection was conducted on June 13,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The fourth inspection was conducted on September 27,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The post-closure inspection checklists for CAU 112 are attached. Photographs and field notes taken during site inspections are maintained in the project files.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

kynema-fmb [SWR-23-07]

Kynema-FMB (FKA: Kynema) is an open-source performance portable flexible multibody (FMB) dynamics solver designed for time-domain simulations. While originally tailored for wind turbine structural dynamics, the formulation and implementation are those of a general flexible-multidbody dynamics solver that can readily be applied to a wide range of systems. Kynema was designed with a narrow focus, namely to provide a lightweight, fast, accurate FMD solver for coupling to computational-fluid-dynamics (CFD) codes, especially the CFD codes in the Kynema suite, for fluid-structure-interaction (FSI) simulations. Kynema-FMB is equipped to model systems that can be represented as a collection of beams and rigid bodies that are connected through constraints. Degrees of freedom are defined in the inertial/global frame of reference and include displacements and rotations (formally as rotation matrices, but stored as quaternions). The underlying formulation is built on a Lie-group time integrator designed for index-3 differential-algebraic equations, which is second-order accurate in time (Bruls et al., 2012). Beam models are based on geometrically exact beam theory and are discretized as high-order spectral finite elements similar to those in BeamDyn (Wang et al., 2017). The governing equations for a FMD system like a wind turbine constitute a highly nonlinear system of constrained partial-differential equations. Kynema-FMB uses analytical Jacobians in the nonlinear-system solves in each time step. Linear systems use sparse storage and several third-party sparse-linear-system solvers are enabled. Ill conditioning of linear systems is mitigated with preconditioning described in Bottasso et al, 2008. Kynema-FMB is integrated with a simple open-source controller (ROSCO). There is an application programming interface (API) for coupling to geometry-resolved CFD (like that in Sharma et al., 2023) and actuator-force CFD (like that in Kuhn et al., 2025). In the latter, for actuator-line models, Kynema-FMB includes an internal blade-element solver that depends on user-provided lookup tables for coefficients of lift and drag, i.e., aerodynamic polars. Kynema-FMB is written in C++ and leverages Kokkos and Kokkos-Kernels (KokkosEcosystem) as its performance portability layer enabling simulations on both CPU and GPU systems. The repository is equipped with extensive automated testing at the unit and regression/system levels. The following describes the high-level development objectives conceived for Kynema: *Kynema will follow modern software development best practices, including test-driven development (TDD), version control, hierarchical automated testing, and continuous integration (CI) for a robust development environment. *The core data structures are memory efficient and enable vectorization and parallelization at multiple levels. *Data structures are data-oriented to exploit methods for accelerated computing including high utilization of chip resources (e.g., single instruction multiple data (SIMD) instruction sets) and parallelization using GP-GPUs. *The computational algorithms incorporate robust open-source libraries for mathematical operations, resource allocation, and data management. *The API design considers multiple stakeholder needs and ensure integration with existing and future ecosystems for data science, machine learning, and AI. *Kynema-FMB is written in modern C++ and leverages Kokkos as its performance-portability library with inspiration from the kynema stack.

Sprague, MichaelA.↗

Multifamily Air Leakage Evaluation: A Modular Case Study

The purpose of this case study is to compare the air leakage rates of modular and site-built multifamily dwelling units. The methods, materials, and equipment were observed to be very similar in the modular and site-constructed units in this case study. The installation quality of building envelope measures such as insulation and air barrier appeared to be better for modular construction, because they were installed in a controlled, factory setting. Through field observations, we identified cosmetic damage to the envelope of modular units following transport to the building site, but with no resulting significant air leakage pathways. However, we did see air leakage pathways resulting from field modifications to the envelope of modular units to accommodate structural and mechanical connections. We found that the extensive use of through-wall HVAC systems, combined with the transport, placement, and rework of modular units may compromise the high-quality envelope installation and airtightness observed in the factory without careful planning and/or design. Opportunities for improvement identified from the tested modular dwelling units include minimizing and optimally locating penetrations, pre-cutting and detailing penetrations at the factory where possible, properly sealing field modifications, and using split HVAC systems in place of through-wall packaged systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ground Source Integrated Heat Pump (GS-IHP) Development

Between October 2008 and May 2013 ORNL and ClimateMaster, Inc. (CM) engaged in a Cooperative Research and Development Agreement (CRADA) to develop a groundsource integrated heat pump (GS-IHP) system for the US residential market. A initial prototype was designed and fabricated, lab-tested, and modeled in TRNSYS (SOLAR Energy Laboratory, et al, 2010) to predict annual performance relative to 1) a baseline suite of equipment meeting minimum efficiency standards in effect in 2006 (combination of air-source heat pump (ASHP) and resistance water heater) and 2) a state-of-the-art (SOA) two-capacity ground-source heat pump with desuperheater water heater (WH) option (GSHPwDS). Predicted total annual energy savings, while providing space conditioning and water heating for a 2600 ft 2 (242 m 2 ) house at 5 U.S. locations, ranged from 52 to 59%, averaging 55%, relative to the minimum efficiency suite. Predicted energy use for water heating was reduced 68 to 78% relative to resistance WH. Predicted total annual savings for the GSHPwDS relative to the same baseline averaged 22.6% with water heating energy use reduced by 10 to 30% from desuperheater contributions. The 1 st generation (or alpha) prototype design for the GS-IHP was finalized in 2010 and field test samples were fabricated for testing by CM and by ORNL. Two of the alpha units were installed in 3700 ft 2 (345 m 2 ) houses at the ZEBRAlliance site in Oak Ridge and field tested during 2011. Based on the steady-state performance demonstrated by the GS-IHPs it was projected that it would achieve >52% energy savings relative to the minimum efficiency suite at this specific site. A number of operational issues with the alpha units were identified indicating design changes needed to the system before market introduction could be accomplished. These were communicated to CM throughout the field test period. Based on the alpha unit test results and the diagnostic information coming from the field test experience, CM developed a 2 nd generation (or beta) prototype in 2012. Field test verification units were fabricated and installed at the ZEBRAlliance site in Oak Ridge in May 2012 and at several sites near CM headquarters in Oklahoma. Field testing of the units continued through February 2013. Annual performance analyses of the beta unit (prototype 2) with vertical well ground heat exchangers (GHX) in 5 U.S. locations predict annual energy savings of 57% to 61%, averaging 59% relative to the minimum efficiency suite and 38% to 56%, averaging 46% relative to the SOA GSHPwDS. Based on the steady-state performance demonstrated by the test units it was projected that the 2 nd generation units would achieve ~58% energy savings relative to the minimum efficiency suite at the Zebra Alliance site with horizontal GHX. A new product based on the beta unit design was announced by CM in 2012 – the Trilogy 40® Q-mode™ (http://cmdealernet.com/trilogy_40.html). The unit was formally introduced in a March 2012 press release (see Appendix A) and was available for order beginning in December 2012.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗

Transient Testing of Nuclear Fuels and Materials in United States

The US Department of Energy (DOE) has been engaged in an effort to develop and qualify next generation LWR fuel with enhanced performance and safety and reduced waste generation since 2010. This program, which has emphasized collaboration between the DOE, U.S. national laboratories and nuclear industry, was refocused from enhanced performance to enhanced accident tolerance following the events at Fukushima in 2011. Accident tolerant fuels have been specifically described as fuels that, in comparison with standard UO2-Zircaloy, can tolerate loss of active cooling in the reactor core for a considerably longer time period (depending on the LWR system and accident scenario) while maintaining or improving the fuel performance during normal operations, operational transients, as well as design-basis and beyond design-basis events. The program maintains an ambitious goal to insert a lead test assembly (LTA) of the new design into a commercial power reactor by 2022 .

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ALFA Non-linear Ocean Waves and PTO Control Strategy

Data from Advanced Laboratory and Field Arrays (ALFA) Non-linear Ocean Waves and Power Take-Off (PTO). Control Strategy project conducted at the O.H. Hinsdale Wave Research Laboratory (HWRL) at Oregon State University in 2019/2020. Contains two zip files (ALFANL.zip, ALFANL2.zip) from two phases of testing with data in engineering units and a report detailing the testing. This data collected by HWRL. A readme file in the docs folder explains the data collection and format. Six zip files (foswec-1 to foswec-6) data recorded by the Floating Oscillating Surge Wave Energy Converter (FOSWEC). Data organized by date and time and report describes data. A test report (ALFA Non-linear Ocean Waves Test Report.docx) details the experiments and data recording.

16 TIDAL AND WAVE POWER↗

High-Mileage Courier Fleet Vehicle Laboratory Battery Pack Testing

For one of each of the AVTA's plug-in hybrid electric vehicles, battery electric vehicles, and some hybrid electric vehicles tested in high-mileage courier fleets, the high-voltage traction battery packs were removed from the vehicle and tested at the beginning and end of fleet testing. For some vehicles, batteries also were tested at periodic intervals during fleet testing. Standard reference performance tests were conducted to characterize battery degradation over time. This dataset contains results from two or more rounds of battery tests for 21 distinct year/make/model vehicles (see reference ["INL Advanced Vehicle Testing Activity: On-road Logger and Laboratory Battery Pack Testing Vehicle List"](https://avt.inl.gov/sites/default/files/pdf/reports/DatasetVehicleList.pdf) for full list of vehicles). Each round of battery testing included the "Static Capacity Test" and the "Hybrid Pulse Power Characterization (HPPC) Test", conducted according to test procedures published in the United States Advanced Battery Consortium ["Battery Test Manual For Power-Assist Hybrid Electric Vehicles"](https://www.uscar.org/commands/files_download.php?files_id=57), ["Battery Test Manual For Plug-In Hybrid Electric Vehicles"](https://www.uscar.org/commands/files_download.php?files_id=168), and ["Electric Vehicle Battery Test Procedures Manual"](https://www.uscar.org/commands/files_download.php?files_id=5) prior to the time of testing. These tests were performed by Intertek Testing Services, North America. (This dataset will be shared by API; a small sample of the vehicle battery and test data has been extracted and is available for download while the API is being developed.)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High-Mileage Courier Fleet Vehicle Laboratory Battery Pack Testing

For one of each of the AVTA's plug-in hybrid electric vehicles, battery electric vehicles, and some hybrid electric vehicles tested in high-mileage courier fleets, the high-voltage traction battery packs were removed from the vehicle and tested at the beginning and end of fleet testing. For some vehicles, batteries also were tested at periodic intervals during fleet testing. Standard reference performance tests were conducted to characterize battery degradation over time. This dataset contains results from two or more rounds of battery tests for 21 distinct year/make/model vehicles (see reference ["INL Advanced Vehicle Testing Activity: On-road Logger and Laboratory Battery Pack Testing Vehicle List"](https://avt.inl.gov/sites/default/files/pdf/reports/DatasetVehicleList.pdf) for full list of vehicles). Each round of battery testing included the "Static Capacity Test" and the "Hybrid Pulse Power Characterization (HPPC) Test", conducted according to test procedures published in the United States Advanced Battery Consortium ["Battery Test Manual For Power-Assist Hybrid Electric Vehicles"](https://www.uscar.org/commands/files_download.php?files_id=57), ["Battery Test Manual For Plug-In Hybrid Electric Vehicles"](https://www.uscar.org/commands/files_download.php?files_id=168), and ["Electric Vehicle Battery Test Procedures Manual"](https://www.uscar.org/commands/files_download.php?files_id=5) prior to the time of testing. These tests were performed by Intertek Testing Services, North America. This dataset is shared by API; a small sample of the vehicle battery and test data has been extracted and is also available for download.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Testbeds for test Readiness: Strategic Snapshot

Test bed engineering, monitoring for underground explosive and nuclear testing will be needed if the United States returns to a test posture of nuclear device testing. To maintain and rebuild the capability of test readiness, agile cost-effective test beds are needed and LANL as well as NNSS are the perfect locations to do this. Shallow and deep boreholes should be created to research containment science, diagnostic placement and optimization, coupling and emplacement science, tracer use for fracture and cratering research, and validation of test article performance.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Nevada national security site environmental remediation Large-Scale Multi-Well Aquifer Tests Used to Define Flow Systems - 15589

Over the past 5 years, 10 new groundwater wells have been drilled and hydraulically tested on Pahute Mesa Corrective Action Unit (CAU) under the Underground Test Area (UGTA) Activity at the Nevada National Security Site (NNSS). The new wells were drilled as part of a Phase II Corrective Action Investigation to gain a better understanding of the geology and hydrology of the system and to support development of a groundwater flow and transport model used for forecasting contaminant boundaries. Multi-well aquifer testing provides the most integrated assessment of hydraulic properties and connectivity within complex geologic systems. By providing hydraulic connectivity, these tests can be used to generate insight on potential contaminant flow paths and provide constraint on overall groundwater flow pathways. Drawdown in observation wells provides direct evidence of a hydraulic connection. During well drilling and testing activities, a total of 20 aquifer tests were conducted with as many as 36 individual completion zones. A signal-processing method developed by the U.S. Geological Survey was used to improve pumping drawdown detection. Using this approach, drawdown as far away as 3-4 kilometers has been detected. In addition to the typical analysis for hydraulic property values, the observed hydraulic connectivity are qualitatively and quantitatively used to inform the hydrogeologic framework model which is updated using other permissible geologic interpretations, when necessary, to incorporate the aquifer-testing results. These results will be used for developing and building confidence in the conceptual and numerical models for the Pahute Mesa CAU. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale Silicone Process for Low-Cost Carbon Dioxide Capture. Final Scientific/Technical Report

GE Global Research has developed, over the last 8 years, a platform of cost effective CO 2 capture technologies based on a non-aqueous aminosilicone solvent (GAP-1m). As demonstrated in a previous funded DOE project (DE-FE0007502), the GAP-1m solvent has increased CO 2 working capacity, lower volatility and corrosivity than the benchmark aqueous amine technology. The current report describes the cooperative program between GE Global Research (GE GRC), and the National Carbon Capture Center (NCCC) to design, construct, and operate a pilot-scale process using GAP-1m solvent to demonstrate its performance at 0.5 MWe. (i) Performance of the GAP-1m solvent was demonstrated in a 0.5 MWe pilot with real flue gas for over 900 hrs. of operation using two alternative desorption designs: a Continuous Stirred Tank Reactor (CSTR), and a Steam Stripper Column (SSC). The CSTR is a one-stage separation unit with reduced space requirements, and capital cost. The alternative is a multi-stage separation column, with improved desorption efficiency. Testing the two desorber options allowed us to identify the most cost effective, and space efficient desorber solution. (ii) CSTR Campaign: The CSTR desorber unit was designed, fabricated and integrated with the pilot solvent test unit (PSTU), replacing the PSTU Steam Stripper Column at NCCC. Solvent management and waste water special procedures were implemented to accommodate operation of the non-aqueous solvent in the PSTU. Performance of the GAP-1m solvent with the CSTR was demonstrated for over 500 hrs. while varying temperature of the desorption (230 – 265 oF), solvent circulation rate (GAP-1m : CO 2 (molar) = 1.5 – 4), and flue gas flow rates (0.2 – 0.5 MWe). Solvent carry-over in the CO 2 product was minimized by maintaining water content below 5 wt.%, and desorption pressure at 7 psig. CO 2 capture efficiency achieved was 95% at 0.25 MWe (GAP-1m : CO 2 = 4 (molar), 230 oF desorption), and 65% at 0.5 MWe (GAP-1m : CO 2 (molar) = 1.5, 248 oF). Solvent loss was dominated by thermal degradation of the rich solvent. (iii) Steam Stripper Column Campaign: Higher expected cost of the solvent vs. aqueous amines makes solvent management a top priority to maintain the low cost for the process. During the testing of the GAP-1m solvent with the CSTR, thermal degradation of the rich solvent was found to be the main mechanism in solvent loss. Small amounts of water in the working solution were found to be an effective way to enable steam stripping, thereby lowering desorption temperature, and hence reducing thermal degradation. Steam stripping also increased working capacity by 30% due to a more efficient desorption. The concept was first tested in a glass stripping column (lab scale, GE GRC), optimized in a continuous bench scale system (2 kWe, GE GRC), and demonstrated in a 0.5 MWe PSTU at NCCC. No special system modifications were required to the PSTU to accommodate the testing of the non-aqueous GAP-1 solvent with the regenerator column. SSC was found to be more robust towards solvent entrainment (H 2 O < 35 wt.%). 90 – 95% CO 2 capture efficiency was achieved under stoichiometric conditions at 0.5 MWe (235 oF desorption, 2 psig and 19 wt. % H 2 O). Both CO 2 capture efficiency and specific duty reached optimum conditions at 18 wt.% H 2 O. Low amine degradation (< 0.05 wt.%/day) was recorded over 350 hrs. of operation. Controlled water addition to GAP-1m solvent decreased the desorption temperature, thermal degradation, and improved the CO 2 working capacity due to more efficient absorption and desorption processes. Under these conditions, the GAP-1m solvent exhibited a 25% increased working capacity, and 10% reduction in specific steam duty vs. MEA, at 10 oF lower desorption temperature. (iv) Techno-economic Analysis: The pilot-scale PSTU engineering data were used to update the capture system process models, and the techno-economic analysis was performed for a 550 MW coal fired power plant. The 1st year CO 2 removal cost for the aminosilicone-based carbon-capture process was evaluated at $48/ton CO 2 using the steam stripper column. This is a 20% reduction compared to MEA, primarily due to lower overall capital cost. CO 2 cost using the CSTR desorber is dominated by the economics of the solvent make-up. The steam stripper desorber is the preferred unit operation due to a more efficient desorption, and reduced solvent make-up rate. Further reduction in CO 2 capture cost is expected by lowering the manufacturing cost of the solvent, implementing flowsheet optimization and/or implementing the next generation aminosilicone solvent with improved stability and increased CO 2 working capacity.

0.5 MW Pilot↗

Streamlined approach for environmental restoration (SAFER) plan for corrective action unit 412: clean slate I plutonium dispersion (TTR) tonopah test range, Nevada, revision 0

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 412. CAU 412 is located on the Tonopah Test Range and consists of a single corrective action site (CAS), TA-23-01CS, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1997 interim corrective action to recommend closure of CAU 412 using the SAFER process. Based on existing data, the presumed corrective action for CAU 412 is clean closure. However, additional data will be obtained during a field investigation to document and verify the adequacy of existing information and determine whether the CAU 412 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU.The following summarizes the SAFER activities that will support the closure of CAU 412:• Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information.• If no COCs are present, establish clean closure as the corrective action. • If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF).• Confirm the preferred closure option is sufficient to protect human health and the environment.

01 COAL, LIGNITE, AND PEAT↗

Permeability scaling relationships of volcanic tuff from core to field scale measurements

A recent chemical explosive test in P-Tunnel at the Nevada National Security Site, Nevada, USA, was conducted to better understand how signals propagate from explosions in the subsurface. A primary signal of interest is the migration of gases that can be used to differentiate chemical from nuclear explosions. Gas migration is highly dependent on the rock permeability which is notoriously difficult to determine experimentally in the field due to a potentially large dependence on the scale over which measurements are made. Here, we present pre-explosion permeability estimates to characterize the geologic units surrounding the recent test. Permeability measurements were made at three scales of increasing size: core samples (≈2 cm), borehole packer system tests (≈1 m), and a pre-shot cavity pressurization test (> 10 m) across ten tuff units. Permeability estimates based on core measurements showed little difference from borehole packer tests. However, permeability in most rock units calibrated from cavity pressurization tests resulted in higher permeability estimates by up to two orders of magnitude. Here, we demonstrate that the scale of the measurement significantly impacts the characterization efforts of hydraulic properties in volcanic tuff, and that local-scale measurements (< 10 m scale) do not incorporate enough heterogeneity to accurately predict field-scale flow and mass transport.

Environmental sciences↗

Demonstration of Mer-Cure Technology for Enhanced Mercury Control

Alstom Power Inc. has completed a DOE/NETL-sponsored program (under DOE Cooperative Agreement No. De-FC26-07NT42776) to demonstrate Mer-Cure{trademark}, one of Alstom's mercury control technologies for coal-fired boilers. The Mer-Cure{trademark}system utilizes a small amount of Mer-Clean{trademark} sorbent that is injected into the flue gas stream for oxidation and adsorption of gaseous mercury. Mer-Clean{trademark} sorbents are carbon-based and prepared with chemical additives that promote oxidation and capture of mercury. The Mer-Cure{trademark} system is unique in that the sorbent is injected into an environment where the mercury capture kinetics is accelerated. The full-scale demonstration program originally included test campaigns at two host sites: LCRA's 480-MW{sub e} Fayette Unit No.3 and Reliant Energy's 190-MW{sub e} Shawville Unit No.3. The only demonstration tests actually done were the short-term tests at LCRA due to budget constraints. This report gives a summary of the demonstration testing at Fayette Unit No.3. The goals for this Mercury Round 3 program, established by DOE/NETL under the original solicitation, were to reduce the uncontrolled mercury emissions by 90% at a cost significantly less than 50% of the previous target of $60,000/lb mercury removed. The results indicated that Mer-Cure{trademark} technology could achieve mercury removal of 90% based on uncontrolled stack emissions. The estimated costs for 90% mercury control, at a sorbent cost of $0.75 to $2.00/lb respectively, were $13,400 to $18,700/lb Hg removed. In summary, the results from demonstration testing show that the goals established by DOE/NETL were met during this test program. The goal of 90% mercury reduction was achieved. Estimated mercury removal costs were 69-78% lower than the benchmark of $60,000/lb mercury removed, significantly less than 50% of the baseline removal cost.

01 COAL, LIGNITE, AND PEAT↗

Addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits Nevada Test Site, Nevada

This document constitutes an addendum to the January 2004, Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 20-23-02, Postshot Cellar • CAS 20-23-03, Cellar • CAS 20-23-04, Postshot Cellar • CAS 20-23-05, Postshot Cellar • CAS 20-23-06, Cellar • CAS 20-37-01, Cellar & Mud Pit • CAS 20-37-05, Cellar These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗