Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Decentralized and mobile biomass torrefaction to upgrade the biomass supply chain

As part of the Cyclotron Road program, Takachar seeks to investigate the scaling laws and behaviors of a small-scale biomass torrefaction reactor design and its technoeconomic feasibility in various potential applications. Traditionally, biomass is logistically expensive and complicated to utilize in various energy and chemical industries, because it is often loose, wet, bulky, and present in small pockets in dispersed regions. Biomass torrefaction is an approach whereby raw biomass is subject to moderate heat, releasing low-energy molecules. The resultant torrefied biomass becomes energy and volume dense, which reduces the relative transportation cost, and in many cases can even support a local value chain that would otherwise not be possible. However, conventional biomass torrefaction systems are often large-scale, centralized in design, rending them difficult to deploy in many biomass applications in rural/decentralized regions. By building upon prior research at Massachusetts Institute of Technology (MIT), the concept of small-scale, low-cost, and portable biomass torrefaction units was explored further. This investigation has led to the advancement and scale-up of the MIT technology which can be deployed to a much wider spectrum of the biomass market than the conventional technologies.

09 BIOMASS FUELS↗

Flexure Upgrade System Engineering Project

At the National Ignition Facility (NIF), a system of lasers is used to implode and blow-up targets and create temperatures and pressures unlike any other place on earth. There are many target types that are used on experiments, but they can be broadly put in two categories – room temperature targets and cold targets. All targets can be mounted on any of the three target positioners on NIF, and two of these three target positioners can cryogenically cool the targets in the low Kelvin range for the cold targets. To minimize the ice buildup and infrared light exposure to these cold targets, a shroud surrounds the targets and seals the target from the outer environment. By shrouding the target, air, water, and other molecules have a difficult time reaching the target and some particles get cryo trapped into the shrouds themselves.

42 ENGINEERING↗

PSMC Upgrade Development Documentation and Functional Testing

The functional verification consists of verifying that the calibration (a.k.a. gain matching) is accurate and that there is no double pulsing or signal cross talk and interference. The calibration is shown to be satisfactory from the plateau plots on the right. The absence of double pulsing and cross talk can be seen in the time-interval diagram below. Both phenomena are manifested by spikes in the time interval distribution around 1µs to 5µs. No such spike is present.

3-He detector electronics↗

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In the Project X era, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring(RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a 650MHz SRF Linac, followed by a ~2-8 GeV pulsed Linac using 1300 MHz cryomodules. The Linac components incorporate recent improvements in SRF technology. The Linac configuration and beam dynamics requirements are presented. Injection options are discussed. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

42 ENGINEERING↗

Economic Extraction, Recovery and Upgrading of Rare Earth Elements from Coal-Based Resources (Final Report)

The overall objective of this project is to produce a rare earth elements product with greater than 8% rare earth elements from coal-based resources using an economically viable and environmentally benign processing methodology. The objective of the coal processing work will be to acquire appropriate coal feed and produce a viable clean coal product, a concentrated REE feed stream, and a pyrite stream (where available) that can be used to enhance leaching. The objective of the bio-oxidation portion of the project is to utilize bacteria to oxidize sulfide minerals and ferrous ions to ferric ions to accelerate leaching and remove the sulfides to prevent future acid mine drainage and related liabilities. The objective of the solution conditioning work is to remove iron and control leaching solution conditions to facilitate extraction of REEs without significant thorium extraction. The objective of the column leaching work is to engineer/model and simulate heap leaching to demonstrate low-cost extraction of REEs from coal-based resources. The objective of the solvent extraction work is to selectively extract and recover through controlled stripping of REEs that are solubilized through leaching. The objective of the precipitation portion of the project is to recover the REEs from the solvent extraction stripping solutions and dry them to achieve the final product of rare earth elements that is > 8 % REEs. The objective of the technical, economic, and environmental analysis is to determine the overall viability of the processing approach that is demonstrated in this project

01 COAL, LIGNITE, AND PEAT↗

Upgrade of Core Conduction Cooldown Test Facility Control System

The CCCTF was designed and installed at ORNL in the 1990s for high-temperature gas-cooled reactor accident simulation. It is located within a modular hot cell housed in the IFEL facility. In 2008 and 2009, modifications were made to the CCCTF in preparation for AGR safety testing. A new airlock was designed and installed to better support periodic exchange of the fission product deposition cups while maintaining the fuel at safety test temperature, and modifications were made to add routines to the existing user interface software for computer-controlled automation of the He sweep gas flow and liquid nitrogen supply to the 85Kr cold traps. However, the furnace control hardware and software remained essentially unchanged. At the conclusion of the AGR-1 and AGR-2 PIE campaigns, continued use of the CCCTF was in question because of the gradual obsolescence of the hardware and software used to control the furnace and ancillary systems that make up the CCCTF. Therefore, an effort was undertaken to replace all the obsolete components with new hardware and update the software to increase system reliability and ensure this capability’s maintenance for future research and fuel qualification efforts. The modifications included creating a new National Instruments (NI) LabVIEW-based control system with a graphical user interface (GUI).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Wall Upgrades for Energy Retrofits: A Techno-Economic Study

Homes built before 1992, when the U.S. Department of Energy’s (DOE) Building Energy Codes Program was established, represent approximately 68% of the residential building stock in the country. Up to 43% of these homes have little to no insulation in the walls and have very high air leakage rates of 10 or more air changes per hour at 50 pascals of pressure (ACH50). These issues can represent a substantial portion of unnecessary money spent on utility bills for homeowners, especially in the colder climates. There is a significant need for cost-effective, reliable retrofit methods for these homes that include air, moisture, and vapor controls which are considered best practices for high-performance new home construction. Well-tested and documented wall retrofit systems can help to achieve substantial energy savings and also improve durability, comfort, health, and resilience. In 2018, DOE’s Building Technologies Office awarded Pacific Northwest National Laboratory, Oak Ridge National Laboratory, and the University of Minnesota funding to complete a 3-year project to compare a range of residential wall retrofit systems that prioritized affordability, durability and energy savings potential. In addition to these core criteria, the ease-of-construction and the wide-scale applicability of the solutions also were considered. In this project, the research team identified, constructed, tested, simulated, and analyzed the feasibility and economics of 16 wall retrofit assemblies (14 test configurations and two baseline configurations).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An 8 GeV Linac as the booster replacement in the Fermilab Power Upgrade [Slides]

Increasing the Fermilab Main Injector beam power available to the high-energy neutrino experiments above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Rapid-cycling synchrotron and Linac solutions were considered for this purpose. We consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring or Main Injector. The new Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~8 GeV in SRF structures. The Linac components incorporate recent improvements in SRF technology.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗