Plans for the Removal of Inventory from HLW Storage Tanks and Impact on Vitrification Feeds - 18175

Over the next 4 years Sellafield will cease reprocessing nuclear fuel. This represents a significant change in the mission of Sellafield Ltd, shifting the site focus from reprocessing operations to preparations for decommissioning. The storage tanks which have stored the acidic high level waste produced during reprocessing will require washing out. These tanks have been used since the 1950's and over time the nature of this waste has changed. It poses unique challenges for both removal and vitrification. A large collaborative programme of work is underway at Sellafield to characterise this inventory and prepare a strategy for its removal and vitrification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenging Engineering Demographics and the READY Program - 18528

The mission of the Liquid Waste Organization at the Savannah River Site involves the safe storage of nuclear waste, closure of waste tanks, and immobilization of the waste into grout (low-level waste) or glass (high-level waste). With much of the mission left to complete and a significant percentage of the engineering organization eligible for retirement within the next 5 years, focus has been on recruiting and retaining new hires and early career engineers. Over the past two years, enhancements have been made to current programs and new programs have been created with the goal of improving the retention rate for engineering. These programs include the Reaching Engineers at the Development Years, the Early Career Professional Technology Exchange, the Shift Technical Engineer Pipeline, and Technical Staff Training. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Meeting the Challenges, Exceeding Expectations in Radioactive Liquid Waste Work - 18657

The Savannah River Site (SRS) is an 803-square kilometer (310-square mile) U.S. Department of Energy (DOE) site located near Aiken, South Carolina, encompassing parts of Aiken, Barnwell, and Allendale counties. SRS is a key industrial complex responsible for environmental stewardship, environmental cleanup, waste management, and disposition of nuclear materials. The Site was constructed in the early 1950's in support of the United States' Cold War efforts. In July 2009, the DOE began a new era by awarding a stand-alone contract to execute the Liquid Waste Mission at SRS. The Liquid Waste Contractor is responsible for all liquid waste operations, including waste management, disposition, and management of all liquid waste facilities at SRS, as well as operationally closing high-level waste tanks. Currently, there are 43 operational underground storage tanks containing approximately 132.5 million liters (35 million gallons) of radioactive waste. Before tanks can be closed, work involves removing, stabilizing, and disposing of high- and low-level radioactive waste from the tanks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flowsheet Definition for the Tank Side Cesium Removal Unit and the Importance of Early Communication - 19142

The U.S. Department of Energy (DOE) tank operations contractor Washington River Protection Solutions, LLC (WRPS) is working toward the start of low-activity waste (LAW) treatment in direct feed mode as soon as 2022. WRPS is responsible for providing the pre-treated feed for this direct feed mode and had originally planned to use the Low Activity Waste Pretreatment System (LAWPS) to supply the initial feed in 2021. In September 2017, in response to a DOE-sponsored LAWPS program review, a new system was proposed to provide the initial feed during direct feed mode until a supplemental pretreatment capability is ready to begin processing feed. This system, known as the Tank Side Cesium Removal (TSCR) system, is based on the Savannah River Tank Closure Cesium Removal (TCCR) system and technology used to separate cesium out of reactor water at Fukushima. A preliminary flowsheet was needed to form the initial basis for future decisions and allow discussions between operations, project management, and the customer. The main goal of the TSCR flowsheet was to form a process flow diagram, process description, and much of the preliminary information to be used to help inform future decisions. When flowsheet development first began, little to no information was readily known and what was known needed to be compiled in one place and digestible by several audiences. The impacts of various parameters on the system also needed a vehicle for clear communication to varying audiences. While a more complicated model was being completed, a model of the process was created using Microsoft Excela which could have several parameters changed while maintaining basic logical requirements (such as treated waste volume cannot exceed the volume of the Interim LAW Storage Tank [ILST], must shutdown for so many days for column changeout, etc.). This program allowed the unit downtime, start dates, treatment rates, and several other variables to be modified and reflect the ILST storage volume as a function of mission progression. The model with several different parameters gathered from the various groups was combined into an early flowsheet of the TSCR process and created one of the first citable documents about TSCR implementation at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone Facility Operating Experience with Mega-Vault Disposal Units - 19497

The Saltstone Production Facility (SPF) has been treating low-level waste aqueous salt solution at the Savannah River Site (SRS) since 1990. Salt solutions are transferred from a large-volume, underground storage tank via underground waste transfer line into the SPF. The waste is received into one of two receipt tanks and then transferred to a twin-shaft mixer where dry feeds are introduced to create a fresh grout slurry. The grout exits the mixer into a hold tank, which has a residence time of approximately two minutes. The slurry is then pumped via peristaltic pump through a grout transfer line to one of several disposal units in the Saltstone Disposal Facility (SDF). The transfer line length varies from 0.4 km to 0.8 km depending on disposal location. With the salt disposal mission at SRS accelerating via the operation of the Modular Caustic Side Solvent Extraction (MCU) facility and the anticipated startup of the Salt Waste Processing Facility (SWPF), it is important that the SPF and SDF operate with minimal outage time and maximum facility availability. To this end, the design of the newest disposal units has incorporated the benefits of commercially available cylindrical concrete tank design on a very large scale to maximize economies of scale. This new design has been placed into radioactive service and the initial operational data will be compared with previous disposal operations along with an overview of how disposal unit design has significantly evolved since the initial construction in the early 1990's. Additionally, several processing facility modifications have either been implemented or developed in recent years to improve operating reliability and ensure facility availability once the SWPF becomes the primary waste generator providing feed for the SPF. These modifications, the issues driving their development, and an assessment of their effectiveness will also be discussed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 23: Start-up of Three Major DOE Treatment Facilities - SWPF, IWTU and DFLAW

This panel focused on the DOE-EM planning to complete construction and start up three major treatment facilities in the next 18 months. This included the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste treatment Unit (IWTU) at Idaho and the Direct Feed Low-Activity Waste (DFLAW) at Hanford. DOE Site Managers from SC, ID and WA introduced each facility then the DOE Contractor provided the details on their biggest challenges in regulatory issues, construction, start-up and operations of each facility. Panelists with presentations: Lessons in Managing Risks in First of a Kind Nuclear Construction and Start-Up (Pamela Marks); Integrated Waste Treatment Unit (Connie Flohr); IWTI-Fluor (Frederick Hughes); Startup and Commissioning (Tom Fletcher)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 55: US DOE Savannah River Operations Office: Liquid Waste Progress

This panel provided an overview of the SRS HLW Liquid Waste Program (history, challenges, opportunities, and future) including discussions of the Defense Waste Processing Facility (DWPF), Tank Closures, Actinide Removal Process/Modular Caustic Side Solvent Extraction Unit, Tank Closure Cesium Removal, and the Salt Waste Processing Facility (SWPF). Panelists with presentations: SRS Liquid Waste Program (James Folk); SRS Liquid Waste Progress (Mark Schmitz); Salt Waste Processing Facility (Frank Sheppard)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 078 - Panel: Start-Up of Three Major DOE Treatment Facilities -SWPF, IWTU and DFLAW (2/2) (R2.4)

This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of the Glycolate Destruction Process with Sodium Permanganate in the Defense Waste Processing Facility (DWPF) - 20141

The Savannah River Site (SRS) seeks to replace formic acid with glycolic acid as a chemical reductant in the Defense Waste Processing Facility (DWPF), where borosilicate glass is mixed with high-level radioactive waste, melted at high temperatures, then poured into stainless steel canisters for safe storage. Prior research and development have demonstrated the feasibility and advantages of the new nitric-glycolic acid flowsheet over the current nitric-formic acid flowsheet to chemically adjust the radioactive sludge slurry waste in the Sludge Receipt and Adjustment Tank (SRAT) prior to vitrification. Use of glycolic acid reduces hydrogen and ammonia generation during the reduction process, thus reducing flammability hazards and purge requirements in the DWPF processing vessels. In addition, glycolic acid will support the new Salt Waste Processing Facility (SWPF) by allowing for receipt of higher volumes of waste due to reduction of flammable gases, increased boil-up rates in the vessels, and easing the processing of future sludge batches containing high levels of mercury. However, during DWPF operations, trace amounts of glycolate are anticipated to be entrained in the recycle stream and sent to the Concentration, Storage, and Transfer Facilities (CSTF) via the Recycle Collection Tank (RCT). The RCT receives condensate from the Slurry Mix Evaporator Condensate Tank (SMECT) and Off-gas Condensate Tank (OGCT) that may contain unreacted glycolate. A literature review found the potential for hydrogen generation due to thermolysis of glycolate in caustic CSTF conditions. Savannah River National Laboratory (SRNL) conducted several tests on simulant and radioactive waste from various tanks at SRS and confirmed that glycolate added to waste at concentrations of approximately 1000 mg/L and higher generates hydrogen through thermolysis. There are potential operating scenarios in the future where glycolate concentration could exceed 1000 mg/L in the 2H Evaporator Drop Tank, the highest accumulation point for DWPF organics received via recycle. These findings presented a need to develop another process to mitigate the impact of glycolic acid to the CSTF. Several DWPF compatible options were evaluated for their ability to destroy glycolate in the DWPF recycle stream under various processing conditions, thereby mitigating its introduction to the CSTF. Downselection testing identified sodium permanganate as the most promising and simplest option to oxidize glycolate. It has been demonstrated to be effective in various RCT simulant compositions, operating temperatures, oxidant addition rates, solution pH, and initial glycolate concentrations. A feasibility study identified existing tanks within the facility that could be used for receiving and storing the commercially available sodium permanganate, as well as feeding it to the RCT for processing. The use of existing equipment as well as the ability to purchase the pre-mixed chemical reduces implementation and operational complexity. The downstream impacts of the sodium permanganate reaction were also evaluated and demonstrated to have minimal impact on other chemical species present in the RCT and CSTF, as well as on the materials of construction of the RCT and CSTF vessels and associated piping and instrumentation. Future work is in progress to validate the glycolate destruction process with testing in actual radioactive RCT waste before implementation in DWPF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel Foaming Solutions for High Level Waste (HLW) Processing - 20195

Foaming occurs during treatment of high level waste (HLW) at Savannah River Site's Defense Waste Processing Facility (DWPF) in the Chemical Process Cell (CPC) due to high gas generation from process steam and chemical offgas products [1]. The presence of amphiphilic particles in the waste slurry stabilizes the foam [2], [3]. Efficient processing of HLW requires foam control, as foam-overs lead to lower productivity and potential radioactive contamination of condensate streams. DWPF currently employs Siovation Antifoam 747, a surfactant produced by Momentive Performance Materials, as an antifoaming agent during waste treatment. Despite its ability to control foam generation, processing issues have arisen from its use [4]. During DWPF chemical processing, a chemical antifoam agent must be effective at temperatures up to 103 deg. C between pH 3-13. Antifoam 747 is effective at pH 7 but degrades as pH deviates [5]. Antifoam 747 is 90% by weight Momentive{sup TM} L77 and 10% by weight Momentive{sup TM} Y-17580. These ingredients are trisiloxane products, which are especially vulnerable to attack in acidic and caustic environments. Since Antifoam 747 readily degrades, periodic addition is required. Several processing concerns related to Antifoam 747 have affected DWPF operation. Its overuse warranted concern of potential flammable melter offgas under upset conditions due to the generation of carbon dioxide and hydrogen. As a result, a Potential Inadequacy in the Safety Analysis (PISA) was declared [6]. Antifoam contribution has been included in the melter offgas flammability strategy and the quantity of antifoam is monitored to ensure limits are not exceeded. Testing at Savannah River National Laboratory (SRNL) determined that propanal, tri-methylsilanol, and hexamethyldisiloxane are generated as Antifoam 747 degrades, leading to a second PISA [7]. The formation of these byproducts poses additional flammability risks. Furthermore, the methyl and ethyl groups of these compounds may be responsible for the formation of the methyl and ethyl mercury discovered in DWPF [8], [9]. The formation of organomercury has specifically been called out by DOE as a need for increased research. The effectiveness of non-chemical methods for foam control and the efficiency of alternative antifoam agents were evaluated as part of an effort to improve HLW treatment operations at DWPF and to reduce, or eliminate, the flammability hazards associated with Antifoam 747 currently in use. Foaming of high-level waste (HLW) slurries is an issue at the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) which is currently mitigated with a chemical antifoam agent. The effectiveness of non-chemical methods for foam control and the efficiency of alternative antifoams were examined to improve HLW treatment at DWPF and to eliminate the flammability hazards associated with Siovation Antifoam 747 currently in use. Non-chemical foam control methods were deemed unviable for chemical processing at DWPF, as the spray/mist technique requires too much water and space limitations make installation and implementation of headspace agitators unfeasible. The use of ultrasonic energy thickened and further stabilized the foam. Two suitable alternative defoaming agents, Momentive{sup TM} Y- 17112 and Evonik Surfynol{sup R} MD-20, were identified. Both defoamers control foam over a pH range of 4- 13 at boiling, with no flammable degradation products, and only minimal quantities (100-200 mg/kg) are required under glycolic acid conditions. In order to validate the effectiveness of these defoaming agents, SRNL recommends irradiation testing and laboratory scale SRAT/SME experiments with actual radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CHEMICAL SLUDGE HEEL REMOVAL AT THE SAVANNAH RIVER SITE F TANK FARM CLOSURE PROJECT 8183

Chemical Sludge Removal (CSR) is the final waste removal activity planned for some of the oldest nuclear waste tanks located at the Savannah River Site (SRS) in Aiken, SC. In 2008, CSR will be used to empty two of these waste tanks in preparation for final closure. The two waste tanks chosen to undergo this process have previously leaked small amounts of nuclear waste from the primary tank into an underground secondary containment pan. CSR involves adding aqueous oxalic acid to the waste tank in order to dissolve the remaining sludge heel. The resultant acidic waste solution is then pumped to another waste tank where it will be neutralized and then stored awaiting further processing. The waste tanks to be cleaned have a storage capacity of 2.84E+06 liters (750,000 gallons) and a target sludge heel volume of 1.89E+04 liters (5,000 gallons) or less for the initiation of CSR. The purpose of this paper is to describe the CSR process and to discuss the most significant technical issues associated with the development of CSR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Processing Through Ion Exchange at the Savannah River Site Selection of Exchange Media and Column Configuration - 9198

The Department of Energy (DOE) has developed, modeled, and tested several different ion exchange media and column designs for cesium removal. One elutable resin and one non-elutable resin were considered for this salt processing application. Deployment of non-elutable Crystalline Silicotitanate and elutable Resorcinol Formaldehyde in several different column configurations were assessed in a formal Systems Engineering Evaluation (SEE). Salt solutions were selected that would allow a grouping of non-compliant tanks to be closed. Tests were run with the elutable resin to determine compatibility with the resin configuration required for an in-tank ion exchange system. Models were run to estimate the ion exchange cycles required with the two resins in several column configurations. Material balance calculations were performed to estimate the impact on the High Level Waste (HLW) system at the Savannah River Site (SRS). Conceptual process diagrams were used to support the hazard analysis. Data from the hazard analysis was used to determine the relative impact on safety. This report will discuss the technical inputs, SEE methods, results and path forward to complete the technical maturation of ion exchange.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of FGD gypsum in fire resistant panels

Gypsum from power plant flue gas desulphurization units (FGD gypsum) is a combustion by-product produced in high quantities. In this paper, gypsum panels composed of 100% FGD gypsum from two power plants have been subjected to different physico-chemical (density, pH, humidity), mechanical (flexural and compressive strength, surface hardness, impact resistance), fire resistance and environmental tests (leaching and radioactivity). The results obtained have been compared with the requirements established in some European standards for commercial gypsum and other standards for similar products. In addition, the panels manufactured have been compared with commercial gypsum panels in order to determine the recycling possibilities of this kind of material in this application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Minimizing Transuranic Waste Generated in Hot Cells at Oak Ridge National Laboratory Through Use of a Non-Destructive CO{sub 2} Pellet Cleaning System - 19577

Wastes generated in shielded hot cells containing materials contaminated with transuranic (TRU) waste present unique problems in waste disposal at Department of Energy (DOE) sites. Oak Ridge National Laboratory (ORNL) routinely processes materials contaminated with TRU waste from the High Flux Isotope Reactor (HFIR) and from other sources (both on and off-site) in their hot cell facilities, generating wastes that require eventual disposal. The waste streams generated by these processes are often high activity and exhibit high dose rates, driving them into the remote-handled (RH) category at the Waste Isolation Pilot Plant (WIPP). Reduction of the TRU waste footprint is desirable from a disposal cost perspective due to constraints with RH waste processing and a lack of space availability at the WIPP. Historically TRU waste generated at ORNL has been processed by the TRU Waste Processing Center (TWPC), which belongs to the Department of Energy's Office of Environmental Management (DOE-EM). Now that Oak Ridge legacy TRU waste is reaching its final stage, DOE-EM has turned over the mission of processing newly-generated TRU waste streams to the DOE Office of Science at ORNL. To reduce the volume of potential TRU waste occupying valuable space in the ORNL Hot Cells, a non-destructive CO{sub 2} pellet cleaning system will be used to capture particulate contaminants removed from the surfaces of waste inside the ORNL Non-Reactor Nuclear Facilities (NNFD) Hot Cells at the Irradiated Fuels Examination Laboratories (IFEL). The particulate will be segregated by particle size and captured for disposal later. This action will separate some of the TRU isotopes (particulate) from the larger waste volume (debris waste items), resulting in both lower waste disposal costs and reduced TRU waste volumes. This will be accomplished through a specialized cyclone separator. Secondary wastes are usually generated through other methods of decontamination, such as water jets and abrasive agents. These secondary wastes are absent with the CO{sub 2} pelletized system, due to sublimation of the dry ice upon impact. This is an important consideration with IFEL, a facility whose primary mission is to perform a series of R and D testing on nuclear fuel rods. Liquid is not a feasible method of decontamination as the IFEL's drains in the Hot Cells were plugged years ago due to Resource Conservation and Recovery Act (RCRA) regulations. Constraints at IFEL, such as criticality safety concerns with use of hydrogenous materials, are also alleviated with the non-destructive CO{sub 2} pellet cleaning system. These are a couple of the considerations why this method of decontamination is preferred. Due to concerns with oxidizers at WIPP grouting will be performed on the contaminated particulate produced during the trapping by the cyclone separation phase. This method will comply with mitigating oxidizing properties in TRU waste, required by the recently published Basis of Knowledge (BoK) document as part of Acceptable Knowledge (AK) by WIPP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

One of U.S. Department of Energy's (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents - approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes - are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC's ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates - WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Deskbook. The TRA consists of three parts: (1) Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. (2) Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. (3) Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the Fourth Quarter 2011 Tank 50 WAC Slurry Sample: Chemical and Radionuclide Contaminant Results

The Saltstone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. Low-level waste (LLW) streams from the Effluent Treatment Project (ETP), H-Canyon, and the decontaminated salt solution product from the Actinide Removal Process/Modular Caustic Side Solvent Extraction (CSSX) Unit (ARP/MCU) process are stored in Tank 50 until the LLW can be transferred to the Saltstone Facility for treatment and disposal. The LLW must meet the specified waste acceptance criteria (WAC) before it is processed into saltstone. The specific chemical and radionuclide contaminants and their respective WAC limits are in the current Saltstone WAC. Waste Solidification Engineering (WSE) requested that Savannah River National Laboratory (SRNL) perform quarterly analysis on saltstone samples. The concentrations of chemical and radionuclide contaminants are measured to ensure the saltstone produced during each quarter is in compliance with the current WAC. This report documents the concentrations of chemical and radionuclide contaminants for the 2011 Fourth Quarter samples collected from Tank 50 on October 12, 2011 and discusses those results in further detail than the previously issued results report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Valorisation of forestry waste by pyrolysis in an auger reactor

Pyrolysis of forestry waste has been carried out in an auger reactor to study the influence of operational variables on the reactor performance and the properties of the related products. Pine woodchips were used for the first time as raw material and fed continuously into the reactor. Ten experiments were carried out under inert atmosphere at: (i) different reaction temperature (1073, 973, 873, 823 and 773 K); (ii) different solid residence time (5, 3, 2 and 1.5 min); and (iii) different biomass flow rate (3.9, 4.8 and 6.9 kg/h). Results show that the greatest yields for liquid production (59%) and optimum product characterisation were obtained at the lowest temperature studied (773 K) and applying solid residence times longer than 2 min. Regarding bio-oil properties, GC/MS qualitative identification show that the most abundant compounds are volatile polar compounds, phenols and benzenediols; and very few differences can be observed among the samples regardless of the pyrolysis operating conditions. On the whole, experimental results demonstrate that complete reaction of forest woodchips can be achieved in an auger reactor in most of the experimental conditions tested. Moreover, this study presents the initial steps for the future scaling up of the auger reactor with the aim of converting it into a mobile plant which will be able to remotely process biomass such as energy crops, forestry and agricultural wastes to obtain bio-oil that, in turn, can be used as energy vector to avoid high transport costs.

09 BIOMASS FUELS↗