Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Characterizing Fit Factor of a One Size Fits-Most Emergency Mask using Subjects with Smaller Neck Circumferences

The Emergency Mask (EM) is an integral part of fire response on ISS, Orion and Gateway. The EM is a hood type protection respirator sealing around the subject’s neck, with an additional nose cup covering the subject’s oral nasal region. When integrated with a pair of Fire Cartridges (FCs), this system can be used to provide safe breathing air in a post-fire environment. The initial EM was certified as a ‘one size fits most’, however a recent requirements scrub discovered that the neck circumferences of the smallest possible crew population were not included in the initial requirement set. The test described in this paper uses the same slightly modified industry standard respirator test called a ‘Fit Factor’ used to certify the existing EM for larger subjects. Tests were performed on eight test subjects with neck circumference smaller than the initial EM requirement to determine if the current EM provided adequate protection during post-fire scenarios. The test included subjects donning an EM and then performing a number of head movements in a tent filled with approximately 50,000 particles/cm3 of smoke particulate. During these motions, particulate measurements were obtained from within the EM and compared with particulate measurements in the surrounding environment to determine the protection the EM provided in a simulated post-fire environment. This paper provides descriptions of the test hardware, methodology and results, which have provided rationale to design and build an EM to accommodate subjects with smaller necks.

Respirator↗

Artemis Internal Science Team Update: Deployed Payloads

Artemis will reestablish human presence on the Moon and lead to a new era of scientific discovery and exploration. Led by the National Aeronautics and Space Administration (NASA), the Artemis effort includes a collaboration of space agencies and companies from around the world [1]. In support of Artemis, a cross-disciplinary effort of science, engineering, operations, and human factors personnel is currently developing the best methods, facilities, and field locations to test hardware, train astronauts, and evaluate concepts of operations. This abstract, as part of the Artemis Internal Science Team (AIST) [2], provides an update to NASA’s plans for the solicitation, development, and operations of deployed surface payloads. In calendar year 2023, NASA’s Science Mission Directorate will solicit proposals for instruments to be deployed by crew on the surface of the Moon (Fig. 1), beginning with Artemis III [3]. The Artemis III mission will land in the south polar region of the Moon, within 6º of latitude from the south pole, in the vicinity of both persistently illuminated and permanently shadowed areas of the Moon, with potential access to surface-accessible volatile deposits [4]. Several of the proposed landing regions are located among some of the oldest parts of the Moon, and together with the permanently shadowed regions, provide the opportunity to learn about the history of the Moon through previously unexplored lunar regions [5]. Deployed payloads will be a critical part of a notional program that captures the highest-priority science for Artemis III and provides the greatest feedforward to follow-on missions and the build-up to the Artemis Base Camp

R. C. Weber↗

Artemis Internal Science Team Update: Deployed Payloads

Artemis will reestablish human presence on the Moon and lead to a new era of scientific discovery and exploration. Led by the National Aeronautics and Space Administration (NASA), the Artemis effort includes a collaboration of space agencies and companies from around the world. In support of Artemis, a cross-disciplinary effort of science, engineering, operations, and human factors personnel is currently developing the best methods, facilities, and field locations to test hardware, train astronauts, and evaluate concepts of operations. This poster, as part of the Artemis Internal Science Team (AIST), provides an update to NASA’s plans for the solicitation, development, and operations of deployed surface payloads. In calendar year 2023, NASA’s Science Mission Directorate will solicit proposals for instruments to be deployed by crew on the surface of the Moon (Fig. 1), beginning with Artemis III. The Artemis III mission will land in the south polar region of the Moon, within 6º of latitude from the south pole, in the vicinity of both persistently illuminated and permanently shadowed areas of the Moon, with potential access to surface-accessible volatile deposits. Several of the proposed landing regions are located among some of the oldest parts of the Moon, and together with the permanently shadowed regions, provide the opportunity to learn about the history of the Moon through previously unexplored lunar regions. Deployed payloads will be a critical part of a notional program that captures the highest-priority science for Artemis III and provides the greatest feed-forward to follow-on missions and the build-up to the Artemis Base Camp.

R. C. Weber↗

Multi-Angle Imager for Aerosols (MAIA) spectral and radiometric calibration

The Multi-angle Imaging SpectroRadiometer (MISR) was launched as part of NASA’s Terra satellite suite of instruments. Still operational, it makes use of observations from multiple view angles to retrieve aerosol abundance and particle properties. The Multi-Angle Imager for Aerosols (MAIA) instrument improves on this heritage by incorporating polarimetry and an expanded spectral range. Combining these data with surface measurements, the relationship between pollution and human health will be explored. MAIA has just completed camera testing, building on the experience from MISR. Spectral calibration now makes use of a double subtractive monochromator, built with the intent to allow the exit slit output to be uniform in spectral content. For radiometric testing, hardware upgrades have included adding UV lamps to the 1.65 cm (65") integrating sphere, use of a NIST-traceable sphere to establish absolute radiances, and the addition of a UV transfer spectrometer to support characterization of the sphere output from 300 to 2500 nm. During camera build, Newton’s rings were observed in the detector Quantum Efficiency (QE) measurements. This is due to etaloning within the detector itself. Etaloning was also evident in the spectral and radiometric characterizations performed on the completed camera. Spectral metrics, including center wavelength and width, are presented here using a moment’s analysis. This better represents the band properties, particularly in bands where fringing is observed, as compared to a full-width at half-maximum determination. It is believed that the MAIA camera has been carefully characterized, and meet its spectral and radiometric requirements.

Harten, Gerard Van↗

Assurance Equations: A Cost and Criticality Model for Optimizing Quality Assurance Surveillance

The cost of quality vs cost of failure correction has been a long-running topic of discussion within the Aerospace community. It leads directly to concepts of “risk tolerance”, and risk-based decision-making. It would be valuable if there was a way to compute the optimal investment in customer-executed quality assurance activities using defect significance with respect to performance objectives, the activities’ defect detection effectiveness, and the cost-penalty for late discovery of impactful defects. This optimization is particularly of interest to projects whose budget constraints significantly limit their risk management options.The cost to fix defects (i.e., failure correction) escalates as the project matures. There have been studies attempting to determine the relative cost of fixing defects discovered during various phases of a project life cycle with important implications, all of which suggest growth factors are large. The commonly referred to 1:10:100 rule represents a cost multiplier for repair/rework across the Design to Fab to Test hardware development phases. Cost premiums for QA activities also accumulate when they are treated as mandatory (due to schedule drag) or are performed later than their assigned phase.This paper describes the modeling of development phase -dependencies in the conduct of typical customer-executed quality assurance activities. Our initial modeling encompasses:• Distinct phases of the production lifecycle• Multiple kinds of Defects, each with some a-priori likelihood of being present• Each defect’s impact on performance Objectives for a type of hardware• The cost and efficacy of assurance techniques at detecting such Defects• The costs of fixing those Defects detected in a given phase of the production lifecycleThe model captures assurance activities’ abilities to Detect defects. Upon detection it is assumed that the Defect is immediately fixed. Defects that “escape” detection by some activity may thereafter be detected by a later activity, but by then the cost of fixing the Defect may have escalated. Defects are related to the performance Objectives they would detract from, were those Defects to remain present in the operating system.We have constructed and are exploring, a model that relates the importance of hardware system elements to mission objectives, the impact of types of Defects on those hardware types, the cost of customer-executed assurance activities (i.e., supplier controls) and their effectiveness towards reducing an impactful quality escape, and the cost of Defect correction across production phase. We describe the approach taken to select the key model aspects, why they are relevant to our NASA mission, and our efforts to populate it with relevant and contemporary data. We use a notional example to illustrate model design and function.

Plante, Jeannette↗

Reactor Network Analysis with Various Reaction Mechanisms to Investigate Hydrogen vs. Methane Fuel at Varying Flame Temperatures with Experimental Data

Emissions data were evaluated for a set of test hardware that adapts Collins Aerospace’s aeroengine liquid fueled injector technology to a ground-based turbine. The hardware was specifically developed to operate on 100% hydrogen; however it has the ability to operate on both pure methane and hydrogen and mixtures in between. 16 injector configurations and seven factors (air split, fuel and air swirl, pressure drop, preheat temperature, fuel composition, and flame temperature) were investigated based on a Box Behnken statistical model. Of the 16, configuration 3 was selected for further discussion being in the middle of the statistical design space. A chemical reactor network was developed based on the experimental data obtained and was assessed with three different mechanisms: GRI Mech 3.0, UCSD, and Galway. All factors were held constant except the fuel composition to directly compare chemical pathways for methane and hydrogen. This study was conducted across different flame temperatures of 1500K, 1675K, and 1850K for both hydrogen and methane. Additional lower flame temperatures of 1100K and 1300K were evaluated for hydrogen. Moreover, results for fully premixed and non-premixed results were compared to obtain information on the implications of mixedness on emissions. These results were compared with the Leonard and Stegmaier plot for methane and a similar plot was constructed for hydrogen.

08 HYDROGEN↗

Intelligent Pixel Detectors: Towards a Radiation Hard ASIC with On-Chip Machine Learning in 28 nm CMOS

Detectors at future high energy colliders will face enormous technical challenges. Disentangling the unprecedented numbers of particles expected in each event will require highly granular silicon pixel detectors with billions of readout channels. With event rates as high as 40 MHz, these detectors will generate petabytes of data per second. To enable discovery within strict bandwidth and latency constraints, future trackers must be capable of fast, power efficient, and radiation hard data-reduction at the source. We are developing a radiation hard readout integrated circuit (ROIC) in 28nm CMOS with on-chip machine learning (ML) for future intelligent pixel detectors. We will show track parameter predictions using a neural network within a single layer of silicon and hardware tests on the first tape-outs produced with TSMC. Preliminary results indicate that reading out featurized clusters from particles above a modest momentum threshold could enable using pixel information at 40 MHz.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An Evaluation of the Additional Acoustic Power Needed to Overcome the Effects of a Test-Articles Absorption During Reverberant Chamber Acoustic Testing of Spaceflight Hardware

It is important to realize that some test-articles may have significant sound absorption that may challenge the acoustic power capabilities of a test facility. Therefore, to mitigate this risk of not being able to meet the customers target spectrum, it is prudent to demonstrate early-on an increased acoustic power capability which compensates for this test-article absorption. This paper describes a concise method to reduce this risk when testing aerospace test-articles which have significant absorption. This method was successfully applied during the SpaceX Falcon 9 Payload Fairing acoustic test program at the NASA Glenn Research Center Plum Brook Stations RATF.

sound power↗

An Evaluation of the Additional Acoustic Power Needed to Overcome the Effects of a Test-Article's Absorption During Reverberant Chamber Acoustic Testing of Spaceflight Hardware

The exposure of a customer's aerospace test-article to a simulated acoustic launch environment is typically performed in a reverberant acoustic test chamber. The acoustic pre-test runs that will ensure that the sound pressure levels of this environment can indeed be met by a test facility are normally performed without a test-article dynamic simulator of representative acoustic absorption and size. If an acoustic test facility's available acoustic power capability becomes maximized with the test-article installed during the actual test then the customer's environment requirement may become compromised. In order to understand the risk of not achieving the customer's in-tolerance spectrum requirement with the test-article installed, an acoustic power margin evaluation as a function of frequency may be performed by the test facility. The method for this evaluation of acoustic power will be discussed in this paper. This method was recently applied at the NASA Glenn Research Center Plum Brook Station's Reverberant Acoustic Test Facility for the SpaceX Falcon 9 Payload Fairing acoustic test program.

absorption↗

Classifications and Requirements for Testing Systems and Hardware to be Exposed to Dust in Planetary Environments

The purpose of this NASA Technical Standard is to establish minimum requirements and provide effective guidance regarding methodologies and best practices for testing systems and hardware to be exposed to dust in dust laden and generating environments. The intent is to facilitate consistency and efficiency in testing space systems, subsystems, or components with operations and missions in dusty environments.

Kristen Kathleen John↗

Europa Environmental Testing of Thermal Hardware for the Mapping Imaging Spectrometer for Europa (MISE) Instrument

The Europa Clipper spacecraft, scheduled for launch in June 2022, hosts a suite of instruments including the Mapping Imaging Spectrometer for Europa (MISE). MISE is a high-optical through-put pushbroom infrared imaging spectrometer that can collect measurements within Europa’s challenging radiation environment. It is externally mounted to the spacecraft and as a result is exposed to high radiation levels and cold temperatures. The instrument consists of a scan mirror assembly, an optical bench including a Dyson spectrometer and a telescope, and a structure that supports a cryocooler and a radiator. The cryocooler is used to actively cool the focal plane array and the spectrometer. The heat from the cryocooler is rejected through pyrolytic graphite sheet thermal straps to a honeycomb radiator. MISE will implement thermal hardware that will either not be used on other parts of the spacecraft or have a more extreme environment than the spacecraft. As a result, the MISE instrument performed numerous environmental tests on its thermal hardware. This paper discusses the results of the thermal cycling and radiation tests performed on the MISE thermal hardware including a Lockheed Martin Micro1-2 cryocooler, Pyrolytic graphite sheet thermal straps, Annealed pyrolytic graphite K-Core, Rosemount Platinum Resistance Thermometers, Tayco Kapton Thermofoil heaters, Dale Ohm resistors, and aluminum honeycomb and facesheets.

Strong, Patrick↗

Stretched Lens Array (SLA) Photovoltaic Concentrator Hardware Development and Testing

Over the past two years, the Stretched Lens Array (SLA) photovoltaic concentrator has evolved, under a NASA contract, from a concept with small component demonstrators to operational array hardware that is ready for space validation testing. A fully-functional four panel SLA solar array has been designed, built and tested. This paper will summarize the focus of the hardware development effort, discuss the results of recent testing conducted under this program and present the expected performance of a full size 7kW array designed to meet the requirements of future space missions.

Piszczor, Michael↗

Cumulative Measurement Errors for Dynamic Testing of Space Flight Hardware

Located at the NASA Johnson Space Center in Houston, TX, the Six-Degree-of-Freedom Dynamic Test System (SDTS) is a real-time, six degree-of-freedom, short range motion base simulator originally designed to simulate the relative dynamics of two bodies in space mating together (i.e., docking or berthing). The SDTS has the capability to test full scale docking and berthing systems utilizing a two body dynamic docking simulation for docking operations and a Space Station Remote Manipulator System (SSRMS) simulation for berthing operations. The SDTS can also be used for nonmating applications such as sensors and instruments evaluations requiring proximity or short range motion operations. The motion base is a hydraulic powered Stewart platform, capable of supporting a 3,500 lb payload with a positional accuracy of 0.03 inches. The SDTS is currently being used for the NASA Docking System testing and has been also used by other government agencies. The SDTS is also under consideration for use by commercial companies. Examples of tests include the verification of on-orbit robotic inspection systems, space vehicle assembly procedures and docking/berthing systems. The facility integrates a dynamic simulation of on-orbit spacecraft mating or de-mating using flight-like mechanical interface hardware. A force moment sensor is used for input during the contact phase, thus simulating the contact dynamics. While the verification of flight hardware presents unique challenges, one particular area of interest involves the use of external measurement systems to ensure accurate feedback of dynamic contact. The measurement systems for the test facility have two separate functions. The first is to take static measurements of facility and test hardware to determine both the static and moving frames used in the simulation and control system. The test hardware must be measured after each configuration change to determine both sets of reference frames. The second function is to take dynamic measurements during hardware motion and contact. While performing dynamic testing of an active docking system, researchers found that the data from the motion platform, test hardware and two external measurement systems exhibited frame offsets and rotational errors. While the errors were relatively small when considering the motion scale overall, they substantially exceeded the individual accuracies for each component. After evaluating both the static and dynamic measurements, researchers found that the static measurements introduced significantly more error into the system than the dynamic measurements even though, in theory, the static measurement errors should be smaller than the dynamic. In several cases, the magnitude of the errors varied widely for the static measurements. Upon further investigation, researchers found the larger errors to be a consequence of hardware alignment issues, frame location and measurement technique whereas the smaller errors were dependent on the number of measurement points. This paper details and quantifies the individual and cumulative errors of the docking system and describes methods for reducing the overall measurement error. The overall quality of the dynamic docking tests for flight hardware verification was improved by implementing these error reductions.

Winnitoy, Susan↗

On-Orbit Constraints Test - Performing Pre-Flight Tests with Flight Hardware, Astronauts and Ground Support Equipment to Assure On-Orbit Success

On-Orbit Constraints Test (OOCT's) refers to mating flight hardware together on the ground before they will be mated on-orbit. The concept seems simple but it can be difficult to perform operations like this on the ground when the flight hardware is being designed to be mated on-orbit in a zero-g and/or vacuum environment of space. Also some of the items are manufactured years apart so how are mating tasks performed on these components if one piece is on-orbit before its mating piece is planned to be built. Both the Internal Vehicular Activity (IVA) and Extra-Vehicular Activity (EVA) OOCT's performed at Kennedy Space Center will be presented in this paper. Details include how OOCT's should mimic on-orbit operational scenarios, a series of photographs will be shown that were taken during OOCT's performed on International Space Station (ISS) flight elements, lessons learned as a result of the OOCT's will be presented and the paper will conclude with possible applications to Moon and Mars Surface operations planned for the Constellation Program.

Haddad, Michael E.↗

Neutral buoyancy test evaluation of hardware and extravehicular activity procedures for on-orbit assembly of a 14 meter precision reflector

A procedure that enables astronauts in extravehicular activity (EVA) to perform efficient on-orbit assembly of large paraboloidal precision reflectors is presented. The procedure and associated hardware are verified in simulated Og (neutral buoyancy) assembly tests of a 14 m diameter precision reflector mockup. The test article represents a precision reflector having a reflective surface which is segmented into 37 individual panels. The panels are supported on a doubly curved tetrahedral truss consisting of 315 struts. The entire truss and seven reflector panels were assembled in three hours and seven minutes by two pressure-suited test subjects. The average time to attach a panel was two minutes and three seconds. These efficient assembly times were achieved because all hardware and assembly procedures were designed to be compatible with EVA assembly capabilities.

Heard, Walter L., Jr.↗

Hardware design and testing of the generic rear transition module for the global trigger subsystem of ATLAS Phase-II Upgrade

Abstract In the framework of the ATLAS experiment’s Phase-II Upgrade at the High-Luminosity Large Hadron Collider (HL-LHC), new and improved trigger hardware and algorithms will be implemented onto a single-level, 10 μs-latency architecture. The Global Trigger is a new subsystem which will bring event-filter capabilities by performing offline-like algorithms on full-granularity calorimeter data. The implementation of the functionality is firmware-focused and composed of several processing nodes, which are hosted on identical hardware, made up of an Advanced Telecommunications Computing Architecture (ATCA) front board, called Global Common Module (GCM), and a rear transition module (RTM), called Generic RTM (GRM). The GRM, which was developed to mitigate the risks deriving from the complex design and power management of the GCM, features an advanced Xilinx Versal Prime system-on-chip and can handle communication with the GCM and Front-End Link eXchange (FELIX) subsystem and trigger processors through 124 25.8 Gb/s transceiver links, for readout and control. Additionally, the GRM mounts a Low-Power GigaBit Transceiver (lpGBT) chip which enables emulation of the detector front-ends for integration tests. This paper presents the GRM hardware design and its testing.

Instruments & Instrumentation↗

Repeatable Method for Conducting Chamber Studies of Aerosolized Lunar Simulant

The Artemis Mission goal of returning humans to the Moon requires new solutions to engineering problems posed by the extremely harsh environment of the lunar surface. Using the Apollo missions as historical evidence, dust will be a significant obstacle in the success of a sustained human and robotic presence. Hardware such as tools, machinery, extra-vehicular activity (EVA) suits, and components of landers and habitats will all be subject to various degrees of contamination by lunar dust, and each piece of hardware has its own considerations for performance under dusty conditions. Such hardware must be tested and verified for use during lunar missions under guidance from NASA technical standards. Aerosolized dust can be used to test and verify hardware in two ways: volumetric and surface area loading. Volumetric loading (measured in mass of airborne dust per volume of air) may cause hardware to malfunction via dust ingestion or other mechanisms. Surface area loading (measured in mass of settled dust per surface area) may cause hardware to malfunction by altering its thermal properties or by fouling optical surfaces such as camera lenses. This publication describes a method to achieve a stable, user-determined volumetric loading in an arbitrary chamber along with recommendations for how to use such chambers for customized hardware testing.

Benjamin J Sumlin↗

Pre-Flight Dark Forward Electrical Testing of the Mir Cooperative Solar Array

The Mir Cooperative Solar Array (MCSA) was developed jointly by the United States (US) and Russia to provide approximately 6 kW of photovoltaic power to the Russian space station Mir. After final assembly in Russia, the MCSA was shipped to the NASA Kennedy Space Center (KSC) in the summer of 1995 and launched to Mir in November 1995. Program managers were concerned of the potential for MCSA damage during the transatlantic shipment and the associated handling operations. To address this concern, NASA Lewis Research Center (LERC) developed an innovative dark-forward electrical test program to assess the gross electrical condition of each generator following shipment from Russia. The use of dark test techniques, which allow the array to remain in the stowed configuration, greatly simplifies the checkout of large area solar arrays. MCSA dark electrical testing was successfully performed at KSC in July 1995 following transatlantic shipment. Data from this testing enabled engineers to quantify the effects of potential MCSA physical damage that would degrade on-orbit electrical performance. In this paper, an overview of the principles and heritage of photovoltaic array dark testing is given. The specific MCSA dark test program is also described including the hardware, software, testing procedures and test results. The current-voltage (4) response of both solar cell circuitry and by-pass diode circuitry was obtained. To guide the development of dark test hardware, software and procedures, a dedicated FORTRAN computer code was developed to predict the dark 4 responses of generators with a variety of feasible damage modes. By comparing the actual test data with the predictions, the physical condition of the generator could be inferred. Based on this data analysis, no electrical short-circuits or open-circuits were detected. This suggested the MCSA did not sustain physical damage that affected electrical performance during handling and shipment from Russia to the US. Good agreement between the test data and computational predictions indicated MCSA electrical performance was amenable to accurate analysis and was well understood.

Kerslake, Thomas W.↗