Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch pad”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Analysis of Possible Explosions at Kennedy Space Center Due to Spontaneous Ignition of Hypergolic Propellants

NASA's Constellation Program plan currently calls for the replacement of the Space Shuttle with the ARES I & V spacecraft and booster vehicles to send astronauts to the moon and beyond. Part of the ARES spacecraft is the Orion Crew Exploration Vehicle (CEV), which includes the Crew Module (CM) and Service Module (SM). The Orion CM's main propulsion system and supplies are provided by the SM. The SM is to be processed off line and moved to the Vehicle Assembly Building (V AB) for stacking to the first stage booster motors prior to ARES move to the launch pad. The new Constellation Program philosophy to process in this manner has created a major task for the KSC infrastructure in that conventional QD calculations are no longer viable because of the location of surrounding facilities near the VAB and the Multi Purpose Processing Facility (MPPF), where the SM will be serviced with nearly 18,000 pounds of hypergolic propellants. The Multi-Payload Processing Facility (MPPF) complex, constructed by NASA in 1994, is located just off E Avenue south of the Operations and Checkout (O&C) building in the Kennedy Space Center industrial area. The MPPF includes a high bay and a low bay. The MPPF high bay is 40.2 m (132 ft) long x 18.9 m (60 ft) wide with a ceiling height of 18.9 m (62 ft). The low bay is a 10.4 m (34 ft) long x 10.4 m (34 ft) wide processing area and has a ceiling height of6.1 m (20 ft). The MPPF is currently used to process non-hazardous payloads. Engineering Analysis Inc. (EAI), under contract with ASRC Aerospace, Inc. in conjunction with the Explosive Safety Office, NASA, Kennedy Space Center (KSC), has carried out an analysis of the effects of explosions at KSC in or near various facilities produced by the spontaneous ignition ofhypergolic fuel stored in the CEV SM. The facilities considered included (1) Vehicle Assembly Building (VAB) (2) Multi-Payload Processing Facility (MPPF) (3) Canister Rotation Facility (CRF) Subsequent discussion deals with the MPPF analysis. Figure 1 provides a view of the MPPF from the northwest. An interior view ofthe facility is shown in Figure 2. The study was concerned with both blast hazards and hazardous fragments which exceed existing safety standards, as described in Section 2.0. The analysis included both blast and fragmentation effects and was divided into three parts as follows: (1) blast (2) primary fragmentation (3) secondary fragmentation Blast effects are summarized in Section 3.0, primary fragmentation in Section 4.0, and secondary fragmentation (internal and external) in Section 5.0. Conclusions are provided in Section 6.0, while references cited are included in Section 7.0. A more detailed description of the entire study is available in a separate document.

Brown, Stephen↗

An Engineering Look at Space Shuttle and ISS Operations

This slide presentation, in Spanish, is an overview of NASA's Space Shuttle operations and preparations for serving the International Space Station. There is information and or views of the shuttle's design, the propulsion system, the external tanks, the foam insulation, the reusable solid rocket motors, the vehicle assembly building (VAB), the mobile launcher platform being moved from the VAB to the launch pad. There is a presentation of some of the current issues with the space shuttle: cracks in the LH2 flow lines, corrosion and pitting, the thermal protection system, and inspection of the thermal protection system while in orbit. The shuttle system has served for more than 20 years, it is still a challenge to re-certify the vehicles for flight. Materials and material science remain as chief concerns for the shuttle,

Hernandez, Jose M.↗

MIT January Operational Internship Experience

This viewgraph presentation describes the MIT January Operational Internship Experience (JOIE) program. The topics include: 1) Landing and Recovery; 2) Transportation; 3) Shuttle Processing; 4) Constellation Processing; 5) External Tank; 6) Launch Pad; 7) Ground Operations; 8) Hypergolic Propellants; 9) Environmental; 10) Logistics; 11) Six Sigma; 12) Systems Engineering; and 13) Human Factors.

Bosanac, Natasha↗

NASA TEERM Hexavalent Chrome Alternatives Projects

This slide presentation reviews the NASA project to select an alternative to hexavalent chrome in the aerospace industry. Included is a recent historic testing and research that the Agency has performed on (1) the external tank, (2) the shuttle orbiter, (3) the Shuttle Rocket Booster, and (4) the Space Shuttle Main Engine. Other related Technology Evaluation for Environmental Risk Mitigation (TEERM) projects are reviewed. The Phase I process of the project performed testing of alternatives the results are shown in a chart for different coating systems. International collaboration was also reviewed. Phase II involves further testing of pretreatment and primers for 6 and 12 months of exposure to conditions at Launch Pad and the beach. Further test were performed to characterize the life cycle corrosion of the space vehicles. A new task is described as a joint project with the Department of Defense to identify a Hex Chrome Free Coatings for Electronics.

Kessel, Kurt↗

Transonic Tones and Excess Broadband Noise in Overexpanded Supersonic Jets

Noise characteristics of convergent-divergent (C-D) nozzles in the overexpanded regime are the focus of this paper. The flow regime is encountered during takeoff and landing of certain airplanes and also with rocket nozzles in launch-pad environment. Experimental results from laboratory-scale single nozzles are discussed. The flow often undergoes a resonance accompanied by emission of tones (referred to as transonic tones). The phenomenon is different from the well-known screech tones. Unlike screech, the frequency increases with increasing supply pressure. There is a staging behavior odd harmonic stages occur at lower pressures while the fundamental occurs in a range of relatively higher pressures. A striking feature is that tripping of the nozzle s internal boundary layer tends to suppress the resonance. However, even in the absence of tones the broadband levels are found to be high. That is, relative to a convergent case and at same pressure ratio, the C-D nozzles are found to be noisier, often by more than 10dB. This excess broadband noise (referred to as EBBN) is further explored. Its characteristics are found to be different from the well-known broadband shockassociated noise ( BBSN ). For example, while the frequency of the BBSN peak varies with observation angle no such variation is noted with EBBN. The mechanisms of the transonic tone and the EBBN are not completely understood yet. They appear to be due to unsteady shock motion inside the nozzle. The shock drives the flow downstream like a vibrating diaphragm, and resonance takes place similarly as with acoustic resonance of a conical section having one end closed and the other end open. When the boundary layer is tripped, apparently a breakdown of azimuthal coherence suppresses the resonance. However, there is still unsteady shock motion albeit with superimposed randomness. Such random motion of the internal shock and its interaction with the separated boundary layer produces the EBBN.

Zaman, Khairul B. M. Q.↗

Evolution of the Florida Launch Site Architecture: Embracing Multiple Customers, Enhancing Launch Opportunities

The impending conclusion of the Space Shuttle Program and the Constellation Program cancellation unveiled in the FY2011 President's budget created a large void for human spaceflight capability and specifically launch activity from the Florida launch Site (FlS). This void created an opportunity to re-architect the launch site to be more accommodating to the future NASA heavy lift and commercial space industry. The goal is to evolve the heritage capabilities into a more affordable and flexible launch complex. This case study will discuss the FlS architecture evolution from the trade studies to select primary launch site locations for future customers, to improving infrastructure; promoting environmental remediation/compliance; improving offline processing, manufacturing, & recovery; developing range interface and control services with the US Air Force, and developing modernization efforts for the launch Pad, Vehicle Assembly Building, Mobile launcher, and supporting infrastructure. The architecture studies will steer how to best invest limited modernization funding from initiatives like the 21 st elSe and other potential funding.

Colloredo, Scott↗

Space Shuttle Propulsion Finishing Strong

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the SRB's on STS-4 and shutdown of an SSME during ascent on STS- 51F. On STS-112 only half the pyrotechnics fired to release the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early Program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. Human rating of solid rocket motors was truly achieved. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. These major events and lessons for the future are discussed. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The propulsion system elements evolved to high reliability and heavy lift capability. The Shuttle system, though not a operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS) and provided significant logistics and down mass for ISS operations. By the end of the Program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and is a heavy lift earth to orbit propulsion system. The story of this amazing system is discussed in detail in the paper.

Owen, James W.↗

The NASA Experience

Projects assigned to: (1) Testing, fixing, and procuring enclosure systems and components for Kennedy Ground Controls Systems at launch pad B. (2) Organizational spreadsheets for all subsystems involved in the project. (Procurement, parts lists, drawings, purchase requests, etc) (3) Resolve is a project devoted to the lunar rover that will sample lunar soil in an effort to remove the moister and separate the metal from the oxygen to produce drinkable water. I helped with the humidity environmental generator for the experiment (moister detector).

Ramos, Alberto↗

Computational Fluid Dynamics Demonstration of Rigid Bodies in Motion

The Design Analysis Branch (NE-Ml) at the Kennedy Space Center has not had the ability to accurately couple Rigid Body Dynamics (RBD) and Computational Fluid Dynamics (CFD). OVERFLOW-D is a flow solver that has been developed by NASA to have the capability to analyze and simulate dynamic motions with up to six Degrees of Freedom (6-DOF). Two simulations were prepared over the course of the internship to demonstrate 6DOF motion of rigid bodies under aerodynamic loading. The geometries in the simulations were based on a conceptual Space Launch System (SLS). The first simulation that was prepared and computed was the motion of a Solid Rocket Booster (SRB) as it separates from its core stage. To reduce computational time during the development of the simulation, only half of the physical domain with respect to the symmetry plane was simulated. Then a full solution was prepared and computed. The second simulation was a model of the SLS as it departs from a launch pad under a 20 knot crosswind. This simulation was reduced to Two Dimensions (2D) to reduce both preparation and computation time. By allowing 2-DOF for translations and 1-DOF for rotation, the simulation predicted unrealistic rotation. The simulation was then constrained to only allow translations.

Camarena, Ernesto↗

Improved Nutation Damper for a Spin-Stabilized Spacecraft

A document proposes an improved liquid- ring nutation damper for a spin-stabilized spacecraft. The improvement addresses the problem of accommodating thermal expansion of the damping liquid. Heretofore, the problem has been solved by either (1) filling the ring completely with liquid and accommodating expansion by attaching a bellows or (2) partially filling the ring and accepting the formation of bubbles. The disadvantage of (1) is that a bellows is expensive and may not be reliable; the disadvantage of (2) is that bubbles can cause fluid lockup and consequent loss of damping. In the improved damper, the ring would be nearly completely filled with liquid, and expansion would be accommodated, but not by a bellows. Instead, an escape tube would be attached to the ring. The escape tube would be positioned and oriented so that the artificial gravitation and the associated buoyant force generated by the spin of the spacecraft would cause the bubbles to migrate toward the tip of the tube. In addition, when the spacecraft was on the launch pad, the escape tube would be at the top of the ring, so that bubbles would rise into the tube.

Woodard, Mark A.↗

Signal-Conditioning Amplifier Recorders

Signal-conditioning amplifier recorders (SCAmpRs) have been proposed as a means of simplifying and upgrading the Kennedy Space Center (KSC) Ground Measurement System (GMS), which is a versatile data-acquisition system that gathers and records a variety of measurement data before and during the launch of a space shuttle. In the present version of the GMS system, signal conditioning amplifiers digitize and transmit data to a VME chassis that multiplexes up to 416 channels. The data is transmitted via a high-speed data bus to a second VME chassis where it is available for snapshots. The data is passed from the second VME chassis to a high-speed data recorder. This process is duplicated for installations at two launch pads and the Vehicle Assembly Building (VAB). Since any failure of equipment in the data path results in loss of data, much of the system is redundant. The architecture of the existing GMS limits expansion or any modification to the system to meet changing requirements because of the cost and time required. A SCAmpR-based system is much more flexible. The basis of the simplification, flexibility, and reliability is the shifting of the recording function to the individual amplifier channels. Each SCAmpR is a self-contained single channel data acquisition system, which in its current implementation, has a data storage capacity of up to 30 minutes when operating at the fastest data sampling rates. The SCAmpR channels are self-configuring and self-calibrating. Multiple SCAmpR channels are ganged on printed circuit boards and mounted in a chassis that provides power, a network hub, and Inter-Range Instrument Group (IRIG) time signals. The SCAmpR channels share nothing except physical mounting on a circuit board. All circuitry is electrically separate for each channel. All that is necessary to complete the data acquisition system is a single master computer tied to the SCAmpR channels by standard network equipment. The size of the data acquisition system dictates the requirements for the specific network equipment.

Medelius, Pedro J.↗

History of the Development of Liquid-Applied Coatings for Protection of Reinforced Concrete

Corrosion of reinforcing steel in concrete is an insidious problem for structures at Kennedy Space Center (KSC). KSC is located on the coast of Florida in a highly corrosive atmosphere. Launch pads, highway bridge infrastructure, and buildings are strongly affected. To mitigate these problems, NASA initiated a development program for a Galvanic Liquid-Applied Coating System (GLACS). A breakthrough in this area would have great commercial value in transportation, marine and construction industry infrastructures. The patented NASA GLACS system has undergone considerable testing to meet the needs of commercialization. A moisture-cure coating gives excellent adhesion with ease of application compared to existing galvanic products on the market. The latest development, GalvaCori; can be sprayed or hand applied to almost any structure shape. A self-adhesive conductive tape system has been devised to simplify current collection within the coating areas. In testing programs, millivolt potential and milliamp output per square foot of anode have been closely studied at actual test sites. These two parameters are probably the most challenging items of a resin-based, room-temperature-applied, galvanic coating. Extensive re-formulation has resulted in a system that provides the needed polarization for catholic protection of reinforcing steel in concrete in a variety of structure environments. The rate of corrosion of rebar in concrete is greatly affected by the environment of the structure. In addition to this, for any given concrete structure; moisture level, carbonization, and chloride contamination influences the rate of rebar corrosion. Similarly, the cathodic protection level of galvanic systems is also dependent on the moisture level of the concrete. GalvaCorr is formulated to maintain galvanic activity as the moisture level of the structure declines. GalvaCorr is available as a three-part kit. The mixing step requires about ten minutes. The viscosity can be easily adjusted to meet the application needs. The pot or working life is four to six hours, depending on the temperature. GalvaCorr can be thought of as a spray-on coating, battery ready to provide up to -1.4 volts (relative to CSE) of cathodic protection (CP) potential.

Curran, Joseph J.↗

ASK Magazine

Welcome to the Academy of Program and Project Leadership (APPL) and ASK Magazine. APPL helps NASA managers and project teams accomplish today's missions and meet tomorrow's challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportunities for project management collaboration with universities, professional associations, industry partners and other government agencies. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, smaLl projects-they're ali here in ASK. Stories in this issue include: Earthly Considerations on Mars, Getting Politically Active, Stumping for the Project, Grins & Giggles: The Launch Pad to High Performance, Transfer Wisdom Workshops: Coming to a NASA Center Near You, Project Management: The Television Show, Lessons Learned Again and Again and Again, Implementation Reviews, ASK Talks with Dr. Michael Hecht, and What Is This Fourth Dimension?.

Laufer, Alexander↗

Large-Scale Cryogenic Testing of Launch Vehicle Ground Systems at the Kennedy Space Center

The development of a new launch vehicle to support NASA's future exploration plans requires significant redesign and upgrade of Kennedy Space Center's (KSC) launch pad and ground support equipment systems. In many cases, specialized test equipment and systems will be required to certify the function of the new system designs under simulated operational conditions, including propellant loading. This paper provides an overview of the cryogenic test infrastructure that is in place at KSC to conduct development and qualification testing that ranges from the component level to the integrated-system level. An overview of the major cryogenic test facilities will be provided, along with a detailed explanation of the technology focus area for each facility

Ernst, E. W.↗

Reusable Solid Rocket Motor - Accomplishments, Lessons, and a Culture of Success

The Reusable Solid Rocket Motor represents the largest solid rocket motor ever flown and the only human rated solid motor. Each Reusable Solid Rocket Motor (RSRM) provides approximately 3-million lb of thrust to lift the integrated Space Shuttle vehicle from the launch pad. The motors burn out approximately 2 minutes later, separate from the vehicle and are recovered and refurbished. The size of the motor and the need for high reliability were challenges. Thrust shaping, via shaping of the propellant grain, was needed to limit structural loads during ascent. The motor design evolved through several block upgrades to increase performance and to increase safety and reliability. A major redesign occurred after STS-51L with the Redesigned Solid Rocket Motor. Significant improvements in the joint sealing systems were added. Design improvements continued throughout the Program via block changes with a number of innovations including development of low temperature o-ring materials and incorporation of a unique carbon fiber rope thermal barrier material. Recovery of the motors and post flight inspection improved understanding of hardware performance, and led to key design improvements. Because of the multidecade program duration material obsolescence was addressed, and requalification of materials and vendors was sometimes needed. Thermal protection systems and ablatives were used to protect the motor cases and nozzle structures. Significant understanding of design and manufacturing features of the ablatives was developed during the program resulting in optimization of design features and processing parameters. The project advanced technology in eliminating ozone-depleting materials in manufacturing processes and the development of an asbestos-free case insulation. Manufacturing processes for the large motor components were unique and safety in the manufacturing environment was a special concern. Transportation and handling approaches were also needed for the large hardware segments. The reusable solid rocket motor achieved significant reliability via process control, ground test programs, and postflight assessment. Process control is mandatory for a solid rocket motor as an acceptance test of the delivered product is not feasible. Process control included process failure modes and effects analysis, statistical process control, witness panels, and process product integrity audits. Material controls and inspections were maintained throughout the sub tier vendors. Material fingerprinting was employed to assess any drift in delivered material properties. The RSRM maintained both full scale and sub-scale test articles. These enabled continuous improvement of design and evaluation of process control and material behavior. Additionally RSRM reliability was achieved through attention to detail in post flight assessment to observe any shift in performance. The postflight analysis and inspections provided invaluable reliability data as it enables observation of actual flight performance, most of which would not be available if the motors were not recovered. These unique challenges, features of the reusable solid rocket motor, materials and manufacturing issues, and design improvements will be discussed in the paper.

Moore, Dennis R.↗

Ares I Scale Model Acoustic Test Instrumentation for Acoustic and Pressure Measurements

Ares I Scale Model Acoustic Test (ASMAT) is a 5% scale model test of the Ares I vehicle, launch pad and support structures conducted at MSFC to verify acoustic and ignition environments and evaluate water suppression systems Test design considerations 5% measurements must be scaled to full scale requiring high frequency measurements Users had different frequencies of interest Acoustics: 200 - 2,000 Hz full scale equals 4,000 - 40,000 Hz model scale Ignition Transient: 0 - 100 Hz full scale equals 0 - 2,000 Hz model scale Environment exposure Weather exposure: heat, humidity, thunderstorms, rain, cold and snow Test environments: Plume impingement heat and pressure, and water deluge impingement Several types of sensors were used to measure the environments Different instrument mounts were used according to the location and exposure to the environment This presentation addresses the observed effects of the selected sensors and mount design on the acoustic and pressure measurements

Vargas, Magda B.↗

Modified Fittings Enhance Industrial Safety

Kennedy Space Center is not only home to one of the largest buildings in the world - the massive Vehicle Assembly Building - it also hosts a number of one-of-a-kind facilities. The more than 30-mile-long campus has witnessed every launch from the Space Shuttle Launch Pad, as well as many homecomings at the Shuttle Landing Facility. Just as important, the Space Station Processing Facility (SSPF) has seen each element of the International Space Station (ISS) that passes through Kennedy before it goes into orbit. The SSPF is where ISS components are checked, tested, and adjusted before being packed into the Space Shuttle for transport. In an environment like the SSPF - spanning 457,000 square feet of processing areas, operational control rooms, laboratories, logistics areas, and office space - large workstands and equipment used to support the processing of ISS components need to be moved around the facility. One of the devices employed for this task is an air pallet. An air pallet moves on cushions of air instead of wheels. Compressed air inflates the cushions underneath the pallet and is then expelled through exhaust holes. This forms a thin film of air between the cushions and the floor, lifting the platform off the floor and making it easy to move the heavy workstands, equipment, and ISS components. Concerned with the safety of the connections on the pressurized air hoses used for the air pallets, engineers at Kennedy modified an existing commercial cam and groove fitting to control the air supply hose in the event of an accidental release of a pressurized hose. This modification prevented the hose from detaching and, propelled by compressed air, striking workers or equipment. "At the time, these were not available on commercial coupling halves, so NASA made a modification and then put them into use. If a worker were to accidentally try to remove a pressurized hose from the pallet, it no longer rapidly separated, and it safely relieved the pressure," says Paul Schwindt, an engineer at Kennedy who together with Alan Littlefield, also an engineer at Kennedy, designed the modification.

Source record↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗