Search NASA⌕ Search

SEARCH · Search NASA

Results for “planner”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

The ubiquitous solar electric propulsion stage

Mission analyses indicate there are several near-term interplanetary missions that cannot be performed with any degree of sophistication without electric propulsion. Cost and performance benefits are suggested when this same technology is included in the Shuttle-based earth-orbital transportation system. Specific earth-orbital payload programs gain from increased weight allowances, decreased costs through simplification, and reduced numbers of spacecraft due to on-orbit servicing. More ambitious mission planners looking toward space industrialization will find uses ranging from GSO debris clearance to a versatile support element for a multipurpose manned space station.

Austin, R. E.↗

Space station systems analysis study. Part 1, volume 1: Executive study

Potential space station system options were examined for a permanent, manned, orbital space facility and to provide data to NASA program planners and decision makers for their use in future program planning. There were ten space station system objectives identified. These were categorized into five major objectives and five supporting objectives. The major objectives were to support the development of: (1) satellite power systems, (2) nuclear energy plants in space, (3) space processing, (4) earth services, and (5) space cosmological research and development. The five supporting objectives, to define space facilities which would be basic building blocks for future systems, were: (1) a multidiscipline science laboratory, (2) an orbital depot to maintain, fuel, and service orbital transfer vehicles, (3) cluster support systems to provide power and data processing for multiple orbital elements, (4) a sensor development facility, and (5) the facilities necessary to enhance man's living and working in space.

Source record↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Large-scale V/STOL testing

Several facets of large-scale testing of V/STOL aircraft configurations are discussed with particular emphasis on test experience in the Ames 40- by 80-Foot Wind Tunnel. Examples of powered-lift test programs are presented in order to illustrate tradeoffs confronting the planner of V/STOL test programs. Large-scale V/STOL wind-tunnel testing can sometimes compete with small-scale testing in the effort required (overall test time) and program costs because of the possibility of conducting a number of different tests with a single large-scale model where several small-scale models would be required. The benefits of both high- or full-scale Reynolds numbers, more detailed configuration simulation, and number and type of onboard measurements are studied.

Koenig, D. G.↗

Conversion of prime agricultural land to urban land uses in Kansas City

In an expanding urban environment, agriculture and urban land uses are the two primary competitors for regional land resources. As a result of an increasing awareness of the effects which urban expansion has upon the regional environment, the conversion of prime agricultural land to urban land uses has become a point of concern to urban planners. A study was undertaken for the Kansas City Metropolitan Region, to determine the rate at which prime agricultural land has been converted to urban land uses over a five year period from 1969 to 1974. Using NASA high altitude color infrared imagery acquired over the city in October, 1969 and in May, 1974 to monitor the extent and location of urban expansion in the interim period, it was revealed that 42% of that expansion had occurred upon land classified as having prime agricultural potential. This involved a total of 10,727 acres of prime agricultural land and indicated a 7% increase over the 1969 which showed that 35% of the urban area had been developed on prime agricultural land.

Shaklee, R. V.↗

University resources sharing using the CTS

NASA-Ames Research Center and Stanford University in California, and Carleton University in Ottawa, Canada, are designing a curriculum-sharing experiment which will use compressed digital television. The experiment will permit evaluation of the potential of curriculum sharing by two universities which are geographically distant, but capable of transmitting and receiving television signals. The evaluation of the curriculum sharing per se will include inputs from faculty, staff and students at both institutions. Accessibility to and acceptability of each other's curriculum will be studied and recorded. Adjustments to differences in academic terms, class meeting times, teaching styles and similar issues will be closely monitored. It is hoped that this experiment will provide long-range planners the kind of information which they will need when designing large-scale educational telecommunications systems for the future.

Down, K. S.↗

The challenge for improved air cargo capability

Requirements for a strategic air cargo capability are considered. Practical national resource investment considerations dictate that future military strategic airlift planners regard civil capabilities as an integral part of the solution. Attention is given to the military needs for airlift, the civil-military airlift commonality, the present air cargo business, growth projections for civil air cargo, future air cargo business, the introduction date for a dedicated airfreighter, and the demands for transport aircraft.

Vaughan, J.↗

Large-scale V/STOL testing

Several facets of large-scale testing of V/STOL aircraft configurations are discussed with particular emphasis on test experience in the Ames 40- by 80-foot wind tunnel. Examples of powered-lift test programs are presented in order to illustrate tradeoffs confronting the planner of V/STOL test programs. It is indicated that large-scale V/STOL wind-tunnel testing can sometimes compete with small-scale testing in the effort required (overall test time) and program costs because of the possibility of conducting a number of different tests with a single large-scale model where several small-scale models would be required. The benefits of both high- and full-scale Reynolds numbers, more detailed configuration simulation, and number and type of onboard measurements increase rapidly with scale. Planning must be more detailed at large scale in order to balance the trade-offs between the increased costs, as number of measurements and model configuration variables increase and the benefits of larger amounts of information coming out of one test.

Koenig, D. G.↗

Self-navigating robot

Rangefinding equipment and onboard navigation system determine best route from point to point. Research robot has two TV cameras and laser for scanning and mapping its environment. Path planner finds most direct, unobstructed route that requires minimum expenditure of energy. Distance is used as measure of energy expense, although other measures such as time or power consumption (which would depend on the topography of the path) may be used.

Thompson, A. M.↗

STARPAHC systems report. Volume 1: Executive summary

A joint NASA and Department of Health, Education, and Welfare/Indian Health Services demonstration project entitled Space Technology Applied to Rural Papago Advanced Health Care (STARPAHC) was conducted to develop a solution for delivering quality health care to people in remote geographical areas. The STARPAHC concept verified the feasibility of telemedicine plus physician assistant - under the direction of a physician as a means of delivering quality health care. The two years of operational evaluation have provided considerable medical and engineering data which will be valuable to the designers and planners of future health care systems on earth and in space.

Source record↗

Deep Space Network to Viking Orbiter telecommunications performance during the Viking extended mission, November 1976 - February 1978

The telecommunications performance during the Viking extended mission, starting with the completion of the first superior conjunction in November 1976 and ending with the jettison of the VO-2 aft bioshield early in March 1978 is discussed. Viking Orbiter activities and problems, the ground system activities and problems, radio science activities, and communication link performance are included. The substantial involvement of the Deep Space Network and the coordination of their telecommunication planners with Viking Project telecommunications analysts in the planning and execution of complex Viking Orbiter sequences are discussed.

Taylor, F. H. J.↗

Space life sciences pilot user development program for the midwest region

The use of space for research by the life science community was promoted through a series of informal one-day seminars with personal follow-up as circumstances dictated. The programs were planned to: (1) describe the space shuttle vehicle and some of its intended uses; (2) discuss problems of manned space flight; (3) stimulate ideas for biological research in space; (4) discuss costs and potential for industrial and; government sponsorship; and (5) show the researcher or corporate planner how to become an active participant in life sciences research in space. An outline of seminar topics is included along with a description of the seminar organization and lists of participants and materials used.

Source record↗

Parametric design of ground data processing/support systems for advanced sensor systems

A parametric system design technique has been applied to ground data processing/support systems for advanced sensor applications. The system establishes a direct link between budget analysts and system planners. Three primary phases are identified: the definition of requirements, system design, and system costing. The system is evaluated for three cases: (1) a study of ground data handling systems for earth resource satellites, (2) a ground data mass storage and processing system for agricultural remote-sensing studies, and (3) a parametric study of shuttle era data processing support required for atmospheric and space physics.

Denny, C.↗

Large engines and vehicles, 1958

During the mid-1950s, the Air Force sponsored work on the feasibility of building large, single-chamber engines, presumably for boost-glide aircraft or spacecraft. In 1956, the Army missile development group began studies of large launch vehicles. The possibilities opened up by Sputnik accelerated this work and gave the Army an opportunity to bid for the leading role in launch vehicles. The Air Force had the responsibility for the largest ballistic missiles and hence a ready-made base for extending their capability for spaceflight. During 1958, actions taken to establish a civilian space agency, and the launch vehicle needs seen by its planners, added a third contender to the space vehicle competition. These activities during 1958 are examined as to how they resulted in the initiation of a large rocket engine and the first large launch vehicle.

Source record↗

Mercury orbiter transport study

A data base and comparative performance analyses of alternative flight mode options for delivering a range of payload masses to Mercury orbit are provided. Launch opportunities over the period 1980-2000 are considered. Extensive data trades are developed for the ballistic flight mode option utilizing one or more swingbys of Venus. Advanced transport options studied include solar electric propulsion and solar sailing. Results show the significant performance tradeoffs among such key parameters as trip time, payload mass, propulsion system mass, orbit size, launch year sensitivity and relative cost-effectiveness. Handbook-type presentation formats, particularly in the case of ballistic mode data, provide planetary program planners with an easily used source of reference information essential in the preliminary steps of mission selection and planning.

Friedlander, A. L.↗

An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem

New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

Schlagheck, R. A.↗

Advanced marine information delivery

The paper examines the information delivery challenges of the follow-on programs to Seasat-1 as they may progress through the next decade. These challenges include coping with the vast amounts of data to be transferred, fulfilling the temporal requirements on data delivery, and the tradeoffs and developments needed to accomplish the various levels of processing required to convert sensor output into useful information. A need for critical development is clearly identifiable in the areas of (1) low cost ground terminals capable of image extraction and image correlation; (2) dynamic data assimilation to accommodate forecasters; (3) low resolution onboard correlators; and (4) low cost user advisory (display) terminals. The system planners for the Ocean Satellite advanced programs are using an end-to-end data systems approach in meeting these challenges.

Durstenfeld, R.↗

User requirements of solar-terrestrial predictions for spacecraft applications

Areas which are influenced by solar-terrestrial coupling effects and which are internal to the Earth's magnetosphere are of interest to mission planners, spacecraft hardware designers, and those engaged in the operation of already orbiting manned or unmanned spacecraft. Accurate models are needed to predict energetic particle flux density, interactions between low energy (10 eV to 100 eV) near-Earth plasma and space systems, and neutral atmospheres. Parameters required for each of these areas are discussed.

Vampola, A. L.↗