Search NASA⌕ Search

SEARCH · Search NASA

Results for “security operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

NASA's Earth Observing System (EOS): Delivering on the Dream, Today and Tomorrow

This paper describes the successful operations of NASA's Earth Observing System (EOS) satellites over the past 10 years and the plans for the future. Excellent operations performance has been a key factor in the overall success of EOS. The EOS Program was conceived in the 1980s and began to take shape in the early 1990s. EOS consists of a series of satellites that study the Earth as an interrelated system. It began with the launch of Terra in December 1999, followed by Aqua in May 2002, and Aura in July 2004. A key EOS goal is to provide a long-term continuous data set to enable the science community to develop a better understanding of land, ocean, and atmospheric processes and their interactions. EOS has produced unprecedented amounts of data which are used all over the world free of charge. Mission operations have resulted in data recovery for Terra, Aqua, and Aura that have consistently exceeded mission requirements. The paper describes the ground systems and organizations that control the EOS satellites, capture the raw data, and distribute the processed science data sets. The paper further describes how operations have evolved since 1999. Examples of this evolution include (a) the implementation of new mission safety requirements for orbital debris monitoring; (b) technology upgrades to keep facilities at the state of the art; (c) enhancements to meet changing security requirements; and (d) operations management of the 2 international Earth Observing Constellations of 11 satellites known as the "Morning Constellation" and the "A-Train". The paper concludes with a view into the future based on the latest spacecraft status, lifetime projections, and mission plans.

Kelly, Angelita C.↗

NAVIGATING A QUALITY ROUTE TO A NATIONAL SAFETY AWARD

Deming quality methodologies applied to safety are recognized with the National Safety Council's annual Robert W. Campbell Award. Over the last ten years, the implementation of Statistical Process Control and quality methodologies at the U.S. Department of Energy's Hanford Site have contributed to improved safety. Improvements attributed to Statistical Process Control are evidenced in Occupational Safety and Health records and documented through several articles in Quality Progress and the American Society of Safety Engineers publication, Professional Safety. Statistical trending of safety, quality, and occurrence data continues to playa key role in improving safety and quality at what has been called the world's largest environmental cleanup project. DOE's Hanford Site played a pivotal role in the nation's defense beginning in the 1940s, when it was established as part of the Manhattan Project. After more than 50 years of producing material for nuclear weapons, Hanford, which covers 586 square miles in southeastern Washington state, is now focused on three outcomes: (1) Restoring the Columbia River corridor for multiple uses; (2) Transitioning the central plateau to support long-term waste management; and (3) Putting DOE assets to work for the future. The current environmental cleanup mission faces challenges of overlapping technical, political, regulatory, environmental, and cultural interests. From Oct. 1, 1996 through Sept. 30, 2008, Fluor Hanford was a prime contractor to the Department of Energy's Richland Operations Office. In this role, Fluor Hanford managed several major cleanup activities that included dismantling former nuclear-processing facilities, cleaning up the Site's contaminated groundwater, retrieving and processing transuranic waste for shipment and disposal off-site, maintaining the Site's infrastructure, providing security and fire protection, and operating the Volpentest HAMMER Training and Education Center. On October 1,2008, a transition occurred that changed Fluor's role at Hanford. Fluor's work at Hanford was split in two with the technical scope being assumed by the CH2M HILL Plateau Remediation Company (CHPRC) CHPRC is now spearheading much of the cleanup work associated with former nuclear-processing facilities, contaminated groundwater, and transuranic waste. Fluor is an integrated subcontractor to CH PRC in this effort. In addition, at the time of this writing, while the final outcome is being determined for the new Mission Support Contract, Fluor Hanford has had its contract extended to provide site-wide services that include security, fire protection, infrastructure, and operating the HAMMER facility. The emphasis has to be on doing work safely, delivering quality work, controlling costs, and meeting deadlines. Statistical support is provided by Fluor to the PRC, within Fluor Hanford, and to a third contractor, Washington Closure Hanford, which is tasked with cleaning up approximately 210 square miles designated as the Columbia River corridor along the outer edge of the Hanford Site. The closing months of Fluor Hanford's 12 year contract were busy, characterized by special events that capped its work as a prime cleanup contractor, transitions of work scope and personnel, and the completion numerous activities. At this time, Fluor's work and approach to safety were featured in state and national forums. A 'Blockbuster' presentation at the Washington State Governor's Industrial Safety Conference in September 2008 featured Fluor Hanford's Chief Operating Officer, a company Safety Representative, and me. Simultaneously, an award ceremony in Anaheim, Calif. recognized Fluor Hanford as the winner of the 2008 Robert W. Campbell Award. The Robert W. Campbell Award is co-sponsored by Exxon Mobil Corporation and the National Safety Council. Named after a pioneer of industrial safety, the Campbell Award recognizes organizations that demonstrate how integration of environmental, health and safety (EHS) management into business operations is a cornerstone of their corporate success. Fluor Hanford received the award for corporations with more than 1,000 employees. Campbell Award winners undergo rigorous assessments that include site visits and comprehensive evaluations of their commitment to, and implementation of, EHS practices. Award winners work with an international partnership of 21 organizations to develop case studies that illustrate their superior EHS programs and best practices, for use by top business and engineering schools worldwide. Quality methodologies in place at Fluor Hanford played a key role in the award process. Fluor Hanford's integrated use of Statistical Process Control and Pareto Charts for analyzing and displaying EHS performance were viewed favorably by the award judges.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

GLIMPSE of Future Power Grid Models

Power grid is one of the critical national infrastructures with social, economics, and national security impacts. Particularly, power distribution systems represent part of the infrastructure between power distribution substations and customers such as residential, commercial, and industrial. To address various grid modernization challenges, state-of-the-art algorithms and methodologies have been developed to deploy, operate, and expand a secure and resilient power grid. At the same time, there is a need to develop capabilities to assist power grid stakeholders to quickly get insight into the design and structure of the grid. Data visualization is a key approach to comprehend and understand complex systems such as the power grid. We present GLIMPSE Grid Layout Interface for Model Preview and System Exploration), a graph-based semantic-aware application to visualize and update distribution power grid models. The GLIMPSE can be used with standard IEEE models to search and highlight power grid objects such as generators, loads, overhead lines, etc. Additionally, it supports updating attributes and model export to integrate with GridLAB-D simulations.

Cybersecurity, power grid, visualization↗

Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Waste Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd{sup 3}) (157,437 cubic feet [ft{sup 3}]). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd{sup 3} (756,999 ft{sup 3}) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd{sup 3} (0.9 million ft{sup 3}). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls [PCBs]) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the U.S. Department of Energy, Nevada Operations Office (DOE/NV) 325, Nevada Test Site Waste Acceptance Criteria (NTSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NTS Class III Permit and the NTSWAC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Multi-Site Networked Hardware-in-Loop Platform for Evaluation of Interoperability and Distributed Intelligence at Grid-Edge

Electric power systems have experienced large increases in the number of intelligent, connected and controllable devices being deployed, leading to a high degree of distributed intelligence at the grid-edge. These devices, both utility-owned and consumer-owned, include but are not limited to: renewable generation sources, energy storage, remote switches, voltage regulators, and smart controllable loads such as electric vehicles. These new devices provide significant potential for increased operational flexibility that can be leveraged to achieve system reconfiguration, resiliency improvements, power quality improvements, and distribution system automation. However, there are two significant challenges that must be addressed before these assets can be leveraged for operations: interoperability and system level validation prior to deployment. Because of the complexity of distributed control systems, and their interactions with legacy centralized controls, a purely simulations-based approach for pre-deployment validation is not sufficient. It requires hardware-in-loop testing to emulate the operational hardware devices and evaluate their performance. Additionally, securely integrating multiple test facilities at utility operators and vendors might enable rapid scale-up of evaluation platforms, and remove the need for multiple expensive standalone installations. Presented in this paper, is the development of a multi-site evaluation platform that employs Advanced Distribution Management Systems (ADMS), distributed control devices, real-time hardware-in-loop assets, secure communication links, and protocol adapters. This platform uses standards-based approaches and open-source tools, and hence can serve as a template for other researchers and institutions to implement their multi-site evaluation frameworks for pre-deployment testing.

Essakiappan, Somasundaram↗

A Year of Exceptional Achievements FY 2008

2008 highlights: (1) Stockpile Stewardship and Complex Transformation - LLNL achieved scientific breakthroughs that explain some of the key 'unknowns' in nuclear weapons performance and are critical to developing the predictive science needed to ensure the safety, reliability, and security of the U.S. nuclear deterrent without nuclear testing. In addition, the National Ignition Facility (NIF) passed 99 percent completion, an LLNL supercomputer simulation won the 2007 Gordon Bell Prize, and a significant fraction of our inventory of special nuclear material was shipped to other sites in support of complex transformation. (2) National and Global Security - Laboratory researchers delivered insights, technologies, and operational capabilities that are helping to ensure national security and global stability. Of particular note, they developed advanced detection instruments that provide increased speed, accuracy, specificity, and resolution for identifying and characterizing biological, chemical, nuclear, and high-explosive threats. (3) Exceptional Science and Technology - The Laboratory continued its tradition of scientific excellence and technical innovation. LLNL scientists made significant contributions to Nobel Prize-winning work on climate change. LLNL also received three R&D 100 awards and six Nanotech 50 awards, and dozens of Laboratory scientists and engineers were recognized with professional awards. These honors provide valuable confirmation that peers and outside experts recognize the quality of our staff and our work. (4) Enhanced Business and Operations - A major thrust under LLNS is to make the Laboratory more efficient and cost competitive. We achieved roughly $75 million in cost savings for support activities through organizational changes, consolidation of services, improved governance structures and work processes, technology upgrades, and systems shared with Los Alamos National Laboratory. We realized nonlabor cost savings of $23 million. Severe fiscal constraints necessitated a major workforce restructuring and reduction.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Security Policies for Mitigating the Risk of Load Altering Attacks on Smart Grid Systems

While demand response programs implement energy efficiency and power quality objectives, they bring potential security threats to the Smart Grid. The ability to influence load in a system enables attackers to cause system failures and impacts the quality and integrity of power delivered to customers. This paper presents a security mechanism to monitor and control load according to a set of security policies during normal system operation. The mechanism monitors, detects, and responds to load altering attacks. We examined the security requirements of Smart Grid stakeholders and constructed a set of load control policies enforced by the mechanism. We implemented a proof of concept prototype and tested it using the simulation environment. By enforcing the proposed policies in this prototype, the system is maintained in a safe state in the presence of load drop attacks.

Ryutov, Tatyana↗

Hyperspectral Sensors Final Report CRADA No. TC02173.0

This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Science Applications International Corporation (SAIC), National Security Space Operations/SRBU, to develop long-wave infrared (LWIR) hyperspectral imaging (HSI) sensors for airborne and potentially ground and space, platforms. The overarching purpose of the CRADA project was to facilitate the transfer of the necessary technology from LLNL to SAIC thereby allowing the U.S. Government to procure LWIR HSI sensors from this company. The purpose of the initial activities involving BIG GREEN sensors was to meet the customer’s delivery schedule for all of the BIG GREEN sensors. BIG GREEN is a complex and sophisticated instrument, and the requisite technology must be imparted to SAIC to allow them to successfully produce the instrument. It was expected that in the first few months of joint work, sensor models (performance, structural, thermal and optical) would be provided to SAIC. Additionally, existing drawings, assembly procedures, test procedures, test equipment definitions, software descriptions and code, and complete Bills of Material (BOM) would be provided. SAIC would analyze the models, purchase material per the BOM, create its own set of production drawings, models and procedures, and identify areas of concern or where further information transfer is required.

47 OTHER INSTRUMENTATION↗

Hyperspectral Sensors Final Report CRADA No. TC02173.0

This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Science Applications International Corporation (SAIC), National Security Space Operations/SRBU, to develop longwave infrared (LWIR) hyperspectral imaging (HSI) sensors for airborne and potentially ground and space, platforms. LLNL has designed and developed LWIR HSI sensors since 1995. The current generation of these sensors has applications to users within the U.S. Department of Defense and the Intelligence Community. User needs are for multiple copies provided by commercial industry. To gain the most benefit from the U.S. Government’s prior investments in LWIR HSI sensors developed at LLNL, transfer of technology and know-how from LLNL HSI experts to commercial industry was needed. The overarching purpose of the CRADA project was to facilitate the transfer of the necessary technology from LLNL to SAIC thereby allowing the U.S. Government to procure LWIR HSI sensors from this company.

47 OTHER INSTRUMENTATION↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

1MV Febetron Pulse Generator Operator's Manual

The Febetron Pulse Generator (FPG) is an experimental assembly used to store electrical energy for a period of time and then release that energy over a short duration pulse to achieve high instantaneous power outputs. The FPG is an ideal device to be used for a variety high energy physics experiments. For mobility and ease of repeatable operation, the FPG is secured on a rolling test fixture and paired with a diagnostic and controls rack. The combination of the FPG, test fixture cart, SF6 gas cart, and controls rack is identified as the Pulse Generator Testing Assembly (PGTA). This document outlines all necessary information regarding the working principles, assembly/disassembly, maintenance, operation, uses, hazards, and experimental procedures of the 1 Mega Volt (MV) PGTA. This document, in addition to the manufacturer’s manuals, should be utilized as a reference whenever working with the PGTA and any of its components.

42 ENGINEERING↗

Design of infrared astronomical satellite /IRAS/ primary mirror mounts

The design of an operational mount to rigidly secure the primary mirror to its baseplate without the introduction of figure error always proves to be a major task on diffraction limited optical systems. A summary of the design of the Infrared Astronomical Satellite (IRAS) primary mirror mount is given. The mirror was designed to be alligned and tested at room temperature and operated in a zero 'g' field at temperatures of 2K. To minimize overstressing, a stiffness requirement of greater than 150 Hz was required for cold launch and room temperature vibration acceptance testing. Additional isolation was required to minimize strains, introduced via the mounting base, due to thermal and mechanical distortions.

Schreibman, M.↗

Learning Competitive Intelligence from a Bunch of Screwballs

Idaho National Laboratory is the Department of Energy’s (DOE) lead lab for nuclear energy research and is dedicated to supporting the advancement of missions in nuclear energy research, energy and environment, and national security. The laboratory is operated by Battelle Energy Alliance (BEA) and participates both independently and jointly with other labs in the support of work for the DOE and other government organizations. The Information Management department is a key support organization whose purpose is to enable the three key areas supporting the Laboratory mission, Nuclear Energy, National and Homeland Security, and Energy and Environment, are successful. The challenge that we face is having relevant information about what these key areas of the Laboratory are working on and how we can best support them in achieving overall mission success. In addition, one of the major challenges that they face comes with knowing their customers and their customer’s needs so that they can successfully execute on their mission. Technology Application Organizations today are dependent on understanding their customers and competitors so that they can respond accordingly, but this can be a difficult and vexing challenge. Customers do not always reveal all of their needs and competitors rarely come out and reveal what they are doing, but this does not mean that hints about their plans are not abundant in information that is readily available. The challenge has always been how to keep track of all that is happening and converting that into useful information. Taking the lead from the “Screwball Division” from World War II, we have the tools available to automate this process and start to mine the Internet to get clues of what our customers and competitors are actively working on. By looking at what is being said and relating that to what else is being said, we can build competitive intelligence and act upon this to further our organizational objectives.

99 GENERAL AND MISCELLANEOUS↗

On Secured Spinning Reserve Deployment of Energy-Limited Resources Against Contingencies

Featured with fast response abilities and high ramp rates, energy storage systems (ESS), such as pumped-storage hydropower (PSH) plants and battery storage systems (BSS), are considered as key first-responders to provide spinning reserve in response to system contingencies. However, ESSs are energy-limited resources, and their sustained spinning reserve deployment is restricted by the stored energy and available capacity. Indeed, the spinning reserve deployment against contingencies may deviate actual state-of-charge (SOC) from the scheduled value, inducing potential SOC boundary violations and non-dispatchability in later hours. This paper proposes the post-contingency operation model and the spinning reserve secure constraints to address these issues. The post-contingency operation model describes that spinning reserve from ESSs is promptly deployed when contingency occurs, and then gradually substituted by quick-start units when they are switched online. By leveraging this operation strategy, spinning reserve secure constraints in terms of SOC headrooms are adopted to guarantee its deplorability. Furthermore, a modified IEEE 118-bus system with multiple PSHs and BSSs is used to verify the proposed approach.

13 HYDRO ENERGY↗

Chapter Nine - Automated Optimal Control in Energy Systems: The Reinforcement Learning Approach

With the development of smart grid technologies an increasing number of new devices and participants have joined modern energy systems and are inevitably making them more complicated and interdependent than ever. Optimally controlling such a complex energy system and maintaining its operation in a high-efficient, secure, and resilient manner are challenging tasks to the system operators. Fortunately, the revolution in deep learning and artificial intelligence (AI), both from hardware and algorithms perspectives, has provided new ideas and solutions to many previously intractable problems. As a result, this advance in computer science also sparked great research interests in utilizing AI in solving engineering problems related to the modern energy systems. Among many AI techniques, deep reinforcement learning (DRL) has demonstrated great potential for solving sequential optimization problems, which are very common in the engineering domains. Its ability to handle nonlinearity and stochasticity in controlled systems has out-competed many traditional optimal control algorithms. Therefore in this chapter, we focus on the state-of-the-art of DRL concepts and related algorithms, compare their pros and cons with traditional optimal control approaches and discuss the typical workflow for leveraging RL in solving complex problems in modern energy systems.

artificial intelligence↗

Stormwater Pollution Prevention Plan, TA-03-22 Power and Steam Plant, Revision 4: LANS Archived 2019

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector O-Steam Electric Generating Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-22 Power and Steam Plant at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-22 Power and Steam Plant and associated areas. The current permit expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan, TA-03-38 Carpenter's Shop, Revision 4: LANS Archived 2019

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector A–Timber Products, Subsector A4 (Wood Products Facilities not elsewhere classified) as a guide. The applicable stormwater discharge permit is EPA General Permit Registration # NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). This SWPPP applies to discharges of stormwater from the operational areas of the TA-03-38 Carpenter’s Shop at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-03-38 Carpenter’s Shop and associated areas. The current permit expires at midnight on June 4, 2020. As the LANS contract ended for LANL MSGP facilities on October 31, 2018, a Notice of Termination (NOT) for permit coverage was filed and is effective as of 11/02/18. A copy of the NOT acknowledgment is located in Appendix C of this SWPPP. This is the archived and final revision of the SWPPP for LANS.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan, TA-60-02 Salvage/Warehouse, Revision 4: LANS Archived 2019

This Storm Water Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the Multi-Sector General Permit for Storm Water Discharges Associated with Industrial Activity (U.S. EPA, June 2015) issued by the U.S. Environmental Protection Agency (EPA) for the National Pollutant Discharge Elimination System (NPDES) and using the industry specific permit requirements for Sector P-Land Transportation and Warehousing as a guide. The applicable stormwater discharge permit is EPA General Permit Registration Number NMR053915 (Los Alamos National Security (LANS) (U.S. EPA, June 2015). This SWPPP applies to discharges of stormwater from the operational areas of the TA-60-02 Salvage and Warehouse facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Los Alamos National Security, LLC (LANS). Throughout this document, the term “facility” refers to the TA-60-02 Salvage/ Warehouse and associated areas. The current permit expires at midnight on June 4, 2020. As the LANS contract ended for LANL MSGP facilities on October 31, 2018, a Notice of Termination (NOT) for permit coverage was filed and is effective as of 11/02/18. A copy of the NOT acknowledgment is located in Appendix C of this SWPPP. This is the archived and final revision of the SWPPP for LANS.

54 ENVIRONMENTAL SCIENCES↗