Search NASA⌕ Search

SEARCH · Search NASA

Results for “variable resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Addressing Market Issues in Electrical Power Systems with Large Shares of Variable Renewable Energy

This paper reports recent findings from IEA Wind TCP Task 25, which compiles international experiences and research related to large-scale integration of wind and other renewable energy. In the paper, we address the main challenges for market integration of variable renewable energy, relating to price formation, cost recovery, balancing and other grid services. The paper gives an overview of recent scenario studies on electricity price impacts of (1) various generation, energy storage and demand types in different markets, and (2) different market designs and energy/climate policies. Studying markets with very high shares of variable renewable energy requires an improved set of analysis tools for forecasting market outcomes, estimating flexibility needs and sources, and assessing resource adequacy. Key market features need to be investigated within these improved analytical capabilities for systems transitioning to high shares of variable renewable energy, storage and flexible demand. System services that can be supported by markets will likely need to be revisited. Finally, this paper identifies open questions and suggested future market design work for supporting systems with very high shares of variable renewable energy, which are to be addressed in follow-up work of Task 25 collaborative research.

cost recovery↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demand Response for Ancillary Services

Many demand response resources are technically capable of providing ancillary services. In some cases, they can provide superior response to generators, as the curtailment of load is typically much faster than ramping thermal and hydropower plants. Analysis and quantification of demand response resources providing ancillary services is necessary to understand the resources economic value and impact on the power system. Methodologies used to study grid integration of variable generation can be adapted to the study of demand response. In the present work, we describe and illustrate a methodology to construct detailed temporal and spatial representations of the demand response resource and to examine how to incorporate those resources into power system models. In addition, the paper outlines ways to evaluate barriers to implementation. We demonstrate how the combination of these three analyses can be used to translate the technical potential for demand response providing ancillary services into a realizable potential.

Demand Response - Ancillary Services - Industrial ↗

Demand Response Resources for Energy and Ancillary Services (Presentation)

Demand response (DR) resources present a potentially important source of grid flexibility particularly on future systems with high penetrations of variable wind an solar power generation. However, DR in grid models is limited by data availability and modeling complexity. This presentation focuses on the co-optimization of DR resources to provide energy and ancillary services in a production cost model of the Colorado test system. We assume each DR resource can provide energy services by either shedding load or shifting its use between different times, as well as operating

14 SOLAR ENERGY↗

Power Law Growth and Delayed Feedbacks in Socio-Hydrological Systems

Water infrastructure dynamics result from coupled social and physical hydrological processes embedded in “socio-hydrological systems” (SHSs). Freshwater fuels socioeconomic activity, which in turn exerts pressure on water resources through increased water demand and water quality degradation. Many factors emphasize the need for quantitative tools to predict the future of these systems, including SHS failures due to growing water scarcity from population growth and climate change. However, unfolding the interactions between social and hydrological factors continues to resist theoretical treatment, impeding progress toward a predictive framework. To resolve this issue, we propose and evaluate time delays as surrogates for the social dynamics in SHS models. This approach permits the development of models that describe SHS dynamics in terms of observable, physical, hydrological state variables. We apply this approach to two case studies: (a) reservoir storage capacity growth in the world and the U.S. Water Resources Regions and (b) global water withdrawals. Substantial variability was identified in empirical estimates of growth rates and time delays. Reservoir construction typically follows a saturating, logistic curve with periodic, punctuated equilibria, separated by delays ranging from 5 to 20 years both globally and regionally. In contrast, global water withdrawal data display faster-than-exponential growth, characteristic of a positive feedback through which water use drives further water development. Historical analysis suggests that growth trends in water resources systems are superimposed by recurring periods of innovation and inactivity which are indicative of slow memory dissipation and delayed effects of past water use on current water infrastructure decisions.

54 ENVIRONMENTAL SCIENCES↗

NREL Integrate: RCS-4-42326

OMNETRIC Corp., Duke Energy, CPS Energy, and the University of Texas at San Antonio (UTSA) created a project team to execute the project 'OpenFMB Reference Architecture Demonstration.' The project included development and demonstration of concepts that will enable the electric utility grid to host larger penetrations of renewable resources. The project concept calls for the aggregation of renewable resources and loads into microgrids and the control of these microgrids with an implementation of the OpenFMB Reference Architecture. The production of power from the renewable resources that are appearing on the grid today is very closely linked to the weather. The difficulty of forecasting the weather, which is well understood, leads to difficulty in forecasting the production of renewable resources. The current state of the art in forecasting the power production from renewables (solar PV and wind) are accuracies in the range of 12-25 percent NMAE. In contrast the demand for electricity aggregated to the system level, is easier to predict. The state of the art of demand forecasting done, 24 hours ahead, is about 2-3% MAPE. Forecasting the load to be supplied from conventional resources (demand minus generation from renewable resources) is thus very hard to forecast. This means that even a few hours before the time of consumption, there can be considerable uncertainty over what must be done to balance supply and demand. Adding to the problem of difficulty of forecasting, is the reality of the variability of the actual production of power from renewables. Due to the variability of wind speeds and solar insolation, the actual output of power from renewable resources can vary significantly over a short period of time. Gusts of winds result is variation of power output of wind turbines. The shadows of clouds moving over solar PV arrays result in the variation of power production of the array. This compounds the problem of balancing supply and demand in real time. Establishing a control system that can manage distribution systems with large penetrations of renewable resources is difficult due to two major issues: (1) the lack of standardization and interoperability between the vast array of equipment in operation and on the market, most of which use different and proprietary means of communication and (2) the magnitude of the network and the information it generates and consumes. The objective of this project is to provide the industry with a design concept and tools that will enable the electric power grid to overcome these barriers and support a larger penetration of clean energy from renewable resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Capturing the Impact of Storage and Other Flexible Technologies on Electric System Planning

Power systems of the future are likely to require additional flexibility. This has been well studied from an operational perspective, but has been more difficult to incorporate into capacity expansion models (CEMs) that study investment decisions on the decadal scale. There are two primary reasons for this. First, the necessary input data, including cost and resource projections, for flexibility options like demand response and storage are significantly uncertain. Second, it is computationally difficult to represent both investment and operational decisions in detail, the latter being necessary to properly value system flexibility, in CEMs for realistically sized systems. In this work, we extend a particular CEM, NREL's Resource Planning Model (RPM), to address the latter issue by better representing variable generation impacts on operations, and then adding two flexible technologies to RPM's suite of investment decisions: interruptible load and utility-scale storage. This work does not develop full suites of input data for these technologies, but is rather methodological and exploratory in nature. We thus exercise these new investment decisions in the context of exploring price points and value streams needed for significant deployment in the Western Interconnection by 2030. Our study of interruptible load finds significant variation by location, year, and overall system conditions. Some locations find no system need for interruptible load even with low costs, while others build the most expensive resources offered. System needs can include planning reserve capacity needs to ensure resource adequacy, but there are also particular cases in which spinning reserve requirements drive deployment. Utility-scale storage is found to require deep cost reductions to achieve wide deployment and is found to be more valuable in some locations with greater renewable deployment. Differences between more solar- and wind-reliant regions are also found: Storage technologies with lower energy capacities are deployed to support solar deployment, and higher energy capacity technologies support wind. Finally, we identify potential future research and areas of improvement to build on this initial analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Universal Compiling and (No-)Free-Lunch Theorems for Continuous-Variable Quantum Learning

Quantum compiling, where a parameterized quantum circuit is trained to learn a target unitary, is an important primitive for quantum computing that can be used as a subroutine to obtain optimal circuits or as a tomographic tool to study the dynamics of an experimental system. While much attention has been paid to quantum compiling on discrete-variable hardware, less has been paid to compiling in the continuous-variable paradigm. Here we motivate several, closely related, short-depth continuous-variable algorithms for quantum compilation. We analyze the trainability of our proposed cost functions and numerically demonstrate our algorithms by learning arbitrary Gaussian operations and Kerr nonlinearities. We further make connections between this framework and quantum learning theory in the continuous-variable setting by deriving no-free-lunch theorems. These generalization bounds demonstrate a linear resource reduction for learning Gaussian unitaries using entangled coherent-Fock states and an exponential resource reduction for learning arbitrary unitaries using two-mode-squeezed states.

97 MATHEMATICS AND COMPUTING↗

Budget Period 2 Summary Report Part 3: Hywind Maine Project

This project was performed under the Work for Others—Funds in Agreement FIA-14-1793 between Statoil and the Alliance for Sustainable Energy, manager and operator of the National Renewable Energy Laboratory (NREL). To support the development of a 6-MW spar-mounted offshore wind turbine, NREL performed tasks on behalf of Statoil in the following three categories: 1. Design and analysis 2. Wake modeling 3. Concept resource assessment. This document summarizes the work performed in Work Package (WP) 3, where the spatial variability and influence that relevant parameters have on levelized cost of energy (LCOE) were analyzed. The study allows Statoil to identify areas of interest for floating wind technology and the Hywind concept in particular. This report describes the results of a study that NREL conducted to provide targeted insight into the United States (U.S.) offshore wind resource area that Statoil can use for taking strategic decisions about how to commercialize and market the company’s Hywind technology. The report centers on a new spatio-economic methodology that NREL has developed to assess how variability in spatial parameters can influence levelized cost of energy (LCOE) for different technologies. The method combines wind plant performance modeling, economic modeling, and national geospatial data layers to estimate the cost of potential projects using Hywind technology, considering the following parameters: • Water depth • Possible inshore assembly areas • Wind resource • Existing grid features and potential connection points • Wave regime • Environmentally sensitive areas • Seabed conditions • Competitive use areas • Prospective staging ports The scope of the study covers the major offshore regions within the contiguous United States, including the Atlantic Ocean, Gulf of Mexico, Pacific Ocean, and the Great Lakes. The spatio-economic assessment extends to 92 km (50 nm) off of the nearest land mass, consistent with the available data on wind characteristics. The study is restricted to those locations that meet the depth criteria for Hywind technology—defined as water depths between 100 m to 1,000 m—and only considered sites with net capacity factors that exceed 30%.

99 GENERAL AND MISCELLANEOUS↗

Stochastic population dynamics under resource constraints

This paper investigates the population growth of a certain species in which every generation reproduces thrice over a period of predefined time, under certain constraints of resources needed for survival of population. We study the survival period of a species by randomizing the reproduction probabilities within a window at same predefined ages and the resources are being produced by the working force of the population at a variable rate. This randomness in the reproduction rate makes the population growth stochastic in nature and one cannot predict the exact form of evolution. Hence we study the growth by running simulations for such a population and taking an ensemble averaged over 500 to 5000 such simulations as per the need. While the population reproduces in a stochastic manner, we have implemented a constraint on the amount of resources available for the population. This is important to make the simulations more realistic. The rate of resource production then is tuned to find the rate which suits the survival of the species. We also compute the mean life time of the species corresponding to different resource production rate. Study for these outcomes in the parameter space defined by the reproduction probabilities and rate of resource production is carried out.

97 MATHEMATICS AND COMPUTING↗

Financial-technical co-design for capital-intensive, resource-responsive energy systems

Because of their capital-intensive operation, wind energy systems that are competitive in terms of the cost of the energy that they produce lead to risk-reward trade-offs that make their business cases less favorable than those of conventional energy generation technologies. However, wind energy systems tend to be designed to maximize energy production or minimize cost of energy rather than to maximize their business cases. In this work, we attempt to exploit designs specifically tailored to business cases. We develop a novel framework for analyzing energy systems that ties their design variables to monthly operating incomes using simple models and historical hourly market and resource data. Using this approach, we demonstrate that for a wind site with abundant wind resource in the California Independent System Operator market, we can control the trade-off between mean and 5th percentile monthly returns by choosing the specific power of the turbine at a fixed modeled initial capital cost. Our framework gives a measure of the risk-reward spectrum of energy generation assets that could be built at a given site with respect to the sub-annual resource/market variation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wave resource characterization at regional and nearshore scales for the U.S. Alaska coast based on a 32-year high-resolution hindcast

A wave resource characterization was performed for the southern coast of Alaska based on a 32-year hindcast covering the period from 1979 to 2010. The characterization closely followed International Electrotechnical Commission (IEC) Technical Specifications. An unstructured-grid Simulating WAves Nearshore (SWAN) model, which had an approximate spatial resolution of 300 m within 30 km from the nearest shoreline, was developed. Additionally, extensive model validation and error characterization was performed. The model was found to perform well with an average absolute percent error of 8.6% in significant wave height, averaged over 18 buoys. Statistics for the six IEC wave resource parameters were calculated and aggregated at 20 km from shore to quantify the incident wave power and its variability at a regional scale. The southern coast of the Aleutian Archipelago was found to have the most available wave energy in the region. A nearshore resource assessment was performed by evaluating resource hotspots located 1 km from shore. More than 900 nearshore stations had an Optimum Hotspot Identifier value of 5 (kW/m) at diverse water depths, thereby positioning Alaska as a promising location for wave energy development.

54 ENVIRONMENTAL SCIENCES↗

Value of Demand Response: Quantities from Production Cost Modeling (Presentation)

Demand response (DR) resources present a potentially important source of grid flexibility particularly on future systems with high penetrations of variable wind and solar power generation. However, managed loads in grid models are limited by data availability and modeling complexity. This presentation focuses on the value of co-optimized DR resources to provide energy and ancillary services in a production cost model. There are significant variations in the availabilities of different types of DR resources, which affect both the operational savings as well as the revenue for each DR resource. The results presented include the system-wide avoided fuel and generator start-up costs as well as the composite revenue for each DR resource by energy and operating reserves. In addition, the revenue is characterized by the capacity, energy, and units of DR enabled.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PUEBLO OF ZIA RENEWABLE ENERGY DEVELOPMENT FEASIBILITY STUDY

The Pueblo of Zia will conduct a comprehensive feasibility study for best-use application(s) for development of renewable energy resources on its tribally held TRUST lands (i.e., Trust Lands of Zia Indian Reservation). The feasibility study is essential for determining the technical and economic viability of a future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe. Project Objectives: The feasibility study is essential for determining the technical and economic viability of future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe to: 1. Provide a balanced local renewable power supply for Zia Pueblo, its members, tribal offices, schools and buildings, and businesses on tribal lands 2. Provide a firm power supply for export and commercial market distribution 3. Provide economic development for the Tribe and its members, including job training and creation, each in accordance with the goals and objectives as conveyed by the Pueblo of Zia Tribal Council, Tribal Administration, and outlined in The Pueblo of Zia Comprehensive Plan and Pueblo of Zia — Zia Enterprise Zone Master Plan. A key goal of the study is to analyze the integrated development of solar, geothermal, and wind renewable energy resources at Zia Pueblo, with added potential to combine gas-fired generation to accomplish energy firming. Geothermal offers a base load source of energy, providing power continuously for end users. Wind and solar offer intermediate and peaking sources of energy, which can be harvested throughout the day, with periods of variable but predicable output. Variability will be managed in an integrated manner, using Zia Pueblo's combined renewable resources to generate high-quality power. Tasks are intended to collect, catalog, map, and analyze existing data on Zia Pueblo's renewable energy resource base and then match resource attributes with the most suitable renewable technologies for tribal energy consumption and needs. Also, key impacts on cultural and social values of Zia Pueblo will be addressed. Selected most favorable uses and technologies will be further investigated to determine initial feasibility and market for business development for up to six sites located on tribal land. The anticipated result will be the recommended development of sites that have sufficient background study completed to warrant a business plan, detailed engineering feasibility, and acquisition of project financing. Valuable technical and economic information will accrue from this study that may be applied to scale up or down the various power technology potential on Zia Pueblo for maximum benefit and best area(s) of application, project phasing and potential for future replicability and expansion.

14 SOLAR ENERGY↗

Grassland productivity responds unexpectedly to dynamic light and soil water environments induced by photovoltaic arrays

Abstract Agrivoltaic (AV) systems are designed to coproduce photovoltaic (PV) energy on lands simultaneously supporting agriculture (food/forage production). PV infrastructure in agroecosystems alters resources critical for plant growth, and water‐limited agroecosystems such as grasslands are likely to be particularly sensitive to the unique spatial and temporal patterns of incident sunlight and soil water inherent within AV systems. However, the impact of resource alteration on forage production, the primary ecosystem service from managed grasslands, is poorly resolved. Here, we evaluated seasonal patterns of soil moisture (SM) and diurnal variation in incident sunlight (photosynthetic photon flux density [PPFD]) in a single‐axis‐tracking AV system established in a formerly managed semiarid C 3 grassland in Colorado. Our goals were to (1) quantify dynamic patterns of PPFD and SM within a 1.2 MW PV array in a perennial grassland, and (2) determine how aboveground net primary production (ANPP) and photosynthetic parameters responded to the resource patterns created by the PV array. We hypothesized that spatial variability in ANPP would be strongly related to SM patterns, typical of most grasslands. We measured significant reductions in ANPP directly beneath PV panels, where SM and PPFD were both low. However, in locations with significantly increased SM from the shedding and redistribution of precipitation by PV panels, ANPP was not increased. Instead, ANPP was greatest in locations where plants were shaded in the afternoon but received high levels of PPFD in the morning hours, when air temperatures and vapor pressure deficits were relatively low. Thus, contrary to expectations, we found relatively weak relationships between SM and ANPP despite significant spatial variability in both. Further, there was little evidence that light‐saturated photosynthesis ( A sat ) and quantum yield of CO 2 assimilation (ϕCO 2 ) differed for plants growing directly beneath (lowest PPFD) versus between (highest PPFD) PV panels. Overall, the AV system established in this semiarid managed grassland did not alter patterns of ANPP in ways predictable from past studies of controls of ANPP in open grasslands. However, our results suggest that the diurnal timing of low versus high periods of PPFD incident on plants is an important determinant of productivity patterns in grasslands.

14 SOLAR ENERGY↗

System for NIS Forecasting Based on Ensembles Analysis

BMA-NIS is a package/library designed to be called by a script (e.g. Perl or Python). The software itself is written in the language of R. The software assists electric power delivery systems in planning resource availability and demand, based on historical data and current data variables. Net Interchange Schedule (NIS) is the algebraic sum of all energy scheduled to flow into or out of a balancing area during any interval. Accurate forecasts for NIS are important so that the Area Control Error (ACE) stays within an acceptable limit. To date, there are many approaches for forecasting NIS but all none of these are based on single models that can be sensitive to time of day and day of week effects.

Gosink, Luke↗

Investigation of Spatial Variation of Sea States Offshore of Humboldt Bay CA Using a Hindcast Model.

Spatial variability of sea states is an important consideration when performing wave resource assessments and wave resource characterization studies for wave energy converter (WEC) test sites and commercial WEC deployments. This report examines the spatial variation of sea states offshore of Humboldt Bay, CA, using the wave model SWAN . The effect of depth and shoaling on bulk wave parameters is well resolved using the model SWAN with a 200 m grid. At this site, the degree of spatial variation of these bulk wave parameters, with shoaling generally perpendicular to the depth contours, is found to depend on the season. The variation in wave height , for example, was higher in the summer due to the wind and wave sheltering from the protruding land on the coastline north of the model domain. Ho wever, the spatial variation within an area of a potential Tier 1 WEC test site at 45 m depth and 1 square nautical mile is almost negligible; at most about 0.1 m in both winter and summer. The six wave characterization parameters recommended by the IEC 6 2600 - 101 TS were compared at several points along a line perpendicular to shore from the WEC test site . As expected, these parameters varied based on depth , but showed very similar seasonal trends.

Dallman, Ann Renee↗

Round-Robin Interlaboratory Study on Rare-Earth Elements in U.S.-Based Geologic Materials

In a study funded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the University of North Dakota (UND) Energy and Environmental Research Center (EERC) performed a first-of-its-kind round-robin interlaboratory study (RRIS) to determine lab-to-lab and method-to-method variability in analyzing the rare earth element (REE) content of domestic resources. Analyses of REEs on eleven different materials were accomplished by the laboratories using four different procedures: ASTM D6357 (Procedure A), ASTM D4503 (Procedure B), an alternate in-house procedure for digestion and REE analysis (Procedure C), and neutron activation analysis (NAA). The results of the RRIS suggest that NAA is the most accurate and reliable method for many of the REEs in these types of materials; however, the method is limited in that it is able to determining only ten of the sixteen REEs. Five of the seven labs reporting data for Procedure A and three of the five labs reporting for Procedure B showed excellent performance in terms of repeatability, reproducibility, agreement with NAA, and SRM recoveries based on AOAC International guidelines on method performance. This indicates that when strictly followed these methods are suitable for REE determination in most materials, although are subject to the overall capabilities and experience of individual laboratories.

58 GEOSCIENCES↗