Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

STS-1 Forward RCS Oxidizer Tank Subsystem Failure Assessment

The launch of the Space Shuttle Columbia on STS-1 marked the beginning of a new era in American spaceflight. It was the only crewed first flight of a launch vehicle to date, and was also the first crewed system to use large solid rockets as primary propulsion. A potential disaster was narrowly averted at liftoff when an ignition overpressure pulse swept up the Shuttle stack. The frequency of this transient shock wave exceeded pre-launch predictions, and resulted in high, alternating normal accelerations along the length of the vehicle. Among the results of this unexpected loading was failure of an oxidizer tank support strut in the orbiter’s forward reaction control system module, which could have led to loss of the mission, crew, and vehicle. This particular incident is investigated in more detail using classical structural mechanics, and the results are discussed to provide additional insight.

Space Shuttle↗

STS-1 Forward RCS Oxidizer Tank Subsystem Preliminary Failure Assessment

The launch of the Space Shuttle Columbia on STS-1 marked the beginning of a new era in American spaceflight. It was the only crewed first flight of a launch vehicle to date, and was also the first crewed system to use large solid rockets as primary propulsion. A potential disaster was narrowly averted at liftoff when an ignition overpressure pulse swept up the Shuttle stack. The frequency of this transient shock wave exceeded pre-launch predictions, and resulted in high, alternating normal accelerations along the length of the vehicle. Among the results of this unexpected loading was failure of an oxidizer tank support strut in the orbiter’s forward reaction control system module, which could have led to loss of the mission, crew, and vehicle. This particular incident is investigated in more detail using classical structural mechanics, and the results are discussed to provide additional insight.

Space Shuttle↗

STS-1 Forward RCS Oxidizer Tank Subsystem Structural Failure Assessment

The launch of the Space Shuttle Columbia on STS-1 marked the beginning of a new era in American spaceflight. It was the only crewed first flight of a launch vehicle to date, and was also the first crewed system to use large solid rockets as primary propulsion. A potential disaster was narrowly averted at liftoff when an ignition overpressure pulse swept up the Shuttle stack. The frequency of this transient shock wave exceeded pre-launch predictions, and resulted in high, alternating normal accelerations along the length of the vehicle. Among the results of this unexpected loading was failure of an oxidizer tank support strut in the orbiter’s forward reaction control system module, which could have led to loss of the mission, crew, and vehicle. This particular incident is investigated in more detail using classical structural mechanics and finite element analyses, and the results are discussed to provide additional insight.

space shuttle↗

J-2X: Progress on the Ares Upper Stage Engine

NASA's Vision for Exploration requires a safe, reliable, affordable upper stage engine to power the Ares I Crew Launch Vehicle (CLV) and the Ares V Cargo Launch Vehicle (CaLV). The J-2X engine epitomizes NASA's philosophy of employing legacy knowledge, heritage hardware, and commonality to carry the next generation of explorers into low-Earth orbit and out into the solar system. As envisioned by the Exploration Systems Architecture Study (ESAS), the reference lunar mission would begin by launching the Ares V into orbit with the Earth Departure Stage (EDS) transporting the Lunar Surface Access Module (LSAM), followed by the Ares I, carrying the Orion Crew Exploration Vehicle, which would rendezvous with the EDS/LSAM before beginning its journey to the Moon.

Byrd, Thomas D.↗

Gateway Integrated ECLSS Model Analysis of Intermodule Ventilation Failures

The Gateway Integrated ECLSS Model (GIEM) is a set of two independent models, made in Aspen Custom Modeler (ACM) and Thermal Desktop (TD), of the Gateway stack and each modules' associated environment control and life support system (ECLSS). The GIEM utilizes the 41-Node Metabolic Man (METMAN) to simulate crew inside the Gateway consuming O2 and producing CO2, H2O, and heat for the ECLSS to remove. The modules and visiting vehicles all have different levels of ECLSS capabilities and may rely on other modules and Intermodular Ventilation (IMV), which is used to exchange gas between the modules, to ensure the entire Gateway environment is controlled. If IMV were to fail or be turned off, some vehicles may have limited access to necessary ECLSS functions. This analysis focuses on evaluating O2, CO2, and H2O levels when crew are in vehicles without their own life support and IMV has failed to evaluate how long before the atmosphere is unsafe for the crew. This analysis uses the integrated nature of the GIEM to look at time to effect for O2 depletion and CO2 and H2O buildup when crew are working in vehicles that have been cut off from the ECLSS-active portion of the stack. This information is used to inform for how long crew can safely continue working in the ECLSS-inactive vehicles before experiencing a requirement violation or physical limitation and can be referenced when developing maintenance and emergency response concept of operations (ConOps).

Lawrence Barrett↗

STS-107 Flight Day 10 Highlights

This video shows the activities of the STS-107 crew (Rick Husband, Commander; William McCool, Pilot; Kalpana Chawla, David Brown, Michael Anderson, Laurel Clark, Mission Specialists; Ilan Ramon, Payload Specialist) during flight day 10 of the Columbia orbiter's final mission. Flight day 10 includes an interview by Mission Control of astronauts Brown, McCool, and Anderson, who answer questions on the mission's spaceborne experiments, as well as biographical and other questions. Much of the video is shot and narrated by Payload Specialist Ramon, who shows the crew members at work on experiments in the SpaceHab RDM (Research Double Module), and performing other tasks. Experiments featured in the video include SOFBALL (Structure of Flame Balls at Low Lewis-Number), the STARS (Space Technology and Research Students) experiments, and experiments on cancer and osteoporosis. Crew activities shown include making a video of Earth, and preparing for sleep. Earth views shown in the video include the Gulf of Aden, Ghana, Lake Chad, and the coast of North Carolina.

Source record↗

STS-1 Forward RCS Oxidizer Tank Subsystem Failure Assessment

The launch of the Space Shuttle Columbia on STS-1 in April 1981 marked the beginning of a new era in American spaceflight. It was the only crewed first flight of a launch vehicle, and was also among the first vehicles to use large solid rockets as primary propulsion. A potential disaster was narrowly averted at liftoff when ignition overpressure waves pulse swept up the Shuttle stack. The frequency of this transient shock wave exceeded pre-launch predictions, and resulted in high, alternating normal accelerations along the length of the vehicle. Among the results of this unexpected loading was failure of an oxidizer tank support strut in the orbiter’s forward reaction control system module, which could have led to loss of the mission, crew and vehicle. This particular incident is investigated in more detail using classical structural mechanics, and the results are discussed to provide additional insight.

Space Shuttle↗

Apollo 8 Mission Report

Postflight analysis of Apollo 8 mission. Apollo 8 was the second manned flight in the program and the first manned lunar orbit mission. The crew were Frank Borman, Commander; James A. Lovell, Command Module Pilot; and William A. Anders, Lunar Module Pilot. The Apollo 8 space vehicle was launched on time from Kennedy Space Center, Florida, at 7:51:00 AM, EST, on December 21, 1968. Following a nominal boost phase, the spacecraft and S-IVB combination was inserted - into a parking orbit of 98 by 103 nautical miles. After a post-insertion checkout of spacecraft systems, the 319-second translunar injection maneuver was initiated at 2:50:37 by reignition of the S-IVB engine.

Source record↗

Skylab status report.

The laboratory will be launched on Apr. 30, 1973, aboard a Saturn V vehicle. Approximately twenty-three and a half hours later the first crew will be launched in a command and service module aboard a Saturn IB launch vehicle. The laboratory will consist of modules. The orbital workshop (OWS) is made from the liquid oxygen and liquid hydrogen tanks of a Saturn S-IVB third stage. The OWS contains the living quarters and two experiments areas. The airlock sits on top of the OWS and contains the controls and hatch for the extra-vehicular activity.

Conrad, C., Jr.↗

Life support system definition for a low cost shuttle launched space station.

Discussion of the tradeoffs and EC/LS definition for a low cost shuttle launched space station to be launched in the late 1970s for use as a long-term manned scientific laboratory. The space station consists of 14-ft-diam modules, clustered together to support a six-man crew at the initial space station (ISS) level and a 12-man crew at the growth space station (GSS) level. Key design guidelines specify low initial cost and low total program cost and require two separate pressurized habitable compartments with independent lift support capability. The methodology used to select the EC/LS design consisted of systematically reducing quantitative parameters to a common denominator of cost. This approach eliminates many of the inconsistencies that can occur in such decision making. The EC/LS system selected is a partially closed system which recovers urine, condensate, and wash water and concentrates crew expired CO2 for use in a low thrust resistojet propulsion system.

Nelson, W. G.↗

Modular space station phase B extension: Mass properties

The MSS system, capable of supporting a six-man crew, is described as consisting of four common station modules, two special modules (core and power), and a cargo module arranged in a cruciform. The station buildup, and space station subsystems including environmental control life support, electrical power, guidance and control are also described. The MSS system weights are presented for design-to-weight, closeout weights, and shuttle payload weights.

Duffey, L. A.↗

Concurrent research on the Space Station transportation node

The feasibility of integrating scientific research on Space Station Freedom (SSF) with concurrent lunar-vehicle assembly and servicing operations associated with the support of Space Exploration Initiative (SEI) is investigated. The SSF, SEI, and lunar-vehicle user resource requirements are reviewed, and a station configuration is derived which can accommodate a significant percentage of user requirements while supporting the lunar transport vehicle (LTV) processing operations. The derived station configuration will require several augmentations to the baseline configuration. Most notably, the SSF power generation will be increased by an addition of six solar dynamic arrays, crew support will be increased by adding two habitation modules, and more payloads will be accomodated by adding dual keels.

Meredith, B. D.↗

Space Biology Initiative. Trade Studies, volume 1

The six studies which are addressed are entitled: Design Modularity and Commonality; Modification of Existing Hardware (COTS) vs. New Hardware Build Cost Analysis; Automation Cost vs. Crew Utilization; Hardware Miniaturization versus Cost; Space Station Freedom/Spacelab Modules Compatibility vs. Cost; and Prototype Utilization in the Development of Space Hardware. The product of these six studies was intended to provide a knowledge base and methodology that enables equipment produced for the Space Biology Initiative program to meet specific design and functional requirements in the most efficient and cost effective form consistent with overall mission integration parameters. Each study promulgates rules of thumb, formulas, and matrices that serves has a handbook for the use and guidance of designers and engineers in design, development, and procurement of Space Biology Initiative (SBI) hardware and software.

Source record↗

Space Biology Initiative. Trade Studies, volume 2

The six studies which are the subjects of this report are entitled: Design Modularity and Commonality; Modification of Existing Hardware (COTS) vs. New Hardware Build Cost Analysis; Automation Cost vs. Crew Utilization; Hardware Miniaturization versus Cost; Space Station Freedom/Spacelab Modules Compatibility vs. Cost; and Prototype Utilization in the Development of Space Hardware. The product of these six studies was intended to provide a knowledge base and methodology that enables equipment produced for the Space Biology Initiative program to meet specific design and functional requirements in the most efficient and cost effective form consistent with overall mission integration parameters. Each study promulgates rules of thumb, formulas, and matrices that serves as a handbook for the use and guidance of designers and engineers in design, development, and procurement of Space Biology Initiative (SBI) hardware and software.

Source record↗

STS-45/Atlas-1 TCDT Activities

Footage shows three T-38 aircraft coming in for landing at Kennedy Space Center (KSC) and jetting on the runway. The crew of Atlantis gets out of the cockpits and are introduced by Commander Charles F. Bolden to the press. The crew is also shown learning about the Atlas-01 module before suiting up to board Atlantis.

Source record↗

STS-105 Post-Flight

The crewmembers of STS-105, Commander Scott Horowitz, Pilot Fred Sturckow, and Mission Specialists Dan Barry and Pat Forrester, narrate this video as footage from the mission is seen, starting with the boarding and launch of Discovery. Various on-orbit activities are shown, including on-orbit activities (H Reflex Experiment), the rendezvous and docking of Discovery with the International Space Station (ISS), the transfer of materials from the Multipurpose Logistics Module, extravehicular activities, and the exchange of resident ISS crews. The video ends with Discovery undocking from the ISS and the landing of the orbiter.

Source record↗

Characterization of Subsystems for a WB-003 Single Stage Shuttle

Subsystems for an all oxygen-hydrogen-single-stage shuttle are characterized for a vehicle designated WB-003. Features of the vehicle include all-electric actuation, fiber optics for information circuitry, fuel cells for power generation, and extensive use of composites for structure. The vehicle is sized for the delivery of a 25,000 lb. payload to a space station orbit without crew. When crew are being delivered, they are carried in a module in the payload bay with escape and manual override capabilities. The underlying reason for undertaking this task is to provide a framework for the study of the operations costs of the newer shuttles.

MacConochie, Ian O.↗

Passive Isolators for use on the International Space Station

The value of the International Space Station (ISS) as a premier microgravity environment is currently at risk due to structure-borne vibration. The vibration sources are varied and include crew activities such as exercising or simply moving from module to module, and electro- mechanical equipment such as fans and pumps. Given such potential degradation of usable microgravity, anything that can be done to dampen vibration on-orbit will significantly benefit microgravity users. Most vibration isolation schemes, both active and passive, have proven to be expensive - both operationally and from the cost of integrating isolation systems into primary/secondary structural interfaces (e.g., the ISS module/rack interface). Recently, passively absorptive materials have been tested at the bolt interfaces between the operating equipment and support structure (secondary/tertiary structural interfaces). The results indicate that these materials may prove cost-effective in mitigating the vibrational problems of the ISS. We report herein tests of passive absorbers placed at the interface of a vibration-inducing component: the Development Distillation Assembly, a subassembly of the Urine Processing Assembly, which is a rotating centrifuge and cylinder assembly attached to a mounting plate. Passive isolators were installed between this mounting plate and its support shelf. Three materials were tested: BISCO HT-800, Sorbothane 30 and Sorbothane 50, plus a control test with a hard shim. In addition, four distinct combinations of the HT-800 and Sorbothane 50 were tested. Results show a significant (three orders of magnitude) reduction of transmitted energy, as measured in power spectral density (PSD), using the isolation materials. It is noted, however, that passive materials cannot prevent the transmission of very strong forces or absorb the total energy induced from structural resonances.

Houston, Janice↗