Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Project Plan: Salt in Situ Heater Test

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project planned for the Waste Isolation Pilot Plant (WIPP) site, titled the Brine Availability Test in Salt (BATS). BATS is the first stage in a planned sequence of tests to bolster the technical basis for disposal of heat generating waste in salt. This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The experiment has begun in January 2020 and the first phase will continue for several months with the possibility for follow on testing. BATS comprises a suite of modular tests, which consist of a group of adjacent horizontal boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (12.2 cm [4.81 diameter) containing equipment for water-vapor collection and borehole closure monitoring, surrounded by smaller-diameter (up to 5.3 cm [2.11 diameter) satellite observation boreholes. Observation boreholes contain grouted-in temperature sensors, electrical resistivity tomography (ERT) sensors, and fiber optics; packer-isolated tracer release and sampling intervals; and acoustic emission (AE) piezoelectric sensors. A larger-diameter (12.2 cm [4.81) satellite borehole includes sorel and salt cement plugs, as part of an engineered barrier sealing test. The first two tests, to be implemented in parallel, are heated (target borehole wall temperature of 120 °C) and unheated, with similar arrays of observation borehole monitoring changes. Follow-on tests will be designed using information gathered from the first two tests, and may be conducted at other borehole wall temperatures, use multiple observation boreholes, and may include different measurement types and test designs. This 2020 update of the original 2018 project plan satisfies DOE-NE Spent Fuel and Waste Science and Technology (SFWST) milestone M3SF-205N010303034, as part of the SNL "Salt Disposal R&D" work package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An MILP-Based Distributed Energy Management for Coordination of Networked Microgrids

An MILP-based distributed energy management for the coordination of networked microgrids is proposed in this paper. Multiple microgrids and the utility grid are coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) update their schedules separately. Then, the price signals are updated according to the generation–load mismatch and distributed to MCs and DMS for the next iteration. The iteration continues until the generation–load mismatch is small enough, i.e., the generation and load are balanced under agreed price signals. Through the proposed distributed energy management, various microgrids and the utility grid with different economic, resilient, emission and socio-economic objectives are coordinated with generation–load balance guaranteed and the microgrid customers’ privacy preserved. In particular, a piecewise linearization technique is employed to approximate the augmented Lagrange term in the alternating direction method of multipliers (ADMM) algorithm. Thus, the subproblems are transformed into mixed integer linear programming (MILP) problems and efficiently solved by open-source MILP solvers, which would accelerate the adoption and deployment of microgrids and promote clean energy. The proposed MILP-based distributed energy management is demonstrated through various case studies on a networked microgrids test system with three microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic gas temperature measurement system

The development of an advanced measuring system which measures the rapidly varying gas temperature at the exit of an aircraft jet engine combustor during ground based testing of hot section components was identified. Sensor guidelines, technical approach/program schedule, and the accomplishments are reviewed. The environment of a present generation combustor is shown. The method uses two beadless junctions type-B thermocouples to measure heat transfer coefficient in situ. Heat conduction effects are shown by a finite element model of the thermocouple.

Elmore, D.↗

Lunar base surface mission operations. Lunar Base Systems Study (LBSS) task 4.1

The purpose was to perform an analysis of the surface operations associated with a human-tended lunar base. Specifically, the study defined surface elements and developed mission manifests for a selected base scenario, determined the nature of surface operations associated with this scenario, generated a preliminary crew extravehicular and intravehicular activity (EVA/IVA) time resource schedule for conducting the missions, and proposed concepts for utilizing remotely operated equipment to perform repetitious or hazardous surface tasks. The operations analysis was performed on a 6 year period of human-tended lunar base operation prior to permanent occupancy. The baseline scenario was derived from a modified version of the civil needs database (CNDB) scenario. This scenario emphasizes achievement of a limited set of science and exploration objectives while emplacing the minimum habitability elements required for a permanent base.

Source record↗

Simulator evaluation of the final approach spacing tool

The design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course is described. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arrivals as well as sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a 4-D trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST was implemented on a high performance workstation. It can be operated as a stand-alone in the Terminal Radar Approach Control (TRACON) Facility or as an element of a system integrated with automation tools in the Air Route Traffic Control Center (ARTCC). FAST was evaluated by experienced TRACON controllers in a real-time air traffic control simulation. Simulation results show that FAST significantly reduced controller workload and demonstrated a potential for an increase in landing rate.

Davis, Thomas J.↗

Application of modern control design methodology to oblique wing research aircraft

A Linear Quadratic Regulator synthesis technique was used to design an explicit model following control system for the Oblique Wing Research Aircraft (OWRA). The forward path model (Maneuver Command Generator) was designed to incorporate the desired flying qualities and response decoupling. The LQR synthesis was based on the use of generalized controls, and it was structured to provide a proportional/integral error regulator with feedforward compensation. An unexpected consequence of this design approach was the ability to decouple the control synthesis into separate longitudinal and lateral directional designs. Longitudinal and lateral directional control laws were generated for each of the nine design flight conditions, and gain scheduling requirements were addressed. A fully coupled 6 degree of freedom open loop model of the OWRA along with the longitudinal and lateral directional control laws was used to assess the closed loop performance of the design. Evaluations were performed for each of the nine design flight conditions.

Vincent, James H.↗

g-LIMIT: A Vibration Isolation System for the Microgravity Science Glovebox

For many microgravity science experiments using the Microgravity Science Glovebox (MSG), the ambient acceleration environment will exceed desirable levels. To provide a more quiescent acceleration environment, a vibration isolation system named g-LIMIT (GLovebox Integrated Microgravity Isolation Technology) is being designed. g-LIMIT is the next generation of technology developed for and demonstrated by STABLE on the USML-2 mission in October 1995. Although g-LIMIT is a sub-rack level isolation system that can be used in a variety of applications, g-LIMIT is uniquely optimized for MSG implementation. Standard MSG structural and umbilical interfaces will be used so that the isolation mount is transparent to the user with no additional accommodation requirements. g-LIMIT consists of three integrated isolator modules, each of which is comprised of a dual axis actuator, two axes of acceleration sensing, two axes of position sensing, control electronics, and data transmission capabilities in a minimum-volume package. In addition, this system provides the unique capability for measuring absolute acceleration of the experiment independent of accelerometers as a by-product of the control system and will have the capability of generating pristine accelerations to enhance experiment operations. g-LIMIT is scheduled for flight during the UF-2 mission and will be available to glovebox investigators immediately after characterization testing.

Whorton, Mark S.↗

Enhanced project management tool

A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

Maluf, David A.↗

Installation of Ohio's First Electrolysis-Based Hydrogen Fueling Station

This paper describes progress made towards the installation of a hydrogen fueling station in Northeast Ohio. In collaboration with several entities in the Northeast Ohio area, the NASA Glenn Research Center is installing a hydrogen fueling station that uses electrolysis to generate hydrogen on-site. The installation of this station is scheduled for the spring of 2012 at the Greater Cleveland Regional Transit Authority s Hayden bus garage in East Cleveland. This will be the first electrolysis-based hydrogen fueling station in Ohio.

Scheidegger, Brianne T.↗

Assessment of Delivery Accuracy in an Operational-Like Environment

In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.

Air Traffic Scheduling↗

NASA Handbook 7010: Direct Field Acoustic Testing

Instruments, spacecraft, antennas, reflectors, and other mechanical hardware have been undergoing acoustic qualification testing over the last decade using loudspeakers. This speaker-generated Direct Field Acoustic Test (DFAT) method offers cost, mobility, and schedule advantages over the conventional Reverberant Acoustic Field Test (RAFT) method. To develop most appropriate acoustic test program using the DFAT method for a flight project, flight project managers and their technical staffs will need overall guidance and technical rational for using DFAT to qualify flight hardware for acoustic environments. The NASA Chief Engineer Office had tasked JPL to prepare a NASA Handbook for DFAT Dynamics Testing. The handbook was completed and was released by NASA headquarters in 2015. The handbook provides advantages and disadvantages of such method of testing, key references and a series of recommended practices for test preparation and test performance. This paper will summarize key and important steps related to this method of acoustic testing.

Kolaini, Ali R↗

Comparison of two Calibrations of NASA's MC60 Five-component Semi-span Balance

Two separate manual calibrations of NASA’s MC60 five–component semi–span balance were compared. The calibrations were performed in 1999 and 2019using CALSPAN Force Measurement System’s Large Load Rig. The Iterative Method was chosen as the load prediction algorithm and data reduction matrices were generated from both calibration data sets. Then, the applied calibration load schedules, the standard deviations of the calibration load residuals, the prime sensitivities of the five gages, and the maximum outputs at capacity of the five gages were compared. In addition, the calibration data of 1999 was used as check load data for the data reduction matrix that was obtained from the 2019 data. Overall, the agreement between the data analysis results is very good considering the facts that two different load schedules were used for the calibrations, different people performed the calibrations, different instrumentation was used to measure the loads and the outputs, the Large Load Rig was moved to a different site in between the calibrations, and no tare load corrections could be applied to the 1999 data set. Nevertheless, the calibration data of 2019 is clearly the better data set. This observation is no surprise considering that CALSPAN Force Measurement Systems made significant investments in calibration hardware and process improvements during the last 20 years.

wind tunnel balance↗

Integration of Data Analytics with Plant System Health Program

This report summarizes the R&D activities of the Plant Health Management (PHM) project during fiscal year 2020 (FY20). This project focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate system sources of risk. This project development lives in cooperation with the Risk Informed Asset Management (RIAM) project. The RIAM project, in fact, uses the reliability models and data generated by the PHM project to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture). This year’s activities for the PHM project focused mainly on the development of two classes of models. The first one includes a series of component reliability models which include aging, testing and maintenance. The second class includes a series of system reliability models which focus on the secondary side of exiting U.S. reactors. These models are based on fault tree logic structures such that they can be used by existing plant PRA software. We also started to focus on the management of health data and we tackled this issue in two directions. The first one focuses on the integration of monitor data with simulation models to assess component health. This approach is moving from a classical data based to a model+data based approach with the goal of improving higher component health information. The second direction focuses on linking equipment reliability data (e.g., maintenance/failure reports, component monitoring data) directly to system reliability models using a safety margin based language rather than a probability based language. The main advantage of a safety margin based language is that it can provide to system engineers more tangible information on system/component health and how it propagates to the system level.

97 MATHEMATICS AND COMPUTING↗

Models and Strategies for Optimal Demand Side Management in the Chemical Industries

Deregulation and the increase of renewable electricity generation from wind and solar photovoltaics have transformed the U.S. electricity market. Economic and environmental benefits notwithstanding, the presence of renewables has increased variability and uncertainty on the supply side of the grid. Managing demand, rather than generation – a strategy referred to as “demand response (DR)” – is an attractive approach for mitigating this imbalance. DR efforts aim to reduce electricity usage during peak demand times, lessening stress on the grid. Industrial users are particularly attractive entities for DR participation since they present large, localized loads that can provide significant relief on grid demand and –unlike other large loads, such as buildings – are minimally dependent on human needs and preferences. In this project, we accomplished three main objectives. (1) We developed data-driven low-order DR scheduling-relevant dynamic models of chemical processes. Concurrently, we studied the formulation and solution of the associated optimal DR production scheduling problems. (a) A prototype air separation unit (ASU) model was used to generate simulated operating data for initial modeling efforts, which enabled the later use of industrial data for data-driven modeling. (b) We utilized Hammerstein-Wiener (HW) and Finite Step Response (FSR) models to represent nonlinear plant dynamics. (c) The HW models were linearized using exact linearization so they could potentially be embedded in power system models, which are formulated as mixed integer linear programs (MILPs). (d) We solved DR optimization problems under uncertainty and found that even naïve predictions of electricity price and product demand led to significant cost savings benefits. (2) Our DR scheduling optimization problem formulations are amenable to real-time solution. (a) We utilized Lagrangian Relaxation (LR) to efficiently solve the optimization problem by decoupling subproblems linked by complicating constraints. (b) We have achieved computation times for the 3-day DR scheduling problem of an ASU as low as 1.88 minutes. (3) Our representations of the DR behavior of chemical process as grid-level batteries were embedded in power system models. (a) For a small-scale grid, we found that incorporating the dynamics of the chemical plant in the optimal power flow calculations resulted in better resource management leading to up to 15% and 46% cost reduction for the grid and chemical plant operations, respectively, during periods of power line congestion. We have published several works dedicated to modeling and solving DR optimization problems from the user side. These were published in top peer-reviewed journals and are summarized in this report. The most recent work (and papers in preparation) considers DR scheduling from the grid side. Future efforts will consider networked plants (e.g., air separation units operating on a common pipeline) for DR participation, which is expected to amplify the capabilities of industrial DR participants to perform load-shifting. Our consideration of uncertainty in DR has inspired future directions in this area as well: we plan to develop multistage methods to fully account for the effects of uncertainty in DR scheduling.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Planning, Scheduling and Execution for Autonomous Mars Rover Operations

With each new rover mission to Mars, rovers are traveling significantly longer distances. This distance increase raises not only the opportunities for science data collection, but also amplifies the amount of environment and rover state uncertainty that must be handled in rover operations. This paper describes how planning, scheduling and execution techniques can be used onboard a rover to autonomously generate and execute rover activities and in particular to handle new science opportunities that have been identified dynamically. We also discuss some of the particular challenges we face in supporting autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations. Finally, we describe our experiences in testing this work using several Mars rover prototypes in a realistic environment.

automated rover operations↗

A Distributed Middleware Architecture for Attack-Resilient Communications in Smart Grids

Distributed Energy Resources (DERs) are being increasingly accepted as an excellent complement to traditional energy sources in smart grids. As most of these generators are geographically dispersed, dedicated communications investments for every generator are capital cost prohibitive. Real-time distributed communications middleware, which supervises, organizes and schedules tremendous amounts of data traffic in smart grids with high penetrations of DERs, allows for the use of existing network infrastructure. In this paper, we propose a distributed attack-resilient middleware architecture that detects and mitigates the congestion attacks by exploiting the Quality of Experience (QoE) measures to complement the conventional Quality of Service (QoS) information to detect and mitigate the congestion attacks effectively. The simulation results illustrate the efficiency of our proposed communications middleware architecture.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement: Preprint

Distribution system resilience enhancement is an important topic to ensure customers have access to the power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecasts. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗

Outage Forecast-Based Preventative Scheduling Model for Distribution System Resilience Enhancement

Distribution system resilience enhancement is an important topic to ensure customers have access to power supply during extreme events. In fact, certain weather-related extreme events can be predicted ahead of time. Therefore, it is important to investigate how to predict grid outages using extreme weather forecasts, and how outage predictions can be incorporated into distribution system resilience enhancement. In this paper, a preventative scheduling model for distribution systems is proposed. The model targets at allocating resources, especially mobile responsive resources such as mobile backup generators and mobile energy storage systems, to prepare for an extreme event in the day-ahead context. To achieve efficient resource allocation and scheduling, a machine learning-based outage prediction module is developed to predict vulnerable or risky segments of the distribution system based on historical operating records and extreme weather event forecast. By integrating the outage prediction results into the scheduling model, optimal resource allocation can be derived to help distribution systems prepare for an upcoming event and improve resilience performance. A real distribution feeder in North Carolina, U.S. is used in the case study to validate the proposed approach.

distributed energy resources↗