Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Connection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Power Hardware-in-the-Loop (PHIL) Testing Facility for Distributed Energy Storage (Poster)

The growing deployment of distributed, variable generation and evolving end-user load profiles presents a unique set of challenges to grid operators responsible for providing reliable and high quality electrical service. Mass deployment of distributed energy storage systems (DESS) has the potential to solve many of the associated integration issues while offering reliability and energy security benefits other solutions cannot. However, tools to develop, optimize, and validate DESS control strategies and hardware are in short supply. To fill this gap, NREL has constructed a power hardware-in-the-loop (PHIL) test facility that connects DESS, grid simulator, and load bank hardware to a distribution feeder simulation.

25 ENERGY STORAGE↗

Real-Time Identifiability of Power Distribution Network Topologies With Limited Monitoring

Recovering the distribution grid topology in real time is essential to perform several distribution system operator (DSO) functions. DSOs often do not have any direct monitoring of switch statuses to track reconfiguration. At the same time, installing real-time meters at a large number of buses is challenging due to the cost of endowing every metered bus with a real-time communication channel. The goal of this letter is to develop a meter placement strategy allowing DSOs to deploy only few real-time meters. After casting the topology recovery task as an optimization problem, a meter placement strategy ensuring unique recovery of the true topology is devised. A graph-theoretical approach is pursued to partition the grid into connected portions called observable islands . The proposed strategy then simply requires installing a meter in the path between every pair of boundary nodes , i.e., ends of edges connecting two different islands. Under some ideal assumptions, this placement strategy ensures unique recovery of the topology. The approach is also validated through numerical simulations under realistic scenarios using a standard IEEE benchmark feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity Assessments on Emulated DER Communication Networks

An increasing number of public utility commissions are adopting Distributed Energy Resource (DER) interconnection standards which require photovoltaic (PV) inverters, energy storage systems, and other DER to include interoperable grid-support functionality. The recently updated national standard, IEEE 1547-2018, requires all DER to include a Sun Spec Modbus, IEEE 2030.5, or IEEE 1815 communication interface in order to provide local and bulk power system services. Those communication protocols and associated information models will ensure system interoperability for PV and storage systems, but these new utility-to-DER communication networks must be deployed with sufficient cybersecurity to protect the U.S. power system and other critical infrastructure reliant on dependable power. Unlike bulk generators, DER are commonly connected to grid operators via public internet channels. These DER networks are exposed to a large attack surface that may leverage sophisticated techniques and infrastructure developed on IT systems, including remote exploits and distributed attacks. Although DER make up a growing portion of the national generation mix, they have limited processing capabilities and do not typically support modern security features such as encryption or authentication. In this work, Sandia National Laboratories constructed simulated DER communication net- works with a range of security features in order to study the security posture of different communication approaches. The experimental test environment was created in a Sandia-developed co-simulation platform, called SCEPTRE, which emulated Sun Spec-compliant DER equipment, the utility DER management system, communication network, and distribution power system. Adversary-based assessments were conducted and a quantitative scoring criteria was applied to evaluate the resilience of various architectures against cyber attacks and to measure the systemic impact during such attacks. The team found that network segmentation, encryption, and moving target defense improved the security of these networks and would be recommended for utility, aggregator, and local DER networks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

Photovoltaic solar system connected to the electric power grid operating as active power generator and reactive power compensator

In the case of photovoltaic (PV) systems acting as distributed generation (DG) systems, the DC energy that is produced is fed to the grid through the power-conditioning unit (inverter). The majority of contemporary inverters used in DG systems are current source inverters (CSI) operating at unity power factor. If, however, we assume that voltage source inverters (VSI) can replace CSIs, we can generate reactive power proportionally to the remaining unused capacity at any given time. According to the theory of instantaneous power, the inverter reactive power can be regulated by changing the amplitude of its output voltage. In addition, the inverter active power can be adjusted by modifying the phase angle of its output voltage. Based on such theory, both the active power supply and the reactive power compensation (RPC) can be carried out simultaneously. When the insolation is weak or the PV modules are inoperative at night, the RPC feature of a PV system can still be used to improve the inverter utilisation factor. Some MATLAB simulation results are included here to show the feasibility of the method. (author)

14 SOLAR ENERGY↗

Digital Twin of an ANPC inverter with integrated Design-For-Trust

Reducing costs and increasing manufacturing output while creating reliable products are three essential components needed to keep a business competitive. In the past, having an asset that could address these three challenges at the same time would be challenging. However, recent advances in computer processing capabilities coupled with increases to network speeds allowed such a system to become possible; and this is known as a Digital Twin (DT), which represents a virtual copy of a production system or a product. Here, this work exhibits a DT application of an Active Neutral Point Clamped (ANPC) inverter using a controller. The controller emulates the ANPC responses of a new Digital Signal Processing (DSP) firmware and validates this new firmware by using Design-For-Trust (DFTr) characteristics. If the new firmware is malicious, then it should be rejected, thus adding preemptive protection measures for inverter based distributed energy resources.

cybersecurity↗

Large-Signal Impedance Modeling of Three-Phase Voltage Source Converters

Resonance problems have become a major hurdle in the large-scale grid integration of renewable energy. It is important to be able to predict the amplitude of resonance-induced distortions for the protection and control design of power electronic converters. We recently presented an impedance-based approach for the prediction of resonance amplitude. It was shown that the impedance response of a converter starts changing with the amplitude of resonance; this blocks the amplitude growth beyond a certain point where the converter forms a limit cycle mode of sustained oscillations. The large-signal impedance of a converter captures the change in its impedance response with the resonance amplitude, and it can be used to predict the resonance amplitude under different operation conditions. This paper presents large-signal sequence impedance modeling for three-phase voltage source converters (VSC) with dq-current control and PLL. Modeling challenges encountered in the absence of the small-signal approximation are addressed by a) leveraging the dominating influence of hard nonlinearities such as pulse-width modulation saturation and limiters over soft nonlinearities in shaping the converter large-signal behavior and b) modeling the large-signal gain of hard nonlinearities using appropriate describing functions. Developed large-signal impedance models are validated using numerical simulations. Measurements of the large-signal impedance responses of a commercial 1-MW VSC-based inverter are also presented to experimentally demonstrate the effects of the injected perturbation amplitude on impedance response as predicted by the developed model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interleaved Cuk Converter Wave Energy System With Advanced Control and Grid Support Functions for Seamless Integration

This paper presents an innovative wave energy conversion system that integrates an interleaved Cuk converter with advanced nonlinear control for seamless grid integration. The system efficiently extracts power on the DC side using the interleaved Cuk converter, while an inverter manages power transfer to the grid or load on the AC side. A nonlinear control architecture, based on the Lyapunov energy function, ensures stable and optimal operation under varying wave conditions, effectively addressing the challenges of variability and unpredictability inherent in wave energy. The proposed system also incorporates features to enhance power quality and minimize losses, making it a robust solution for renewable energy integration. The system's effectiveness in harnessing wave energy and achieving smooth grid integration is validated through comprehensive computer simulations in MATLAB/Simulink, with case study results demonstrating its capabilities.

HYDRO ENERGY,TIDAL AND WAVE POWER↗

Hardware-in-the-Loop Testbed for Cyber-Physical Security of Photovoltaic Farms

In the last decades, modem grids with distributed energy resources, such as photovoltaic (PV) farms, are increasingly vulnerable to cyber-attacks that seriously affect the stability and performance of the power system. While cyber-physical security of smart grids is extensively studied, most of the existing work focuses on the grid level and neglects the modeling and features of device-level power electronics converters (PECs). Furthermore, establishing a high-fidelity simulation testbed that can simulate harmonic frequencies of the PV farm is in urgent need. In this paper, a high-fidelity and real-time hardware-in- the-loop testbed is built to simulate the harmonics of power electronics converters for cyber-physical security of PEC-enabled PV farms. Based on this testbed, the impact of typical cyber-attacks and physical faults on the PV converter can be analyzed, thus providing a foundation for cyber-attack detection, root cause diagnosis, and resilient control to mitigate the adverse effects of cyber-attacks.

14 SOLAR ENERGY↗

Optimization Methods for Evaluating PEV Charging Considering Customer Behavior

Plug-in electric vehicles (PEVs) can be connected to grid through electrical vehicle supply equipment (EVSE) to provide various grid services in addition to battery charging. This paper evaluates loading condition of a distribution system with a medium penetration of PEVs considering different charging strategies and public EVSE availability. A mobility and charging flexibility model is proposed to capture PEVs’ temporal availability and varying charging capability at different parking locations. Detailed trip information extracted from the National Household Travel Survey is used to represent travel and parking patterns. An optimization method is then proposed to coordinate PEV charging to effectively shift load from peak to off-peak hours. One of the prototypical feeders developed by the Pacific Northwest National Laboratory is studied in different scenarios.

Wu, Di↗

Bus Clustering for Distribution Grid Topology Identification

Recovering the distribution grid topology is essential to perform several distribution system operator functions. Many algorithms that address the topology recovery problem have already been proposed in the literature. Most are based on a priori information regarding which buses are fed by which substation; however, this information might not be available because frequent grid reconfigurations change the distribution grid portion connected to each substation. This paper addresses the problem of assigning every substation the set of buses that it is feeding, given field data. First, the aforementioned task is cast as a nonconvex optimization problem. Second, a relaxed version of the optimization problem is solved via the alternating direction method of multipliers. Finally, the performance of our approach is validated through numerical simulations of realistic scenarios using a standard IEEE benchmark feeder.

bus clustering↗