Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Opportunity Evaluation and Implementation: Providing Strategic Energy Solutions through Thoughtful Planning and Practical Know-How to Produce Groundbreaking Results [Fact Sheet]

The National Renewable Energy Laboratory (NREL) is the U.S. Department of Energy's (DOE's) only national laboratory focused on renewable energy and energy efficiency. For more than 35 years, our energy research, development, analysis, commercialization, and deployment work with public and private sector partners around the world has catalyzed the expansion of global clean energy solutions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Management of Biological Materials in Wastewater from Research & Development Facilities

PNNL has developed and instituted a systematic approach to managing work with biological material that begins in the project planning phase and carries through implementation to waste disposal. This paper describes two major processes used at PNNL to analyze and mitigate the hazards associated with working with biological materials and evaluate them for disposal to the sewer, ground, or surface water in a manner that protects human health and the environment. The first of these processes is the Biological Work Permit which is used to identify requirements for handling, storing, and working with biological materials and the second is the Sewer Approval process which is used to evaluate discharges of wastewaters containing biological materials to assure they meet industrial wastewater permits and other environmental regulations and requirements.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Resource Conservation and Recovery Act General Contingency Plan for Hazardous Waste Treatment, Storage, and Disposal Units at the Y-12 National Security Complex. Revision 12

This document, Y/TS-1015/R12, Resource Conservation and Recovery Act General Contingency Plan for Hazardous Waste Treatment, Storage, and Disposal Units at the Y-12 National Security Complex, is for reference purposes. It is a consolidation of the August 10, 2018, versions of Attachment 6, “Contingency Plan,” from Tennessee Hazardous Waste Management Permits TNHW-122 and TNHW-127. It is not intended to supersede any requirements in these permits and any differences are unintentional. The decision to implement this contingency plan, as part of the Emergency Plan, depends upon whether an imminent or actual incident involving a RCRA treatment, storage, or disposal unit could threaten human health or the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pala Energy Options Analysis (Final Report)

The Pala Energy Options Project scope focused on assessing electric and thermal energy related options for the Pala Band of Mission Indians. Although the assessment also considered options for transportation fuels – including potential for electrification – and other energy uses, initial reviews with PED staff indicated that the most practical and substantial options likely would involve serving current building electric and thermal energy resources and uses. Assessment scope varies by specific options considered; some merited in-depth assessment for immediate action to initiate or advance implementation, while higher level assessments were more appropriate for options that would take longer to implement and would require updated in-depth assessments during project planning and design phases. The primary objectives of the Project were to 1) identify energy resources/loads, 2) assess energy needs and exports, 3) investigate and evaluate supply-side and demand side energy options, and 4) select and prioritize options in an implementation plan.

14 SOLAR ENERGY↗

Strategic Energy Plan: Playa de Ponce, Ponce, Puerto Rico

Un Nuevo Amanecer Inc. (UNA), a community-based NGO (501C(3)), sought technical assistance through the U.S. Department of Energy's (DOE's) Energy Technology Innovation Partnership Project (ETIPP) to develop a strategic energy plan (SEP) for the community of Playa de Ponce on the south coast of Puerto Rico. A SEP helps communities identify energy goals and priority projects, and outline strategies and actions to build a shared path toward their energy vision. The primary goal of this SEP is to collaboratively explore pathways for the community's energy future. Researchers from the National Laboratory of the Rockies (NLR) engaged with the community for a period of seven months and facilitated a series of in-person community engagement workshops along with ETIPP regional partner Puerto Rico Hispanic Federation, UNA, and community leaders. The SEP workshops were held twice, March 18-20 and June 24-26, 2025. Through facilitated discussions, the community worked together to define and articulate a clear vision for its short-, medium-, and long-term energy goals. The workshops played a key role in identifying the specific strategies and priority projects that would best suit the needs of the community. The discussions outlined the community's energy aspirations, establishing a shared vision, setting goals, and outlining the priority actions needed to bring them to fruition. During the workshops, the community shared some of the most pressing energy challenges that they face on a regular basis, such as high energy costs that disproportionately impact an aging population and unreliable electricity during extreme weather events that result in frequent power outages. These issues have also exacerbated risks to public health and safety of the community. In response, UNA requested technical assistance through ETIPP to inform the development of a SEP tailored to Playa de Ponce to support its energy vision. This document explores four community-driven energy strategies aligned with that vision. Figure 1 shows the strategies outlined in this plan, which are categorized into three focus areas as identified by the community: energy reliability; safety and security; and stakeholder participation, education, and capacity building. This document serves as a shared roadmap for developing and implementing energy solutions that meet the needs of Playa de Ponce. It is intended to serve as a public resource for the community, UNA, and local authorities - providing tools, information and a shared foundation to inform future implementation efforts. This plan is intended to complement ongoing planning frameworks at the municipal, regional, and island-wide levels. As a living document, this SEP can evolve alongside Playa de Ponce's changing energy goals, while offering a framework to help them realize their energy vision.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1, with ROTC-1

The purpose of the Nevada National Security Site (NNSS) Integrated Groundwater Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein.

54 ENVIRONMENTAL SCIENCES↗

Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 0

The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.

54 ENVIRONMENTAL SCIENCES↗

Solid waste management challenges for cities in developing countries

Highlights: Black-Right-Pointing-Pointer Stakeholders. Black-Right-Pointing-Pointer Factors affecting performance waste management systems. Black-Right-Pointing-Pointer Questionnaire as Annex for waste management baseline assessment. - Abstract: Solid waste management is a challenge for the cities' authorities in developing countries mainly due to the increasing generation of waste, the burden posed on the municipal budget as a result of the high costs associated to its management, the lack of understanding over a diversity of factors that affect the different stages of waste management and linkages necessary to enable the entire handling system functioning. An analysis of literature on the work done and reported mainly in publications from 2005 to 2011, related to waste management in developing countries, showed that few articles give quantitative information. The analysis was conducted in two of the major scientific journals, Waste Management Journal and Waste Management and Research. The objective of this research was to determine the stakeholders' action/behavior that have a role in the waste management process and to analyze influential factors on the system, in more than thirty urban areas in 22 developing countries in 4 continents. A combination of methods was used in this study in order to assess the stakeholders and the factors influencing the performance of waste management in the cities. Data was collected from scientific literature, existing data bases, observations made during visits to urban areas, structured interviews with relevant professionals, exercises provided to participants in workshops and a questionnaire applied to stakeholders. Descriptive and inferential statistic methods were used to draw conclusions. The outcomes of the research are a comprehensive list of stakeholders that are relevant in the waste management systems and a set of factors that reveal the most important causes for the systems' failure. The information provided is very useful when planning, changing or implementing waste management systems in cities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-C-BRB-03: Novel Technique to Implement GRID Therapy in a Commercial Treatment Planning System

Purpose: Due to the difficulty of creating an accurate multi-aperture block in treatment planning systems (TPS), spatially fractionated radiation therapy (GRID Therapy) is limited to clinical setups using simple monitor unit calculations. In this work, we present a novel approach to accurately model a grid block in a TPS and evaluate its dosimetric accuracy. Methods: An acrylic GRID block was fashioned such that the hole size and spacing were the same dimensions of the brass GRID block (dotDecimal) at isocenter. Holes were non-divergent and drilled 1 cm deep. CT scans (RT Lightspeed, GE Healthcare) of the block were acquired using axial slices with a thickness of 0.625 mm. These were imported into Eclipse (version 11, Varian Medical Systems) and holes were auto-contoured into structures. The GRID block was created in Eclipse by forming apertures around the hole structures using a simple three step process. Treatment plans were created in a water-equivalent phantom using 6 and 10 MV beams, delivered with a linear accelerator (Clinac iX, Varian Medical Systems) and measured using a water tank, film and a diode array. Results: Comparisons of percent depth dose curves and profiles at depths of maximum dose, 5cm, and 10cm for field sizes ranging from 5 cm{sup 2} to 25 cm{sup 2} using water and film were within 3% of their respective positions in Eclipse. GRID plans utilizing various jaw sizes and MLC blocking measured with film and a diode array showed pass rates with an average of 97% using Gamma analysis at 3%/ 3 mm and no lower than 93%. Conclusion: We have developed a simple yet accurate method of incorporating a GRID block into a commercially available TPS and demonstrated that the TPS accurately reflects the dose delivered. This will allow for real-time planning using patient scans and encourage new methods for GRID therapy. Support provided by dotDecimal, Sanford, FL.

60 APPLIED LIFE SCIENCES↗

Determining thyroid {sup 131}I effective half-life for the treatment planning of Graves' disease

Purpose: Thyroid {sup 131}I effective half-life (T{sub eff}) is an essential parameter in patient therapy when accurate radiation dose is desirable for producing an intended therapeutic outcome. Multiple {sup 131}I uptake measurements and resources from patients themselves and from nuclear medicine facilities are requisites for determining T{sub eff}, these being limiting factors when implementing the treatment planning of Graves' disease (GD) in radionuclide therapy. With the aim of optimizing this process, this study presents a practical, propitious, and accurate method of determining T{sub eff} for dosimetric purposes. Methods: A total of 50 patients with GD were included in this prospective study. Thyroidal {sup 131}I uptake was measured at 2-h, 6-h, 24-h, 48-h, 96-h, and 220-h postradioiodine administration. T{sub eff} was calculated by considering sets of two measured points (24-48-h, 24-96-h, and 24-220-h), sets of three (24-48-96-h, 24-48-220-h, and 24-96-220-h), and sets of four (24-48-96-220-h). Results: When considering all the measured points, the representative T{sub eff} for all the patients was 6.95 ({+-}0.81) days, whereas when using such sets of points as (24-220-h), (24-96-220-h), and (24-48-220-h), this was 6.85 ({+-}0.81), 6.90 ({+-}0.81), and 6.95 ({+-}0.81) days, respectively. According to the mean deviations 2.2 ({+-}2.4)%, 2.1 ({+-}2.0)%, and 0.04 ({+-}0.09)% found in T{sub eff}, calculated based on all the measured points in time, and with methods using the (24-220-h), (24-48-220-h), and (24-96-220-h) sets, respectively, no meaningful statistical difference was noted among the three methods (p > 0.500, t test). Conclusions: T{sub eff} obtained from only two thyroid {sup 131}I uptakes measured at 24-h and 220-h, besides proving to be sufficient, accurate enough, and easily applicable, attributes additional major cost-benefits for patients, and facilitates the application of the method for dosimetric purposes in the treatment planning of Graves' disease.

60 APPLIED LIFE SCIENCES↗

Ten-Year ALARA Review of Dosimetry Results 1 January 2008 through 31 December 2017

Dosimetry results from 1 January 2008 through 31 December 2017 were reviewed to demonstrate that radiation protection methods used at Sandia National Laboratories are compliant with regulatory limits and consistent with the philosophy to keep exposures to radiation As Low As is Reasonably Achievable (ALARA). Personnel dosimetry (external and internal) and environmental thermoluminescent dosimeter results were reviewed for the Sandia National Laboratories in New Mexico, California, and Nevada. ALARA is a philosophical approach to radiation protection by managing and controlling radiation exposures (individual and collective) to the work force and to the public to levels that are As Low As is Reasonably Achievable taking social, technical, economic, practical, and public policy considerations into account. ALARA is not a dose limit but a planning tool with the objective to keep doses below applicable dose limits As Low As is Reasonably Achievable. In the case of Sandia National Laboratories, formal ALARA goals are not needed since Collective and individual doses are well below applicable limits through operational ALARA practices implemented during Work Planning and Control activities.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-F-P-07: Applying Failure Modes and Effects Analysis to Treatment Planning System QA

Purpose: A small-scale implementation of Failure Modes and Effects Analysis (FMEA) for treatment planning system QA by utilizing methodology of AAPM TG-100 report. Methods: FMEA requires numerical values for severity (S), occurrence (O) and detectability (D) of each mode of failure. The product of these three values gives a risk priority number (RPN). We have implemented FMEA for the treatment planning system (TPS) QA for two clinics which use Pinnacle and Eclipse TPS. Quantitative monthly QA data dating back to 4 years for Pinnacle and 1 year for Eclipse have been used to determine values for severity (deviations from predetermined doses at points or volumes), and occurrence of such deviations. The TPS QA protocol includes a phantom containing solid water and lung- and bone-equivalent heterogeneities. Photon and electron plans have been evaluated in both systems. The dose values at multiple distinct points of interest (POI) within the solid water, lung, and bone-equivalent slabs, as well as mean doses to several volumes of interest (VOI), have been re-calculated monthly using the available algorithms. Results: The computed doses vary slightly month-over-month. There have been more significant deviations following software upgrades, especially if the upgrade involved re-modeling of the beams. TG-100 guidance and the data presented here suggest an occurrence (O) of 2 depending on the frequency of re-commissioning the beams, severity (S) of 3, and detectability (D) of 2, giving an RPN of 12. Conclusion: Computerized treatment planning systems could pose a risk due to dosimetric errors and suboptimal treatment plans. The FMEA analysis presented here suggests that TPS QA should immediately follow software upgrades, but does not need to be performed every month.

60 APPLIED LIFE SCIENCES↗

Hanford Tank Waste to WIPP - Maximizing the Value of our National Repository Asset

Preplanning scope for the Hanford tank transuranic (TRU) waste project was authorized in 2013 by the Department of Energy (DOE) Office of River Protection (ORP) after a project standby period of eight years. Significant changes in DOE orders, Hanford contracts, and requirements at the Waste Isolation Pilot Plant (WIPP) have occurred during this time period, in addition to newly implemented regulatory permitting, re-evaluated waste management strategies, and new commercial applications. Preplanning has identified the following key approaches for reactivating the project: qualification of tank inventory designations and completion of all environmental regulatory permitting; identifying program options to accelerate retrieval of key leaking tank T-111; planning fully compliant implementation of DOE Order 413.3B, and DOE Standard 1189 for potential on-site treatment; and re-evaluation of commercial retrieval and treatment technologies for better strategic bundling of permanent waste disposal options.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

State Technologies Advancement Collaborative

The U. S. Department of Energy (DOE), National Association of State Energy Officials (NASEO), and Association of State Energy Research and Technology Transfer Institutions (ASERTTI) signed an intergovernmental agreement on November 14, 2002, that allowed states and territories and the Federal Government to better collaborate on energy research, development, demonstration and deployment (RDD&D) projects. The agreement established the State Technologies Advancement Collaborative (STAC) which allowed the states and DOE to move RDD&D forward using an innovative competitive project selection and funding process. A cooperative agreement between DOE and NASEO served as the contracting instrument for this innovative federal-state partnership obligating funds from DOE's Office of Energy Efficiency and Renewable Energy and Office of Fossil Energy to plan, fund, and implement RDD&D projects that were consistent with the common priorities of the states and DOE. DOE's Golden Field Office provided Federal oversight and guidance for the STAC cooperative agreement. The STAC program was built on the foundation of prior Federal-State efforts to collaborate on and engage in joint planning for RDD&D. Although STAC builds on existing, successful programs, it is important to note that it was not intended to replace other successful joint DOE/State initiatives such as the State Energy Program or EERE Special Projects. Overall the STAC process was used to fund, through three competitive solicitations, 35 successful multi-state research, development, deployment, and demonstration projects with an overall average non-federal cost share of 43%. Twenty-two states were awarded at least one prime contract, and organizations in all 50 states and some territories were involved as subcontractors in at least one STAC project. Projects were funded in seven program areas: (1) Building Technologies, (2) Industrial Technologies, (3) Transportation Technologies, (4) Distributed Energy Resources, (5) Hydrogen Technology Learning Centers, (6) Fossil Energy, and (7) Rebuild America.

01 COAL, LIGNITE, AND PEAT↗

Supporting cost-effective watershed management strategies for Chesapeake Bay using a modeling and optimization framework

Extensive efforts to adaptively manage nutrient pollution rely on Chesapeake Bay Program’s (Phase 6) Watershed Model, called Chesapeake Assessment Scenario Tool (CAST), which helps decision-makers plan and track implementation of Best Management Practices (BMPs). We describe mathematical characteristics of CAST and develop a constrained nonlinear BMP-subset model, software, and visualization framework. This represents the first publicly available optimization framework for exploring least-cost strategies of pollutant load control for the United States’ largest estuary. The optimization identifies implementation options for a BMP subset modeled with load reduction effectiveness factors, and the web interface facilitates interactive exploration of >30,000 solutions organized by objective, nutrient control level, and for ~200 counties. We assess framework performance and demonstrate modeled cost improvements when comparing optimization-suggested proposals with proposals inspired by jurisdiction plans. Stakeholder feedback highlights the framework’s current utility for investigating cost-effective tradeoffs and its usefulness as a foundation for future analysis of restoration strategies.

54 ENVIRONMENTAL SCIENCES↗