Search NASA⌕ Search

SEARCH · Search NASA

Results for “JPL projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

SKYMAP: Exploring the Universe in software

SKYMAP is a computer program which produces maps of arbitrary portions of the sky in a variety of projections and coordinate systems. Over the past ten years it has been used to produce finder charts for occultations by planets, display scan and image data from the Spacelab 2 Infrared Telescope, and make maps of fields for astronomical observations at X-ray, optical, infrared, and radio wavelengths. It can display multiple source catalogs, including the HST Guide Star Catalog, as well as solar system objects with astrometric accuracy using the JPL DE-130 ephemeris or tabulated positions. SKYMAP can be tuned to a specific task using an ASCII parameter file which controls how information is displayed on any Tektronix-compatible graphics display. The program contains a variety of interactive graphic and image processing features and has been ported to a variety of computer systems. A recent project visually demonstrates source density variation in various commonly-used all-sky catalogs.

Mink, D. J.↗

DCE and Legacy Systems - An Experience Report What Really Happened

The Multimission Ground Data System (MGDS) in use at the Jet Propulsion Laboratory (JPL) was developed in the latter half of the 1980s. It was a major departure from the one-of-a-kind, non-distributed ground data system previously employed. Today, a project is underway to determine if the Distributed Computing Environment (DCE) has a place in MGDS. The initial component targeted for replacement is an application layer built on top of TCP/IP which handles the MGDS message-passing requirements.

Multimission Ground Data System MGDS Distributed C↗

Modular, Reconfigurable, High-Energy Technology Development

The Modular, Reconfigurable High-Energy (MRHE) Technology Demonstrator project was to have been a series of ground-based demonstrations to mature critical technologies needed for in-space assembly of a highpower high-voltage modular spacecraft in low Earth orbit, enabling the development of future modular solar-powered exploration cargo-transport vehicles and infrastructure. MRHE was a project in the High Energy Space Systems (HESS) Program, within NASA's Exploration Systems Research and Technology (ESR&T) Program. NASA participants included Marshall Space Flight Center (MSFC), the Jet Propulsion Laboratory (JPL), and Glenn Research Center (GRC). Contractor participants were the Boeing Phantom Works in Huntsville, AL, Lockheed Martin Advanced Technology Center in Palo Alto, CA, ENTECH, Inc. in Keller, TX, and the University of AL Huntsville (UAH). MRHE's technical objectives were to mature: (a) lightweight, efficient, high-voltage, radiation-resistant solar power generation (SPG) technologies; (b) innovative, lightweight, efficient thermal management systems; (c) efficient, 100kW-class, high-voltage power delivery systems from an SPG to an electric thruster system; (d) autonomous rendezvous and docking technology for in-space assembly of modular, reconfigurable spacecraft; (e) robotic assembly of modular space systems; and (f) modular, reconfigurable distributed avionics technologies. Maturation of these technologies was to be implemented through a series of increasingly-inclusive laboratory demonstrations that would have integrated and demonstrated two systems-of-systems: (a) the autonomous rendezvous and docking of modular spacecraft with deployable structures, robotic assembly, reconfiguration both during assembly and (b) the development and integration of an advanced thermal heat pipe and a high-voltage power delivery system with a representative lightweight high-voltage SPG array. In addition, an integrated simulation testbed would have been developed containing software models representing the technologies being matured in the laboratory demos. The testbed would have also included models for non-MRHE developed subsystems such as electric propulsion, so that end-to-end performance could have been assessed. This paper presents an overview of the MRHE Phase I activities at MSFC and its contractor partners. One of the major Phase I accomplishments is the assembly demonstration in the Lockheed Martin Advanced Technology Center (LMATC) Robot-Satellite facility, in which three robot-satellites successfully demonstrated rendezvous & docking, self-assembly, reconfiguration, adaptable GN&C, deployment, and interfaces between modules. Phase I technology maturation results from ENTECH include material recommendations for radiation hardened Stretched Lens Array (SLA) concentrator lenses, and a design concept and test results for a hi-voltage PV receiver. UAH's accomplishments include Supertube heatpipe test results, which support estimates of thermal conductivities at 30,000 times that of an equivalent silver rod. MSFC performed systems trades and developed a preliminary concept design for a 100kW-class modular reconfigurable solar electric propulsion transport vehicle, and Boeing Phantom Works in Huntsville performed assembly and rendezvous and docking trades. A concept animation video was produced by SAIC, wllich showed rendezvous and docking and SLA-square-rigger deployment in LEO.

Carrington, Connie↗

Land Use Planning

Computer technology, aerial photography and space imagery are being combined in a NASA community services program designed to help solve land use and natural resource planning problems. As urban areas grow, so grows the need for comprehensive, up-to-date information on which to base intelligent decisions regarding land use. State and local planners need information such as the nature of urban change, where the changes are occurring, how they affect public safety, transportation, the economy, tax assessment, sewer systems, water quality, flood hazard, noise impact and a great variety of other considerations. Most importantly they need continually updated maps. Preparing timely maps, gathering the essential data and maintaining it in orderly fashion are becoming matters of increasing difficulty. The NASA project, which has nationwide potential for improving efficiency in the planning process, is a pilot program focused on Tacoma, Washington and surrounding Pierce County. Its key element, developed by Jet Propulsion Laboratory (JPL), is a computerized Land Use Management Information System (LUMIS).

Source record↗

Search for Terrestrial Planets with SIM Planet Quest

SIM is an astrometric mission that will be capable of 1 microarcsec relative astrometric accuracy in a single measurement of approx.1000 sec. The search for terrestrial planets in the habitable zone around nearby stars is one of the main science goals of the project. In 2001, NASA through the peer review process selected 10 key projects, two of which had as its goal, the search for terrestrial planets around nearby stars. The two teams, one led by G. Marcy (UC Berkeley) and one lead by M. Shao (JPL), have an extensive preparatory science program underway. This paper describes the status of this activity as well as the technology status of SIM's narrow angle astrometry capability, to reach 1 uas in a single epoch measure and its ability to average multiple epoch measurements to well below 1 uas.

extrasolar planets↗

Solar System Escape Architecture for Revolutionary Science

Our most distance spacecraft, Voyager 1 and Voyager 2, recently reached the boundary of the solar system known as the Heliopause. Beyond this boundary lies interstellar space, and, at tremendous distance, the stars. The Voyager spacecraft have shown us that the Heliopause is a dynamic, rapidly changing environment, varying greatly as the fields and effects emanating from the sun are met by a host of forces pushing in from our nearby galactic neighborhood. This is the region we aim to explore. Specifically we aim to develop a mission architecture and spacecraft concept capable of reaching the Heliopause (approximately100 AU (Astronomical Units)) region in multiple directions of interest, with a variety of scientific instrument suites, within a reasonable timeframe (about 15 years.) This report details our Phase 1 work including science goal definition, trajectory planning, technology research, mission planning, instrument selection, spacecraft design, and more. We present an architecture employing a 250-meter by 250-meter solar sail with a 175 kilogram spacecraft. This spacecraft could carry a variety of instrument suites depending on the destination, time, and other factors. The spin-stabilized spacecraft would powered by a small radioisotope power system (about 20 watts), makes use of an optical communication system, and carries 3 extensible booms for instrument accommodation as visible in the sketch and rendering below. We conclude that it would be reasonable to implement the architecture described herein in the 2020-2030 timeframe based on likely near-term technological and material advances. We are confident that cruise times of around 15 years could be achieved to science-rich destinations. This report details the approach we used to come to these conclusions and identifies some of the steps along the way. We utilized a variety of methodologies involving our full capability at JPL (Jet Propulsion Laboratory) - from small point studies to large collaborative engineering processes. This paper also describes potential industry partnerships and costing information, and includes the methods used to account for our project’s significant deviation from any prior mission in the NASA costing tool database. Outreach and public engagement is an important part of NASA activities. We engaged in several different forms of this outreach and describe them in this report. We conclude with some open questions and a summary of activities we hope to engage in with Phase 2 funding. The entire team would like to thank the NIAC (NASA Innovative Advanced Concepts) program for the opportunity to investigate this fascinating and challenging concept. The Voyager program gives us tantalizing clues as to the nature and behavior of the Heliopause – the boundary between the sun’s influence and the interstellar medium. This information comes from forty-year old instruments designed to study the outer planets. A targeted Heliopause investigation would give insight into the formation of the solar system, the role of the sun in the local interstellar neighborhood, and contribute to human exploration planning by helping to predict periods of low galactic cosmic ray (GCR) penetration into the inner solar system.

Spacecraft↗

Hazard Detection Software for Lunar Landing

The Autonomous Landing and Hazard Avoidance Technology (ALHAT) Project is developing a system for safe and precise manned lunar landing that involves novel sensors, but also specific algorithms. ALHAT has selected imaging LIDAR (light detection and ranging) as the sensing modality for onboard hazard detection because imaging LIDARs can rapidly generate direct measurements of the lunar surface elevation from high altitude. Then, starting with the LIDAR-based Hazard Detection and Avoidance (HDA) algorithm developed for Mars Landing, JPL has developed a mature set of HDA software for the manned lunar landing problem. Landing hazards exist everywhere on the Moon, and many of the more desirable landing sites are near the most hazardous terrain, so HDA is needed to autonomously and safely land payloads over much of the lunar surface. The HDA requirements used in the ALHAT project are to detect hazards that are 0.3 m tall or higher and slopes that are 5 or greater. Steep slopes, rocks, cliffs, and gullies are all hazards for landing and, by computing the local slope and roughness in an elevation map, all of these hazards can be detected. The algorithm in this innovation is used to measure slope and roughness hazards. In addition to detecting these hazards, the HDA capability also is able to find a safe landing site free of these hazards for a lunar lander with diameter .15 m over most of the lunar surface. This software includes an implementation of the HDA algorithm, software for generating simulated lunar terrain maps for testing, hazard detection performance analysis tools, and associated documentation. The HDA software has been deployed to Langley Research Center and integrated into the POST II Monte Carlo simulation environment. The high-fidelity Monte Carlo simulations determine the required ground spacing between LIDAR samples (ground sample distances) and the noise on the LIDAR range measurement. This simulation has also been used to determine the effect of viewing on hazard detection performance. The software has also been deployed to Johnson Space Center and integrated into the ALHAT real-time Hardware-in-the-Loop testbed.

Huertas, Andres↗

Digital processing of Mariner 9 television data.

The digital image processing performed by the Image Processing Laboratory (IPL) at JPL in support of the Mariner 9 mission is summarized. The support is divided into the general categories of image decalibration (the removal of photometric and geometric distortions from returned imagery), computer cartographic projections in support of mapping activities, and adaptive experimenter support (flexible support to provide qualitative digital enhancements and quantitative data reduction of returned imagery). Among the tasks performed were the production of maximum discriminability versions of several hundred frames to support generation of a geodetic control net for Mars, and special enhancements supporting analysis of Phobos and Deimos images.

Green, W. B.↗

Software cost/resource modeling: Deep space network software cost estimation model

A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. J.↗

Bringing AI up to the space challenge

The state of the art in automated systems for working in environments hostile to humans is assessed, together with the technological advancements necessary to meet NASA goals. Since completely automated operations are not possible with the current level of artificial intelligence (AI), the operator must have access to remote television access and interactive computerized controls. A proximal system exists when the teleoperated mechanism is close enough so that negligible time passes between operator and servocontrolled activation and feedback. An additional constraint is the complexity of the signal. Further development areas have been identified as limiting the necessary communication, compensating for technical limitations of communication with remote systems, such as bandwidth, error rate, and equipment response time, and to build-in fault tolerance, self-diagnosis, and self-maintenance capabilities. An AI expert system is being developed at JPL to provide an expert knowledge base and a decision-making capability. It is suggested that only thorough questioning of mission and spacecraft experts, as well as searching the large volume of project documentations, will provide the necessary data for establishing an expert data base for AI implementation.

Heer, E.↗

Developing the JPL Engineering Processes

This paper briefly recounts the recent history of process reengineering at the NASA Jet Propulsion Laboratory, with a focus on the engineering processes. The JPL process structure is described and the process development activities of the past several years outlined. The main focus of the paper is on the current process structure, the emphasis on the flight project life cycle, the governance approach that lead to Flight Project Practices, and the remaining effort to capture process knowledge at the detail level of the work group.

reengineering↗

Managing Complex Space Missions Like the James Webb Space Telescope

Program Management Summary; Organizational structure is established. Roles and responsibilities are well defined: a) All major contracts are in place. b) All foreign partners are in place, operating under signed Memoranda of Understanding (MOUs). c) Partners include GSFC, NGST, Ball, ITT, ATK, STScI, ESA, CSA, UAz, LM, JPL, MSFC, ARC, JSC, etc. All enabling technologies are at Technical Readiness Level-6. Earned Value Management is being applied to all major contracts consistent with Agency guidance. Schedules are baselined and the project critical path is understood/managed. Budget with reserves established. Liens and threats system in use. Formal Configuration Management (CM) processes are in place. Project-level schedules are maintained within the CM system. Formal Risk Management processes are in place. Requirements are stable and flowed down. Project metrics are established and tracked monthly: a) Includes technical as well as cost and schedule metrics. b) Changes as well as trends are reported each month.

Sabelhaus, Phil↗

Mobile antenna development at JPL

The Jet Propulsion Laboratory (JPL), under the sponsorship of NASA, has pioneered the development of land vehicle antennas for commercial mobile satellite communications. Several novel antennas have been developed at L-band frequencies for the Mobile Satellite (MSAT) program initiated about a decade ago. Currently, two types of antennas are being developed at K- and Ka-band frequencies for the ACTS (Advanced Communications Technology Satellite) Mobile Terminal (AMT) project. For the future, several hand-held antenna concepts are proposed for the small terminals of the Ka-band Personal Access Satellite System (PASS). For the L-band MSAT program, a number of omni-directional low-gain antennas, such as the crossed drooping-dipoles, the higher-order-mode circular microstrip patch, the quadrifilar helix, and the wrapped-around microstrip 'mast' array, have been developed for lower data rate communications. Several medium-gain satellite tracking antennas, such as the electronically scanned low-profile phased array, the mechanically steered tilted microstrip array, the mechanically steered low-profile microstrip Yagi array, and the hybrid electronically/mechanically steered low-profile array, have been developed for the MSAT's higher data rate and voice communications. To date, for the L-band vehicle application, JPL has developed the world's lowest-profile phased array (1.8 cm height), as well as the lowest-profile mechanically steered antenna (3.7 cm height). For the 20/30 GHz AMT project, a small mechanically steered elliptical reflector antenna with a gain of 23 dBi has recently been developed to transmit horizontal polarization at 30 GHz and receive vertical polarization at 20 GHz. Its hemispherical radome has a height of 10 cm and a base diameter of 23 cm. In addition to the reflector, a mechanically steered printed MMIC active array is currently being developed to achieve the same electrical requirements with a low profile capability. These AMT antenna developments, along with other Ka-band technologies, will lead to the development of several compact hand-held terminals for the PASS program. A few antenna concepts, such as the lap-top or desk-top terminal's printed array, the hand-held phased array, and the head-mounted low-profile array, have been proposed to achieve a future vision for the personal access communications system.

Huang, J.↗

Requirements Development and Management on the Psyche Project

In January 2017, Psyche was one of two mission concepts selected by NASA for flight as part of the 14th Discovery mission competition. The project has been staffing up and maturing the spacecraft, instrument and mission system baseline designs on the path towards a 2022 launch. During much of 2018, the Project has been executing the lifecycle stage called Phase B, “Preliminary Design and Technology Completion,” one key element of which is the development and management of requirements at various levels. In the case of the Psyche project, this process has been particularly unique for several reasons. The project utilizes a Solar Electric Propulsion (SEP) Chassis from Space Systems Loral (SSL), a high volume manufacturer of commercial geostationary (GEO) telecom spacecraft based on the 1300 satellite bus. While SSL has an extensive, well-vetted set of requirements based on their very successful Earth-orbiting product line, translating that heritage to a deep space science mission required special care. In addition to the differences associated with the deep space environment and longer communication times, new interfaces had to be incorporated. While a substantial portion of the Flight System consists of the SEP Chassis, there were several new interfaces within various subsystems between SSL components and those provided by JPL and other contractors. Managing these interfaces through requirements at a relatively higher level than normally seen on internal or external builds proved challenging. Finally, the Psyche spacecraft plans to host the flight terminal of the Deep Space Optical Communications (DSOC) technology demonstration, which is itself a separate project with its own requirements that must be flowed down and managed. This paper will present an overview of the requirement development and management process for the Psyche project. It will discuss in detail the various challenges summarized above, the methods and decisions chosen to address them, and evaluate their overall effectiveness at this stage in the project.

Elkins-Tanton, Linda T.↗

JPL Institutional Parts Program

This viewgraph presentation focuses on the past, present, and future space parts environment. The past environment was characterized by long lead time flagship missions having substantial support from NASA and DOD. The future environment is characterized by many BFC missions, short development cycles, smaller projects and shorter part delivery schedules. These ideas are elaborated upon.

Clark, Kevin P.↗

The NASA SETI sky survey - Recent developments

NASA's Search for Extraterrestrial Intelligence (SETI) project utilizes two complimentary search strategies: a sky survey and a targeted search. The SETI team at the Jet Propulsion Laboratory have primary responsibility to develop and carry out the sky survey part of the Microwave Observing Project. The paper describes progress that has been made to develop the major elements of the survey including a two-million channel wideband spectrum analyzer system that is being developed and constructed by JPL for the Deep Space Network. The new system will be a multiuser instrument that will serve as a prototype for the SETI Sky Survey processor. This system will be used to test the signal detection and observational strategies on deep-space network antennas in the near future.

Klein, Michael J.↗

A new multi-mission data system for space flight support through the 1990's

The Space Flight Operations Center (SFOC) is described with attention given to historical and technical aspects. The SFOC is designed to support each new JPL mission with all of its mission-unique processing as a ready adaptation of some set of baseline capabilities. Another goal of the SFOC is to allow the migration of current older JPL missions from their current systems that use aging and costly hardware and software to newer systems with similar functionality. Upon its completion, the planned support includes both downlink and uplink processing for a projected six mission set.

Gainsborough, A. J.↗

Preparing for the initial observations of the Targeted Search and the Sky Survey systems

During this period, the SETI project prepared for the initial observations with both the Targeted Search and Sky Survey systems. I am nominally a member of the Targeted Search team, but participated actively in both parts of the project. My activities were concentrated primarily in three areas: coordination with Arecibo Observatory in preparation for the initial observations on October 12, 1992; development of a design concept for confirming observations; and participation (at JPL) in a design review of the rf system.

Davis, Michael M.↗