Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCH”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

JPSS-1 VIIRS Pre-Launch Radiometric Performance

The first Joint Polar Satellite System (JPSS-1 or J1) mission is scheduled to launch in January 2017, and will be very similar to the Suomi-National Polar-orbiting Partnership (SNPP) mission. The Visible Infrared Imaging Radiometer Suite (VIIRS) on board the J1 spacecraft completed its sensor level performance testing in December 2014. VIIRS instrument is expected to provide valuable information about the Earth environment and properties on a daily basis, using a wide-swath (3,040 km) cross-track scanning radiometer. The design covers the wavelength spectrum from reflective to long-wave infrared through 22 spectral bands, from 0.412 m to 12.01 m, and has spatial resolutions of 370 m and 740 m at nadir for imaging and moderate bands, respectively. This paper will provide an overview of pre-launch J1 VIIRS performance testing and methodologies, describing the at-launch baseline radiometric performance as well as the metrics needed to calibrate the instrument once on orbit. Key sensor performance metrics include the sensor signal to noise ratios (SNRs), dynamic range, reflective and emissive bands calibration performance, polarization sensitivity, bands spectral performance, response-vs-scan (RVS), near field response, and stray light rejection. A set of performance metrics generated during the pre-launch testing program will be compared to the sensor requirements and to SNPP VIIRS pre-launch performance.

Oudrari, Hassan↗

NASA's Space Launch System: A Transformative Capability for Deep Space Missions

Already making substantial progress toward its first launches, NASA’s Space Launch System (SLS) exploration-class launch vehicle presents game-changing new opportunities in spaceflight, enabling human exploration of deep space, as well as a variety of missions and mission profiles that are currently impossible. Today, the initial configuration of SLS, able to deliver more than 70 metric tons of payload to low Earth orbit (LEO), is well into final production and testing ahead of its planned first flight, which will send NASA’s new Orion crew vehicle around the moon and will deploy 13 CubeSats, representing multiple disciplines, into deep space. At the same time, production work is already underway toward the more-capable Block 1B configuration, planned to debut on the second flight of SLS, and capable of lofting 105 tons to LEO or of co-manifesting large exploration systems with Orion on launches to the lunar vicinity. Progress being made on the vehicle for that second flight includes initial welding of its core stage and testing of one of its engines, as well as development of new elements such as the powerful Exploration Upper Stage and the Universal Stage Adapter “payload bay.” Ultimately, SLS will evolve to a configuration capable of delivering more than 130 tons to LEO to support humans missions to Mars. In order to enable human deep-space exploration, SLS provides unrivaled mass, volume, and departure energy for payloads, offering numerous benefits for a variety of other missions. For robotic science probes to the outer solar system, for example, SLS can cut transit times to less than half that of currently available vehicles or substantially increased spacecraft mass. In the field of astrophysics, SLS’ high payload volume, in the form of payload fairings with a diameter of up to 10 meters, creates the opportunity for launch of large-aperture telescopes providing an unprecedented look at our universe. This presentation will give an overview of SLS’ capabilities and its current status, and discuss the vehicle’s potential for human exploration of deep space and other game-changing utilization opportunities.

Creech, Stephen D.↗

Accommodations for Secondary Payloads in NASA's Space Launch System

NASA's new heavy-lift launch vehicle, the Space Launch System (SLS), is moving closer to its planned 2019 launch, with the in-space stage and spacecraft adapters complete and all other major elements of the rocket manufactured and currently being outfitted for flight. Exploration Mission-1 (EM-1), the first flight of SLS and the new Orion crew vehicle, will verify and validate new systems and provide an unparalleled opportunity for 13 6U CubeSat-class payloads to be released into deep space. Payloads are being developed by NASA, industry, international and academic partners and were selected for the EM-1 flight to address strategic knowledge gaps in the agency's plans for human deep space exploration. Destinations range from the lunar surface to an asteroid to an orbit around the Earth-moon L2 libration point. Missions include studying the effects of space radiation on a living organism (yeast), landing the smallest lander to date on the moon, and searching for water in permanently shaded lunar craters. Propulsion technology demonstrations include solar sails, use of inert water to carry out lunar gravity assist maneuvers, and use of new "green" chemical propellants. SLS employs an evolutionary design approach, with an initial capability of at least 26 metric tons (t) to trans-lunar injection (TLI). The later Block 1B configuration, which will become the Agency's workhorse launch vehicle into the 2020s, will lift at least 34 t to TLI in its crew configuration and at least 37 t in the cargo configuration. In addition to greater lift capability, Block 1B will also offer larger payload volume than Block 1 for both co-manifested and secondary payloads. In Block 1B, various combinations of 6U, 12U and 27U payloads may be accommodated in the vehicle's stage adapter. Opportunities for deep space research once out of reach for small science payloads will be within reach, opening many possibilities for exciting new technology demonstrations and scientific missions. This paper will provide an overview of the capabilities and the status of the Block 1 vehicle, with particular emphasis on the secondary payload accommodations and the deployment system. Brief descriptions of the 13 6U EM-1 payloads will be included. In addition, a discussion of the payload developers' responsibilities and the Space Launch System Program's roles and responsibilities in accommodating these and future payloads will be included. Finally, the author will look ahead to SLS Block 1B and missions beyond EM-1 and the opportunities for 6U, 12U and 27U CubeSats.

Robinson, Kimberly F.↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As part of a renewed focus on deep space exploration, NASA and its private sector and international partners are building a new super heavy-lift launch vehicle, the Space Launch System (SLS), as well as the new Orion crew vehicle, and upgrading launch facilities at Kennedy Space Center. Progress made on the Block 1 vehicle, as well as its expected performance metrics and fiscal support from the U.S. administration and Congress, have opened up additional manifest possibilities that the Agency continues to evaluate. Offering a combination of power, payload capacity and departure energy unmatched in contemporary boosters, the SLS family of launch vehicles features the world's most-proven propulsion system: solid rocket boosters and RS-25 main engines with a modified existing cryogenic in-space stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) of payload to trans-lunar injection (TLI). The vehicle's flexible architecture will enable the rocket to evolve over the next decade to meet the most demanding deep space mission requirements. The second configuration, Block 1B, will deliver at least 34 to 40 t to TLI, depending on whether the crewed or cargo variant is selected. Although designed to facilitate human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with affordable access to deep space. For the first integrated mission of SLS and Orion, launching from Kennedy Space Center in fiscal year 2020, SLS Block 1 will send Orion on a 25.5-day mission to a distant retrograde lunar orbit with the primary objective to test and validate new systems and procedures. That first mission, called Exploration Mission-1 (EM-1), also has 13 6U-class CubeSat payloads manifested. Those payloads, which will carry out a variety of scientific experiments and technology demonstrations, will deploy in several locations along the trajectory after Orion has separated from SLS. Contractors and suppliers have made significant progress since last year manufacturing the Block 1 vehicle for EM-1. The upper stage and adapters are complete as are the four RS-25 engines. All other major components are constructed and being outfitted for flight. In fact, hardware for the second flight is currently being manufactured at locations across the United States. This paper will outline hardware, avionics and testing progress toward the first and second flights of SLS. Manifest opportunities for primary, co-manifested and secondary payloads will be discussed. An in-depth look at payload utilization and integration will be provided, as well as lessons learned from installing a secondary payload deployment system for EM-1.

Creech, Steve↗

Space Launch System and Missions to Near Rectilinear Halo Orbits

The first major evolution of NASA’s Space Launch System (SLS) will begin its flights starting in the mid-2020’s. This new configuration, called Block 1B, replaces the Interim Cryogenic Propulsion Stage with a larger Exploration Upper Stage (EUS). The additional capability provided by the new upper stage will allow SLS to send heavier payloads into deep space. One destination of interest to the SLS program is called a Near Rectilinear Halo Orbit (NRHO). This is a type of lunar orbit with multiple advantages for deep space exploration. These benefits include Earth/lunar access, low station-keeping requirements, and high communication potential with Earth. Therefore, it is a leading candidate for the proposed Lunar Orbital Platform-Gateway (LOP-G). This paper will provide a detailed assessment of the SLS Block 1B requirements and capabilities for sending payloads to an NRHO. Analysts at Marshall Space Flight Center are producing a multi-year mission availability scan for the SLS Block 1B configuration to a predefined NRHO orbit. The analysis produces an optimized trajectory for each day of the scan window. A maximized payload and minimized propellant requirement are determined for each day. All maneuvers from launch to the end of the Trans-Lunar-Injection (TLI) are being modeled as finite burns. Injections into an NRHO are being modeled as impulsive maneuvers. The payload element is arbitrary, but includes sufficient mass to represent a large habitat or propulsion module. The resulting parameters of payload capability, delta-v requirements, and launch windows length vary over the course of the scan. Many launch days in the scan are eliminated in post-processing as they violate mission constraints such as payload mass and propellant usage to insert into an NRHO. Based off previous one-year scan results for the SLS Block 1B Design Analysis Cycle 2 (DAC-2), it is expected that there will be one to three days per week where the payload is able to insert into an NRHO within SLS constraints objectives. This scan provides results for longer than one-year, allowing analysts to better understand the launch availability and energy requirements of SLS Block 1B over time. The in-space mission design and scans utilize Copernicus, an n-body trajectory optimization tool originally developed out of the University of Texas at Austin with further development at Johnson Space Center in Houston, TX. To seed the in-space trajectory, Copernicus uses a plugin to call a database of SLS ascent trajectories optimized in the Program to Simulate Optimized Trajectories II (POST2). The ascent trajectories are developed using a framework that parametrizes payload mass and LEO inclination, and targets a 100 nmi (nautical mile) altitude circular parking orbit. Though this analysis is specific to the SLS program, it will provide a summary of mission design benefits and constraints associated with generic NRHO access, and may be applied to other programs or concepts that will utilize this orbit.

Statham, T. L.↗

NASA’s Space Launch System: Exploration Mission-1 Hardware Nears Completion

The Space Launch System (SLS) Program completed several significant production milestones in 2018 for the launch vehicle’s first mission (Fig. 1) and is poised for greater accomplishments in 2019. With manufacturing and hardware installation finished, Boeing completed the core stage forward join and shipped the liquid hydrogen tank structural test article to Marshall Space Flight Center for testing. The core stage aft join and LOX tank STA are expected to be completed in 2019 on the way to final stage integration. The four EM-1 engines are poised for stage integration in 2019. The Launch Vehicle Stage Adapter completed outfitting at Marshall and will be shipped to Kennedy Space Center in 2019. All solid rocket motor segments for the EM-1 boosters are cast, inspected and ready for shipment to KSC. The upper stage, the Interim Cryogenic Propulsion Stage (ICPS), and the Orion Stage Adapter (OSA), where 13 6U CubeSats will ride to deep space on EM-1, were completed and delivered to Exploration Ground Systems at KSC in 2017 and 2018, respectively. The Program continues to work toward first launch of the nation’s new super heavy lift deep space capability in fiscal 2020. SLS is designed, engineered and tested to launch the most challenging exploration missions, minimizing risk and providing the greatest opportunity for mission success. This paper will discuss the technical and programmatic successes and challenges of the past year and look ahead to plans for 2019.

Honeycutt, John↗

Astrobee Free Flyers: Integrated and Tested. Ready for Launch!

As of March 2019, four Astrobee free-flying robots have been integrated, tested and shipped to NASA’s Johnson Space Center, Texas, ready to be launched to space. Two of these Astrobee units (Honey and Bumble) will be launched to the International Space Station (ISS) on April 17, 2019, on the Cygnus NG-11 (Northrop Grumman) cargo resupply spacecraft from the Mid-Atlantic Regional Spaceport (MARS) launch facility, at NASA's Wallops Flight Facility, in Virginia, while the third unit (Queen) will be launched in mid-July 2019, with the cargo resupply mission Space-X 18, from Cape Canaveral, at NASA’s Kennedy Space Center. The primary purpose of the Astrobee system is to provide an autonomous and flexible platform for research on zero-g free-flying robotics, with the ability to accommodate guest researchers looking to utilize the unique capabilities of this platform in the microgravity of low earth orbit, and to advance the state of the art of guest science software and research payloads, which range from gecko-inspired adhesives for perching on smooth surfaces, to augmented reality interfaces to help astronauts and robots work together effectively, to RFID reader, performing inventory of RFID tagged items inside the ISS. Astrobee will also serve utility functions, such as free-flying cameras to record video and provide assistance during astronaut activities, and as mobile sensor platforms to conduct surveys of the ISS. In this paper we will give an overview of the status of the Astrobee system, which includes the docking station already launched and mounted in the JAXA JEM module of the ISS, the Astrobee robots, the Astrobee robotic arms, the ground data system (GDS) and the development of the several guest science payloads.

Carlino, Roberto↗

NASA's Space Launch System: Deep Space Access for CubeSats

NASA is embarking on a new generation of missions to the Moon, known as the Artemis program. The Agency’s new super heavy-lift launch vehicle, the Space Launch System (SLS), is a critical enabling capability for these efforts, which will serve as a proving ground for future crewed expeditions to Mars. SLS is designed to return astronauts to the Moon in the Orion spacecraft and to launch more mass and provide more volume for critical payloads than commercially available vehicles, giving NASA a unique asset for deep space exploration. When performance margin and volume is available, as it is on the first flight, Artemis I (previously Exploration Mission-1), SLS can offer CubeSats access to deep space, beyond Earth’s orbit. The Artemis I flight has 13 6U (14 kg) CubeSats manifested, and the Program is currently accepting proposals for 6U and 12U payloads for the Artemis II flight through the agency’s CubeSat Launch Initiative (CSLI) program. Proposals from U.S.-based payload developers to fly on Artemis II will be accepted through CSLI until November 4, 2019. When ridesharing on SLS deep space missions, CubeSats must demonstrate they will not interfere with primary mission objectives. The 13 Artemis I CubeSats that hail from industry, academia, NASA and its international partners represent an array of exciting deep space science investigations and technology demonstrations that may help inform future Artemis missions. The initial SLS Block 1 vehicle for the Artemis I flight is fully manufactured; several elements are complete and have been delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center (KSC), which has responsibility for integrating and launching the SLS and Orion stack. Completed elements of the Artemis I vehicle include the Orion Stage Adapter (OSA), which houses the 13 Artemis I CubeSats. With the Artemis I flight hardware and software nearing completion, work is in progress for the second Block 1 launcher, designated for the crewed Artemis II flight. Hardware is being manufactured for every element of the Artemis II vehicle. In this paper, the author will review the status of the Artemis I vehicle and the payloads manifested for the initial flight. Information on the Secondary Payload Deployment System (SPDS) that the SLS Program provides to payload developers will also be included.

Creech, Stephen D.↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Stephen D.↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Steve↗

Aerodynamic Characterization and Improved Testing Methods for the Space Launch System Liftoff and Transition Environment

Low-speed wind tunnel testing for the liftoff and transition environment of the Space Launch System (SLS) was recently completed in the NASA Langley Research Center 14- by 22-Foot Subsonic Tunnel using 1.75%-scale models of three SLS vehicle configurations. During the liftoff testing, the primary objective was to evaluate the aerodynamic forces and moments on the SLS launch vehicles, as the vehicle, launch tower, and mobile launch platform were subjected to ground winds from all directions at varying heights for the vehicle off the launch pad. Additionally, aerodynamic forces and moments were acquired for all three SLS vehicles during the transition phase from liftoff to ascent that covered a wide range of angles of attack and angles of side slip. Details of the experimental setup including improved testing methods and a stiffer sting-balance system based on lessons learned from previous test entries are presented. Also, a new force measurement technique was applied during the test where two subminiature six-component load cells were installed in each Solid Rocket Booster (SRB) to acquire forces and moments for each SRB separately from the full vehicle forces and moments measured by the main strain gauge balance. Finally, sample results from the experiment are presented including improved overall data coverage, evaluation of the new SRB data, and smoke flow visualization photos.

Chan, David T.↗

NASA Space Launch System Prepares for Key Hotfire Test Before Vehicle Integration

NASA this year is working toward the final major integrated hardware and avionics test for its Space Launch System (SLS), the agency’s new super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars and beyond. As the backbone of the Artemis human lunar exploration program, Artemis I SLS operations will then shift to the launch site and integration for the inaugural mission. For this final major test of the first vehicle NASA has built exclusively for deep space exploration since the Saturn V, a NASA/Boeing/Aerojet Rocketdyne team will conduct the final core stage “green run” test at NASA's Stennis Space Center with a dramatic firing of all four core stage engines. This test will validate the operation of the stage structures, main propulsion system, engines, avionics, and software. Following data review, stage inspection, and refurbishment, the stage will be barged to NASA’s Kennedy Space Center to continue integration of the Artemis I launch vehicle. Already underway is assembly of the mission’s five-segment solid rocket boosters. The mission’s upper stage and spacecraft adapters also are staged at the launch site ready for integration. Even as the Artemis I SLS proceeds toward launch later this year, the Artemis II and Artemis III vehicles are coming together, with core stages, engines, boosters, upper stage, and payload accommodations in various stages of manufacturing and/or processing. Planning is also underway for additional core stages and a new, more powerful upper stage that will increase lunar payload mass. SLS is the anchor transportation leg of a plan for sustained human exploration of the Moon, including the first human landing later in the decade. This paper will discuss SLS progress to date and expected 2021 milestones.

Bruce R. Askins↗

NASA Space Launch System Completes Green Run Testing, Begins Assembly

NASA’s Space Launch System (SLS) Program is poised in 2021 to shift its focus to the launch site with the completion of its last major integrated hardware and software test. SLS is NASA’s evolvable super heavy-lift launch vehicle for deep space exploration. Using proven propulsion technologies, SLS will be the most powerful launch vehicle in the world. That capability translates not only into more mass and volume to destinations but also simplified payload design and mission operations and greater opportunity for mission success. These capabilities will be important for the Artemis program, NASA’s plan to return humans to the Moon to stay in a sustainable way in order to develop and test technologies and operations needed for human missions to Mars and other destinations. SLS will anchor the transportation leg of an innovative, sustainable program of lunar exploration with commercial and international partners as the first step of human exploration of deep space. While all major hardware and software efforts made significant progress in 2020 and 2021, the most visible was the Green Run test series of the Artemis I core stage conducted at NASA’s Stennis Space Center (SSC) on the B-2 test stand. The series validated core stage design, performance, workmanship, and readiness for shipment to NASA Kennedy Space Center (KSC) for final processing, integration and launch. The core stage provides the backbone for SLS’ main propulsion system, consisting of two five-segment solid rocket boosters and four RS-25 liquid hydrogen (LH2)/liquid oxygen (LOX) engines. SLS also includes an Interim Cryogenic Propulsion Stage (ICPS) that will insert the Orion crew spacecraft into a lunar trajectory.

John Honeycutt↗

NASA Space Launch System Completes Key Hotfire Test And Begins Vehicle Integration

NASA and its commercial and international partners are on the way back to the Moon. As directed by the White House in 2019, the agency team is striving to return humans to the Moon and land the first woman and the first person of color on the lunar surface. NASA and its commercial partners made significant progress in the second half of 2020 and the first half of 2021 on the agency’s Space Launch System (SLS), one of the key parts of the Artemis program. The team is preparing for a 2021 launch of Artemis I, the first integrated launch of the Block 1 variant of SLS with the Orion crew capsule. Hardware for the Artemis II launch, which will be the first to launch crew on SLS and Orion, is progressing through assembly, and hardware for Artemis III has started manufacturing. Artemis IV manufacturing has also started, and engines for Artemis V are in development/manufacturing. This paper will discuss the progress made in the last year and the items currently in work on for future SLS flights and variants.

Bruce R Askins↗

NASA Space Launch System Completes Key Hot Fire Test and Begins Vehicle Integration

NASA and its commercial and international partners are on the way back to the Moon. Significant progress towards that goal was made in 2021, including on the agency’s Space Launch System (SLS) rocket – a key part of the Artemis initiative. The SLS core stage for the Artemis I mission – the first launch of SLS and an uncrewed Orion capsule – completed its Green Run test series in early 2021 and was successfully mated with the SLS twin solid rocket boosters on the mobile launcher at Kennedy Space Center (KSC). The launch vehicle stage adapter, interim cryogenic propulsion stage, and the Orion stage adapter structural test article and Orion spacecraft mass simulator were also stacked. The flight Orion spacecraft and Orion stage adapter are being prepared for stacking and launch, targeted for late 2021 following a wet dress rehearsal at Launch Complex 39B. SLS hardware for Artemis II, which will be the first flight of crew on Orion and SLS, is also in work. Work progressed on core stage components, booster segments, and other hardware for Artemis III and future missions. This paper will detail the progress made.

John Honeycutt↗

Beyond Gravity Single Launch Payload Accommodations Shock Testing

The Vulcan Centaur launch vehicle is purpose-built to meet all the U.S. government’s National Security Space Launch (NSSL) needs. A shock test for the Centaur V’s payload accommodations (PLA), single launch (SL) configuration was successfully conducted at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, in May 2021. This test was a joint effort between MSFC, Beyond Gravity and United Launch Alliance. The primary purpose of the shock test was to characterize the shock environment induced by the separation event on components attached to the PLA and its interfaces. Additional test requirements included: (1) verifying the payload fairing (PLF) did not contact the flight hardware during the mechanical separation of the PLF horizontal separation system (HSS) and (2) evaluating the performance of the HSS spring packages during jettison. The data acquired during the PLF SL shock test will be used to validate the shock predictions from pre-test analysis of the launch vehicle and the PLF separation analysis. This paper provides an overview of the PLA SL shock test planning and execution as well as the required catch system, instrumentation and results.

separation↗

NASA’s Space Launch System: Comprehensive Test Program Leads to Mission Success during Artemis I Flight Test

NASA’s SLS (Space Launch System) rocket had a successful first launch on Nov. 16, 2022, sending an uncrewed Orion spacecraft to the Moon on the agency’s Artemis I mission. Ten 6U CubeSats were also deployed from SLS during the mission. Orbital insertion parameters, including insertion velocity and altitude, were within hundredths and tenths of a percent from predicted values, corroborating data collected from the individual elements that showed similar performance accuracy. While launch remains the main test – and Artemis I was a true test flight – to collect data, confirm and refine computer models, and validate hardware test data, multiple test programs led up to the first flight and enabled the historic launch. Additionally, SLS was designed from the beginning to be a crew-rated launch vehicle, and teams put the astronauts who will fly on it at the forefront of the development process. This paper and presentation will cover the SLS design and development programs that led to the successful Artemis I mission, and which have set the stage to send the first astronauts back to cislunar space since the Apollo 17 crew in 1972.

John Honeycutt↗

Comprehensive Test Program of NASA's Space Launch System Rocket Leads to Successful Artemis Mission

NASA’s SLS (Space Launch System) rocket had a successful first launch on Nov. 16, 2022, sending an uncrewed Orion spacecraft to the Moon on the agency’s Artemis I mission. Ten 6U CubeSats were also deployed from SLS during the mission. Orbital insertion parameters, including insertion velocity and altitude, were within hundredths and tenths of a percent from predicted values, corroborating data collected from the individual elements that showed similar performance accuracy. While launch remains the main test – and Artemis I was a true test flight – to collect data, confirm and refine computer models, and validate hardware test data, multiple test programs led up to the first flight and enabled the historic launch. Additionally, SLS was designed from the beginning to be a crew-rated launch vehicle, and teams put the astronauts who will fly on it at the forefront of the development process. This paper and presentation will cover the SLS design and development programs that led to the successful Artemis I mission, and which have set the stage to send the first astronauts back to cislunar space since the Apollo 17 crew in 1972.

John Honeycutt↗