Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operating Experience”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

FNAL PIP-II Accumulator Ring

The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.

43 PARTICLE ACCELERATORS↗

Machine Learning for Improved Availability of the SNS Klystron High Voltage Converter Modulators

Beam availability has increased at the SNS, however, the targeted availability is greater than 95 %, while the SNS has failed to meet lower targets in the past. The HVCM used to power the linac klystrons have been one source of lost beam time and was chosen to explore using AI/ML techniques to improve reliability. Among the possibilities being explored are automating the tuning of HVCMs and predicting component failures such as capacitor aging, rectifier assemblies containing hundreds of diodes, and insulating oil degradation. The methodology pursued includes data cleaning, de-noising, post-analysis data labeling, and machine learning model development. We explore using Long Short-Term Memory and autoencoders for anomaly detection and prognostication used to schedule maintenance. We evaluate the use of model regularizers and constraints to improve the performance of the model and investigate methods to estimate the uncertainty of the models to provide a robust prediction with statistical interoperability. This paper describes the operational experience and known failures of the HVCMs and the proposed ML methodology and the preliminary results of training the AI/ML algorithms.

Pappas, Chris↗

Cryogenic testing of the first HL-LHC Q1/Q3 cryo-assembly at Fermilab

In early 2023, Fermilab is conducting horizontal cryogenic testing of the first Q1/Q3 cryo-assembly for the high-luminosity LHC upgrade (HL-LHC). The cryo-assembly was installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of this test include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from this first test.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

ADS-Related Initiatives in the US

Even though there are no government-funded ADS initiatives in the USA, there are many activities that are relevant for ADS, particularly in the domain of high-power superconducting accelerators. The talk will provide an overview of these activities, including operational experience from CEBAF (electrons) and SNS (protons), prototyping of Project X linac cavities, and a brief introduction to topics presented in detail later in the conference. There have been several conferences on the use of Thorium as a nuclear fuel and these will be summarized for completeness.

Hutton, Andrew↗

Overview of the First Five Refurbished CEBAF Cryomodules

The Thomas Jefferson National Accelerator Facility is currently engaged in a cryomodule refurbishment project known as the C50 project. The goal of this project is robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project includes removing, refurbishing and replacing ten CEBAF cryomodules at a rate of three per year. Refurbishment includes reprocessing of SRF cavities to eliminate field emission and increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New "dogleg" couplers between the cavity and helium vessel flanges will intercept secondary electrons that produce arcing at the 2 K ceramic window in the fundamental Power Coupler (FPC). Modifications of the external Q (Qext) of the FPC will allow higher gradient operations. Other changes include new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Any damaged or worn components will be replaced as well. Currently, five refurbished cryomodules have been installed in CEBAF and are currently operational. This paper will summarize the test results and current operational experience.

Drury, Michael↗

Plant maintenance and plant life extension issue, 2009

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Application of modeling and simulation to nuclear power plants, by Berry Gibson, IBM, and Rolf Gibbels, Dassault Systems; Steam generators with tight manufacturing procedures, by Ei Kadokami, Mitsubishi Heavy Industries; SG design based on operational experience and R and D, by Jun Tang, Babcock and Wilcox Canada; Confident to deliver reliable performance, by Bruce Bevilacqua, Westinghouse Nuclear; An evolutionary plant design, by Martin Parece, AREVA NP, Inc.; and, Designed for optimum production, by Danny Roderick, GE Hitachi Nuclear Energy. Industry Innovation articles include: Controlling alloy 600 degradation, by John Wilson, Exelon Nuclear Corporation; Condensate polishing innovation, by Lewis Crone, Dominion Millstone Power Station; Reducing deposits in steam generators, by the Electric Power Research Institute; and, Minimizing Radiological effluent releases, by the Electric Power Research Institute. The plant profile article is titled 2008 - a year of 'firsts' for AmerenUE's Callaway plant, by Rick Eastman, AmerenUE.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Application of Margin-Based Methods to Assess System Health

Health management of complex systems such as nuclear power plants is an essential task to guarantee system reliability. This task can be greatly enhanced by constantly monitoring asset status and performances and process such data (through anomaly detection, diagnostic, and prognostic computational algorithms) to identify asset degradation trends and faulty states. While such information and data are typically available for many of the assets, they are not propagated from the asset to the system level in order to identify the most critical assets and prioritize maintenance and surveillance activities. The main reason is driven by the fact that current reliability modeling techniques are inadequate to process such information/data. This is due to the nature of these techniques which are based on the concept of failure rate/probability that do not serve an operational context where quantitative asset health information is available. Simply stated, current reliability techniques serve a run-to-failure operational setting and not a predictive maintenance one where the goal is to perform maintenance and surveillance activities only when they are needed based on asset health. The risk informed asset management (RIAM) project is focusing on the development of a different kind of reliability modeling techniques designed to adequately serve a predictive operational setting. Such reliability techniques move aways from a failure rate/probability to a margin-based mindset where margin is here used as a metric to quantify asset health based only on current and past operational experience of the asset under consideration. In addition, margin-based reliability techniques are able to propagate asset health information from the component to system level and provide importance measure to each asset. This report summarizes a recent activity performed in collaboration with plant modernization pathway designed to integrate monitoring data into margin-based reliability models. Such activity focuses on a specific system of an existing nuclear power plant where large amount of historic monitoring data is used to monitor asset and system health.

97 MATHEMATICS AND COMPUTING↗

Trade-off study on the power capacity of a prototype SFR in Korea

The major roles of a prototype SFR are to provide irradiation test capability for the fuel and structure materials, and to obtain operational experiences of systems. Due to a compromise between the irradiation capability and construction costs, the power level should be properly determined. In this paper, a trade-off study on the power level of the prototype SFR was performed from a neutronics viewpoint. To select candidate cores, the parametric study of pin diameters was estimated using 20 wt.% uranium fuel. The candidate cores of different power levels, 125 MWt, 250 MWt, 400 MWt, and 500 MWt, were compared with the 1500 MWt reference core. The resulting core performance and economic efficiency indices became insensitive to the power at about 400-500 MWt and sharply deteriorated at about 125-250 MWt with decreasing core sizes. Fuel management scheme, TRU core performance comparing with uranium core, and sodium void reactivity were also evaluated with increasing power levels. It is found that increasing the number of batches showed higher burnup performance and economic efficiency. However, increasing the cycle length showed the trends in lower economic efficiency. Irradiation performance of TRU and enriched TRU cores was improved about 20 % and 50 %, respectively. The maximum sodium void reactivity of 5.2$ was confirmed less than the design limit of 7.5$. As a result, the power capacity of the prototype SFR should not be less than 250 MWt and would be appropriate at {approx} 500 MWt considering the performance and economic efficiency. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Radiation Hardened Beam Instrumentations for Multi-mega-watt Beam Facilities

A beam instrumentation is an essential element for the successful operate particle accelerators in which various diagnostics and beam control systems are integrated into beam optics. However, the performance of beam instrumentation is often subject to constraints such as prompt radiation dose, integrated radiation dose, operation (ambient) temperature and humidity, available space, and strength of embedded electromagnetic fields at the monitoring point. These constraints will limit the dynamic range of operational beam parameters, like the maximum achievable beam power. A seamless R\&D effort to develop the radiation hardened beam instrumentation should be made for future multi-MW beam facilities. In this paper, we describes about a radiation hardened beam instrumentation based on the operational experience of the NuMI beam line.

43 PARTICLE ACCELERATORS↗

Cask Processing Enclosure Specification/Operation - 12231

Following an evaluation of throughput rates in the Hot Cell at the Transuranic Waste Processing Center and considering the variability in the waste with respect to actual dose rates a new approach to processing transuranic waste was necessary. Compounding the issue was the remote equipment poor reliability and high down-time. After considering all the factors, the evaluation resulted in the design and construction of a new waste processing area for handling the concrete casks that predominately contain contact handled transuranic (TRU) waste. The area is called the Cask Processing Enclosure and essentially the Cask Processing Enclosure mimics the projects current process techniques used for processing Contact Handled -TRU waste in the existing Box Breakdown Area and Glovebox. The Cask Processing Enclosure approach was developed based on a review of the RH processing throughput rates in the Hot Cell. As the process was reviewed consideration was given to the variability in the waste with respect to actual dose rates and the lack of equipment reliability and high wear in the Hot Cell. Based on that review, a new contact handled processing area for handling the concrete casks is being constructed and startup is expected shortly following WM2012. The Cask Processing Enclosure essentially mimics the projects current process techniques used for processing Contact Handled waste in the existing Box Breakdown Area and Glovebox and the design takes into consideration six years of operational experience. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing and Starting up of the Plasma Melting Facility for Industrial Treatment of Radioactive Waste - 17362

The operation and maintenance of nuclear power plants, the nuclear fuel cycle in general, research laboratories and pharmaceutical, medical and industrial facilities generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified and afterwards oxidized in an afterburner and purified in an off-gas cleaning system. This paper describes the principles of plasma, the different waste feed systems, off-gas treatment and operational experience and future plasma plants. More specifically, it presents the new full-scale plasma facility for the treatment of radioactive waste at the Kozloduy Nuclear Power Plant in Bulgaria for which construction and assembly was finalized end of August 2016. It also describes in more detail the Site Acceptance Tests (SAT) of this facility. This facility is designed and built as an EPC contract by the Joint Venture Iberdrola Ingenieria y Construccion (Spain) and Belgoprocess (Belgium). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EPRI Research Results: International Nuclear Power Plant Waste Classification - 17444

Different countries around the globe use varying schemes for the classification of radioactive waste. Many countries develop country specific waste classification schemes based on the International Atomic Energy Agency (IAEA) waste classification framework. The United States of America use the Class A, B, and C waste classification. Additionally, some countries use concentration limits to classify wastes while others use dose rate limits or a combination of concentration and dose rate limits. General comparisons have been made between the IAEA and the United States classification schemes, but a clear and well researched comparison of the international schemes was not evident in the available research data sets. In 2013 Electric Power Research Institute (EPRI) initiated the Comparison of Global Low and Intermediate Level Waste Management Methods project. The objective of the project was to understand how six countries managed their low and intermediate level wastes from generation to disposal. A major task of this project was to conduct a comparison of the international waste classification schemes. EPRI developed a set of reference waste volumes that are representative of nuclear power plant low-level radioactive waste in form and radioactivity concentrations (e.g. dry active waste, high activity resin, low activity resin, high activity filters and low activity filters). These waste volumes were then classified using the waste classification systems in place in several countries around the world. In 2016, EPRI presented a paper providing a status update on this research. This 2017 paper provides the final results of that research, show where comparisons and correlations can be made, and provide a discussion on how this information might inform international radioactive research and development and benchmarking of radioactive waste management strategies, operational experiences, best practices, and technology implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Solutions for Loading Smaller Standardized Dry Storage Canister Systems for Used Nuclear Fuel - 16232

An integrated team lead by EnergySolutions has developed and evaluated design concepts and loading processes for standardized transportation, aging and disposal (STAD) canister systems for the dry storage of United States (US) commercial used nuclear fuel (UNF). These STADs would be smaller than the Dual Purpose Canisters (DPCs) currently in use for storage and transportation of UNF at the nuclear power plant (NPP) sites in the US, so it was necessary to study the operational requirements and impacts related to their implementation at the NPPs and develop innovative approaches to mitigate these impacts. This work was funded by the US Department of Energy (DOE) to support the DOE in evaluating the option of using standardized canister systems for storage, transport, and disposal of US commercial UNF as part of an integrated waste management system. The NPP utilities are currently placing UNF into increasingly large DPCs because this reduces loading times and associated worker dose uptake. However, whether large DPCs may be able to be directly disposed is not known at this time, and will depend in part on future geologic disposal concepts and the DPC heat content. The use of STAD canisters rather than DPCs at the NPP sites and/or at an interim storage facility could avoid a potential need to repackage the UNF for disposal but, to make STAD canisters attractive for use, ways need to be found to fill and seal them efficiently from an operational perspective. This paper describes the generic design for a small STAD canister system, the loading processes and process improvements that were identified for the small, medium and large STAD canister sizes, the methodology for, and results from, the assessment of the performance of the loading processes, and the practicality of the results versus NPP operating experience. The work that this paper reports thus reflects research and development efforts to explore technical concepts that could support future decision-making by DOE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oxidizer Testing on Alternative Absorbents for Los Alamos National Laboratory - 18656

In the summer of 2016, during glovebox operations in TA-55, cheesecloth, a cellulosic material, was used to clean up a small spill of 9.8 molar nitric acid (oxidizer). Because cellulosic materials and oxidizers are incompatible, this prompted a chemical compatibility evaluation of the waste in TA-55 to determine if this waste was Resource Conservation and Recovery Act (RCRA) ignitable waste (D001) or RCRA reactive waste (D003). After testing and consulting with the Carlsbad Field Office in Carlsbad (CBFO), Los Alamos National Laboratory (LANL) NPI-7 decided to look for alternative absorbents to use in the gloveboxes that would not create an incompatibility issue with an oxidizer. While small spills are infrequent, they do happen and LANL wanted to be proactive and search for a material that would be compatible with an oxidizer. In December 2016, LANL NPI-7 requested LANL-Carlsbad's (LANL-CO) Difficult Waste Team to perform compatibility testing on potential alternative wipes for disposal at the Waste Isolation Pilot Plant (WIPP). The purpose for testing was to meet the Operational Experience Level 3 (OE-3) requirements that states 'any proposed use of organic absorbents or engineered absorbents in combination with potentially oxidizing TRU waste, wet or dry, should be evaluated and approved by the National TRU Program, Carlsbad Field Office' [1]. LANL NPI-7 requested LANL-CO to perform these tests because they were the group that performed all of the oxidizer testing for CBFO for the Basis of Knowledge (BoK) [2]. LANL NPI-7 chose nine fabrics and KMI Zeolite to be tested. The testing in Carlsbad took approximately 2 months to prepare the procedures, test plans and for the procurement of items. The burn rate testing was done in accordance with the requirements discussed in the BoK and approved by the LANL-CO Difficult Waste Team. Each absorbent was tested for 1) capacity limiting tests, 2) verifying the non-oxidizer threshold concentration of the oxidizer and 3) establishing the non-oxidizer concentration based on the experimental results. The effect of rinsing cheesecloth samples that have absorbed an oxidizer was also tested [3]. The burn rate testing provided three potential alternative absorbents (Spilfyter Hazmat Sorbent SM Pads Premium, Kimtech Pure W4 Wipers and Polybenzimidazole (PBI) Staple fiber) that produced a non-oxidizer result as defined by the BoK. Two wipes Spilfyter Hazmat Sorbent SM Pads Premium and Kimtech Pure W4 Wipers were able to absorb the highest concentration of potassium nitrite and still produce a non-oxidizer. TA-55 has used Spilfyter Hazmat Sorbent SM Pads Premium for a number of years in several of the processes and has ordered Kimtech Pure W4 Wipers for use in the facility. PBI fabric passed at 25 wt. % solution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Synergistic Fuel Cycle Options with Thorium and Heavy Water Reactors

Fuel cycle options (FCOs) with thorium-based fuels have characteristics that may have benefits for meeting certain objectives, such as transuranic actinide inventory management and overall natural resource utilization. Neutron irradiation of thorium and uranium-233 results in negligible production of transuranic actinides. This advantage is compromised, to a degree, when thorium fuels are used in conjunction with uranium-238; however, strategic reprocessing and fuel use (e.g., recycle of plutonium and/or minor actinides) can be used to manage this problem. Furthermore, thorium FCOs with reprocessing can extend the availability of natural nuclear resources by breeding new fissile material, recovering and recycling unused material, and achieving high burnups. In instances where natural thorium is more readily available than uranium, FCOs which use thorium may be preferable from sustainability and energy security perspectives. However, many hybrid uranium-thorium FCOs struggle to perform well in this regard, since large amounts of external fissile material (and therefore natural uranium) are required to breed the required uranium-233. DOE's evaluation and screening effort reports that for every metric ton (MT) of U-233 bred in a light water reactor for reuse, about 1000 MT of natural uranium are required to support such breeding, much of which is used inefficiently due to enrichment. The combination of HWRs and thorium-based fuels has the potential to reduce this consumption of natural uranium resources. Because heavy water moderates neutrons without significant absorption, fissile material requirements are lower compared to those of LWRs. This has enabled conventional 'once-through' HWRs to operate with only slightly-enriched or even natural uranium. Also, HWRs can be combined with LWRs in multistage FCOs where used LWR fuel can be processed and the remaining fissile content is sufficient to support use as fuel in HWRs in spite of the presence of neutron poisons (e.g., uranium-236); this concept has been demonstrated at a research scale in Korea. Thus, additional energy is extracted from the same initial natural uranium feed and uranium enrichment effort. Another consideration with using thorium-based fuels in HWRs is the current limited operational experience of the reactors and associated fuel cycle facilities using these fuels. However, work continues internationally towards gaining further experience. For example, at equilibrium the third stage of India's planned Three-Stage Nuclear Power Program uses thorium/uranium-233 or thorium/plutonium fuels with a fissile supply from second-stage fast reactors. Further, China plans to experiment with low-enriched uranium (LEU)-Th CANFLEX fuel bundles in a once-through configuration in its HWRs and a long-term objective is to transition to thorium use in a closed HWR FCO. Vanderbilt University (VU) and Oak Ridge National Laboratory (ORNL) are characterizing multi-stage, thermal-reactor FCOs that incorporate thorium and examining their potential performance. This paper presents insights from the examination of FCOs which consider the synergy of HWRs and thorium. Two multi-stage FCOs which incorporate thorium-based fuels in HWRs have been examined for their potential, one which uses recycled PWR uranium oxide fuel in conjunction with thorium in an HWR, and another that uses recycled HWR fuel in an MSR which also includes thorium. Both of the systems studied offer resource utilization improvements as compared to a once-through LWR fueled with low-enrichment uranium and highlight the potential synergy of thorium and HWRs. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PGSFR Core Design and Performance Characteristics

Korea Atomic Energy Research Institute (KAERI) has developed a Prototype Generation-IV Sodium-cooled Fast Reactor (PGSFR) as a representative of Gen-IV concepts. The final PGSFR core will be composed of transuranic (TRU) fuels to transmute LWR spent fuels and self-recycled its fuels, in combination with a pyro-processing facility. However, the initial POSFR core consists of low enriched uranium (LEU) fuels in order to: 1) provide an irradiation test for TRU fuels and structural materials, 2) keep pace with the development of pyro-processing technology, and 3) obtain operational experience on the reactor systems and components. During the first phase of PGSFR development plan (2012-2015), the power level was decided to be 150 MWe from many trade-off studies using different power level. The PGSFR uranium core performance characteristics at the initial, transition and equilibrium states have been carried out. In this paper, the PGSFR core design and related performance characteristics are introduced. The PGSFR uranium core design was performed at the initial/transition/equilibrium core based on the candidate fuel management scheme. It was confirmed that this design can satisfy surely all design limit and requirement. The chapter 4 of PGSFR Preliminary Safety Information Document (PSID) published in December 2015 contains the detailed information and characteristics of PGSFR core. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Fuel Cycle Study to Developing a Viable Long Term Nuclear Power Scenario for the UK

Within the UK a closed fuel cycle has been in operation for decades but with the introduction of a new build programme to create 16 GWe capacity using LWR technology and with the closure of the UK's reprocessing industry, an open fuel cycle will be implemented beyond 2020. However, it is expected that 16 GWe nuclear capacity will not be enough for the UK to curb greenhouse gas emissions through increased demand for low carbon electricity, and tackle energy security. As such further nuclear expansion scenarios are being considered between 40 and 75 GWe by 2050. This study evaluates a viable 40 GWe UK nuclear scenario, evaluating the extent to which key drivers can impact a future UK nuclear energy strategy, including; the ability to sustain a relatively high nuclear capacity, fresh uranium availability, accumulation of spent fuel at decommissioning nuclear reactor sites and capacity requirements of future GDF host sites. The thermal reactor open fuel cycle is the de-facto standard around the world for many reasons including the reliance on extremely mature technology, significant operational experience and most importantly a relatively low cost. However, the premise that a thermal reactor open fuel cycle is the correct one to adopt long term is dependent on the notion that large quantities of UO{sub 2} spent fuel can eventually be disposed of in a geological disposal facility and the future availability of fresh uranium. The total amount of available uranium is unknown and if extraction from seawater proves to be economic and practical then any future concerns regarding supply disappear. Spent fuel disposability on the other hand has never been performed on a commercial scale and there is some uncertainty when and whether this can be achieved. This paper will follow from previous work already presented in 2013 [REF] which examined UK fuel cycles involving the transition to a closed fast reactor fleet by the end of this century. The revised scenarios now assume fast reactors are required later in the scenario, in-line with other countries. In addition, the new study has used physics methods originally developed by SKB to assess the physical size of the repository required to dispose of all intermediate and high level waste whilst ensuring temperature limits imposed by the engineered barriers and surrounding geology are adhered to. The disposition of less Am-241 in the repository will no doubt lead to a reduction in GDF footprint. However, this may not be important to GDF design and economics. The purpose of this paper is to also critically review the importance of and put into perspective a smaller GDF footprint and lower fissile inventory. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of an Alternative Approach to Demonstrating Environmental Performance in the UK - 19354

European basic safety standards require that exposure of humans to the potentially harmful effects of ionising radiation are optimised so that they are as low as reasonably achievable, taking account of economic and societal factors. In the United Kingdom the responsibility for ensuring that exposures to humans are optimised is split between two regulatory functions. The Office of Nuclear Regulation regulates exposures to workers in all scenarios and to members of the public in the event of an accident. Environmental regulators in each of the four nations comprising the United Kingdom regulate exposures to members of the public from normal operations. Since the early 1990's, all permissions granted to nuclear sites in the UK for the discharge/disposal of radioactive waste to the environment have contained conditions requiring holders to demonstrate that they minimise the generation of radioactive waste, apply appropriate abatement and discharge/dispose of it in a way that minimises impacts on members of the public and the environment. For many years, the industry standard for providing this demonstration, which was heavily influenced by regulatory expectations and feedback, was to undertake one or a series of multi-attribute decision assessments (MADA). Wood's team of environmental specialists has been involved in undertaking such MADA studies for many years. Since the mid-2000's, our team has become increasingly aware of some of the limitations of undertaking MADA to demonstrate environmental performance for large scale new nuclear build projects and, in particular, the next generation of new nuclear power stations that are being planned and implemented in the UK. We have collaborated with the vendors of reactor technologies, the prospective/owner operators of new nuclear power stations and the developers of new facilities on existing sites to develop an alternative approach to demonstrating environmental performance. Our alternative approach comprises three main pillars which are summarised as: - Evolution - benefit from progressive improvements, operational experience and recent permitting activities. Our alternative approach uses the claim, argument, evidence approach which is commonly used for nuclear safety cases and which allows us to 'tell the story' of how environmental performance has been achieved. We have successfully deployed this approach for all new nuclear power stations proposed in the UK. - Integration - ensure that optimisation is integrated into the project programme and forms part of the 'big picture'. Our alternative approach allows environmental performance to be managed better throughout the life cycle of the project and ensures that our outputs are 'living' documents and do not 'sit on the shelf'. We have successfully demonstrated how this can be applied during rationalisation of major schemes and significant design changes on nuclear new build projects. - Opportunity - identify the best time to deliver elements of the programme. Our alternative approach aims to minimise the overall time, trouble and costs associated with demonstrating environmental performance by ensuring that decisions are made at the time when they offer greatest benefit and by minimising unnecessary rework. Our advice has helped to reduce the project costs and minimise delays associated with regulatory queries and interventions. This paper describes the journey that we have taken with our clients in developing our alternative approach to demonstrating environmental performance. We explain the UK regulatory context and explore the need for change. We present a number of case studies related to new nuclear power stations and other new facilities on existing nuclear sites that demonstrate the successful application of our alternative approach. We provide examples of how we have successfully implemented the outputs of our alternative approach into project and corporate management arrangements. Finally, we examine feedback from clients, regulators and other interested parties to propose future refinements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗