Search NASA⌕ Search

SEARCH · Search NASA

Results for “Payload developer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Erectable platform for science and applications payloads circa 1985

A program involving the development of one or more free-flying platforms for earth orbit to provide accommodations and operational services to space science and applications payloads is described. An overview is presented of studies carried out to select a specific platform and utilities module concept, its subsystems, and the means by which services are supplied to dependent science and applications mission equipment. Some examples are given of candidate research and technology programs that support development of the platform system.

Zylius, F. A.↗

The OSTA-1 mission - Overview of the goals, mission parameters and instrumentation for the first Shuttle scientific payload

Aspects of the second Space Shuttle flight, which carried the first payload of scientific instruments for remote sensing of the earth's atmosphere, oceans, and land areas, are discussed. The development and integration of the payload, the mission simulations and end-to-end testing, the launch, the payload mission operations, the landing, data removal, and payload removal, the scientific results, and some planned experiments using the Shuttle are addressed. Summaries of the experimental results are presented, including those for the imaging radar, infrared radiometer, ocean color experiment, air pollution measurements, feature identification and location experiment, night/day optical lightning survey, and bioengineering test. The availability of data and science reports is also covered.

Taranik, J. V.↗

Assessment of candidate-expendable launch vehicles for large payloads

In recent years the U.S. Air Force and NASA conducted design studies of 3 expendable launch vehicle configurations that could serve as a backup to the space shuttle--the Titan 34D7/Centaur, the Atlas II/Centaur, and the shuttle-derived SRB-X--as well as studies of advanced shuttle-derived launch vehicles with much larger payload capabilities than the shuttle. The 3 candidate complementary launch vehicles are judged to be roughly equivalent in cost, development time, reliability, and payload-to-orbit performance. Advanced shuttle-derived vehicles are considered viable candidates to meet future heavy lift launch requirements; however, they do not appear likely to result in significant reduction in cost-per-pound to orbit.

Source record↗

Differential Absorption Lidar (DIAL) Measurements of Atmospheric Water Vapor Utilizing Robotic Aircraft

A new unpiloted air vehicle (UAV) based water vapor DIAL system will be described. This system is expected to offer lower operating costs, longer test duration and severe weather capabilities. A new high-efficiency, compact, light weight, diode-pumped, tunable Cr:LiSAF laser will be developed to meet the UAV payload weight and size limitations and its constraints in cooling capacity, physical size and payload. Similarly, a new receiver system using a single mirror telescope and an avalanche photo diode (APD) will be developed. Projected UAV parameters are expected to allow operation at altitudes up to 20 km, endurance of 24 hrs and speed of 400 km/hr. At these conditions measurements of water vapor at an uncertainty of 2-10% with a vertical resolution of 200 m and horizontal resolution of 10 km will be possible.

Hoang, Ngoc↗

An Examination of Launch Vehicle Loads Reanalysis Techniques

The typical approach to calculating dynamic launch loads in aerospace applications is coupled loads analysis (CLA). A component mode model of the launch vehicle is coupled with a component mode model of a payload, system modes are calculated, forcing functions are applied, and the dynamic responses are computed. This approach requires the explicit knowledge of the component models for the launch vehicle and payload, as well as the forcing functions. In many situations, the launch vehicle and forcing functions do not change from one analysis to the next only the payload is different. For this type of application, a method called reanalysis was developed to compute the response of a modified payload on the same launch vehicle. If the launch forcing functions are also the same, the approach eliminates the need for the launch vehicle model and the forcing functions and dramatically reduces the computation time. This work investigates the application and accuracy of three previously developed reanalysis methods using a typical launch vehicle and two different payloads. All three methods are based on knowledge of system modes from the original CLA, and Hurty/Craig-Bampton (HCB) models of the original and new payloads. The first method was developed at JPL (Jet Propulsion Lab) and is often referred to as substitution. It is a frequency-domain method, which requires transformation of time signals to and from the frequency domain. The other two methods are time-domain methods that more closely mimic the CLA process. The three methods were applied to two simple examples and a more complex one. The results indicate that the time-domain methods are considerably more robust with respect to modal truncation and other numerical errors than the frequency-domain JPL method.

Reanalysis↗

Integration Process for Payloads in the Fluids and Combustion Facility

The Fluids and Combustion Facility (FCF) is an ISS research facility located in the United States Laboratory (US Lab), Destiny. The FCF is a multi-discipline facility that performs microgravity research primarily in fluids physics science and combustion science. This facility remains on-orbit and provides accommodations to multi-user and Principal investigator (PI) unique hardware. The FCF is designed to accommodate 15 PI's per year. In order to allow for this number of payloads per year, the FCF has developed an end-to-end analytical and physical integration process. The process includes provision of integration tools, products and interface management throughout the life of the payload. The payload is provided with a single point of contact from the facility and works with that interface from PI selection through post flight processing. The process utilizes electronic tools for creation of interface documents/agreements, storage of payload data and rollup for facility submittals to ISS. Additionally, the process provides integration to and testing with flight-like simulators prior to payload delivery to KSC. These simulators allow the payload to test in the flight configuration and perform final facility interface and science verifications. The process also provides for support to the payload from the FCF through the Payload Safety Review Panel (PSRP). Finally, the process includes support in the development of operational products and the operation of the payload on-orbit.

Free, James M.↗

A study of the compatibility of science instruments with the solar electric propulsion space vehicle

Electromagnetic interference and field-of-view constraints are identified as the areas of most concern to science on solar electric propulsion space vehicles. Several areas are indicated which more detailed data on the space vehicle environment are needed. In addition, possible means to attain or demonstrate science/space vehicle compatibility are recommended for further iteration between space vehicle design and science payload considerations. The space vehicle design developed by the solar electric propulsion system integration technology effort is used. Two payload sets for comet Encke missions (a slow flyby and a rendezvous), as well as several instruments which are not included in the two payload sets, are analyzed to determine requirements on the space vehicle imposed by the instruments in order to meet their objectives. Environmental requirements for the sets of instruments are developed and compared to both the SEPSIT design criteria and the environment as it is presently understood.

Parker, R. H.↗

Space qualification of optical instruments using the NASA Long-Duration Exposure Facility

The NASA Long-Duration Exposure Facility (LDEF), designed for the in situ testing of optical instrumentation in the space environment is described. The LDEF is basically a reusable structure which is three-axis gravity-gradient stabilized when flying free in space. The structure weighs about 8,000 lbs. and accommodates experiment trays weighing about 10,000 lbs. A vacuum exposure control canister is being designed for controlled exposure experiments. The LDEF will have an experiment power and data system and a shuttle bay environmental measurements system is being designed for measuring parameters such as acoustics, vibration, acceleration. The induced environment contamination monitor will evaluate the contamination levels of shuttle payloads. Experiments currently under development include the evaluation of active optical components and the study of fiber optic data transmission.

Clark, L. G.↗

X-ray spectrometer spectrograph telescope system

A new sounding rocket payload that has been developed for X-ray spectroscopic studies of the solar corona is described. The instrument incorporates a grazing incidence Rowland mounted grating spectrograph and an extreme off-axis paraboloic sector feed system to isolate regions of the sun of order 1 x 10 arc seconds in size. The focal surface of the spectrograph is shared by photographic and photoelectric detection systems, with the latter serving as a part of the rocket pointing system control loop. Fabrication and alignment of the optical system is based on high precision machining and mechanical metrology techniques. The spectrograph has a resolution of 16 milliangstroms and modifications planned for future flights will improve the resolution to 5 milliangstroms, permitting line widths to be measured.

Bruner, E. C., Jr.↗

Orifice Blocks Heat Pipe in Reverse Mode

High forward-mode conductance is combined with rapid reverse-mode shutoff in a heat pipe originally developed to cool spacecraft payloads. A narrow orifice within the pipe "chokes off" the evaporator if heat sink becomes warmer than source. During normal operation, with source warmer than sink, orifice has little effect. Design is simpler and more compact than other thermal-diode heat pipes and requires no special materials, forgings, or unusual construction techniques.

Alario, J. P.↗

The 30/20 GHz flight experiment system, phase 2. Volume 1: Executive summary

Summary information on the final communication system design, communication payload, space vehicle, and development plan for the 30/20 GHz flight experiment will be installed on the LEASAT spacecraft which will be placed into orbit from the space shuttle cargo bay. The communication concept has two parts: a truck service and a customer premise service (CPS). The trucking system serves four spot beams which are interconnected in a satellite switched time division multiple access mode by an IF switch matrix. The CPS covers two large areas of the eastern United States with a pair of scanning beams.

Bronstein, L.↗

Mission Control Center operations for the Space Transportation System

Orbital flight tests of the Space Shuttle Program involved three types of activities, including classic flight testing of the vehicle hardware and software, operational procedures evaluation and development, and performance of payload mission operations. This combination of activities required a capability of the Mission Control Center (MCC) to provide thorough support to the Orbiter and its crew across a broad spectrum of activities. Attention is given to MCC organization, the general functions performed by the MCC teams, a flight support description, the motivation for a change in MCC operations, support elements, orbit phase functions, and dynamic flight phase functions. It is pointed out that the MCC facilities for the operational mode of support will not be fully implemented until 1984.

Frank, M. P.↗

The development of expertise on an intelligent tutoring system

An initial examination was conducted of an Intelligent Tutoring System (ITS) developed for use in industry. The ITS, developed by NASA, simulated a satellite deployment task. More specifically, the PD (Payload Assist Module Deployment)/ICAT (Intelligent Computer Aided Training) System simulated a nominal Payload Assist Module (PAM) deployment. The development of expertise on this task was examined using three Flight Dynamics Officer (FDO) candidates who had no previous experience with this task. The results indicated that performance improved rapidly until Trial 5, followed by more gradual improvements through Trial 12. The performance dimensions measured included performance speed, actions completed, errors, help required, and display fields checked. Suggestions for further refining the software and for deciding when to expose trainees to more difficult task scenarios are discussed. Further, the results provide an initial demonstration of the effectiveness of the PD/ICAT system in training the nominal PAM deployment task and indicate the potential benefits of using ITS's for training other FDO tasks.

Johnson, Debra Steele↗

The development of expertise using an intelligent computer-aided training system

An initial examination was conducted of an Intelligent Tutoring System (ITS) developed for use in industry. The ITS, developed by NASA, simulated a satellite deployment task. More specifically, the PD (Payload Assist Module Deployment)/ICAT (Intelligent Computer Aided Training) System simulated a nominal Payload Assist Module (PAM) deployment. The development of expertise on this task was examined using three Flight Dynamics Officer (FDO) candidates who has no previous experience with this task. The results indicated that performance improved rapidly until Trial 5, followed by more gradual improvements through Trial 12. The performance dimensions measured included performance speed, actions completed, errors, help required, and display fields checked. Suggestions for further refining the software and for deciding when to expose trainees to more difficult task scenarios are discussed. Further, the results provide an initial demonstration of the effectiveness of the PD/ICAT system in training the nominal PAM deployment task and indicate the potential benefits of using ITS's for training other FDO tasks.

Johnson, Debra Steele↗

STS-31 Space Shuttle mission report

The STS-31 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem activities on this thirty-fifth flight of the Space Shuttle and the tenth flight of the Orbiter Vehicle Discovery (OV-103). In addition to the Discovery vehicle, the flight vehicle consisted of an External Tank (ET) (designated as ET-34/LWT-27), three Space Shuttle main engines (SSME's) (serial numbers 2011, 2031, and 2107), and two Solid Rocket Booster (SRB) (designated as BI-037). The primary objective of the mission was to place the Hubble Space Telescope (HST) into a 330 nmi. circular orbit having an inclination of 28.45 degrees. The secondary objectives were to perform all operations necessary to support the requirements of the Protein Crystal Growth (PCG), Investigations into Polymer Membrane Processing (IPMP), Radiation Monitoring Equipment (RME), Ascent Particle Monitor (APM), IMAX Cargo Bay Camera (ICBC), Air Force Maui Optical Site Calibration Test (AMOS), IMAX Crew Compartment Camera, and Ion Arc payloads. In addition, 12 development test objectives (DTO's) and 10 detailed supplementary objectives (DSO's) were assigned to the flight. The sequence of events for this mission is shown. The significant problems that occurred in the Space Shuttle Orbiter subsystems during the mission are summarized, and the official problem tracking list is presented. In addition, each of the Space Shuttle Orbiter problems is cited in the subsystem discussion.

Camp, David W.↗

Data management system advanced architectures

The topics relating to the Space Station Freedom (SSF) are presented in view graph form and include: (1) the data management system (DMS) concept; (2) DMS evolution rationale; (3) the DMS advance architecture task; (4) DMS group support for Ames payloads; (5) DMS testbed development; (6) the DMS architecture task status; (7) real time multiprocessor testbed; (8) networked processor performance; (9) and the DMS advance architecture task 1992 goals.

Chevers, ED↗

Test/score/report: Simulation techniques for automating the test process

A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.

Hageman, Barbara H.↗

Transportable Payload Operations Control Center reusable software: Building blocks for quality ground data systems

The Mission Operations Division (MOD) at Goddard Space Flight Center builds Mission Operations Centers which are used by Flight Operations Teams to monitor and control satellites. Reducing system life cycle costs through software reuse has always been a priority of the MOD. The MOD's Transportable Payload Operations Control Center development team established an extensive library of 14 subsystems with over 100,000 delivered source instructions of reusable, generic software components. Nine TPOCC-based control centers to date support 11 satellites and achieved an average software reuse level of more than 75 percent. This paper shares experiences of how the TPOCC building blocks were developed and how building block developer's, mission development teams, and users are all part of the process.

Mahmot, Ron↗