Search NASA⌕ Search

SEARCH · Search NASA

Results for “Programmatic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Survey of Advanced Booster Options for Potential Shuttle Derivative Vehicles

A never-ending major goal for the Space Shuttle program is to continually improve flight safety, as long as this launch system remains in operational service. One of the options to improve system safety and to enhance vehicle performance as well, that has been seriously studied over the past several decades, is to replace the existing strap-on four segment solid rocket boosters (SRB's) with more capable units. A number of booster upgrade options have been studied in some detail, ranging from five segment solids through hybrids and a wide variety of liquid strap-ons (both pressure and pump fed with various propellants); all the way to a completely reusable liquid fly back booster (complete with air breathing engines for controlled landing and return). All of these possibilities appear to offer improvements in varying degrees; and each has their strengths and weaknesses from both programmatic and technical points of view. The most beneficial booster upgrade/design, if the shuttle program were to continue long enough to justify the required investment, would be an approach that greatly increased both vehicle and crew safety. This would be accomplished by increasing the minimum range/minimum altitude envelope that would readily allow abort to orbit (ATO), possibly even to zero/zero, and possibly reduce or eliminate the Return to Launch Site (RTLS) and even the Trans Atlantic Landing (TAL) abort mode requirements. This paper will briefly survey and discuss all of the various booster'upgrade options studied previously, and compare their relative attributes. The survey will explicitly discuss, in summary comparative form, options that include: five segment solids; several hybrid possibilities; pressure and/or pump-fed liquids using either LO2/kerosene, H2O/kerosene and LO2/J2, any of which could be either fully expendable, partly or fully reusable; and finally a fully reusable liquid fly back booster system, with a number of propellant and propulsion system options. Performance and configuration comparison illustrations and tables will be included to provide a comprehensive survey for the paper.

Sackheim, Robert L.↗

Space Shuttle Main Engine (SSME) Evolution

The SSME when developed in the 1970's was a technological leap in space launch propulsion system design. The engine has safely supported the space shuttle for the last two decades and will be required for at least another decade to support human space flight to the international space station. This paper discusses the continued improvements and maturing of the system to its current state and future considerations for its critical role in the nations space program. Discussed are the initiatives of the late 1980's, which lead to three major upgrades through the 1990's. The current capabilities of the propulsion system are defined in the areas of highest programmatic importance: ascent risk, in-flight abort thrust, reusability, and operability. Future initiatives for improved shuttle safety, the paramount priority of the Space Shuttle program are discussed.

Worlund, Len A.↗

Rocket Propellants Engine Design/Operations/Validation

Lockheed Martin Astronautics Operations (LMA) was competitively awarded a contract May 21, 2001 for next generation launch system architecture definition and technology maturation. The Second Generation Launch Vehicle Program objectives include reducing the technical and programmatic risk of proceeding to full scale development of the system by establishing requirements for the next generation launch system and maturing critical technologies needed by the system. LMA will conduct analyses and trades to optimize the architecture ETO elements including configuration, conceptual designs, and preliminary operations definition. To fully understand the engine and propellant trades were conducted by LMA to yield the optimized architecture system from the operability, reliability, safety, and cost perspectives. A government/industry team addressed the required trade studies, the parameters and weighting factors, and the most critical trades were addressed. This report summarizes the participation of JCM Consulting, Inc. in the propellant trade study.

Monk, Jan C.↗

Tether Impact Rate Simulation and Prediction with Orbiting Satellites

Space elevators and other large space structures have been studied and proposed as worthwhile by futuristic space planners for at least a couple of decades. In June 1999 the Marshall Space Flight Center sponsored a Space Elevator workshop in Huntsville, Alabama, to bring together technical experts and advanced planners to discuss the current status and to define the magnitude of the technical and programmatic problems connected with the development of these massive space systems. One obvious problem that was identified, although not for the first time, were the collision probabilities between space elevators and orbital debris. Debate and uncertainty presently exist about the extent of the threat to these large structures, one in this study as large in size as a space elevator. We have tentatively concluded that orbital debris although a major concern not sufficient justification to curtail the study and development of futuristic new millennium concepts like the space elevators.

Harrison, Jim↗

Phase 1 Space Fission Propulsion System Design Considerations

Fission technology can enable rapid, affordable access to any point in the solar system. If fission propulsion systems are to be developed to their full potential; however, near-term customers must be identified and initial fission systems successfully developed, launched, and operated. Studies conducted in fiscal year 2001 (IISTP, 2001) show that fission electric propulsion (FEP) systems operating at 80 kWe or above could enhance or enable numerous robotic outer solar system missions of interest. At these power levels it is possible to develop safe, affordable systems that meet mission performance requirements. In selecting the system design to pursue, seven evaluation criteria were identified: safety, reliability, testability, specific mass, cost, schedule, and programmatic risk. A top-level comparison of three potential concepts was performed: an SP-100 based pumped liquid lithium system, a direct gas cooled system, and a heatpipe cooled system. For power levels up to at least 500 kWt (enabling electric power levels of 125-175 kWe, given 25-35% power conversion efficiency) the heatpipe system has advantages related to several criteria and is competitive with respect to all. Hardware-based research and development has further increased confidence in the heatpipe approach. Successful development and utilization of a "Phase 1" fission electric propulsion system will enable advanced Phase 2 and Phase 3 systems capable of providing rapid, affordable access to any point in the solar system.

Houts, Mike↗

Aspect-Oriented Programming is Quantification and Implicit Invocation

We propose that the distinguishing characteristic of Aspect-Oriented Programming (AOP) languages is that they allow programming by making quantified programmatic assertions over programs that lack local notation indicating the invocation of these assertions. This suggests that AOP systems can be analyzed with respect to three critical dimensions: the kinds of quantifications allowed, the nature of the interactions that can be asserted, and the mechanism for combining base-level actions with asserted actions. Consequences of this perspective are the recognition that certain systems are not AOP and that some mechanisms are metabolism: they are sufficiently expressive to allow straightforwardly programming an AOP system within them.

Filman, Robert E.↗

Recent Advances in Vibroacoustics

Numerous vibroacoustics advances and impacts in the aerospace industry have occurred over the last 15 years. This article addresses some of these that developed from engineering programmatic task-work at the NASA Glenn Research Center at Lewis Field.

Hughes, William O.↗

Options and Risk for Qualification of Electric Propulsion System

Electric propulsion vehicle systems envelop a wide range of propulsion alternatives including solar and nuclear, which present unique circumstances for qualification. This paper will address the alternatives for qualification of electric propulsion spacecraft systems. The approach taken will be to address the considerations for qualification at the various levels of systems definition. Additionally, for each level of qualification the system level risk implications will be developed. Also, the paper will explore the implications of analysis verses test for various levels of systems definition, while retaining the objectives of a verification program. The limitations of terrestrial testing will be explored along with the risk and implications of orbital demonstration testing. The paper will seek to develop a template for structuring of a verification program based on cost, risk and value return. A successful verification program should establish controls and define objectives of the verification compliance program. Finally the paper will seek to address the political and programmatic factors, which may impact options for system verification.

Bailey, Michelle↗

The Idyllic Workplace

How many of us have worked in organizations where the discipline was so rigid and unyielding that it would send even a Marine Corps Drill Instructor screaming into the night? How many of us have worked in organizations where sightings of senior management were sporadic and rare, and any other interactions were by appointment only? Or, how many of us have worked in organizations where your role, absent specific direction, was to be seldom seen and rarely heard? And how many of us have worked in organizations where seemingly light itself was not permitted to escape without the acquiescence and approval of the director? Sadly, there are organizations that embody some of these conditions, and the resultant adverse effects on employee productivity, creativity and morale are profound. But what if you could work in an organization in which there was little hierarchy, where rank and seniority played no part, where there were no closed meetings or doors, where everyone knows what was expected of them, and where creativity was not only tolerated but encouraged and celebrated? Was there ever such a place? There was, and it was known as NASA's Space Station Task Force. I was fortunate enough to work there for a time, and I would like to tell you how this organization with few apparent rules led to incredibly high levels of employee satisfaction and fulfillment, and yielded work products of enduring quality. On May 20, 1982, NASA Administrator James M. Beggs established the Space Station Task Force under the direction of John D. Hodge. The Task Force was charged with the responsibility for "the development of the programmatic aspects of a Space Station as they evolve, including mission analysis, requirements definition and program management," and was authorized to draw on Space Station activities at the NASA Program Offices and Field Centers. No additional conditions or directions were provided. Hodge knew that in order to accomplish the job he had been given, he was going to have to obtain the services of the "best and the brightest" and facilitate the unleashing of the full force of their creative capabilities. In order to avoid the stultifying effects of a typical hierarchical organization, he set up a loosely structured, horizontal organization with only one supervisor of record - himself. He populated this organization with detailees from Headquarters, the field Centers and the Jet Propulsion Lab, thereby assuring himself of the political and technical expertise with which to deal with Congress and the bureaucracy, and conduct the required engineering studies and analyses.

Schoenfelder, Tony E.↗

Phase 1 Space Fission Propulsion Energy Source Design

Fission technology can enable rapid, affordable access to any point in the solar system. If fission propulsion systems are to be developed to their full potential; however, near-term customers must be identified and initial fission systems successfully developed, launched, and operated. Studies conducted in fiscal year 2001 (IISTP, 2001) show that fission electric propulsion (FEP) systems with a specific mass at or below 50 kg/kWjet could enhance or enable numerous robotic outer solar system missions of interest. At the required specific mass, it is possible to develop safe, affordable systems that meet mission requirements. To help select the system design to pursue, eight evaluation criteria were identified: system integration, safety, reliability, testability, specific mass, cost, schedule, and programmatic risk. A top-level comparison of four potential concepts was performed: a Testable, Passive, Redundant Reactor (TPRR), a Testable Multi-Cell In-Core Thermionic Reactor (TMCT), a Direct Gas Cooled Reactor (DGCR), and a Pumped Liquid Metal Reactor.(PLMR). Development of any of the four systems appears feasible. However, for power levels up to at least 500 kWt (enabling electric power levels of 125-175 kWe, given 25-35% power conversion efficiency) the TPRR has advantages related to several criteria and is competitive with respect to all. Hardware-based research and development has further increased confidence in the TPRR approach. Successful development and utilization of a "Phase I" fission electric propulsion system will enable advanced Phase 2 and Phase 3 systems capable of providing rapid, affordable access to any point in the solar system.

Houts, Mike↗

Continuous Risk Management

Risk identification is an ongoing activity that takes place during the routine project work flow. Project activities such as programmatic and technical meetings, telecons, reviews, and other forms of communication often bring to light project risks. When this occurs, we record and analyze the risk on a Risk Information Sheet. This process helps the project team identify and cope with project risks throughout the life of the project.

Sabelhaus, Phil↗

The Use of Remote Sensing for Monitoring, Prediction, and Management of Hydrologic, Agricultural, and Ecological Processes in the Northern Great Plains

The NASA-EPSCoR program in South Dakota is focused on the enhancement of NASA-related research in earth system science and corresponding infrastructure development to support this theme. Hence, the program has adopted a strategy that keys on research projects that: a) establish quantitative links between geospatial information technologies and fundamental climatic and ecosystem processes in the Northern Great Plains (NGP) and b) develop and use coupled modeling tools, which can be initialized by data from combined satellite and surface measurements, to provide reliable predictions and management guidance for hydrologic, agricultural, and ecological systems of the NGP. Building a partnership network that includes both internal and external team members is recognized as an essential element of the SD NASA-EPSCoR program. Hence, promoting and tracking such linkages along with their relevant programmatic consequences are used as one metric to assess the program's progress and success. This annual report first summarizes general activities and accomplishments, and then provides progress narratives for the two separate, yet related research projects that are essential components of the SD NASA-EPSCoR program.

Farwell, Sherry O.↗

Numerical Simulation of Flow, Pressure and Motion of Front Back Fingers in a Two Rows Finger Seal

This proposal fits within the programmatic long-term development direction for turbine engine seals of the Seal Team of the Mechanical Component Branch. The intended work concerns the further development of the Finger Seal concept which is a compliant passive-adaptive seal meant to mitigate (and eventually replace) the shortcomings of the entire class of rigid seals used today (labyrinth, honeycomb, mechanical face seals) in the gas turbines and compressors,

Braun, M. Jack↗

Rapid Maturation of Edge Sensor Technology and Potential Application in Large Space Telescopes with Segmented Primary Mirrors

This paper explores the history and results of the last two year's efforts to transition inductive edge sensor technology from Technology Readiness Level 2 to Technology Readiness Level 6. Both technical and programmatic challenges were overcome in the design, fabrication, test, and installation of over a thousand sensors making up the Segment Alignment Maintenance System (SAMs) for the 91 segment, 9.2-meter. Hobby Eberly Telescope (HET). The integration of these sensors with the control system will be discussed along with serendipitous leverage they provided for both initialization alignment and operational maintenance. The experience gained important insights into the fundamental motion mechanics of large segmented mirrors, the relative importance of the variance sources of misalignment errors, the efficient conduct of a program to mature the technology to the higher levels. Unanticipated factors required the team to develop new implementation strategies for the edge sensor information which enabled major segmented mirror controller design simplifications. The resulting increase in the science efficiency of HET will be shown. Finally, the on-going effort to complete the maturation of inductive edge sensor by delivering space qualified versions for future IR (infrared radiation) space telescopes.

Montgomery, Edward E., IV↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Propellant Densification for Shuttle: The SSME Perspective

The subject of cryogenic propellant densification as a potential upgrade to the Space Shuttle is a subject that has been raised on several occasions over the last decade. Due to advancements in densification technology made as a part of and in parallel to the X-33 project, the subject was raised and studied once again in May 2001. Across the Space Shuttle program people from many disciplines converged to discuss issues and perform trade studies to determine whether densified propellants was worth pursuing. This paper discusses one of these areas, specifically the Space Shuttle Main Engine (SSME). The effects of propellant densification on steady state performance are presented along with discussions of potential transient performance issues. Engine component redesign and retrofit issues are discussed as well the high level requirements to modify the ground test stands to accommodate propellant densification hardware and tanks. And finally, the matter of programmatic concerns enters the subject at hand as part of a discussion of SSME recertification requirements. In the end, potential benefits to SSME performance can be demonstrated and, subject to the densification scheme chosen, there does not appear to insurmountable technical obstacles.

Greene, William D.↗

Oxidizer Selection for the ISTAR Program (Liquid Oxygen versus Hydrogen Peroxide)

This paper discusses a study of two alternate oxidizers, liquid oxygen and hydrogen peroxide, for use in a rocket based combined cycle (RBCC) demonstrator vehicle. The flight vehicle is baselined as an airlaunched self-powered Mach 0.7 to 7 demonstration of an RBCC engine through all or its air breathing propulsion modes. Selection of an alternate oxidizer has the potential to lower overall vehicle size, system complexity/ cost and ultimately the total program risk. This trade study examined the oxidizer selection effects upon the overall vehicle performance, safety and operations. After consideration of all the technical and programmatic details available at this time, 90% hydrogen peroxide was selected over liquid oxygen for use in this program.

Quinn, Jason Eugene↗

Proceedings of the NASA Laboratory Astrophysics Workshop

This document is the proceedings of the NASA Laboratory Astrophysics Workshop, convened May 1-3, 2002 at NASA's Ames Research Center. Sponsored by the NASA Office of Space Science (OSS), this programmatic workshop is held periodically by NASA to discuss the current state of knowledge in the interdisciplinary field of laboratory astrophysics and to identify the science priorities (needs) in support of NASA's space missions. An important goal of the Workshop is to provide input to OSS in the form of a white paper for incorporation in its strategic planning. This report comprises a record of the complete proceedings of the Workshop and the Laboratory Astrophysics White Paper drafted at the Workshop.

Salama, Farid↗