Search NASA⌕ Search

SEARCH · Search NASA

Results for “RECEIPTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

592 records · Page 33

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation and Systems Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. An analyst using NGSAM has the ability to define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions on and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams had been working closely for several years before formalizing this collaboration. START provides the SNF routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM, as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transportation and System Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and waste custodian sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. An analyst using NGSAM can define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide the visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions at and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams have been working closely for several years before formalizing this collaboration. START provides the SNF transportation routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SPC-70808 Rev 0 AL-30 Secondary Support Standoff Blocks Build to Print Fabrication for Use in MARVEL

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL AL-30 Secondary Support Standoff Blocks manufactured by Zircar. The design requires twelve blocks; however, the requested quantity shall be 16 to account for required testing after receipt of materials. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70804 Rev 1 Zircar ZAL-45 Alumina Standoff Plates for Use in MARVEL

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL ZAL-45 standoff plates manufactured by Zircar. The design requires eight (8) ceramic standoff plates; however, the requested quantity shall be twelve to account for required testing after receipt of materials. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

IMPACT OF NOBLE METALS AND MERCURY ON HYDROGEN GENERATION DURING HIGH LEVEL WASTE PRETREATMENT AT THE SAVANNAH RIVER SITE

The Defense Waste Processing Facility (DWPF) at the Savannah River Site vitrifies radioactive High Level Waste (HLW) for repository internment. The process consists of three major steps: waste pretreatment, vitrification, and canister decontamination/sealing. HLW consists of insoluble metal hydroxides (primarily iron, aluminum, calcium, magnesium, manganese, and uranium) and soluble sodium salts (carbonate, hydroxide, nitrite, nitrate, and sulfate). The pretreatment process in the Chemical Processing Cell (CPC) consists of two process tanks, the Sludge Receipt and Adjustment Tank (SRAT) and the Slurry Mix Evaporator (SME) as well as a melter feed tank. During SRAT processing, nitric and formic acids are added to the sludge to lower pH, destroy nitrite and carbonate ions, and reduce mercury and manganese. During the SME cycle, glass formers are added, and the batch is concentrated to the final solids target prior to vitrification. During these processes, hydrogen can be produced by catalytic decomposition of excess formic acid. The waste contains silver, palladium, rhodium, ruthenium, and mercury, but silver and palladium have been shown to be insignificant factors in catalytic hydrogen generation during the DWPF process. A full factorial experimental design was developed to ensure that the existence of statistically significant two-way interactions could be determined without confounding of the main effects with the two-way interaction effects. Rh ranged from 0.0026-0.013% and Ru ranged from 0.010-0.050% in the dried sludge solids, while initial Hg ranged from 0.5-2.5 wt%, as shown in Table 1. The nominal matrix design consisted of twelve SRAT cycles. Testing included: a three factor (Rh, Ru, and Hg) study at two levels per factor (eight runs), three duplicate midpoint runs, and one additional replicate run to assess reproducibility away from the midpoint. Midpoint testing was used to identify potential quadratic effects from the three factors. A single sludge simulant was used for all tests and was spiked with the required amount of noble metals immediately prior to performing the test. Acid addition was kept effectively constant except to compensate for variations in the starting mercury concentration. SME cycles were also performed during six of the tests.

08 HYDROGEN↗

THE RESULTS OF TESTING TO EVALUATE CRYSTAL FORMATION AND SETTLING IN THE COLD CRUCIBLE INDUCTION MELTER

The Cold Crucible Induction Melter (CCIM) technology offers the potential to increase waste loading for High Level Waste (HLW) glasses leading to significant improvements in waste throughput rates compared to the reference Joule Heated Melter (JHM). Prior to implementation of a CCIM in a production facility it is necessary to better understand processing constraints associated with the CCIM. The glass liquidus temperature requirement for processing in the CCIM is an open issue. Testing was conducted to evaluate crystal formation and crystal settling during processing in the CCIM to gain insight into the effects on processing. A high aluminum/high iron content glass composition with known crystal formation tendencies was selected for testing. A continuous melter test was conducted for approximately 51 hours. To evaluate crystal formation, glass samples were obtained from pours and from glass receipt canisters where the glass melt had varying residence time in the melter. Additionally, upon conclusion of the testing, glass samples from the bottom of the melter were obtained to assess the degree of crystal settling. Glass samples were characterized in an attempt to determine quantitative fractions of crystals in the glass matrix. Crystal identity and relative composition were determined using a combination of x-ray diffraction (XRD) and scanning electron microscopy coupled with energy dispersive spectroscopy (SEM/EDS). Select samples were also analyzed by digesting the glass and determining the composition using inductively coupled atomic emission spectroscopy (ICP-AES). There was evidence of crystal formation (primarily spinels) in the melt and during cooling of the collected glass. There was evidence of crystal settling in the melt over the duration of the melter campaign.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Results of Voloxidation Processing of Kilogram Quantities of Used Nuclear Fuel

Advanced nuclear fuel processing methodologies are being studied as part of the Advanced Fuel Cycle Initiative (AFCI) program at ORNL. To support this initiative, processes and equipment were deployed at ORNL to perform all steps in the recycle process on actual used nuclear fuels, ranging from used fuel receipt to production of products and waste forms at the kilogram-scale (with capacity to process 20 kg of used fuel per year in up to four campaigns). In the first campaign, approximately 4 kg of used fuel was processed. As previously reported, the head-end processing was completed using saw-segmented Dresden fuel in lab-scale equipment in multiple batches. The second processing campaign used a new single pin shear and a new bench-scale voloxidizer to perform the dry head-end treatment prior to fuel dissolution. Approximately ~5 kg of used fuel (heavy metal basis) was processed in the second campaign. Two different fuels were oxidized in three separate batches to provide a range of processing conditions. The material used for each batch and general processing conditions are summarized in Table 1. Progress of the oxidation reaction was monitored continuously by two primary measurements; the concentration of oxygen in the effluent stream which was depressed as the oxygen was consumed, and the concentration of krypton-85 in the effluent stream as measured by a gamma counter on the off-gas pipeline. Table 1. Voloxidation test conditions for second campaign. Batch Fuel Source Burnup (GWd/MT)Batch size (kg*)/(kg**)Segment Length (in) Oxidation GasOperation Temperature ( C) 1Surry-2361.223/1.7041.0Air500 2North Anna63 702.071/2.8850.88Air600 3North Anna63 702.012/2.8030.88Oxygen600 * Heavy metal basis. ** Total fuel (oxide + cladding) basis. Fission product gases evolved from the fuel during the oxidation process were trapped for subsequent chemical and radiochemical analysis. The series of traps included a bed of molecular sieves to recover tritium (as HTO), silver-substituted zeolite to capture iodine (e.g. as AgI), a caustic scrubber to collect carbon dioxide (including 14CO2), a hydrogen-substituted mordenite to capture krypton (e.g. 85Kr) by cryogenic temperature swing adsorption, and a silver-substituted mordenite to capture xenon by cryogenic temperature swing absorption. The quantities of these volatile gases collected were compared to ORIGEN calculations to estimate the effectiveness of the voloxidation process to separate the volatiles from the used fuel. This paper will describe the voloxidation system and present preliminary results from the second processing campaign.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dynamic visualization of data streams

One embodiment of the present invention includes a data communication subsystem to receive a data stream, and a data processing subsystem responsive to the data communication subsystem to generate a visualization output based on a group of data vectors corresponding to a first portion of the data stream. The processing subsystem is further responsive to a change in rate of receipt of the data to modify the visualization output with one or more other data vectors corresponding to a second portion of the data stream as a function of eigenspace defined with the group of data vectors. The system further includes a display device responsive to the visualization output to provide a corresponding visualization.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

CETE R&D at Oak Ridge National Laboratory Supporting Management of Nuclear Waste - 9227

Oak Ridge National Laboratory (ORNL) is conducting a complete, coupled end-to-end (CETE) demonstration of advanced nuclear fuel reprocessing to support the Advanced Fuel Cycle Initiative (AFCI) Research and Development Program. The CETE project under way at ORNL is focused on (1) the demonstration of separations technology that would significantly reduce the quantity of nuclear waste that would require long-term geologic disposal and (2) providing products and waste streams for further treatment and testing to develop suitable forms for recycle or disposal. Equipment for the CETE research and development (R&D) capability has been installed to provide all primary processing operations, ranging from spent fuel receipt to production of products and waste forms. The head-end treatment and off-gas recovery as well as the various solvent extraction processes separate the spent fuel into a number of discrete product streams, each with unique properties. As part of the CETE project demonstrations at ORNL, each of these product streams is recovered to serve as the feed to other critical process and waste management research, development, and demonstration activities. These include the production of recycle MOX fuel, transmutation fuels, recycle cladding, and new waste forms. The paper discusses the separation and recovery processes used in the CETE demo and the resulting products from the first campaign.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Human Reliability for the Next Generation of Nuclear Experts

As the nuclear renaissance progresses and today s nuclear and radiological experts retire, a new generation of experts will ultimately be recruited, trained, and replace the old guard. Selecting individuals who have the attitudes and values appropriate to work in the nuclear industry and who have the best qualifications for the position will be a key to the success of this renaissance. In a world with deep divisions on political and social issues; how a State, agency, or company assures that those hired can be trusted with the access to, and responsibilities for, nuclear and/or radiological materials is an important consideration. Human interactions invariably rely on the offering of assurance and the receipt of trust. A fundamental element in any human relationship is knowing when to trust and when to doubt. When are assurances to be believed or questioned? Human reliability programs (HRP) are used to assure a person s truthfulness and loyalty to the State. An HRP program has a number of elements and may not fit all cultures in the same form. An HRP can vary in scope from simple background checks of readily available data to full field investigations and testing. This presentation discusses possible elements for an HRP from regulation to implementation and the issues related to each element. The effects of an HRP on potential recruits will be discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

MANAGEMENT OF RESEARCH AND TEST REACTOR ALUMINUM SPENT NUCLEAR FUEL - A TECHNOLOGY ASSESSMENT

The Department of Energy's Environmental Management (DOE-EM) Program is responsible for the receipt and storage of aluminum research reactor spent nuclear fuel or used fuel until ultimate disposition. Aluminum research reactor used fuel is currently being stored or is anticipated to be returned to the U.S. and stored at DOE-EM storage facilities at the Savannah River Site and the Idaho Nuclear Technology and Engineering Center. This paper assesses the technologies and the options for safe transportation/receipt and interim storage of aluminum research reactor spent fuel and reviews the comprehensive strategy for its management. The U.S. Department of Energy uses the Appendix A, Spent Nuclear Fuel Acceptance Criteria, to identify the physical, chemical, and isotopic characteristics of spent nuclear fuel to be returned to the United States under the Foreign Research Reactor Spent Nuclear Fuel Acceptance Program. The fuel is further evaluated for acceptance through assessments of the fuel at the foreign sites that include corrosion damage and handleability. Transport involves use of commercial shipping casks with defined leakage rates that can provide containment of the fuel, some of which are breached. Options for safe storage include wet storage and dry storage. Both options must fully address potential degradation of the aluminum during the storage period. This paper focuses on the various options for safe transport and storage with respect to technology maturity and application.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Composite drill pipe

A composite pipe segment is formed to include tapered in wall thickness ends that are each defined by opposed frustoconical surfaces conformed for self centering receipt and intimate bonding contact within an annular space between corresponding surfaces of a coaxially nested set of metal end pieces. The distal peripheries of the nested end pieces are then welded to each other and the sandwiched and bonded portions are radially pinned. The composite segment may include imbedded conductive leads and the axial end portions of the end pieces are shaped to form a threaded joint with the next pipe assembly that includes a contact ring in one pipe assembly pierced by a pointed contact in the other to connect the corresponding leads across the joint.

47 OTHER INSTRUMENTATION↗

An integrated approach for the verification of fresh mixed oxide fuel (MOX) assemblies at light water reactor MOX recycle reactors

This paper presents an integrated approach for the verification of mixed oxide (MOX) fuel assemblies prior to their being loaded into the reactor. There is a coupling of the verification approach that starts at the fuel fabrication plant and stops with the transfer of the assemblies into the thermal reactor. The key measurement points are at the output of the fuel fabrication plant, the receipt at the reactor site, and the storage in the water pool as fresh fuel. The IAEA currently has the capability to measure the MOX fuel assemblies at the output of the fuel fabrication plants using a passive neutron coincidence counting systems of the passive neutron collar (PNCL) type. Also. at the MOX reactor pool, the underwater coincidence counter (UWCC) has been developed to measure the MOX assemblies in the water. The UWCC measurement requires that the fuel assembly be lifted about two meters up in the storage rack to avoid interference from the fuel that is stored in the rack. This paper presents a new method to verify the MOX fuel assemblies that are in the storage rack without the necessity of moving the fuel. The detector system is called the Underwater MOX Verification System (UMVS). The integration and relationship of the three measurements systems is described.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of Readiness to Receive and Store Sister Rods from the R&D Project

While low burn-up fuel [that characterized as having a burn-up of less than 45 gigawatt days per metric ton uranium (GWD/MTU)] has been stored for nearly three decades, the storage of high burn-up used fuels is more recent. The DOE has funded a High Burn-Up (HBU) Confirmatory Data Project to confirm the behavior of used high burn-up fuel under prototypic conditions. The Electric Power Research Institute (EPRI) is leading a project team to develop and implement the Test Plan to collect this data from a UNF dry storage system containing high burn-up fuel. As part of that project, 25 “sister” fuel rods have been selected, removed from assemblies, and placed in a fuel container ready for shipment to a national laboratory. This report documents that status of readiness to receive the fuel if that fuel were to be sent to Idaho National Laboratory (INL).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗