Search NASA⌕ Search

SEARCH · Search NASA

Results for “Relocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Site Characterization and Adaptation - Lessons Learned from the Port Granby LLRW Project in Canada - 19255

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Town of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project is part of the broader PHAI being completed by Canadian Nuclear Laboratories (CNL). The scope of remediation activities at Port Granby includes: 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Remediation design required extensive site investigations of waste buried in unmarked and unlined trenches across the PGWMF area. Investigations included reviews of historical records, interviews with past staff of Eldorado and Atomic Energy Canada Limited (the entity managing the PHAI cleanup prior to CNL), radiological surveys, and the advancement of boreholes across the site to facilitate the physical sampling of soil and groundwater contaminants indicative of the presence of LLRW. This paper describes the challenges associated with characterizing and quantifying waste prior to remediation and lessons-learned to adjust procedural adaptations during the characterization phase of a project to better anticipate the unanticipated nature and growth of the contamination profile that often occurs during remediation. Despite substantial pre-remediation investigative efforts, current PGWMF remediation activities have resulted in growth of both the areal and vertical extent of contamination. The contamination profile was shown to be dramatically influenced by leaching of contaminants deeper into native soils. In addition, remedial excavation discovered specific waste types such as unidentified compressed gas cylinders outside of the location indicated by historical records, as well as a quantity of unknown liquids and unmarked drums. These discoveries have resulted in higher waste quantity estimates and have required a partial redesign of the LTWMF mound (a higher final elevation and steeper slopes) to accommodate the increased waste volume. In addition, the means and methods necessary to execute the remedial construction had to be modified to account for the new conceptual model developed from the new contamination data. Despite extensive historical review and site characterization to define the nature and extent of LLRW buried at the PGWMF, actual conditions encountered during remediation efforts necessitated taking an adaptive approach to both the design of the LTWMF and the means and methods used for excavation and transport of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Most Recent Chemical Decontamination for Decommissioning Projects - 19280

In 2017, Westinghouse performed a full system chemical decontamination of Units 1 and 2 of the Bohunice V1 Nuclear Power Plant. Bohunice V1 is a VVER 440 design with six loops. The application was performed two loops at a time, with the reactor core bypassed. The Pressurizer and Pressurizer Relief Tank (Bubble Tank) were decontaminated as well, in a separate application. This was a recovery decontamination that had been attempted by another company prior to Westinghouse. Several modifications to equipment and design of process were required to make the decontamination successful. The project was initiated to perform pre-dismantling chemical decontamination of primary circuits of both V1 units using Decontamination for Decommissioning (DfD) to meet the following objectives (see References 1 and 2 for process descriptions of DfD): - Remove activity from the primary circuit components; - Reduce dose rates around piping and components; - Simplify access to the installations, making it possible to use hands-on techniques for dismantling, rather than the more expensive use of robotics or manipulators; - Minimize the potential for spreading contamination during decommissioning activities - Reduce the activity of components that they may be disposed of at a lower classification, therefore more economical, waste disposal category. Several techniques were employed that were unique, or first of a kind, to aid in the decontamination, including resin regeneration and bypass of the reactor core, while still providing enough flow to to allow sufficient dispersal through all the steam generator tubes. Equipment that was already available on site was evaluated and, when possible, combined with Westinghouse equipment to minimize application cost and schedule. The lessons learned from the first unit (Unit 2) were applied to the second unit (Unit 1) application. The partial relocation of equipment allowed for the most efficient schedule to complete the second decontamination. The paper will describe in more detail the results and lessons learned from the full system chemical decontaminations performed, as well as updates on another recent decontamination project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preserving the Mound Laboratory Legacy-The Mound Cold War Discovery Center - 19550

The Mound Cold War Discovery Center (MCWDC) opened at the former DOE Mound Laboratory in Miamisburg, Ohio, on April 23, 2018, approximately three years after the US Department of Energy (DOE) Office of Legacy Management, Dayton History, the Mound Science and EnergyMuseum Association (MSEMA), and the Mound Development Corporation signed the Mound Educational Center Memorandum of Agreement (MOA). This MOA designated each party's responsibilities for the facility and laid the groundwork for DOE to enter into a Cooperative Agreement with Dayton History to design, build, and perform initial operations of the educational center. Dayton History is a nonprofit organization that operates several historical facilities in Montgomery County, Ohio. The Mound Development Corporation is the nonprofit organization that operates the Mound Business Park, privately owned property previously associated with the former DOE Mound Laboratory. The US Atomic Energy Commission began operations at the Mound Laboratory in 1948 as an integrated research, development, and production facility that supported the nation's weapons and energy programs. In October 2015, DOE entered into a five-year Cooperative Agreement with Dayton History to preserve, protect, and make accessible legacy records and information about the history of the Mound site through the development of an educational center. Years One and Two were for design and construction, respectively. Years Three through Five were for operation of the new center. The new center, located in a building owned by the Mound Development Corporation, would carry on the mission started by the MSEMA, a nonprofit organization started by former Mound site employees more than 15 years ago after DOE mission work ended at the site. As part of the cooperative agreement, Dayton History is responsible for creating interactive displays and exhibits to draw, entertain, and educate the public on the Mound site's significant contributions to the protection of the nation; developing educational programs; and initiating marketing strategies for the long-term sustainability of the educational center. In 2016, parties to the MOA officially named the facility the Mound Cold War Discovery Center. The MCWDC was designed to preserve the history of the Mound site through effective, entertaining, and efficient communication of the history of the Mound Laboratory; the site's legacy to the US weapons production complex and space exploration program; and promote understanding of what has happened at the site since DOE mission work ended, including environmental cleanup under the Comprehensive Environmental Response, Compensation, and Liability Act and the regulator-approved end state of industrial/commercial land use with associated institutional controls. The cooperative agreement requires Dayton History to develop and implement marketing strategies to support the long-term sustainability of the MCWDC at the Mound site. Dayton History will submit a report after the first year of operation and every year thereafter during the period of the cooperative agreement. These reports will describe and status efforts to obtain sustainability and offer for consideration any operational changes, corrections, or suggestions that may improve the potential for sustainability. Prior to the end of the cooperative agreement, a sustainability assessment decision will be made by DOE to determine whether the MCWDC has enough community interest to financially sustain itself at the Mound site. The status of the MCWDC Legacy Fund established by Dayton History will be considered in DoE's assessment determination. If DOE determines that the MCWDC is not sustainable at the Mound site, the exhibits will be relocated to Carillon Historical Park in Dayton, with the five key exhibits that were predetermined in the MOA to be placed on permanent display, thereby maintaining the legacy of the Mound site. Dayton History is required to submit a final closeout report at the end of Year Five of the cooperative agreement. The report will describe all activities completed under the agreement, provide an assessment of how project goals were achieved or not achieved, and describe how the legacy of the site will be preserved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concoction and Appraisal of Radiation Hardened Polyurethane Foams for DOE Decontamination and Decommissioning (D and D) Operations

Since World War 2, a number of nuclear facilities have been relocating their nuclear waste to long term storage, or final disposition. These facilities face monumental challenges in cleaning up the fixated transferrable radioactive waste that is left in these facilities after initial cleaning operations have ended. SRNL has identified a solution that is utilizing two-part epoxy foams with heavy metal additives for fixating and shielding transferable radioactive material that has accumulated in non uniform volumes. The purpose of this experiment is to make a library of data of physical characteristics of each foam and additive combination that will have data concerning how the material cures and performs in different environments with varying temperatures and how it will act and perform after being irradiated. Materials Being Tested: - Foam iT 7FR, Foam iT 23FR, 3M Fire Barrier foam, and Hilti CP620 foam; - Additives Bi, Bi2O{sub 3}, Na{sub 2}WO{sub 3}, and WO{sub 3} at 12.5% and 25%. What's being investigated: - Expansion data from each foam; - Radiation shielding data for each foam combination; - Peak temperatures for each foam. Utilized a FLIR thermal camera to find peak temperature and time it took the foam to reach it. No noticeable difference in volume or weight after blank foam samples sat in the environmental chamber for 24 hours except the 3M foam at the extreme relative humidity of 90% highlighted above. The more additives used in the foam, the more they were able to shield. The foams begin to saturate around 100% wt% where more additive used will not increase the shielding capability of the foam. Similar thermal dispersion in blanks and in samples with Bi additive. Time taken to peak temperature is very similar between the two. Similar peak temperatures in blanks and in Bi samples. Hilti had slightly elevated temperatures. All foams maintained their physical properties post environmental chamber except the 3M foam. With the increased sponginess from the high relative humidity's, 3M may be disqualified for further testing if its mechanical properties also suffer. While curing all foams had their peak temperature occur between 40 deg. C and 70 deg. C except the Hilti which occurred above 90 deg. C with and without additive. With this information, no foams would be disqualified. After radiation shielding studies, it was found that IT 14 with Bismuth and Bismuth Oxide Additives provided the best shielding of Co-60 with over 9% attenuation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 34: US DOE Featured Site: Savannah River Operations Office: 70 Years of Service

The Savannah River Site celebrates its 70. anniversary on November 28, 2020. On this date in 1950, President Harry S. Truman requested the Dupont Company to design, build and operate what was then known as the Savannah River Plant in response to the Soviet Union's detonation of its first atomic weapon, which set the Cold War into motion. During the 1950's, six South Carolina towns were relocated for the construction of SRS and by 1953, the 310 square mile site was complete. Nearly 40,000 workers were employed t build five nuclear reactors and support facilities, two chemical separations plants, heavy water extraction plant, nuclear fuel and target fabrication facility tritium extraction facility and waste management facilities. SRS played a key role in winning the Cold War and for seven decades, SRS has been a leader within the DOE complex. Today, the site supports environmental stewardship and maintains the nation's nuclear deterrent while ensuring the safekeeping and disposal of domestic and international nuclear materials. The site continues to support the nation's nuclear defense as it explores new potential NNSA missions. SRS has a proud 70- year history and looks forward to a future of service as a national asset and strong community partner. The session was kicked off with a video message from Secretary of Energy, Dan Brouillette, who thanked employees past and current for their efforts. The video also provided an overview of the history and future of the Site. This panel provided an overview of the Savannah River Site's 70 years of service (history, challenges, opportunities, and future) presented by the SRS's Senior leadership and the local Aiken, South Carolina Mayor. Panelists with presentations: US DOE Secretary Dan Brouillette's Overview of DOE and SRS - A Legacy of 70 Years of Service (Amy Boyette); 70 Years of Service (Michael Budney); 70 Years of Service (Stuart MacVean); SRS Liquid Waste (Thomas Foster); National Nuclear Security Administration (Nicole Nelson-Jean)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND Consortium - In-situ Identification of Surface Corrosion Products on Spent Nuclear Fuels - 20276

The management of spent nuclear fuel is a major ongoing concern for the UK owing to the cessation of reprocessing operations at Sellafield and the large, complex inventory arising from Magnox, AGR, PWR and prototype reactors. Retrieval and relocation operations for legacy fuels are imminent and therefore, any models that enhance our understanding of fuel evolution will help mitigate the risks associated with fuel storage and disposal. The TRANSCEND Consortium on nuclear waste management comprises four work packages, within this current paper we provide a summary overview of progress to date and illustrative results from Theme 3: Spent Nuclear Fuels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HBU R and D Cask Transportation Options - 20436

The TN-32B HBU Demonstration Cask was successfully loaded in November 2017 with 32 high burnup (HBU) fuel assemblies at Dominion's North Anna Nuclear Plant and is collecting thermal data as intended. The first two phases of this very successful project sponsored by DOE and EPRI was designed to collect thermal data of HBU fuel to support extended storage. The next phase of the project requires the cask be licensed for transportation so the cask can be relocated to a site (to be determined by DOE) to facilitate long term monitoring and additional research on the fuel. This is a unique challenge given the constraints that exist for this particular bolted metal cask. The TN-32B cask is a 234,288 lb. (storage configuration) dry storage system that was selected for this project and it was modified to provide thermal data and the ability to collect gas samples after loading. Several major issues must be addressed to obtain the transport license including protecting the seven lid penetrations that were made to allow for the insertion of the thermocouples into the selected fuel assemblies after the cask was loaded. In order to protect the integrity of the research, the payload must remain as is. Therefore, the cask system must be placed into the transportation configuration without rewetting the fuel, replacing the lid and without removing the thermocouple instrumentation that is currently installed. A critical portion of the design and engineering that was performed in the first two phases of the project was to ensure that future transportation of the cask was integrated into the approach. Efforts were made to accommodate requirements such as containment boundary leakage testing, installation of impact limiter brackets and lid bolts suitable for transportation. Due to the science requirements of the project, the fuel selected was intended to yield the highest payload temperatures permitted to provide the greatest value for the researchers. This resulted in higher than usual external dose rates and surface temperatures that warranted performing as much preparatory work prior to cask loading to ensure ALARA and personnel safety to the greatest extent practical rather than working on a loaded cask. In addition to the work performed prior to cask load, there are remaining challenges such as protecting the modified lid, design and fabrication of impact limiters that accommodate the modified cask lid and preserving the thermocouple connections for continued monitoring. The project team is currently performing the necessary calculations, engineering, and design to support the licensing as required by the US NRC. Pre-application meetings have been held to inform the regulator of the planned technical approach to ensure compliance with the applicable regulations. The current plan is to obtain the transportation C of C by the end of 2021. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transporting Non-Compliant TRU Wastes in the OPTIMUS{sup TM} Packages - 20493

The OPTIMUS{sup TM} product line of packages was developed with the purpose of providing a versatile and modular packaging option for shipping problematic wastes and fissile material contents. The product line includes a high-activity design in the OPTIMUS-H and a low activity design in the OPTIMUS-L. The two variants utilize a singular containment vessel design, that is enclosed in different protective components that offer different levels of shielding along with thermal and impact protection. The thick shielding provided by the OPTIMUS-H packaging allows for higher activity contents than the OPTIMUS-L to be transported. But the lightweight design of the OPTIMUS-L packaging allows for more packages to be transported in a single shipment. The containment vessel design shared between the two packages provides leak-tight containment of all radioactive contents along with the capabilities to easily leak test and the option to inert and backfill the contents, as necessary, prior to each shipment of the package. Together the OPTIMUS package designs offer significant flexibility and are capable of handling a wide variety of waste materials and other radioactive contents. One of the primary contents covered in the initial design effort for these packages is TRU waste contents beyond the standard waste materials that are compliant with the WIPP Waste Acceptance Criteria. More specifically, the initial content of interest is TRU Waste drums containing sealed containers with potentially flammable gases. While there are multiple other packaging options available for transporting standard WIPP compliant TRU wastes, the goal of the OPTIMUS packages is to offer a superior option for transporting both standard TRU wastes as well as the more problematic non-compliant wastes, among other contents. The non-compliant TRU waste contents explicitly included for the OPTIMUS packages are standard aerosol cans and DOT 3E lecture bottles. However, the methods applied for the package containment can be easily adjusted to cover other sealed container types with potentially flammable gases. The primary challenges with including these items are both the obvious issue of potential for flammable gases (e.g. aerosol propellants) in the package, but also the uncertainty in the exact state of the contents. Because these desired contents are waste materials, the characterization of the materials present in the waste may include some uncertainties. For example, though it may be known that there are one or more aerosol cans in a TRU waste drum, it may not be known if this can is full, spent, or anywhere in between. Also there may be equal uncertainty in the contents of the aerosol can, specifically in the potentially flammable propellant remaining in the can. To include these types of non-compliant items as acceptable contents for the package, the methods utilized in the safety analyses of the OPTIMUS packages must consider all of the uncertainties in the characterization of the waste. The methods utilized cover a range of concerns with transporting contents of this nature including pressure buildup, gas generation, and gaseous combustion for demonstrating the containment of the package. The ability to transport these problematic contents in the OPTIMUS packages gives TRU waste generating sites the option to relocate these drums to an offsite location where the non-compliant items can be properly managed through removal or destruction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Neutron-Gamma flux and Dose calculations in a Pressurized Water Reactor (PWR)

The Institute of Radiological Protection and Nuclear Safety (IRSN) acts as technical support to the French nuclear safety authorities. In this context, one of its missions is to improve nuclear safety through the enhancement of knowledge regarding operating nuclear power reactors. The issues concerning the aging and the characterisation of the reactor vessel require knowledge of the neutron and gamma radiation environment on the vessel and beyond. Since few years, ENEA (Energia Nucleare e Energie Alternative, i.e. Nuclear Energy and Alternative Energy agency) and IRSN collaborate on Monte-Carlo simulations and Variance Reduction Techniques (VRT), which are used to determine neutron and gamma spectra in and out of the core. Additionally, IRSN participates in the DISCOMS project, which stands for 'Distributed Sensing for Corium Monitoring and Safety', aiming at examining the status of the third barrier of confinement, in order to define possible mitigation strategies in case of a severe accident, namely: i) reactor pressure vessel breakthrough and corium relocation outside the vessel, ii) reactor pit concrete erosion and iii) corium cooling. One of the IRSN tasks in the frame of the DISCOMS project is to provide the radiation level in terms of neutron and gamma doses and flux energy spectra at various locations. This paper summarizes the study performed on the radiation transport in the Tihange-I Belgian nuclear reactor and contributes to several issues requiring the knowledge of the radiation environment in and outside the reactor vessel. This paper gives an overview of the work presented at the ICRS-13 and RPSD-2016 conference (for more details see the proceedings paper)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Out-of-Pile Testing and Instrumentation Transient Water Irradiation System

Current initiatives to increase the burnup of conventional nuclear fuels past the approximate 62 GWd/t limit have been spurred on by direct savings to refueling and waste storage. The technical justification for a new license limit requires extensive qualification through experimental testing. Unlike beginning-of-life fuels, high-burnup fuels are more susceptible to fuel fragmentation, relocation, and dispersal (FFRD), therefore more data is needed to characterize fuels under key accident scenarios. The Transient Reactor Test Facility (TREAT) located at the Idaho National Laboratory has developed a testing apparatus architecture to test fuels and claddings at prototypic conditions. The Transient Water Irradiation System (TWIST) is the latest iteration of a testing device capable of conducting loss of coolant accidents (LOCAs) in TREAT. The Out-of-Pile Testing and Instrumentation TWIST (OPTI-TWIST) is an electrically heated device that is analogous to TWIST. OPTI-TWIST allows for detailed instrumentation and thermal-hydraulic characterization. TWIST ultimately aims to conduct the most advanced in-situ diagnostics to evaluate FFRD in a prototypic LOCA. Moreover, it will explore the phenomenological bifurcation of a decay-energy heat up driven LOCA and a stored-energy heat up driven LOCA. The instrumentation suite includes conventional thermocouples and pressure transducers in addition to an electro impedance sensor, an acoustic emission sensor, an optical pressure sensor, and an optical pyrometer. Characterizing these instruments in OPTI-TWIST eliminates complications of irradiation effects while preserving extreme thermal-hydraulic conditions. Finally, benchmarking both devices to a thermal-hydraulic code like the Reactor Excursion and Leak Analysis Program (RELAP)5-3D provides a unique opportunity for iteration. Pre-test predictions and post-test interpretations inform the physical designs, operational procedures, test conditions, and instrumentation types and positions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design of a Loss of Coolant Blowdown Capsule for Remote Assembly with High Burnup Fuel

The Transient Water Irradiation System is an enhanced capability capsule type irradiation vehicle designed to support fuel safety research for light water reactor specimens in the Transient Reactor Test Facility and is designed to simulate loss of coolant and reactivity-initiated accidents. The capsule was designed, deployed, and commissioned with fresh fuel specimens to validate instrumentation and prepare for previously irradiated high burnup specimens. The irradiation system features an extensive in-situ instrumentation package to detect phenomena typical to light water reactor fuels. To accommodate the assembly with high burnup specimens inside the Hot Fuel Examination Facility, and to ensure instrumentation integrity is maintained throughout assembly, the design was updated to support remote handling. The updated design features a hinge mechanism which allows for remote pre-irradiated specimen loading and assembly while protecting sensitive instrumentation by relocating during loading. Fixtures and equipment have been developed to handle the experiment capsule and components in cell, and to support remote assembly. The experiment module also includes radiation shielding and contamination control to support operations after removal from the hot cell.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Loss of Coolant High Burnup (LOC-HBu) Program

LOC-HBu is a joint experimental program (JEEP) operating within the Nuclear Energy Agency’s (NEA’s) framework for irradiation experiments II (FIDES-II). LOC-HBu is dedicated to the understanding of light water reactor (LWR) fuel performance at high burnup under loss of coolant accident (LOCA) conditions. LOC-HBu aims to support burnup extension needs by addressing identified R&D priorities to achieve an improved understanding of fuel fragmentation, relocation, and dispersal (FFRD) of HBu fuel during LOCA events. The need for such experiments was identified in the United States by the Fuel Performance Testing Technical Expert Group (FPTTEG) under the Electric Power Research Institute (EPRI)’s Collaborative Research on Advanced Fuel Technologies (CRAFT) framework. A combined in-pile and furnace testing program plan was developed by researchers at Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) which was reviewed and approved by the FPTTEG Combined TREAT-LOC and SATS LOCA Experiment Plan. The first 4 tests identified in this plan are being put forward by the U.S. Department of Energy (U.S. DOE) and INL for inclusion in the FIDES-II second triannual work period. The data produced under this plan will be used to further validate and confirm existing models and inform future R&D and model development. The experimental program was specifically developed to address data gaps and opportunities identified via detailed review of the existing public knowledge base on LOCA FFRD, as well as reviewing specific experimental development activities regarding prototypic LOCA conditions for light-water reactor (LWR) systems. The program will systematically investigate the impacts of prototypic HBu fuel/cladding thermomechanical behaviors under postulated LWR LOCA conditions not yet fully investigated. These conditions correspond with prototypic decay-energy heatup (DEH) and stored-energy heatup (SEH) conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Transient Reactor Test Facility (TREAT)

TREAT operated from 1959-1994, later refurbished & resumed operation in 2017 to support fuel safety testing Zircaloy-clad graphite/fuel blocks comprise core Virtually any power history possible within ~2000 MJ core transient energy capacity From milliseconds to minutes: Pulses, Ramps, LOCA Fuel motion monitoring system “hodoscope” observes fast neutrons emitted from specimens to track fuel relocation in real time Reactor also can be a neutron source to adjacent radiography facility Experiment vehicle does everything else Safety containment, specimen environment, and instrumentation

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Computational Investigation of Fuel Dispersal Phenomena during Large-Break Loss of Coolant Accident in Light-Water Reactors

In the event of cladding rupture, which could occur in light water reactor fuel assemblies during a loss-of-coolant accident (LOCA), fuel particles, along with fission gases, can be expelled into the reactor core from the fractured fuel rod. This expulsion of fragmented fuel particles, referred as fuel dispersal, is the subject of investigation to evaluate the safety implications of increasing fuel burnup in light water reactors, with a specific focus on fuel fragmentation, relocation, and dispersal. Particle trajectories and the resulting mass distribution of the settled particles within the reactor pressure vessel can pose a long-term cooling challenge for the reactor core. The fuel dispersal phenomenon is significantly influenced by the ejection characteristics of the fuel fragments, as well as the size and shape of the cladding rupture and fuel rod depressurization history during LOCA transients. In this study, the transport of fuel particles within a scaled 5 × 5 lattice of a pressurized water reactor rod bundle geometry is modeled through a two-fluid Eulerian framework that treats the gas and solid phases as interpenetrating continua. The required boundary conditions are evaluated from the fuel performance code BISON in a postulated large-break LOCA scenario. The modeling framework considers solid fuel particles as granular matter, interacting with the gaseous dry steam phase and fission gases through the governing interfacial momentum and energy exchange between the gas and solid phases. The simulation results provide the volume fraction of the solids settled on the bottom surface of the fuel bundle, quantifying the deposition within the bundle geometry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Meso-scale modeling of UO2 nuclear fuel to high burnup

To improve the economics of light water reactors for commercial nuclear energy generation, utility operators are seeking to obtain regulatory approval to run UO2 fuel to higher levels of burnup. One potential impediment to obtaining this approval is the phenomenon of fuel fragmentation, relocation, and dispersal (FFRD). FFRD can result when fuel experiences a rapid temperature transient, such as that occurring during a Loss Of Coolant Accident (LOCA). FFRD has historically been most associated with the rim region in UO2 fuel pellets, where the phenomenon of fragmentation is also referred to as pulverization due to the small size of the fragments. More recent evidence suggests that the so-called “dark zone” (due to its appearance in micrographs) that can be observed in the mid-radial regions of high burnup fuel is also susceptible to FFRD. Although empirical fuel performance models have been developed that can adequately predict pulverization in the rim region under typical LWR conditions, a scientific understanding of what underlies fuel restructuring and subsequent FFRD is lacking even in the rim region, and no models are currently available for the behavior the dark zone. To address these challenges, the U.S. Department of Energy’s Nuclear Energy Advanced Modeling and Simulation (NEAMS) program has employed a multi-scale modeling approach to improve scientific understanding and develop new fuel performance models. In this talk, I will focus on meso-scale efforts, which form a crucial link between atomic-scale and engineering-scale models. Phase-field modeling combined with cluster dynamics is used to predict the restructuring process in the rim region. Phase-field fracture modeling, informed by atomistic simulations, is used to predict the onset of pulverization in the rim region. Combining these techniques together allows the extent of rim pulverization to be predicted. The formation and evolution of the dark zone has also been simulated with the phase-field method, using an improved approach to vacancy source term parameterization. The work shows the important impact of microstructure on fuel performance.

fracture↗