Search NASA⌕ Search

SEARCH · Search NASA

Results for “custom data sets”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Computing in space: Issues and answers

Future plans for space exploration call for scientific instruments whose data is increasingly voluminous, far exceeding constraints set by telemetry rates, and therefore, an increased role for spaceborne computing. Three issues that greatly influence the realization of spaceborne computing systems are addressed. The first involves the identification of those research problems which are unique to space computing. Resources must be expended on these problems if efforts are to add value to, and have impact on, the technology of computing in space. The second addresses the transfer of new technology from the research laboratory to use in space. What can be done to expedite this process and shrink the technology gap that separates Earth and space based systems must be assessed. The third issue involves the user's point of view of what is required of new space computing systems. That is, what are the driving forces that most influence customers' decisions to use or not use new technology? Issues of design environment for spaceborne computers, tools for modeling and evaluation of flight systems, and validation of space flight hardware and software are also discussed.

Davidson, John M.↗

Statistical change detection of building energy consumption: Applications to savings estimation

The surge in interval meter data availability and associated activity in energy data analytics has inspired new interest in advanced methods for building efficiency savings estimation. Statistical and machine learning approaches are being explored to improve the energy baseline models used to measure and verify savings. One outstanding challenge is the ability to identify and account for operational changes that may confound savings estimates. In the measurement and verification (M&V) context, ‘non-routine events’ (NREs) cause changes in building energy use that are not attributable to installed efficiency measures, and not accounted for in the baseline model’s independent variables. In the M&V process NREs must be accounted for as ‘adjustments’ to appropriately attribute the estimated energy savings to the specific efficiency interventions that were implemented. Currently this is a manual and custom process, conducted using professional judgment and engineering expertise. As such it remains a barrier in scaling and standardizing meter-based savings estimation. Here in this work, a data driven methodology was developed to (partially) automate, and therefore streamline the process of detecting NREs in the post-retrofit period and making associated savings adjustments. The proposed NRE detection algorithm is based on a statistical change point detection method and a dissimilarity metric. The dissimilarity metric measures the proximity between the actual time series of the post-retrofit energy consumption and the projected baseline, which is generated using a statistical baseline model. The suggested approach for NRE adjustment involves the NRE detection algorithm, the M&V practitioner, and a regression modeling algorithm. The performance of the detection and adjustment algorithm was evaluated using a simulation-generated test data set, and two benchmark algorithms. Results show a high true positive detection rate (75%-100% across the test cases), higher than ideal false positive detection rates (20%-70%), and low errors in energy adjustment (<0.7%). These results indicate that the algorithm holds for helping M&V practitioners to streamline the process of handling NREs. Moreover, the change point algorithm and underlying statistical principles could prove valuable for other building analytics applications such as anomaly detection and fault diagnostics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Time-Varying Value of Energy Efficiency in Michigan

Quantifying the time-varying value of energy efficiency is necessary to properly account for all of its benefits and costs and to identify and implement efficiency resources that contribute to a low-cost, reliable electric system. Historically, most quantification of the benefits of efficiency has focused largely on the economic value of annual energy reduction. Due to the lack of statistically representative metered end-use load shape data in Michigan (i.e., the hourly or seasonal timing of electricity savings), the ability to confidently characterize the time-varying value of energy efficiency savings in the state, especially for weather-sensitive measures such as central air conditioning, is limited. Still, electric utilities in Michigan can take advantage of opportunities to incorporate the time-varying value of efficiency into their planning. For example, end-use load research and hourly valuation of efficiency savings can be used for a variety of electricity planning functions, including load forecasting, demand-side management and evaluation, capacity planning, long-term resource planning, renewable energy integration, assessing potential grid modernization investments, establishing rates and pricing, and customer service (KEMA 2012). In addition, accurately calculating the time-varying value of efficiency may help energy efficiency program administrators prioritize existing offerings, set incentive or rebate levels that reflect the full value of efficiency, and design new programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Using XML and Java Technologies for Astronomical Instrument Control

Traditionally, instrument command and control systems have been highly specialized, consisting mostly of custom code that is difficult to develop, maintain, and extend. Such solutions are initially very costly and are inflexible to subsequent engineering change requests, increasing software maintenance costs. Instrument description is too tightly coupled with details of implementation. NASA Goddard Space Flight Center, under the Instrument Remote Control (IRC) project, is developing a general and highly extensible framework that applies to any kind of instrument that can be controlled by a computer. The software architecture combines the platform independent processing capabilities of Java with the power of the Extensible Markup Language (XML), a human readable and machine understandable way to describe structured data. A key aspect of the object-oriented architecture is that the software is driven by an instrument description, written using the Instrument Markup Language (IML), a dialect of XML. IML is used to describe the command sets and command formats of the instrument, communication mechanisms, format of the data coming from the instrument, and characteristics of the graphical user interface to control and monitor the instrument. The IRC framework allows the users to define a data analysis pipeline which converts data coming out of the instrument. The data can be used in visualizations in order for the user to assess the data in real-time, if necessary. The data analysis pipeline algorithms can be supplied by the user in a variety of forms or programming languages. Although the current integration effort is targeted for the High-resolution Airborne Wideband Camera (HAWC) and the Submillimeter and Far Infrared Experiment (SAFIRE), first-light instruments of the Stratospheric Observatory for Infrared Astronomy (SOFIA), the framework is designed to be generic and extensible so that it can be applied to any instrument. Plans are underway to test the framework with other types of instruments, such as remote sensing earth science instruments.

Ames, Troy↗

Validation of Non-Invasive Waste Assay System (Gamma Box Counter) Performance at AECL Whiteshell Laboratories - 13136

Low-level radioactive waste (LLW) in solid form, resulting from decommissioning and operations activities at AECL's Whiteshell Laboratories (WL), is packaged in B-25 and B-1000 standard waste containers and characterized before it is shipped to an on-site interim storage facility, pending AECL decisions on long term management of its LLW. Assay of the waste packages before shipment contributes to an inventory of the interim storage facility and provides data to support acceptance at a future repository. A key characterization step is a gamma spectrometric measurement carried out under standard conditions using an automated, multi-detector Waste Assay System (WAS), purchased from Antech Corporation. A combination of ORTEC gamma acquisition software and custom software is used in this system to incorporate multiple measurements from two collimated high-resolution detectors. The software corrects the intensities of the gamma spectral lines for geometry and attenuation, and generates a table of calculated activities or limits of detection for a user-defined list of radioisotopes that may potentially be present. Validation of WAS performance was a prerequisite to routine operation. Documentation of the validation process provides assurance of the quality of the results produced, which may be needed one or two decades after they were generated. Aspects of the validation included setting up a quality control routine, measurements of standard point sources in reproducible positions, study of the gamma background, optimization of user-selectable software parameters, investigation of the effect of non-uniform distribution of materials and radionuclides, and comparison of results with measurements made using other gamma detector systems designed to assay bulk materials. The following key components of the validation process have been established. A daily quality control routine has been instituted, to verify stability of the gamma detector operation and the background levels. A test box containing plywood (specific gravity 0.5) with holes for reproducible positioning of known point sources has been constructed and used in several configurations. Gamma spectra have been processed multiple times with user-adjustable parameters set to a variety of values to gain agreement on the most appropriate settings. A similar optimization process was followed with the custom software provided by the instrument manufacturer to reach agreement on the most stable settings for reliable results. Measurements made with the Canberra In-Situ Object Counting System (ISOCS) instrument were compared with the WAS results as part of an estimate of instrument precision and accuracy. The validation report will conclude with recommendations for the configuration, appropriate use and limitations of the Waste Assay System. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Command Interface ASIC - Analog Interface ASIC Chip Set

A command interface application-specific integrated circuit (ASIC) and an analog interface ASIC have been developed as a chip set for remote actuation and monitoring of a collection of switches, which can be used to control generic loads, pyrotechnic devices, and valves in a high-radiation environment. The command interface ASIC (CIA) can be used alone or in combination with the analog interface ASIC (AIA). Designed primarily for incorporation into spacecraft control systems, they are also suitable for use in high-radiation terrestrial environments (e.g., in nuclear power plants and facilities that process radioactive materials). The primary role of the CIA within a spacecraft or other power system is to provide a reconfigurable means of regulating the power bus, actuating all valves, firing all pyrotechnic devices, and controlling the switching of power to all switchable loads. The CIA is a mixed-signal (analog and digital) ASIC that includes an embedded microcontroller with supporting fault-tolerant switch control and monitoring circuitry that is capable of connecting to a redundant set of interintegrated circuit (I(sup 2)C) buses. Commands and telemetry requests are communicated to the CIA. Adherence to the I(sup 2)C bus standard helps to reduce development costs by facilitating the use of previously developed, commercially available components. The AIA is a mixed-signal ASIC that includes the analog circuitry needed to connect the CIA to a custom higher powered version of the I(sup 2)C bus. The higher-powered version is designed to enable operation with bus cables longer than those contemplated in the I(sup 2)C standard. If there are multiple higher-power I(sup 2)C-like buses, then there must an AIA between the CIA and each such bus. The AIA includes two identical interface blocks: one for the side-A I(sup 2)C clock and data buses and the other for the side B buses. All the AIAs on each side are powered from a common power converter module (PCM). Sides A and B of the I(sup 2)C buses are electrically isolated from each other (see figure). They are also isolated from the CIA by use of transformer coupling of signals between the AIA blocks and the CIA.

Ruiz, Baldes↗

Update on Rover Sequencing and Visualization Program

The Rover Sequencing and Visualization Program (RSVP) has been updated. RSVP was reported in Rover Sequencing and Visualization Program (NPO-30845), NASA Tech Briefs, Vol. 29, No. 4 (April 2005), page 38. To recapitulate: The Rover Sequencing and Visualization Program (RSVP) is the software tool to be used in the Mars Exploration Rover (MER) mission for planning rover operations and generating command sequences for accomplishing those operations. RSVP combines three-dimensional (3D) visualization for immersive exploration of the operations area, stereoscopic image display for high-resolution examination of the downlinked imagery, and a sophisticated command-sequence editing tool for analysis and completion of the sequences. RSVP is linked with actual flight code modules for operations rehearsal to provide feedback on the expected behavior of the rover prior to committing to a particular sequence. Playback tools allow for review of both rehearsed rover behavior and downlinked results of actual rover operations. These can be displayed simultaneously for comparison of rehearsed and actual activities for verification. The primary inputs to RSVP are downlink data products from the Operations Storage Server (OSS) and activity plans generated by the science team. The activity plans are high-level goals for the next day s activities. The downlink data products include imagery, terrain models, and telemetered engineering data on rover activities and state. The Rover Sequence Editor (RoSE) component of RSVP performs activity expansion to command sequences, command creation and editing with setting of command parameters, and viewing and management of rover resources. The HyperDrive component of RSVP performs 2D and 3D visualization of the rover s environment, graphical and animated review of rover predicted and telemetered state, and creation and editing of command sequences related to mobility and Instrument Deployment Device (robotic arm) operations. Additionally, RoSE and HyperDrive together evaluate command sequences for potential violations of flight and safety rules. The products of RSVP include command sequences for uplink that are stored in the Distributed Object Manager (DOM) and predicted rover state histories stored in the OSS for comparison and validation of downlinked telemetry. The majority of components comprising RSVP utilize the MER command and activity dictionaries to automatically customize the system for MER activities.

Cooper, Brian↗

Real-Time Kennedy Space Center and Cape Canaveral Air Force Station High-Resolution Model Implementation and Verification

Customer: NASA's Launch Services Program (LSP), Ground Systems Development and Operations (GSDO), and Space Launch System (SLS) programs. NASA's LSP, GSDO, SLS and other programs at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) use the daily and weekly weather forecasts issued by the 45th Weather Squadron (45 WS) as decision tools for their day-to-day and launch operations on the Eastern Range (ER). For example, to determine if they need to limit activities such as vehicle transport to the launch pad, protect people, structures or exposed launch vehicles given a threat of severe weather, or reschedule other critical operations. The 45 WS uses numerical weather prediction models as a guide for these weather forecasts, particularly the Air Force Weather Agency (AFWA) 1.67 kilometer Weather Research and Forecasting (WRF) model. Considering the 45 WS forecasters' and Launch Weather Officers' (LWO) extensive use of the AFWA model, the 45 WS proposed a task at the September 2013 Applied Meteorology Unit (AMU) Tasking Meeting requesting the AMU verify this model. Due to the lack of archived model data available from AFWA, verification is not yet possible. Instead, the AMU proposed to implement and verify the performance of an ER version of the AMU high-resolution WRF Environmental Modeling System (EMS) model (Watson 2013) in real-time. The tasking group agreed to this proposal; therefore the AMU implemented the WRF-EMS model on the second of two NASA AMU modeling clusters. The model was set up with a triple-nested grid configuration over KSC/CCAFS based on previous AMU work (Watson 2013). The outer domain (D01) has 12-kilometer grid spacing, the middle domain (D02) has 4-kilometer grid spacing, and the inner domain (D03) has 1.33-kilometer grid spacing. The model runs a 12-hour forecast every hour, D01 and D02 domain outputs are available once an hour and D03 is every 15 minutes during the forecast period. The AMU assessed the WRF-EMS 1.33-kilometer domain model performance for the 2014 warm season (May-September). Verification statistics were computed using the Model Evaluation Tools, which compared the model forecasts to observations. The mean error values were close to 0 and the root mean square error values were less than 1.8 for mean sea-level pressure (millibars), temperature (degrees Kelvin), dewpoint temperature (degrees Kelvin), and wind speed (per millisecond), all very small differences between the forecast and observations considering the normal magnitudes of the parameters. The precipitation forecast verification results showed consistent under-forecasting of the precipitation object size. This could be an artifact of calculating the statistics for each hour rather than for the entire 12-hour period. The AMU will continue to generate verification statistics for the 1.33-kilometer WRF-EMS domain as data become available in future cool and warm seasons. More data will produce more robust statistics and reveal a more accurate assessment of model performance. Once the formal task was complete, the AMU conducted additional work to better understand the wind direction results. The results were stratified diurnally and by wind speed to determine what effects the stratifications would have on the model wind direction verification statistics. The results are summarized in the addendum at the end of this report. In addition to verifying the model's performance, the AMU also made the output available in the Advanced Weather Interactive Processing System II (AWIPS II). This allows the 45 WS and AMU staff to customize the model output display on the AMU and Range Weather Operations AWIPS II client computers and conduct real-time subjective analyses. In the future, the AMU will implement an updated version of the WRF-EMS model that incorporates local data assimilation. This model will also run in real-time and be made available in AWIPS II.

Numerical Weather Prediction↗

Energy Information Systems: From the Basement to the Boardroom

A significant buildings energy reduction opportunity exists in the office sector, given that this market segment typically is an early adopter of new technology. There is a rising trend towards smart and connected offices through the internet of things (IoT) that provides new opportunities for operational efficiency and environmental sustainability practices. Leading commercial real estate companies have begun to shift from individual building automation systems (BAS) to partially integrated and automated systems such as energy information systems (EIS). In both the United States and India, organizations are seeking operational excellence, enhanced tenant relationships, and topline growth. Hence it is imperative to engage the executives with decision-making power, by tapping into their interest in sustainability, corporate social responsibility, and innovation. This expansion of interest can enable data-driven decisions, strong energy investments, and deeper energy benefits, and would drive innovation in this field. However, none of this would be possible without robust, consistent building energy information to provide visibility across all the levels of decision making, i.e. from the basement where the facilities staff take operational action to the boardroom where the executives make investment decisions. Price, security, and ease of use remain barriers to the adoption and pervasive use of promising EIS technologies in commercial office buildings. We believe that these barriers can be addressed through the development of ready, simplified, consistent, commercially available, low-cost EIS-in-a-box packages, that have a pre-defined set of hardware components and software features and functionality that are pertinent to a particular building sector. These simplified, sector-specific EIS packages can help to obviate the need for customization, and enhance ease of use, thereby enabling scale-up, in order to facilitate building energy savings. The EIS-in-a-box are adaptable in both U.S. and Indian office buildings, and potentially beyond these two countries.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NIF Experiment Editor Redesign. Setting up for the future

The Campaign Management project at the National Ignition Facility is embarking on a major redesign of the software used by experimentalists to setup experiments on the NIF. The current editor was architected over a decade ago and optimized for a different purpose than supporting production science campaigns. It has a steep learning curve and lacks many desirable features. Furthermore, its underlying technology stack and architecture do not support the kind of routine capability evolution that represents current and future growth needs of the Program. The principal stakeholders are the physicists who are users of the editing application, but the entire integrated suite of Campaign Management software has a broad customer base spanning experimentalists, NIF sub-system subject matter experts, planners, and shot operations staff. A recent DOE-mandated review of NIF activity, conducted with the goal of improving the shot rate at NIF, identified the experiment editor as a clear barrier to a more productive and efficient experiment lifecycle, exposing unnecessary levels of detail, lacking adequate automation, and lacking adequate integration with related activities and data sources in what should be a shared data environment.

42 ENGINEERING↗

Colorado Better Buildings Project. Final Report

The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Department of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among field advisors and across local governments and local service vendors. A portion of the BetterBuildings grant went to the Metro Mayors Caucus (MMC) who worked in partnership with the Denver Regional Council of Governments (DRCOG) to conduct a series of 10 energy efficiency workshops for local government officials and other interested parties. The workshops helped showcase lessons learned on energy efficiency and helped guide other local governments in the establishment of similar programs. The workshops covered a wide range of energy efficiency and renewable energy topics such as clean energy finance, social mobilization and communications, specific case studies of Colorado towns, energy efficiency codes, net zero buildings and solar power. Since the programs launched in January 2011, these communities have collectively spurred economic investments in energy efficiency, achieved greater than 5:1 leveraging of grant funds, saved energy and reduced greenhouse gas emissions, provided trainings for a robust local energy contractor network, and proved out viable and replicable program models that local utilities and other communities are adopting, with long lasting market transformation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Organizing and Typing Persistent Objects Within an Object-Oriented Framework

Conventional operating systems provide little or no direct support for the services required for an efficient persistent object system implementation. We have built a persistent object scheme using a customization and extension of an object-oriented operating system called Choices. Choices includes a framework for the storage of persistent data that is suited to the construction of both conventional file system and persistent object system. In this paper we describe three areas in which persistent object support differs from file system support: storage organization, storage management, and typing. Persistent object systems must support various sizes of objects efficiently. Customizable containers, which are themselves persistent objects and can be nested, support a wide range of object sizes in Choices. Collections of persistent objects that are accessed as an aggregate and collections of light-weight persistent objects can be clustered in containers that are nested within containers for larger objects. Automated garbage collection schemes are added to storage management and have a major impact on persistent object applications. The Choices persistent object store provides extensible sets of persistent object types. The store contains not only the data for persistent objects but also the names of the classes to which they belong and the code for the operation of the classes. Besides presenting persistent object storage organization, storage management, and typing, this paper discusses how persistent objects are named and used within the Choices persistent data/file system framework.

Madany, Peter W.↗

Developing custom fire behavior fuel models from ecologically complex fuel structures for upper Atlantic Coastal Plain forests.

Currently geospatial fire behavior analyses are performed with an array of fire behavior modeling systems such as FARSITE, FlamMap, and the Large Fire Simulation System. These systems currently require standard or customized surface fire behavior fuel models as inputs that are often assigned through remote sensing information. The ability to handle hundreds or thousands of measured surface fuelbeds representing the fine scale variation in fire behavior on the landscape is constrained in terms of creating compatible custom fire behavior fuel models. In this study, we demonstrate an objective method for taking ecologically complex fuelbeds from inventory observations and converting those into a set of custom fuel models that can be mapped to the original landscape. We use an original set of 629 fuel inventory plots measured on an 80,000 ha contiguous landscape in the upper Atlantic Coastal Plain of the southeastern United States. From models linking stand conditions to component fuel loads, we impute fuelbeds for over 6000 stands. These imputed fuelbeds were then converted to fire behavior parameters under extreme fuel moisture and wind conditions (97th percentile) using the fuel characteristic classification system (FCCS) to estimate surface fire rate of spread, surface fire flame length, shrub layer reaction intensity (heat load), non-woody layer reaction intensity, woody layer reaction intensity, and litter-lichen-moss layer reaction intensity. We performed hierarchical cluster analysis of the stands based on the values of the fire behavior parameters. The resulting 7 clusters were the basis for the development of 7 custom fire behavior fuel models from the cluster centroids that were calibrated against the FCCS point data for wind and fuel moisture. The latter process resulted in calibration against flame length as it was difficult to obtain a simultaneous calibration against both rate of spread and flame length. The clusters based on FCCS fire behavior parameters represent reasonably identifiable stand conditions, being: (1) pine dominated stands with more litter and down woody debriscomponents than other stands, (2) hardwood and pine stands with no shrubs, (3) hardwood dominated stands with low shrub and high non-woody biomass and high down woody debris, (4) stands with high grass and forb (i.e., non-woody) biomass as well as substantial shrub biomass, (5) stands with both high shrub and litter biomass, (6) pine-mixed hardwood stands with moderate litter biomass and low shrub biomass, and (7) baldcypress-tupelo stands. Models representing these stand clusters generated flame lengths from 0.6 to 2.3 musing a 30 km h{sub 1} wind speed and fireline intensities of 100-1500 kW m{sub 1} that are typical within the range of experience on this landscape. The fuel models ranked 1 < 2 < 7 < 5 < 4 < 3 < 6 in terms of both flame length and fireline intensity. The method allows for ecologically complex data to be utilized in order to create a landscape representative of measured fuel conditions and to create models that interface with geospatial fire models.

09 BIOMASS FUELS↗

Long-term monitoring experiences at the HADES underground lab and its relevance for radwaste repository monitoring

In the frame of its radwaste disposal research programme, SCK-CEN started the construction of the HADES underground research facility in 1980. Including several extensions and a comprehensive experimental programme, it has provided a lot of experience on monitoring. Monitoring is performed for many reasons: construction follow-up, field characterisation, investigation of phenomena, and model validations - in which the underground lab offers the opportunity for up-scaling conventional laboratory set-ups. Construction monitoring has allowed to develop and optimise the underground construction techniques in a previously poorly known environment, resulting in a well-mastered application of mechanised methods for gallery construction with minimal damage to the host formation. Access to this formation also allows its characterisation, both geotechnical, geological and geochemical, and the detailed investigation of phenomena such as fracturing and oxidation. Finally, instrumented set-ups allow to test various numerical models by comparing the observations with the predicted behaviour. The specific conditions of the underground laboratory put particular requirements to the sensors. These conditions include the long-term nature of many set-ups - typically several years to decades, the inaccessibility of many sensors after installation, high mechanical and water pressures, and corrosion. Combined with the fact that many sensors are custom made, obtaining and maintaining a fully functional instrumented set-up can be challenging. A lot of experience has therefore been gained which is very valuable when designing the monitoring of radwaste repositories - and it has allowed us to determine the critical success factors for monitoring. Engineers tend to look at this first from a technical viewpoint - and there are many technical aspects indeed that determine the reliability of monitoring. A first one is the combination of different observations ('redundancy') which can be implemented by the use of several sensors, different sensor principles, different (coupled) parameters, and the combination of point measurements with geophysical techniques. Cabling is also a critical issue as it is often considered as the primary enemy of barrier integrity. Minimal cabling techniques, such as distributed fibre optic monitoring and wireless signal transmission, therefore get increasing attention. Also the interpretation of the monitoring data - in particular those that are perceived as 'wrong' or 'unexpected', needs sufficient attention. The long-term experience has however also shown that the design of a monitoring programme must look beyond the technical part. In particular for long-term applications, issues such as data management and record keeping are vital to guarantee success in this. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic Enrichment Processing of Roche 454 Titanium Emlusion PCR at the DOE Joint Genome Institute

Enrichment of emulsion PCR product is the most laborious and pipette-intensive step in the 454 Titanium process, posing the biggest obstacle for production-oriented scale up. The Joint Genome Institute has developed a pair of custom-made robots based on the Microlab Star liquid handling deck manufactured by Hamilton to mediate the complexity and ergonomic demands of the 454 enrichment process. The robot includes a custom built centrifuge, magnetic deck positions, as well as heating and cooling elements. At present processing eight emulsion cup samples in a single 2.5 hour run, these robots are capable of processing up to 24 emulsion cup samples. Sample emulsions are broken using the standard 454 breaking process and transferred from a pair of 50ml conical tubes to a single 2ml tube and loaded on the robot. The robot performs the enrichment protocol and produces beads in 2ml tubes ready for counting. The robot follows the Roche 454 enrichment protocol with slight exceptions to the manner in which it resuspends beads via pipette mixing rather than vortexing and a set number of null bead removal washes. The robotic process is broken down in similar discrete steps: First Melt and Neutralization, Enrichment Primer Annealing, Enrichment Bead Incubation, Null Bead Removal, Second Melt and Neutralization and Sequencing Primer Annealing. Data indicating our improvements in enrichment efficiency and total number of bases per run will also be shown.

59 BASIC BIOLOGICAL SCIENCES↗

Digital Channel Simulator Developed and Tested

The Digital Channel Simulator (DCS) is a real-time test set developed in-house by the NASA Glenn Research Center at Lewis Field that simulates the characteristics of the modulator, demodulator, and transmission medium in a typical communications system to enable controlled laboratory testing of codec pairs. The DCS can support data rates up to 100 megasymbols per second (Msymbols/sec) with symbol sizes up to 10 bits and is compatible with both TTL (transistor transistor logic) and ECL (emitter coupled logic) interfaces. Because of its use of digital integrated circuits (IC's), the DCS offers the user accurate and repeatable testing while maintaining a simple reconfiguration of the modulation scheme and noise characteristics. The PC-based graphical user interface (GUI) assures user friendly operation for configuring, controlling, and monitoring the DCS and system during tests. In a typical communications system, the modulator places a symbol in constellation space and puts it on a carrier to be sent to the demodulator. Because of noise on the channel, the I and Q position in constellation space cannot be recovered exactly, and the received coordinates shift. To mimic this process in the laboratory, the DCS uses a mapper to place the symbol in constellation space. It simulates the shift in coordinates by digitally adding "noise" to the I and Q values. The mapper and noise source are implemented in lookup tables. Modulation schemes and noise characteristics are set by the values loaded in these tables. The mapper also has a pass-through mode to facilitate modulator testing, allowing noise to be added to 8-bit I and Q values of modulated data without a second mapping. To achieve high symbol rates, eight processing circuits are placed in parallel between an ECL demultiplexer and multiplexer. A graphical user interface was developed to calculate, load, and verify the values for the lookup tables. This interface can also be used to debug and verify proper operation of the channel simulator or to control an experiment. Operation of the DCS has been verified through three tests: a low-speed comprehensive system test, a high-speed (20 Msymbols/sec) test of the TTL interface, and a high-speed (100 Msymbols/sec) test of the ECL interface. The DCS is now ready for use by NASA and external customers.

Bizon, Thomas P.↗

Structural Testing of a 6m Hypersonic Inflatable Aerodynamic Decelerator System

NASA is developing low ballistic coefficient technologies to support the Nations long-term goal of landing humans on Mars. Current entry, decent, and landing technologies are not practical for this class of payloads due to geometric constraints dictated by current and future launch vehicle fairing limitations. Hypersonic Inflatable Aerodynamic Decelerators (HIADs) are being developed to circumvent this limitation and are now considered a leading technology to enable landing of heavy payloads on Mars. At the beginning of 2014, a 6m diameter HIAD inflatable structure with an integrated flexible thermal protection system (TPS) was subjected to a static load test series to verify its structural performance under flight-relevant loads. The inflatable structure was constructed into a 60 degree sphere-cone configuration using nine inflatable torus segments composed of fiber-reinforced thin films. The inflatable tori were joined together using adhesives and high-strength textile woven structural straps. These straps help distribute the load throughout the inflatable structure. The 6m flexible TPS was constructed using multiple layers of high performance materials that are designed to protect the inflatable structure from heat loads that would be seen in flight during atmospheric entry. A custom test fixture was constructed to perform the static load test series. The fixture consisted of a round structural tub with enough height and width to allow for displacement of the HIAD test article as loads were applied. The bottom of the tub rim had an airtight seal with the floor. The rigid centerbody of the HIAD was mounted to a pedestal in the center of the structural tub. Using an impermeable membrane draped over the HIAD test article, an airtight seal was created with the top rim of the static load tub. This seal allowed partial vacuum to be pulled beneath the HIAD resulting in a uniform static pressure load applied to the outer surface. Using this technique, the test article was subjected to loads of up to 50,000lbs. During the test series an extensive amount of instrumentation was used to provide a rich data set, including deflected shape, structural strap loads, torus cord loads, inflation pressures, and applied static load. In this paper the 2014 6m HIAD static load test series will be discussed in detail, including the design of the 6m HIAD test article, the test setup, and test execution. Analysis results will be described supporting the conclusions that were drawn from the test series..

Hypersonic↗

Progress towards Managing Residential Electricity Demand: Impacts of Standards and Labeling for Refrigerators and Air Conditioners in India

The development of Energy Efficiency Standards and Labeling (EES&L) began in earnest in India in 2001 with the Energy Conservation Act and the establishment of the Indian Bureau of Energy Efficiency (BEE). The first main residential appliance to be targeted was refrigerators, soon to be followed by room air conditioners. Both of these appliances are of critical importance to India's residential electricity demand. About 15percent of Indian households own a refrigerator, and sales total about 4 million per year, but are growing. At the same time, the Indian refrigerator market has seen a strong trend towards larger and more consumptive frost-free units. Room air conditioners in India have traditionally been sold to commercial sector customers, but an increasing number are going to the residential sector. Room air conditioner sales growth in India peaked in the last few years at 20percent per year. In this paper, we perform an engineering-based analysis using data specific to Indian appliances. We evaluate costs and benefits to residential and commercial sector consumers from increased equipment costs and utility bill savings. The analysis finds that, while the BEE scheme presents net benefits to consumers, there remain opportunities for efficiency improvement that would optimize consumer benefits, according to Life Cycle Cost analysis. Due to the large and growing market for refrigerators and air conditioners in India, we forecast large impacts from the standards and labeling program as scheduled. By 2030, this program, if fully implemented would reduce Indian residential electricity consumption by 55 TWh. Overall savings through 2030 totals 385 TWh. Finally, while efficiency levels have been set for several years for refrigerators, labels and MEPS for these products remain voluntary. We therefore consider the negative impact of this delay of implementation to energy and financial savings achievable by 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗