Search NASA⌕ Search

SEARCH · Search NASA

Results for “facility development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Technology Development Roadmap for Volatile Radionuclide Capture and Immobilization

An "Off-Gas and Waste Forms Strategy Workshop" was held in Washington, D.C. on January 31, and February 1, 2023, to review the current state of the art (baseline) technologies for capturing and immobilizing these volatile radionuclides in waste forms (WFs). The discussions in that workshop were used to develop a roadmap for future research and development to mature technologies that are presently not ready for use in a commercial reprocessing facility and develop and demonstrate technologies that provide more safety, more simplicity, or lower costs compared to the current baseline.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The role of the real-time simulation facility, SIMFAC, in the design, development and performance verification of the Shuttle Remote Manipulator System (SRMS) with man-in-the-loop

The SIMFAC has played a vital role in the design, development, and performance verification of the shuttle remote manipulator system (SRMS) to be installed in the space shuttle orbiter. The facility provides for realistic man-in-the-loop operation of the SRMS by an operator in the operator complex, a flightlike crew station patterned after the orbiter aft flight deck with all necessary man machine interface elements, including SRMS displays and controls and simulated out-of-the-window and CCTV scenes. The characteristics of the manipulator system, including arm and joint servo dynamics and control algorithms, are simulated by a comprehensive mathematical model within the simulation subsystem of the facility. Major studies carried out using SIMFAC include: SRMS parameter sensitivity evaluations; the development, evaluation, and verification of operating procedures; and malfunction simulation and analysis of malfunction performance. Among the most important and comprehensive man-in-the-loop simulations carried out to date on SIMFAC are those which support SRMS performance verification and certification when the SRMS is part of the integrated orbiter-manipulator system.

Mccllough, J. R.↗

Decision Point 1 of Statement of Project Objectives (SOPO)Recovery Act: Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems

Air Products is designing, building, and operating a ceramic membrane fabrication facility (the “CerFab”) to enable production of membrane modules to supply a conceptual 2000 ton per day (TPD) ITM Oxygen facility (the “ITM Oxygen Development Facility”). Air Products is executing this project under the American Recovery and Reinvestment Act (ARRA) with the objective to accelerate the adoption of ITM Oxygen technology to help meet the country’s goals for deploying clean power plants. The objective of this Topical Report is to address the requirements of Decision Point 1, which pertains to the Site Selection for the CerFab. Air Products with subcontractor Ceramatec, Inc., has determined a ceramic membrane module manufacturing process and the building and site requirements of the process consistent with the manufacturing objectives of the ITM Oxygen development program and this ARRA project. Based on cost estimates for new construction and refurbishments of existing sites, Air Products chose to consider only existing buildings rather than new construction. The Salt Lake City, Utah, region was selected as the preferred location for the CerFab to enable Ceramatec, Inc., to support the Phase V project and on-going Phase III development activities. Twenty available properties were screened in this region, from which one property emerged clearly as the most suitable property to house the CerFab. The site meets the requirements of the CerFab in terms of floor space, power and other utilities, and building structural features. The site also meets criteria for ease of obtaining the requirement environmental permits, and is within the project cost allocation for the building site. Moreover, the site formerly housed a manufacturing company that ceased operations in 2010 as a result of the economic recession of 2008-9; the region of the site has experienced more than a doubling of the unemployment rate since 2007. Restarting a manufacturing operation in the same facility will return employment to the area, consistent with the goals of the ARRA. Air Products recommends proceeding with procuring this preferred site and continuing to execute Task 30.1 to establish the CerFab at the site.

Armstrong, Phillip↗

Development on the National Ignition Facility of a High Energy Density Opacity Platform

X-ray opacity is a crucial factor in all radiation-hydrodynamics calculations, yet it is one of the least validated of the material properties in simulation codes for high-energy-density plasmas. Recent opacity experiments at the Sandia Z-machine have shown up to factors of two discrepancies between theory and experiment for various mid-Z elements (Fe, Cr, Ni). These discrepancies raise doubts regarding the accuracy of the opacity models which are used in ICF and stewardship as well as in astrophysics. Therefore, a new experimental opacity platform has been developed on the National Ignition Facility (NIF), not only to verify the Z-machine experimental results, but also to extend the experiments to other temperatures and densities. Within the context of the national opacity strategy, the first NIF experiments were directed towards measuring the opacity of iron at a temperature of ~160 eV and an electron density of ~7xl021 cm-3(Anchor 1). The Z data agree with theory at these conditions, providing a reference point for validation of the NIF platform. Development shots on NIF have demonstrated the ability to create a sufficiently bright point backlighter using an imploding plastic capsule, and also a combined hohlraum, sample and laser drive able to produce iron plasmas at the desired conditions. Spectrometer qualification has been completed, albeit with additional improvements planned, and the first iron absorption spectra have now been obtained.

36 MATERIALS SCIENCE↗

Technology Development Roadmap for Volatile Radionuclide Capture and Immobilization

An “Off-Gas and Waste Forms Strategy Workshop” was held in Washington, D.C. on January 31, and February 1, 2023, to review the current state of the art (baseline) technologies for capturing and immobilizing these volatile radionuclides in waste forms (WFs). The discussions in that workshop were used to develop a roadmap for future research and development to mature technologies that are presently not ready for use in a commercial reprocessing facility and develop and demonstrate technologies that provide more safety, more simplicity, or lower costs compared to the current baseline.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preparation, verification, and operational control of a large space-environment-simulation chamber for contamination sensitive tests

A 2-year program to prepare chamber A at the NASA Manned Spacecraft Center for Apollo telescope mount thermal-vacuum tests is discussed. This program covers modification to existing chamber systems, the development of facility and chamber operating procedures, the selection of chamber cleaning and control methods, and the development and evaluation of diagnostic instrumentation. Extensive efforts to ensure a minimum contamination environment for the Apollo telescope mount test series are illustrated. Recent thermal-vacuum tests of this chamber at progressive stages of cleanliness have demonstrated the success achieved in reducing the particulate and molecular contamination levels of the basic chamber interior.

Visentine, J. T.↗

System reliability analysis through corona testing

A corona vacuum test facility for nondestructive testing of power system components was built in the Reliability and Quality Engineering Test Laboratories at the NASA Lewis Research Center. The facility was developed to simulate operating temperature and vacuum while monitoring corona discharges with residual gases. The facility is being used to test various high-voltage power system components.

Lalli, V. R.↗

Development of a fire test facility for graphite fiber-reinforced composites

A number of modifications were added to the Model 25 facility to make it specifically applicable for composite material screening tests. Most significant was the development of hardware for trapping fibers released during test and isolating them for quantitative measurement. Capability was added for increasing test section velocities and increasing the range of air/fuel ratios available from very rich to very lean. A provision was added for agitation of the test specimen and the combustion gases by a pulsating gas supply. A variety of specimen configurations was evaluated by an extensive series of tests on a graphite-epoxy reference composite which is representative of material currently used in advanced aircraft. A standard test technique and specimen configuration were established which was satisfactory for the reference composite. A test program was then performed on several alternate composite materials to verify the validity of the test method for relative evaluation of a variety of composite materials.

Alexander, J. G.↗

Theoretical and experimental studies relevant to interpretation of auroral emissions

The accomplishments achieved over the past year are detailed with emphasis on the interpretation or auroral emissions and studies of potential spacecraft-induced contamination effects. Accordingly, the research was divided into two tasks. The first task is designed to add to the understanding of space vehicle induced external contamination. An experimental facility for simulation of the external environment for a spacecraft in low earth orbit was developed. The facility was used to make laboratory measurements of important phenomena required for improving the understanding of the space vehicle induced external environment and its effect on measurement of auroral emissions from space-based platforms. A workshop was sponsored to provide a forum for presentation of the latest research by nationally recognized experts on space vehicle contamination and to discuss the impact of this research on future missions involving space-based platforms. The second task is to add an ab initio auroral calculation to the extant ionospheric/thermospheric global modeling capabilities. Once the addition of the code was complete, the combined model was to be used to compare the relative intensities and behavior of various emission sources (dayglow, aurora, etc.). Such studies are essential to an understanding of the types of vacuum ultraviolet (VUV) auroral images which are expected to be available within two years with the successful deployment of the Ultraviolet Imager (UVI) on the ISTP POLAR spacecraft. In anticipation of this, the second task includes support for meetings of the science working group for the UVI to discuss operational and data analysis needs. Taken together, the proposed tasks outline a course of study designed to make significant contributions to the field of space-based auroral imaging.

Keffer, Charles E.↗

The Planning and Implementation of Test Facility Improvements

As engineering programs develop, and product testing begins, ideas for process improvement soon become obvious. Engineers envision new holding and handling fixtures. Additional custom-made support equipment may be needed. Perhaps modifications to the building or modifications to facility hardware are the order of the day. This is where a flexible creative test organization is needed. We need not be content with the status quo. All of these desired test innovations can make the difficult easy and improve the work flow. At times, implementing these new ideas demands more time or specialized expertise than test team members have. Through the coordinated use of labor resources, the needed improvements can still be made and in a timely fashion that supports program schedules. This presentation provides practical advice and a method whereby test personnel can creatively develop facility improvements and manage them from start to finish. You can control just how much time you invest and what part of your concepts you will personally design. By wisely defining the requirements and presenting them to the appropriate help sources (vendors, contractors, coworkers, and support departments), you can get the help you need to bring the improvements you have conceived, into fruition. Aspects of this presentation include defining requirements for test facility improvements, choosing labor resources, writing a statement of work, determining cost and benefits, securing department approval, coordinating procurement, managing the project, and training the end users. The process of successfully implementing test facility improvements is thoroughly explained. It has been tried, proven and improved over nearly 25 years of use. Whether considering a $50 improvement or a $50 million dollar improvement, this discussion will provide helpful pointers. Examples of improvements made through this process and their illustration will be included.

Oberlander, Larry↗

Compact Heat Exchanger Design and Testing for Advanced Reactors and Advanced Power Cycles

The goal of the proposed research is to demonstrate the thermal hydraulic performance of innovative surface geometries in compact heat exchangers used as intermediate heat exchangers (IHXs) and recuperators for the supercritical carbon dioxide (s-CO 2 ) Brayton cycle. Printed-circuit heat exchangers (PCHEs) are the primary compact heat exchangers of interest. The overall objectives are: To develop optimized PCHE designs for different working fluid combinations including helium to s-CO 2 , liquid salt to s-CO 2 , sodium to s-CO 2 , and liquid salt to helium; To experimentally and numerically investigate thermal performance, thermal stress and failure mechanism of PCHEs under various transients; and To study diffusion bonding techniques for elevated-temperature alloys and examine post-test material integrity of the PCHEs. The project objectives were accomplished by defining and executing five different tasks corresponding to these specific objectives. The first task involved a thorough literature review and a selection of IHX candidates with different surface geometries as well as a summary of prototypic operational conditions. The second task involved optimization of PCHE design with numerical analyses of thermal-hydraulic performances and mechanical integrity. The subsequent task dealt with the development of testing facilities and engineering design of PCHE to be tested in s-CO 2 fluid conditions. The next task involved experimental investigation and validation of the thermal-hydraulic performances and thermal stress distribution of prototype PCHEs manufactured with particular surface geometries. The last task involved an investigation of diffusion bonding process and posttest destructive testing to validate mechanical design methods adopted in the design process. The experimental work utilized the two test facilities at The Ohio State University (OSU) including one existing High-Temperature Helium Test Facility (HTHF) and the newly developed s-CO 2 test loop (STL) facility and s-CO 2 test facility at University of Wisconsin – Madison (UW).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Using the NPSS Environment to Model an Altitude Test Facility

An altitude test facility was modeled using Numerical Propulsion System Simulation (NPSS). This altitude test facility model represents the most detailed facility model developed in the NPSS architecture. The current paper demonstrates the use of the NPSS system to define the required operating range of a component for the facility. A significant number of additional component models were easily developed to complete the model. Discussed in this paper are the additional components developed and what was done in the development of these components.

Lavelle, Thomas M.↗

Distributed Wind Development Potential at United States Correctional Facilities

The goal of this assessment was to provide a high-level overview of distributed wind development potential at correctional facilities across the United States. The assessment considered the wind resource, electricity rates, and electricity consumption at facilities. In total, Pacific Northwest National Laboratory (PNNL) estimates that 2,421 facilities in 1,280 counties, projected to consume a combined 12,000 GWh/year, have the potential to host distributed wind projects.

17 WIND ENERGY↗

Air-bearing spin facility for measuring energy dissipation

The air-bearing spin facility was developed to determine experimentally the effect of energy dissipation upon the motion of spinning spacecraft. The facility consists of an air-bearing spin table, a telemetry system, a command system, and a ground control station. The air-bearing spin table was designed to operate in a vacuum chamber. Tests were run on spacecraft components such as fuel tanks, nutation dampers, reaction wheels, and active nutation damper systems. Each of these items affected the attitude of a spinning spacecraft. An experimental approach to determine these effects was required because the dissipation of these components could not be adequately analyzed. The results of these experiments have been used, with excellent results, to predict spacecraft motion.

Peterson, R. L.↗

NASA-VCOSS dynamic test facility

The Large Space Structure Ground Test Facility under development at the NASA Marshall Space Flight Center in Huntsville, Alabama is described. The Ground Test Facility was established initially to test experimentally the control system to be used on the Solar Array flight Experiment. The structural dynamics of the selected test article were investigated, including the fidelity of the associated mathematical model. The facility must permit the investigation of structural dynamics phenomena and be able to evaluate candidate attitude control and vibration suppression techniques.

Waites, H. B.↗

Improving a high-efficiency, gated spectrometer for x-ray Thomson scattering experiments at the National Ignition Facility

We are developing x-ray Thomson scattering for applications in implosion experiments at the National Ignition Facility. In particular we have designed and fielded MACS, a high-efficiency, gated x-ray spectrometer at 7.5–10 keV [T. Döppner et al., Rev. Sci. Instrum. 85, 11D617 (2014)]. Here we report on two new Bragg crystals based on Highly Oriented Pyrolytic Graphite (HOPG), a flat crystal and a dual-section cylindrically curved crystal. We have performed in situ calibration measurements using a brass foil target, and we used the flat HOPG crystal to measure Mo K-shell emission at 18 keV in 2nd order diffraction. Such high photon energy line emission will be required to penetrate and probe ultra-high-density plasmas or plasmas of mid-Z elements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Mission and Readiness Assessment for Fusion Nuclear Facilities

Magnetic fusion development toward DEMO will most likely require a number of fusion nuclear facilities (FNF), intermediate between ITER and DEMO, to test and validate plasma and nuclear technologies and to advance the level of system integration. The FNF mission space is wide, ranging from basic materials research to net electricity demonstration, so there is correspondingly a choice among machine options, scope, and risk in planning such a step. Readiness requirements to proceed with a DEMO are examined, and two FNF options are assessed in terms of the contributions they would make to closing DEMO readiness gaps, and their readiness to themselves proceed with engineering design about ten years from now. An advanced tokamak (AT) pilot plant with superconducting coils and a mission to demonstrate net electricity generation would go a long way toward DEMO. As a next step, however, a pilot plant would entail greater risk than a copper-coil FNSF-AT with its more focussed mission and technology requirements. The stellarator path to DEMO is briefly discussed. Regardless of the choice of FNF option, an accompanying science and technology development program, also aimed at DEMO readiness, is absolutely essential.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Right-Sized Reuse - Use a Systematic Process, and Design for a Specialized, Yet Flexible Result - 13558

The process of transferring real property from the U.S. Department of Energy (DOE) is always the same - except when it's not. The most frequently asked questions in the process are: how can this take so long and be so complex, and why is it different every time? The process of transferring real property from the Department of Energy is always the same - except when it's not. Repeat as needed. The authority for DOE to transfer property is found in the Atomic Energy Act of 1954 (AEA). Specifically, the transfer of real property for mission-related purposes is done pursuant to the AEA Section 161(g). Another rule that can provide certain unique benefits to the transferee is found in 10 Code of Federal Regulations (CFR) Part 770, Transfer of Real Property at Defense Nuclear Facilities for Economic Development; it can be followed for economic development purposes at defense nuclear facilities. All federal real property transfers include at minimum a National Environmental Policy Act (NEPA) review and a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) chap. 120(h) environmental due diligence evaluation. The end-point objective is to be able to demonstrate that a transfer is protective of human health and the environment - typically attained via a risk evaluation. That's it...mostly. None of these requirements are new; their processes are well-known. So, why is it different every time there is a transfer and what can be done to move things along? Time and the perception of open-ended schedules kill projects. Economic development projects that are proposed by Community Reuse Organizations (CROs) and others or by parties who need private capital are especially time-sensitive. It is not reasonable to expect business interests or investors to wait two years while the property transfer process is carried out. Lenders are also risk-sensitive and not solely business-risk sensitive. After all, these are federal properties where contamination is a factor. What are some of the things you can do to address those time and risk issues? Issues of time and complexity arise from several variables. Short-sighted vision and lack of project definition lead to wasted effort and lengthy delays. Some variability on the input side of the process can be controlled in a way that will save you time and actually work to your advantage. Steps can be taken to systematize the transfer process on the agency's part and on the requester/grantee's part. Having the right mix of dedicated people from the beginning, planning with flexibility, coordinating with the clean-up program at your site, knowing the interests and issues of your stakeholders, and working with the CRO/economic development authorities - all of these measures and others can and will help you. The key is not simply knowing the steps and making a punch-list, but understanding the steps and how to work with and use them. These concepts can be applied to create a vision of success for those engaged in real property transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗