Search NASA⌕ Search

SEARCH · Search NASA

Results for “flight scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

WetLab-2: Providing Quantitative PCR Capabilities on ISS

The objective of NASA Ames Research Centers WetLab-2 Project is to place on the ISS a system capable of conducting gene expression analysis via quantitative real-time PCR (qRT-PCR) of biological specimens sampled or cultured on orbit. The WetLab-2 system is capable of processing sample types ranging from microbial cultures to animal tissues dissected on-orbit. The project has developed a RNA preparation module that can lyse cells and extract RNA of sufficient quality and quantity for use as templates in qRT-PCR reactions. Our protocol has the advantage that it uses non-toxic chemicals, alcohols or other organics. The resulting RNA is transferred into a pipette and then dispensed into reaction tubes that contain all lyophilized reagents needed to perform qRT-PCR reactions. These reaction tubes are mounted on rotors to centrifuge the liquid to the reaction window of the tube using a cordless drill. System operations require simple and limited crew actions including syringe pushes, valve turns and pipette dispenses. The resulting process takes less than 30 min to have tubes ready for loading into the qRT-PCR unit.The project has selected a Commercial-Off-The-Shelf (COTS) qRT-PCR unit, the Cepheid SmartCycler, that will fly in its COTS configuration. The SmartCycler has a number of advantages including modular design (16 independent PCR modules), low power consumption, rapid thermal ramp times and four-color detection. The ability to detect up to four fluorescent channels will enable multiplex assays that can be used to normalize for RNA concentration and integrity, and to study multiple genes of interest in each module. The WetLab-2 system will have the capability to downlink data from the ISS to the ground after a completed run and to uplink new programs. The ability to conduct qRT-PCR on-orbit eliminates the confounding effects on gene expression of reentry stresses and shock acting on live cells and organisms or the concern of RNA degradation of fixed samples. The system can be used to validate terrestrial analyses of samples returned from ISS by providing on-orbit gene expression benchmarking prior to sample return. The ability to get on-orbit data will provide investigators with the opportunity to adjust experimental parameters in real time for subsequent trials, without the need for sample return and re-flight to sample multigenerational changes. The system can also be used for analysis of air, surface, water, and clinical samples to monitor environmental contaminants and crew health. The verification flight of the instrument is scheduled to launch on SpaceX-7 in June 2015. The WetLab-2 Project is supported by NASAs ISS Program at JSC, Code OZ.

ISS tools↗

Evaluation of Ultem 1000, 1010, and 9085 for Radome Applications at 24.5 GHz

The UAS in the NAS project Flight Test 6 (FT6) campaign scheduled for FY19Q3 will evaluate the proficiency of a Honeywell DAPA-Lite Radar installed on a Tiger Shark unmanned vehicle to detect the presence of air traffic operating in its vicinity. A 3D printed radome will be manufactured for the front of the Tiger Shark to enclose the radar during FT6 operations. The DAPA-Lite radar operates in the 24.5 GHz frequency band. Material properties of 3D printer filaments are widely available for the mechanical and thermal properties, but limited knowledge exists on the electrical properties for radome applications and no data was found to correspond at the 24.5 Ghz frequency band. To minimize project risk associated with the radome performance, transmissivity and reflectivity measurements were conducted on two candidate 3D printed dielectric material filaments (Ultem 1010 Natural and Ultem 9085 Black) and two thicknesses of a solid laminate (Ultem 1000) material. The 3D printed Ultem coupons were tested shortly after being printed and again 8 months later to examine ageing effects of the open cell structure. This paper presents the transmissivity and reflectivity measurement results collected on the Ultem coupons and concludes the 3D printed 1010 Natural coupon is a suitable candidate filament for radome applications at 24.5 GHz. The design of the structure’s open cell matrix has a significant impact on the material’s surface reflectivity.

Szatkowski, George N.↗

Design of a Crossflow Attenuated Natural Laminar Flow Flight Test Article

This abstract includes preliminary information on the computational design and analysis of a flight test article. The flight test aims to experimentally validate the new Crossflow Attenuated Natural Laminar Flow (CATNLF) design method in a flight environment. The CATNLF design method uses geometry shaping to produce specific pressure distributions that enable laminar flow on vehicle components with high sweep and high Reynolds numbers by attenuating the crossflow growth that typically leads to premature transition on such components. The flight test article design is scheduled to be completed at the end of 2019, with model fabrication beginning in early 2020.Design results presented in this abstract are representative of the final test article. The final paper will be updated to include the finalized test article geometry and analysis.

Michelle N. Lynde↗

Integrated Demand Management: Concepts and Procedures

This report provides a comprehensive description of the Integrated Demand Management concept. Motivation: NASA’s Integrated Demand Management (IDM) research explores the idea that, under certain conditions, time-based flow management (TBFM) arrival operations can benefit from the coordinated use of a strategic traffic management initiative (TMI) to “precondition” the inbound demand. The research was motivated by the observation that TBFM was usually turned off during convective weather, even in facilities where it was routinely used. Our hypothesis was that strategic adjustments to the inbound traffic so that it provided a better match to the off-nominal changes in capacity observed during these conditions could enable TBFM scheduling to continue to provide effective support for arrival traffic management. Concept: IDM proposes that a TMI (e.g., a Collaborative Trajectory Options Program, or CTOP) be used to adjust the rate and/or geographic distribution across flows of the traffic inbound to a high-demand, TBFM-managed airport before that traffic reaches the TBFM planning horizon. After this strategic preconditioning, TBFM can then tactically fine-tune the demand to deliver a well-managed, orderly feed to the destination airport. Coordinated use of these two flow management capabilities is intended to improve system performance in terms of: • Equity of ground delay assignment, avoiding excessive ground delay for TBFM-scheduled departures, without penalizing longer flights; • Throughput, by distributing traffic to maximize use of available capacity; • Predictability for operators, providing advance notice about the impact on individual flights; • Increased flexibility, supporting operator mitigation strategies such as slot swapping or trajectory options; • Efficiency of flight operations, using ground delay more effectively and reducing airborne delay. The operational description in this document highlights how the IDM concept builds upon already existing tools and procedures, and also indicates where tool enhancements could facilitate conduct of IDM operations. However, enhanced tools are not a requirement for concept introduction. In fact, initial deployment that focused on training procedures and rationale for coordinated use of TFMS and TBFM, without changes to existing tools, might be a simpler way to introduce and to familiarize traffic managers with the idea of preconditioning. The concept and procedures described in this document can hopefully provide useful guidance for introduction of IDM into field operations..

IDM↗

Development of a Test Article to Demonstrate the Long Duration Storage of Liquid Hydrogen via a Two-Stage Active Cooling Approach

A NASA team is developing a test article for the purpose of demonstrating the long duration storage of liquid hydrogen utilizing passive Cryogenic Fluid Management and cryocoolers via a two-stage active cooling approach. Funded by NASA’s Technology Demonstration Mission Program and managed by the Cryogenic Fluid Management Portfolio Project, the team is leveraging demonstrations conducted under pervious NASA activities to develop a fully integrated test article that will demonstrate the zero boil-off storage of liquid hydrogen. This paper discusses the previous activities being leveraged from NASA’s Cryogenic Propellant Storage and Transfer project, the test article design and build, hardware and instrumentation selections, control methodology, and the planned primary and secondary test objectives. The test article assembly and demonstration are both to be conducted in the East Test Area at NASA Marshall Space Flight Center and are currently scheduled for Fiscal Year 2024.

Active Cooling↗

Long Duration Storage of Liquid Hydrogen via Two-Stage Active Cooling Hardware Characterization and Test Planning

The zero boil-off storage of liquid hydrogen using active cooling (cryocoolers) with a two-stage cooling approach is being investigated by NASA. In interest of advancing the technology to enable extended duration storage for the agency’s future long duration missions, NASA’s Technology Demonstration Mission Program has funded this five-year effort which includes the design, build and testing of a test article to demonstrate this concept. This paper includes discussions of the multiple Cryogenic Fluid Management technologies that were studied under NASA’s Cryogenic Propellant Storage and Transfer project, design of the test article to be demonstrated, then the planned test objectives which include characterization testing of the active cooling system, demonstration of the control system, preliminary testing with liquid nitrogen, and a complete demonstration of zero boil-off storage of liquid hydrogen. The full demonstration will be conducted in the East Test Area at NASA Marshall Space Flight Center and is currently scheduled to begin on October 1st, 2024.

Cryogenic Fluid Management↗

Orion GNC Mitigation Efforts for Van Allen Radiation

The Orion Crew Module (CM) is NASA's next generation manned space vehicle, scheduled to return humans to lunar orbit in the coming decade. The Orion avionics and GN&C architectures have progressed through a number of project phases and are nearing completion of a major milestone. The first unmanned test mission, dubbed "Exploration Flight Test One" (EFT-1) is scheduled to launch from NASA Kennedy Space Center late next year and provides the first integrated test of all the vehicle systems, avionics and software. The EFT-1 mission will be an unmanned test flight that includes a high speed re-entry from an elliptical orbit, which will be launched on an expendable launch vehicle (ELV). The ELV will place CM and the ELV upper stage into a low Earth orbit (LEO) for one revolution. After the first LEO, the ELV upper stage will re-ignite and place the combined upper stage/CM into an elliptical orbit whose perigee results in a high energy entry to test CM response in a relatively high velocity, high heating environment. While not producing entry velocities as high as those experienced in returning from a lunar orbit, the trajectory was chosen to provide higher stresses on the thermal protection and guided entry systems, as compared against a lower energy LEO entry. However the required entry geometry with constraints on inclination and landing site result in a trajectory that lingers for many hours in the Van Allen radiation belts. This exposes the vehicle and avionics to much higher levels of high energy proton radiation than a typical LEO or lunar trajectory would encounter. As a result, Van Allen radiation poses a significant risk to the Orion avionics system, and particularly the Flight Control Module (FCM) computers that house the GN&C flight software. The measures taken by the Orion GN&C, Flight Software and Avionics teams to mitigate the risks associated with the Van Allen radiation on EFT-1 are covered in the paper. Background on the Orion avionics subsystem is provided, as well as an overview of the GN&C software architecture. The measures taken to handle radiation induced failure of the one or both of the FCM's are presented, and finally simulation and actual hardware-in-the-loop (HWIL) results are shown confirming the validity of the implementation. The paper presents an overview of the Orion avionics architecture describing the GNC sensors, onboard data network as well as the flight control computers and their planned restart capabilities. GN&C sensors include two Orion Inertial Measurement Units (OIMU's), a Vision Processing Unit (VPU) to process camera images, three barometric altimeters and a single GPS receiver. All of the sensors communicate to one of two Power and Data Units (PDU's). The PDU's multiplex analog and serial data from the sensors and write the data to the Orion Data Network (ODN). The OIMU s write measurement messages directly as onto the ODN, but they are routed through PDU network switches.

King, Ellis T.↗

Orion Exploration Flight Test-l (EFT -1) Absolute Navigation Design

Scheduled to launch in September 2014 atop a Delta IV Heavy from the Kennedy Space Center, the Orion Multi-Purpose-Crew-Vehicle (MPCV's) maiden flight dubbed "Exploration Flight Test -1" (EFT-1) intends to stress the system by placing the uncrewed vehicle on a high-energy parabolic trajectory replicating conditions similar to those that would be experienced when returning from an asteroid or a lunar mission. Unique challenges associated with designing the navigation system for EFT-1 are presented in the narrative with an emphasis on how redundancy and robustness influenced the architecture. Two Inertial Measurement Units (IMUs), one GPS receiver and three barometric altimeters (BALTs) comprise the navigation sensor suite. The sensor data is multiplexed using conventional integration techniques and the state estimate is refined by the GPS pseudorange and deltarange measurements in an Extended Kalman Filter (EKF) that employs the UDUT decomposition approach. The design is substantiated by simulation results to show the expected performance.

Sud, Jastesh↗

Hyper-X: Flight Validation of Hypersonic Airbreathing Technology

This paper provides an overview of NASA's focused hypersonic technology program, i.e. the Hyper-X program. This program is designed to move hypersonic, air breathing vehicle technology from the laboratory environment to the flight environment, the last stage preceding prototype development. This paper presents some history leading to the flight test program, research objectives, approach, schedule and status. Substantial experimental data base and concept validation have been completed. The program is concentrating on Mach 7 vehicle development, verification and validation in preparation for wind tunnel testing in 1998 and flight testing in 1999. It is also concentrating on finalization of the Mach 5 and 10 vehicle designs. Detailed evaluation of the Mach 7 vehicle at the flight conditions is nearing completion, and will provide a data base for validation of design methods once flight test data are available.

Rausch, Vincent L.↗

Propulsion Control and Health Management (PCHM) Technology for Flight Test on the C-17 T-1 Aircraft

The C-I 7 T-l Globemaster III is an Air Force flight research vehicle located at Edwards Air Force Base. NASA Dryden and the C-17 System Program Office have entered into a Memorandum of Agreement to permit NASA the use of the C-I 7 T-I to conduct flight research on a mutually coordinated schedule. The C-17 Propulsion Control and Health Management (PCHM) Working Group was formed in order to foster discussion and coordinate planning amongst the various government agencies conducting PCHM research with a potential need for flight testing, and to communicate to the PCHM community the capabilities of the C-17 T-l aircraft to support such flight testing. This paper documents the output of this Working Group, including a summary of the candidate PCHM technologies identified and their associated benefits relative to NASA goals and objectives.

Simon, Donald L.↗

Interaction Between Strategic and Local Traffic Flow Controls

The loosely coordinated sets of traffic flow management initiatives that are operationally implemented at the national- and local-levels have the potential to under, over, and inconsistently control flights. This study is designed to explore these interactions through fast-time simulations with an emphasis on identifying inequitable situations in which flights receive multiple uncoordinated delays. Two operationally derived scenarios were considered in which flights arriving into the Dallas/Fort Worth International Airport were first controlled at the national-level, either with a Ground Delay Program or a playbook reroute. These flights were subsequently controlled at the local level. The Traffic Management Advisor assigned them arrival scheduling delays. For the Ground Delay Program scenarios, between 51% and 53% of all arrivals experience both pre-departure delays from the Ground Delay Program and arrival scheduling delays from the Traffic Management Advisor. Of the subset of flights that received multiple delays, between 5.7% and 6.4% of the internal departures were first assigned a pre-departure delay by the Ground Delay Program, followed by a second pre-departure delay as a result of the arrival scheduling. For the playbook reroute scenario, Dallas/Fort Worth International Airport arrivals were first assigned pre-departure reroutes based on the MW_2_DALLAS playbook plan, and were subsequently assigned arrival scheduling delays by the Traffic Management Advisor. Since the airport was operating well below capacity when the playbook reroute was in effect, only 7% of the arrivals were observed to receive both rerouting and arrival scheduling delays. Findings from these initial experiments confirm field observations that Ground Delay Programs operated in conjunction with arrival scheduling can result in inequitable situations in which flights receive multiple uncoordinated delays.

Grabbe, Son↗

The NASA Hyper-X Program

This paper provides an overview of NASA's Hyper-X Program; a focused hypersonic technology effort designed to move hypersonic, airbreathing vehicle technology from the laboratory environment to the flight environment. This paper presents an overview of the flight test program, research objectives, approach, schedule and status. Substantial experimental database and concept validation have been completed. The program is currently concentrating on the first, Mach 7, vehicle development, verification and validation in preparation for wind-tunnel testing in 1998 and flight testing in 1999. Parallel to this effort the Mach 5 and 10 vehicle designs are being finalized. Detailed analytical and experimental evaluation of the Mach 7 vehicle at the flight conditions is nearing completion, and will provide a database for validation of design methods once flight test data are available.

Freeman, Delman C., Jr.↗

Flight Team Development in Support of LCROSS - A Class D Mission

The LCROSS (Lunar Crater Observation and Sensing Satellite) project presented a number of challenges to the preparation for mission operations. A class D mission under NASA s risk tolerance scale, LCROSS was governed by a $79 million cost cap and a 29 month schedule from "authority to proceed" to flight readiness. LCROSS was NASA Ames Research Center s flagship mission in its return to spacecraft flight operations after many years of pursuing other strategic goals. As such, ARC needed to restore and update its mission support infrastructure, and in parallel, the LCROSS project had to newly define operational practices and to select and train a flight team combining experienced operators and staff from other arenas of ARC research. This paper describes the LCROSS flight team development process, which deeply involved team members in spacecraft and ground system design, implementation and test; leveraged collaborations with strategic partners; and conducted extensive testing and rehearsals that scaled in realism and complexity in coordination with ground system and spacecraft development. As a testament to the approach, LCROSS successfully met its full mission objectives, despite many in-flight challenges, with its impact on the lunar south pole on October 9, 2009.

Tompkins, Paul D.↗

Strategic workload management and decision biases in aviation

Thirty pilots flew three simulated landing approaches under conditions of low, medium, and high workload. Workload conditions were created by varying time pressure and external communications requirements. Our interest was in how the pilots strategically managed or adapted to the increasing workload. We independently assessed the pilot's ranking of the priority of different discrete tasks during the approach and landing. Pilots were found to sacrifice some aspects of primary flight control as workload increased. For discrete tasks, increasing workload increased the amount of time in performing the high priority tasks, decreased the time in performing those of lowest priority, and did not affect duration of performance episodes or optimality of scheduling of tasks of any priority level. Individual differences analysis revealed that high-performing subjects scheduled discrete tasks earlier in the flight and shifted more often between different activities.

Raby, Mireille↗

Orion GN and C Mitigation Efforts for Van Allen Radiation

The Orion Crew Module (CM) is NASA's next generation manned space vehicle, scheduled to return humans to lunar orbit in the coming decade. The Orion avionics and GN&C architectures have progressed through a number of project phases and are nearing completion of a major milestone. The first unmanned test mission, dubbed "Exploration Flight Test One" (EFT-1) is scheduled to launch from NASA Kennedy Space Center late next year and provides the first integrated test of all the vehicle systems, avionics and software.

King, Ellis T.↗

Space-Based Telemetry And Range Safety Flight Demonstration #1

The basic ability of STARS to maintain a satellite communications link with TDRSS satellites during dynamic aircraft flights was successfully demonstrated during FD 1. The Range Safety and Range User systems' link margins were measured. The ability to acquire/reacquire and maintain lock between a high-dynamic vehicle and a satellite-based system was demonstrated. The Range Safety system simultaneously received and processed command links from space and ground transmitters and provided near real-time Range Safety telemetry to DFRC, which then sent it in near real time to KSC, GSFC, and WFF for monitoring. The GPS receiver maintained track except during extremely dynamic maneuvers. The Range User system sent data at three different data rates. There were excellent cooperation and support from the different Centers, contractors, and Ranges. A large amount of data was recorded and extensive post-flight analysis was performed. The Range User TDRSS link margin met or exceeded the predicted performance at three different data rates. The Range Safety launch-head link margins generally agreed with the predicted performance. The UPS positions and velocities agreed with those from tracking radar to within about 20 m and a few rn/s. The link margins for the Range Safety TDRSS telemetry link were less than expected. The link margin for one TDRSS command link LPT channel was occasionally much less than the other. Additional post-flight testing has yet to identify the root causes of these results. There were many lessons learned from this first set of test flights. The most important one is that more time and testing are needed for each step to deal with the inevitable problems. It is vital that these lessons be among the primary areas of study that will carry over from FD#1 to FD#2, which is currently scheduled for early FY05 at DFRC and will use a specially designed Ku-band phased array antenna for the Range User system. The next series of flight demonstrations scheduled for late 2004 at DFRC will incorporate many lessons learned from FD#1. A specially designed Ku-band phased array antenna will be used with the Range User system. A test flight on a hypersonic vehicle is planned by the end of 2006.

Demspm. Erol↗

Big Software for SmallSats: Adapting cFS to CubeSat Missions

Expanding capabilities and mission objectives for SmallSats and CubeSats is driving the need for reliable, reusable, and robust flight software. While missions are becoming more complicated and the scientific goals more ambitious, the level of acceptable risk has decreased. Design challenges are further compounded by budget and schedule constraints that have not kept pace. NASA's Core Flight Software System (cFS) is an open source solution which enables teams to build flagship satellite level flight software within a CubeSat schedule and budget. NASA originally developed cFS to reduce mission and schedule risk for flagship satellite missions by increasing code reuse and reliability. The Lunar Reconnaissance Orbiter, which launched in 2009, was the first of a growing list of Class B rated missions to use cFS.

Flight Software↗

Big Software for SmallSats: Adapting CFS to CubeSat Missions

Expanding capabilities and mission objectives for SmallSats and CubeSats is driving the need for reliable, reusable, and robust flight software. While missions are becoming more complicated and the scientific goals more ambitious, the level of acceptable risk has decreased. Design challenges are further compounded by budget and schedule constraints that have not kept pace. NASA's Core Flight Software System (cFS) is an open source solution which enables teams to build flagship satellite level flight software within a CubeSat schedule and budget. NASA originally developed cFS to reduce mission and schedule risk for flagship satellite missions by increasing code reuse and reliability. The Lunar Reconnaissance Orbiter, which launched in 2009, was the first of a growing list of Class B rated missions to use cFS. Large parts of cFS are now open source, which has spurred adoption outside of NASA. This paper reports on the experiences of two teams using cFS for current CubeSat missions. The performance overheads of cFS are quantified, and the reusability of code between missions is discussed. The analysis shows that cFS is well suited to use on CubeSats and demonstrates the portability and modularity of cFS code.

Open Source↗