NASA battery testbed: A designed experiment for the optimization of LEO battery operational parameters

Simulation of spacecraft battery operation is implemented. Robust design experiment to obtain optimum battery operational parameters is performed. It is found that short term tests using robust design of experiments can provide guidelines for optimum battery operation. It is decided to use robust design approach to provide guidelines for battery operation on current spacecraft in orbit as batteries age (GRO, UARS, EUVE, TOPEX).

Deligiannis, F.

Advanced Composite Structures and Materials Technologies for Launch Vehicles

The NASA's Advanced Composites Technologies (ACT) Project has the potential to develop composite materials and structures technologies for the largest composite aerospace structures ever made. The objective the ACT Project of is to develop mid-technology readiness level (TRL) composite materials and structures technologies to TRL 6 for specific heavy lift Ares V launch vehicle and Altair lunar lander applications. To accomplish this objective, the ACT Project has four major technical elements: materials and manufacturing; structural concepts development and assessment of lightweight components; testing and evaluation; and highly loaded composite struts. The Project uses capabilities from across NASA to form multi-disciplinary, cross-center teams to meet the milestones of these technical elements. This presentation will describe the activities and plans for the ACT Project. Studies from the first execution year of the project will be summarized including results from materials selection and structural concept evaluation studies. Plans for continuing activities include studies for nondestructive evaluation/structural health monitoring, damage tolerance, joints, and material and structural testing, and these studies will be described. A major emphasis this fiscal year is the start of work for a manufacturing demonstration barrel. This structure will be composed of six, 5-m-diameter, 3-m-long curved panels that when assembled, result in a 10-m-diameter barrel. Activities related to the development of this structure will also be described.

Mark J Shuart

Numerical Modeling of the Transient Chilldown Process of a Cryogenic Propellant Transfer Line

Before cryogenic fuel depots can be fully realized, efficient methods with which to chill down the spacecraft transfer line and receiver tank are required. This paper presents numerical modeling of the chilldown of a liquid hydrogen tank-to-tank propellant transfer line using the Generalized Fluid System Simulation Program (GFSSP). To compare with data from recently concluded turbulent LH2 chill down experiments, seven different cases were run across a range of inlet liquid temperatures and mass flow rates. Both trickle and pulse chill down methods were simulated. The GFSSP model qualitatively matches external skin mounted temperature readings, but large differences are shown between measured and predicted internal stream temperatures. Discrepancies are attributed to the simplified model correlation used to compute two-phase flow boiling heat transfer. Flow visualization from testing shows that the initial bottoming out of skin mounted sensors corresponds to annular flow, but that considerable time is required for the stream sensor to achieve steady state as the system moves through annular, churn, and bubbly flow. The GFSSP model does adequately well in tracking trends in the data but further work is needed to refine the two-phase flow modeling to better match observed test data.

Temperature Sensors

Multitask graph neural networks for elastoplastic response prediction in dual-phase polycrystals

Microstructure-sensitive prediction of elastoplastic response remains a recurring bottleneck in multiscale damage and fatigue modeling, where large ensembles of statistically distinct polycrystals are required to quantify variability and extreme-value behavior. In this work, we develop a multitask graph neural network (GNN) surrogate that maps dual-phase ferrite–martensite polycrystal microstructures to Statistical Volume Element (SVE)-level elastoplastic Quantities of Interest (QoIs). Each SVE is represented as a grain-adjacency graph, with node features encoding phase, geometry, and crystallographic orientation, and edge features encoding relative misorientation. A message-passing graph convolution generates node embeddings, which are pooled into a graph representation and passed to a multitask regression head that jointly predicts 10 scalar QoIs and vector-valued stress–strain responses in orthogonal loading directions across multiple martensite volume fractions and SVE sizes. Results show high accuracy for scalar QoIs and strong agreement for full stress–strain trajectories, with population envelopes reproducing both median behavior and finite-SVE variability across compositions and partition scales. A unified model trained on pooled volume-fraction data preserves most within-regime accuracy relative to regime-specific models while also capturing the broader cross-regime variation reflected in the pooled test set. Distributional comparisons further demonstrate that the surrogate preserves heterogeneity under SVE partitioning, enabling statistically consistent block-wise random-field construction for mesoscale analyses. Overall, the proposed grain-graph surrogate provides a practical pathway to accelerate ensemble-based studies of SVE-level constitutive variability in dual-phase polycrystals.

Crystal plasticity

EMU battery/SMM power tool characterization study

The power tool which will be used to replace the attitude control system in the SMM spacecraft was modified to operate from a self contained battery. The extravehicular mobility unit (EMU) battery was tested for the power tool application. The results are that the EMU battery is capable of operating the power tool within the pulse current range of 2.0 to 15.0 amperes and battery temperature range of -10 to 40 degrees Celsius.

Palandati, C.

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

3D-Printed mmWave Quasi-Holographic Antenna for 2-D Beamforming

This paper presents the design and manufacturing of a novel 2D-scanning antenna that integrates a 3D-printed Rotman lens with a quasi-holographic leaky-wave antenna (HLWA). The proposed design achieved beam-scanning capabilities by leveraging the beamforming of the Rotman lens and the high-gain directive properties of the quasi-HLWA. The Rotman lens (RL) enables beam steering in the elevation plane by switching between input ports. The quasi-HLWA, designed using holographic principles, achieves frequency-controlled beam scanning in the azimuth plane. The entire antenna structure was fabricated using additive manufacturing with an Ink1092 substrate and silver ink for the conductive traces. This approach provides greater control over material placement and design freedom compared to traditional methods. A 25° transmission linear substrate taper was used to ensure good impedance matching between the Rotman lens and the quasi-HLWA, allowing greater gain while maintaining a good scanning range. The experimental results validate the 2D scanning capability of the proposed antenna. The antenna system provides coverage from −54° to 54° in the elevation θ plane and −28° to 28° in the azimuth plane ϕ , with a maximum measured gain of 21.3 dBi at 28 GHz with an average radiation efficiency η=60 %. The fabricated prototype was tested, and the performance was in good agreement with the simulated performance.

Rotman lens

NASA's Small Spacecraft and Distributed Systems: Development and Demonstration of Technologies Enabling Swarms and New Spacecraft Platforms with AI and Edge Computing

NASA’s Small Spacecraft & Distributed Systems (SSDS) within the Research and Technology Mission Directorate (RTMD) expands U.S. capability to execute unique missions through targeted investment, rapid development, and flight demonstration of small spacecraft technologies applicable to exploration, science and the commercial space sector. SSDS strategically invests in technology development and on-orbit demonstrations executed across NASA, other government agencies, industry, and academia. The program’s University SmallSat Technology Partnerships initiative awards academic researchers with the opportunity to collaborate with NASA to mature innovative technology. Capabilities aligned with RTMD’s technology shortfalls and interests - power, processing, propulsion, sensors, communications, autonomous navigation, architectures, and advanced applications like artificial intelligence (AI), machine learning, and edge computing - are prioritized in SSDS investments. These investments enable distributed, autonomous, and cooperative small spacecraft systems that support swarm missions extending beyond low Earth orbit into cislunar and deep space. This paper highlights representative SSDS flight demonstrations that mature these capabilities to enable a future operational infrastructure needed to support sustained exploration of the Moon and beyond. SSDS’s investment strategy emphasizes rapid development and on-orbit demonstration to validate spacecraft technologies required for swarms and distributed mission architectures. The Starling swarm technology demonstration mission exemplifies this approach by advancing distributed spacecraft autonomy, cooperative operations, and space situational awareness. Extended flight testing and ongoing studies of next generation swarm configurations and on-orbit space traffic monitoring and management continue to inform future swarm designs. DiskSat’s four-spacecraft demonstration mission represents SSDS’s strategic vision to expand the design space for future small spacecraft through its commitment to advance novel platform concepts that can impact how science is performed on orbit. Continuing to invest in future platforms, the notional PY12 concept is a 12-spacecraft swarm hosting neuromorphic processors and is envisioned as an on-orbit testbed for AI, edge computing, and positioning, navigation and timing technologies. SSDS also invests in single-spacecraft technology demonstrations that underpin the success of future swarm missions and accelerate the availability of validated technologies across the small spacecraft ecosystem. Examples of such demonstrations include Pathfinder Technology Demonstrator-3 (PTD-3), which performed high-rate optical communications; PTD-R, which demonstrated a camera capable of simultaneous ultraviolet and short-wave infrared optical sensing; and CAPSTONE, the Cislunar Autonomous Positioning System Technology and Operations Navigation Experiment, which validated autonomous navigation in cislunar space. Collectively, SSDS-funded demonstrations advance capabilities across swarms and illustrate a coordinated investment strategy to mature high-impact technologies required for autonomous, distributed, and cooperative small spacecraft systems for low Earth orbit, cislunar, and deep space applications. Technology demonstrations strengthen SSDS partnerships with industry, academia, and other government agencies, and promote small spacecraft community adoption of capabilities required to close technical gaps for swarm missions.

Jan Stupl

32nd Aerospace Mechanisms Symposium

The proceedings of the 32nd Aerospace Mechanism Symposium are reported. NASA John F. Kennedy Space Center (KSC) hosted the symposium that was held at the Hilton Oceanfront Hotel in Cocoa Beach, Florida on May 13-15, 1998. The symposium was cosponsored by Lockheed Martin Missiles and Space and the Aerospace Mechanisms Symposium Committee. During these days, 28 papers were presented. Topics included robotics, deployment mechanisms, bearing, actuators, scanners, boom and antenna release, and test equipment.

S W Walker

Nitrile/Buna N Material Failure Assessment for an O-Ring used on the Gaseous Hydrogen Flow Control Valve (FCV) of the Space Shuttle Main Engine

After the rollout of Space Shuttle Discovery in April 2005 in preparation for return-to-flight, there was a failure of the Orbiter (OV-103) helium signature leak test in the gaseous hydrogen (GH2) system. Leakage was attributed to the Flow Control Valve (FCV) in Main Engine 3. The FCV determined to be the source of the leak for OV-103 is designated as LV-58. The nitrile/Buna N rubber O-ring seal was removed from LV-58, and failure analysis indicated radial cracks providing leak paths in one quadrant. Cracks were eventually found in 6 of 9 FCV O-rings among the three Shuttle Orbiters, though none were as severe as those for LV-58, OV-103. Testing by EM10 at MSFC on all 9 FCV O- rings included: laser dimensional, Shore A hardness and properties from a dynamic mechanical analyzer (DMA) and an Instron tensile machine. The following test data was obtained on the cracked quadrant of the LV-58, OV-103 O-ring: (1) the estimated compression set was only 9.5%, compared to none for the rest of the O-ring; (2) Shore A hardness for the O.D. was higher by almost 4 durometer points than for the rest of the O-ring; and (3) DMA data showed that the storage/elastic modulus E was almost 25% lower than for the rest of the O-ring. Of the 8 FCV O-rings tested on an Instron, 4 yielded tensile strengths that were below the MIL spec requirement of 1350 psi-a likely influence of rubber cracking. Comparisons were made between values of modulus determined by DNA (elastic) and Instron (Young s). Each nitrile/Buna N O-ring used in the FCV conforms to the MIL-P-25732C specification. A number of such O-rings taken from shelf storage at MSFC and Kennedy Space Center (KSC) were used to generate a reference curve of DMA glass transition temperature (Tg) vs. shelf storage time ranging from 8 to 26 years. A similar reference curve of TGA onset temperature (of rubber weight loss) vs. shelf storage time was also generated. The DMA and TGA data for the used FCV O-rings were compared to the reference curves. Correlations were also made between the DMA modulus (at 22 C) and Shore A hardness for all 9 of the FCV O-rings used among the three Shuttle Orbiters. The radial cracking in the FCV O-rings was determined to be due to ozone attack, as nitrile/Buna N rubber is susceptible to such attack. Nitrile/Buna N material under MIL-P25732C should be used in a hydraulic fluid environment to help protect it from cracking. However, the FCV O-rings were used in an air only environment. The FCV design has as much as a 9-mil gap that allows the O.D. of the O-ring to be directly exposed to ozone, pressurized air and some elevated temperatures, accelerating the weathering process that leads to O-ring cracking. Space Shuttle flights will likely not continue past 2010. Therefore, Shuttle management decided to continue using the nitrile/Buna N material for the FCVs, but have each O-ring replaced after 3 years to minimize any chances for crack initiation.

Doug Wingard

Low Temperature Environment Operations of Turboengines (Design and User's Problems)

The author summarizes and links together a number of papers that were presented at the Propulsion and Energetics (PEP) symposium on low temperature environment operation of turbojet engines that was held October 8 to 12, 1990. Topics covered include operational experience of ice ingestion in the turboprop engine in the 2,000 hp class, icing on helicopter turbo engines, icing test facilities, ice relevant cloud physical parameters, and low temperature and fuel problems.

R Jacques