Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Lifecycle Management of Nuclear Security Radiation Detection Systems: Testing and Evaluation

The lifecycle of radiation detection systems functioning within a State’s Nuclear Security Detection Architecture encompasses all activities associated with acquisition, deployment, and eventual disposal. Throughout a system’s lifecycle, testing and evaluation activities are needed to ensure requirements are continually met, as underscored by recent experiences.This paper provides:1.A discussion of reasons why testing should be part of the radiation detection equipment lifecycle before, during, and after acquisition.2.A general process for determining applicable evaluation methods.3.A discussion of issues related to integrating testing and evaluation into procurement and operational processes and mitigation strategies.

Harris, Tyrone↗

Results of the Alternative Water Processor Test, A Novel Technology for Exploration Wastewater Remediation

Biologically-based water recovery systems are a regenerative, low energy alternative to physiochemical processes to reclaim water from wastewater. This report summarizes the results of the Alternative Water Processor (AWP) Integrated Test, conducted from June 2013 until April 2014. The system was comprised of four (4) membrane aerated bioreactors (MABRs) to remove carbon and nitrogen from an exploration mission wastewater and a coupled forward and reverse osmosis system to remove large organic and inorganic salts from the biological system effluent. The system exceeded the overall objectives of the test by recovering 90% of the influent wastewater processed into a near potable state and a 64% reduction of consumables from the current state of the art water recovery system on the International Space Station (ISS). However, the biological system fell short of its test goals, failing to remove 75% and 90% of the influent ammonium and organic carbon, respectively. Despite not meeting its test goals, the BWP demonstrated the feasibility of an attached-growth biological system for simultaneous nitrification and denitrification, an innovative, volume- and consumable-saving design that does not require toxic pretreatment.

Meyer, Caitlin E.↗

Ground-Based Capabilities for Lunar Infrastructure Testing

A focus of NASA’s Moon-to-Mars objectives is the development of the infrastructure on the lunar surface that will be needed to support broader lunar surface operations. This infrastructure is intended to support both United States and international partners to expand human presence on the lunar surface. As this lunar infrastructure is designed and established, it will be critical to ensure that the various hardware elements work together to both enable the capabilities and to avoid unintended actions. NASA’s Glenn Research Center (GRC) is establishing ground-based testing and emulation facilities to mimic the lunar environment that the surface power and communications infrastructure will operate in. These facilities are intended to represent power and communications providers, users, and interfaces to ensure that systems operate as intended to support the lunar economy. They will empower industry to rapidly evaluate new technologies under realistic conditions. In 2023 GRC is opening a new, state-of-the-art, Aerospace Communications Facility featuring hardware-in-the-loop and ground-to-orbit testbeds. The Multiple Asset Testbed for Research in Innovative Communications Systems (MATRICS) capability will emulate the lunar communications environment, enabling validation of mission concepts and technologies to reduce risk through performance and operations testing, training, and uncover potential issues in compatibility among communication systems providers and users. In addition to the communications testbed, GRC is also developing a full-scale power grid to reduce lunar mission risk. The Adaptable Surface Power Integration and Research (ASPIRE) project aims to reduce mission and hardware risk via high-fidelity integrated testing and pave the way for commercially supplied utility power on the lunar surface. The facility will be scalable and highly adaptable and will be available to NASA, Industry, Academia, and International Partners. ASPIRE will allow developers to integrate and demonstrate their power solutions in a relevant environment, and it will be able to characterize the lunar power performance in representative mission contexts.

ground-based testing↗

Cool GTL - A New Biogas Conversion Process from GTI

GTI is currently developing the Cool GTL process, to convert biogas into jet fuel. Cool GTL can be used to convert any biogas stream or high CO2 content natural gas to high quality liquid fuels. In Cool GTL we convert high CO2 feeds to synthesis gas at a 2-2.4/1 H2/CO ratio using a novel CO2/steam reforming catalyst which has high stability. The 2.0-2.4/1 H2/CO synthesis gas ratio is always achieved, for a variety of levels of feed CO2 content, by adjusting the amount of water added according to the amount of CO2 in the feed. The reformer catalyst has been tested for 500 hours and shows no deactivation. The product from the reformer then goes directly to a low temperature bubbling fluid bed Fischer Tropsch reactor with an integrated finishing hydroisomerization reactor which makes hydrocarbon liquids from the synthesis gas, With this configuration no wax is produced. The fluid bed allows excellent temperature control. Cool GTL is under development but still requires longer integrated testing. Currently Cool GTL is being developed at GTI through DOE funding in the project “Cool GTL for the Production of Jet Fuel from Biogas”. In this DOE project, our goal is to make 100 gallons of high quality jet fuel. This project will also demonstrate Cool GTL catalyst and process stability through long term, 24 hour operation. Once the DOE project is complete, we believe the Cool GTL process will be ready for larger scale commercial deployment in multiple applications.

09 BIOMASS FUELS↗

Progress on advanced dc and ac induction drives for electric vehicles

Progress is reported in the development of complete electric vehicle propulsion systems, and the results of tests on the Road Load Simulator of two such systems representative of advanced dc and ac drive technology are presented. One is the system used in the DOE's ETV-1 integrated test vehicle which consists of a shunt wound dc traction motor under microprocessor control using a transistorized controller. The motor drives the vehicle through a fixed ratio transmission. The second system uses an ac induction motor controlled by transistorized pulse width modulated inverter which drives through a two speed automatically shifted transmission. The inverter and transmission both operate under the control of a microprocessor. The characteristics of these systems are also compared with the propulsion system technology available in vehicles being manufactured at the inception of the DOE program and with an advanced, highly integrated propulsion system upon which technology development was recently initiated.

Schwartz, H. J.↗

STEAM OXIDATION, BURST AND CRITICAL HEAT FLUX TESTING OF COMMERCIAL FECRAL CLADDING

A new accident tolerant Fe-12Cr-6Al-2Mo-0.2Si-0.03Y (C26M) fuel cladding was developed in response to the nuclear accident in Japan. Now that large quantities of commercial tubing are being fabricated, integral testing has expanded to include isothermal and non-isothermal steam oxidation testing, loss of coolant accident (LOCA) burst testing and critical heat flux (CHF) behavior. The oxidation behavior is being compared to other FeCrAl compositions and includes protective alumina scale formation during ramp testing at up to 11°C/min to 1475°C. Using standard LOCA conditions of 5°C/s heating in steam, burst testing was conducted with hoop stresses of 20-110 MPa and indicated higher burst temperatures for C26M compared to first generation FeCrAlY compositions without Mo and Si. Using the same LOCA equipment, a new experiment is being developed to simulate CHF conditions and the deformation behavior of C26M was compared to Zircaloy-4.

Pint, Bruce↗

Integration and Performance of New Technologies in the CMS Simulation [Slides]

CMS upgrade simulation for HL-LHC may be 2–3×slower than Run 2. CMS integration tests of GeantV met all goals: 1. Co-development ensured compatible threading models & interfaces, 2. Similar speedup measured in full experiment software framework, and 3. Efficient path to integration was established. GeantV prototype is a useful demonstrator. The next step is a GeantX project for HPCs w/ GPUs.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Flight test techniques for the X-29A aircraft

The X-29A advanced technology demonstrator is a single-seat, single-engine aircraft with a forward-swept wing. The aircraft incorporates many advanced technologies being considered for this country's next generation of aircraft. This unusual aircraft configuration, which had never been flown before, required a precise approach to flight envelope expansion. This paper describes the real-time analysis methods and flight test techniques used during the envelope expansion of the X-29A aircraft, including new and innovative techniques that provided for a safe, efficient envelope expansion. The use of integrated test blocks in the expansion program and in the overall flight test approach is discussed.

Hicks, John W.↗

Follow-on cable coupling lightning test, volume 1

A redesigned solid rocket motor test article was subjected to simulated lightning strikes. This test was performed to evaluate the effects of lightning strike to the redesigned motor and Space Transportation System. The purpose of the test was to evaluate the performance of systems tunnel design changes when subjected to the lightning discharges. The goal of the design changes was to reduce lightning induced coupling to cables within the systems tunnel. The test article was subjected to several different amounts and kinds of discharges. Changes in coupling levels detected during the tests are recorded. The dominant mode of coupling appears to be caused by the diffusion of the magnetic fields through the system tunnel covers. The results from bond strap integrity testing showed that 16 of 18 bond straps survived. Design change evaluations showed that coupling reduction ranged from 0 to 36 decibels for each type of cable. The type of cable has less effect on coupling than does strike location and strike levels. Recommendations for design changes are made.

Danforth, Richard↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

Tools Automate Spacecraft Testing, Operation

"NASA began the Small Explorer (SMEX) program to develop spacecraft to advance astrophysics and space physics. As one of the entities supporting software development at Goddard Space Flight Center, the Hammers Company Inc. (tHC Inc.), of Greenbelt, Maryland, developed the Integrated Test and Operations System to support SMEX. Later, the company received additional Small Business Innovation Research (SBIR) funding from Goddard for a tool to facilitate the development of flight software called VirtualSat. NASA uses the tools to support 15 satellites, and the aerospace industry is using them to develop science instruments, spacecraft computer systems, and navigation and control software."

Source record↗

Embedded Systems for Intelligent Vehicle Research

Connected and automated vehicles are becoming more and more popular. Research and development in these fields will require new and unique test environments and strategies. Several things can be learned from prior history with specialized vehicle data bus applications. Data bus development and testing techniques for three real-world car and heavy truck vehicle data bus projects are presented in this paper, with an emphasis on hardware-in-the-loop system integration testing.

Barker, Alan↗

Digital test signal generation: An accurate SNR calibration approach for the DSN

A new method of generating analog test signals with accurate signal to noise ratios (SNRs) is described. High accuracy will be obtained by simultaneous generation of digital noise and signal spectra at a given baseband or bandpass limited bandwidth. The digital synthesis will provide a test signal embedded in noise with the statistical properties of a stationary random process. Accuracy will only be dependent on test integration time with a limit imposed by the system quantization noise (expected to be 0.02 dB). Setability will be approximately 0.1 dB. The first digital SNR generator to provide baseband test signals is being built and will be available in early 1991.

Gutierrez-Luaces, B. O.↗

X-33 Leading the Way to VentureStar(Trademark) in this Decade

The X-33, reusable space plane technology demonstrator is on course to begin the flights of the X-33 by the end of 2002 that will serve as a basis for industry and government decisions that could lead to VentureStar(Trademark). Lockheed Martin has placed the VentureStar(Trademark) LLC in it's Space Company and is now competing in an industry wide effort that will permit NASA to select a Second Generation RLV source by 2005. This move provides the focus for firm business planning needed to enable the decision by the time X-33 flies in mid 2002 and possibly with upgraded technologies a year or so later. Since the IAF 50th Congress in Amsterdam, most of the major hardware elements of X-33 have been through their assembly and test. The flight liquid oxygen tank was the first major element to complete final assembly. Aerospike Engine qualification testing has progressed successfully through its test objectives and the two flight engines are in preparation to be delivered to the Assembly Facility in Palmdale. All Thermal Protection System (TPS) metallic panels have completed qualification testing and have been delivered to Palmdale and all remaining TPS elements have been assembled and are ready for delivery. Flight Software and Avionics have been delivered and are in integration testing. In November 1999, the first graphite composite liquid hydrogen tank experienced a debond between the tank inner skin and the honeycomb core in testing. This tank had completed its third successful cryogenic and loads testing at MSFC. Replacement liquid hydrogen tanks have completed design and are in fabrication. The resulting delay from this change of design for the liquid hydrogen tank will be approximately two years.

Austin, Robert E.↗

More Than A SketchUp

This 2014 summer internship assignment at John F. Kennedy Space Center (K.S.C) was conducted with the National Aeronautics and Space Administration (NASA) Engineering and Technology (NE) group in support of the Control and Data Systems Division (NE-C) within the Test, Operations & Support Software Engineering Branch (NE-C2). The primary focus of this project was to assist Branch Chief Laurie B. Griffin, to support NASA's Small Payload Launch Integrated Testing Services (SPLITS) mission, by mastering the capabilities of 3-D modeling software called SketchUp. I used SketchUp to create a virtual environment for different laboratories of the NE-00 Division. My mission was to have these models uploaded into a K.S.C Partnerships Website and be used as a visual aid to viewers who browsed the site. The leads of this project were Kay L. Craig, Business and Industry Specialist (AD-A) and Steven E. Cain, (FA-C). I teamed with fellow intern Tait Sorenson of the Flight Structures and Thermal Protection Systems Branch (NE-M5) and met with many K.S.C lab managers willing to display their lab's structure and capabilities. The information collected during these lab tours was vital to the building of the K.S.C Partnerships Website. To accomplish this goal Sorenson and I later teamed with fellow Marketing intern Marlee Pereda-Ramos, of the Spaceport Planning Office In Center Planning And Development (AD-A) Along with Ramos, Tait and I toured an array of laboratories and got first hand exposure to their functions and capabilities.

Trimble Corporation↗

Dynamic Modeling, Controls, and Testing for Electrified Aircraft

Electrified aircraft have the potential to provide significant benefits for efficiency and emissions reductions. To assess these potential benefits, modeling tools are needed to provide rapid evaluation of diverse concepts and to ensure safe operability and peak performance over the mission. The modeling challenge for these vehicles is the ability to show significant benefits over the current highly refined aircraft systems. The STARC-ABL (single-aisle turbo-electric aircraft with an aft boundary layer propulsor) is a new test proposal that builds upon previous N3-X team hybrid designs. This presentation describes the STARC-ABL concept, the NASA Electric Aircraft Testbed (NEAT) which will allow testing of the STARC-ABL powertrain, and the related modeling and simulation efforts to date. Modeling and simulation includes a turbofan simulation, Numeric Propulsion System Simulation (NPSS), which has been integrated with NEAT; and a power systems and control model for predicting testbed performance and evaluating control schemes. Model predictions provide good comparisons with testbed data for an NPSS-integrated test of the single-string configuration of NEAT.

Connolly, Joseph↗

Modular experimental platform for science and applications

A modularized, standardized spacecraft bus, known as MESA, suitable for a variety of science and applications missions is discussed. The basic bus consists of a simple structural arrangement housing attitude control, telemetry/command, electrical power, propulsion and thermal control subsystems. The general arrangement allows extensive subsystem adaptation to mission needs. Kits provide for the addition of tape recorders, increased power levels and propulsion growth. Both 3-axis and spin stabilized flight proven attitude control subsystems are available. The MESA bus can be launched on Ariane, as a secondary payload for low cost, or on the STS with a PAM-D or other suitable upper stage. Multi-spacecraft launches are possible with either booster. Launch vehicle integration is simple and cost-effective. The low cost of the MESA bus is achieved by the extensive utilization of existing subsystem design concepts and equipment, and efficient program management and test integration techniques.

Hill, A. S.↗

A Hybrid Method of Assurance Cases and Testing for Improved Confidence in Autonomous Space Systems

Autonomous systems react intelligently to their environments, making them capable of handling many possible conditions, but challenging to test. We are investigating a new test development method that aims to maximize the confidence to be achieved by combining Assurance Cases with High Throughput Testing (HTT). Assurance Cases, developed for safety-critical systems, are a rigorous argument that the system satisfies a property (e.g., the Mars rover will not tip over during a traverse). They integrate testing, analysis, and environmental and operational assumptions, from which the set of conditions that testing must cover is determined. In our method, information from the Assurance Case is used to determine the test coverage needed, and then input to HTT to generate the minimal test suites needed to provide that coverage.

Huntsberger, Terry↗