Search NASA⌕ Search

SEARCH · Search NASA

Results for “lessons”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Designing Specification Languages for Process Control Systems: Lessons Learned and Steps to the Future

Previously, we defined a blackbox formal system modeling language called RSML (Requirements State Machine Language). The language was developed over several years while specifying the system requirements for a collision avoidance system for commercial passenger aircraft. During the language development, we received continual feedback and evaluation by FAA employees and industry representatives, which helped us to produce a specification language that is easily learned and used by application experts. Since the completion of the PSML project, we have continued our research on specification languages. This research is part of a larger effort to investigate the more general problem of providing tools to assist in developing embedded systems. Our latest experimental toolset is called SpecTRM (Specification Tools and Requirements Methodology), and the formal specification language is SpecTRM-RL (SpecTRM Requirements Language). This paper describes what we have learned from our use of RSML and how those lessons were applied to the design of SpecTRM-RL. We discuss our goals for SpecTRM-RL and the design features that support each of these goals.

Leveson, Nancy G.↗

Lessons Learned on Operating and Preparing Operations for a Technology Mission from the Perspective of the Earth Observing-1 Mission

The New Millennium Program's first Earth-observing mission (EO-1) is a technology validation mission. It is managed by the NASA Goddard Space Flight Center in Greenbelt, Maryland and is scheduled for launch in the summer of 2000. The purpose of this mission is to flight-validate revolutionary technologies that will contribute to the reduction of cost and increase of capabilities for future land imaging missions. In the EO-1 mission, there are five instrument, five spacecraft, and three supporting technologies to flight-validate during a year of operations. EO-1 operations and the accompanying ground system were intended to be simple in order to maintain low operational costs. For purposes of formulating operations, it was initially modeled as a small science mission. However, it quickly evolved into a more complex mission due to the difficulties in effectively integrating all of the validation plans of the individual technologies. As a consequence, more operational support was required to confidently complete the on-orbit validation of the new technologies. This paper will outline the issues and lessons learned applicable to future technology validation missions. Examples of some of these include the following: (1) operational complexity encountered in integrating all of the validation plans into a coherent operational plan, (2) initial desire to run single shift operations subsequently growing to 6 "around-the-clock" operations, (3) managing changes in the technologies that ultimately affected operations, (4) necessity for better team communications within the project to offset the effects of change on the Ground System Developers, Operations Engineers, Integration and Test Engineers, S/C Subsystem Engineers, and Scientists, and (5) the need for a more experienced Flight Operations Team to achieve the necessary operational flexibility. The discussion will conclude by providing several cost comparisons for developing operations from previous missions to EO-1 and discuss some details that might be done differently for future technology validation missions.

Mandl, Dan↗

Lessons Learned During Implementation and Early Operations of the DS1 Beacon Monitor Experiment

A new approach to mission operations will be flight validated on NASA's New Millennium Program Deep Space One (DS1) mission which launched in October 1998. The Beacon Monitor Operations Technology is aimed at decreasing the total volume of downlinked engineering telemetry by reducing the frequency of downlink and the volume of data received per pass. Cost savings are achieved by reducing the amount of routine telemetry processing and analysis performed by ground staff. The technology is required for upcoming NASA missions to Pluto, Europa, and possibly some other missions. With beacon monitoring, the spacecraft will assess its own health and will transmit one of four beacon messages each representing a unique frequency tone to inform the ground how urgent it is to track the spacecraft for telemetry. If all conditions are nominal, the tone provides periodic assurance to ground personnel that the mission is proceeding as planned without having to receive and analyze downlinked telemetry. If there is a problem, the tone will indicate that tracking is required and the resulting telemetry will contain a concise summary of what has occurred since the last telemetry pass. The primary components of the technology are a tone monitoring technology, AI-based software for onboard engineering data summarization, and a ground response system. In addition, there is a ground visualization system for telemetry summaries. This paper includes a description of the Beacon monitor concept, the trade-offs with adapting that concept as a technology experiment, the current state of the resulting implementation on DS1, and our lessons learned during the initial checkout phase of the mission. Applicability to future missions is also included.

Sherwood, Rob↗

ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with ACTS. The ACTS experiments program proposed to validate Ka-band satellite and ground-station technology, demonstrate future telecommunication services, demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals and the lessons learned throughout their 6-year operation, including the inclined orbit phase-of-operations. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector-based offset-fed antenna systems with antennas ranging in size from 0.35 to 3.4 in. in diameter. Gateway earth stations included two systems referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET).

Reinhart, Richard C.↗

The Advanced Communications Technology Satellite - Performance, Reliability and Lessons Learned

The Advanced Communications Satellite (ACTS) was conceived and developed in the mid- 1980s as an experimental satellite to demonstrate unproven Ka-band technology, and potential new commercial applications and services. Since launch into geostationary orbit in September 1993. ACTS has accumulated almost seven years of essentially trouble-free operation and met all program objectives. The unique technology, service experiments. and system level demonstrations accomplished by ACTS have been reported in many forums over the past several years. As ACTS completes its final experiments activity, this paper will relate the top-level program goals that have been achieved in the design, operation, and performance of the particular satellite subsystems. Pre-launch decisions to ensure satellite reliability and the subsequent operational experiences contribute to lessons learned that may be applicable to other comsat programs.

Krawczyk, Richard J.↗

Using Model-Based Reasoning for Autonomous Instrument Operation - Lessons Learned From IMAGE/LENA

Model-based reasoning has been applied as an autonomous control strategy on the Low Energy Neutral Atom (LENA) instrument currently flying on board the Imager for Magnetosphere-to-Aurora Global Exploration (IMAGE) spacecraft. Explicit models of instrument subsystem responses have been constructed and are used to dynamically adapt the instrument to the spacecraft's environment. These functions are cast as part of a Virtual Principal Investigator (VPI) that autonomously monitors and controls the instrument. In the VPI's current implementation, LENA's command uplink volume has been decreased significantly from its previous volume; typically, no uplinks are required for operations. This work demonstrates that a model-based approach can be used to enhance science instrument effectiveness. The components of LENA are common in space science instrumentation, and lessons learned by modeling this system may be applied to other instruments. Future work involves the extension of these methods to cover more aspects of LENA operation and the generalization to other space science instrumentation.

Johnson, Michael A.↗

A Balanced Model for Exploration of the Terrestrial Planets: Lessons from the Lunar Experience

The Moon is the only extraterrestrial rocky body for which we have a combination of surface-selected samples, high-resolution orbital photography (Lunar Orbiter), manned and robotic surface exploration (Surveyor, Apollo, Luna), and global compositional, mineralogical, and geophysical data (Galileo, Clementine, Lunar Prospector). Beginning in 1998, CAPTEM organized a series of workshops and conference sessions aimed at integrating these diverse data sets. The insights gained by bringing together scientists from the remote-sensing and sample-analysis communities have been singularly rewarding. Not least of these has been the recognition by both groups that having both kinds of data maximizes the scientific return and permits reconciling information from diverse scales and perspectives. The 20-20 hindsight of the Lunar experience thus provides important lessons; learning from mistakes as well as successes, we can derive a sensible scientific program for Mars exploration. In this abstract, we describe examples of key information from (a) in-situ geologic investigation, (b) laboratory analysis of returned samples whose geologic context and location are known, and (c) global remote sensing of mineralogy, composition, and geophysical parameters. We then show the value of integrating these diverse data sets.

Jolliff, B. L.↗

Lessons Learned from the Construction of Upgrades to the NASA Glenn Icing Research Tunnel and Re-activation Testing

Major upgrades were made in 1999 to the 6- by 9-Foot (1.8- by 2.7-m) Icing Research Tunnel (IRT) at the NASA Glenn Research Center. These included replacement of the electronic controls for the variable-speed drive motor, replacement of the heat exchanger, complete replacement and enlargement of the leg of the tunnel containing the new heat-exchanger, the addition of flow-expanding and flow-contracting turning vanes upstream and downstream of the heat exchanger, respectively, and the addition of fan outlet guide vanes (OGV's). This paper presents an overview of the construction and reactivation testing phases of the project. Important lessons learned during the technical and contract management work are documented.

Sheldon, David W.↗

The Biological Relevance of Artificial Life: Lessons from Artificial Intelligence

There is no fundamental reason why A-life couldn't simply be a branch of computer science that deals with algorithms that are inspired by, or emulate biological phenomena. However, if these are the limits we place on this field, we miss the opportunity to help advance Theoretical Biology and to contribute to a deeper understanding of the nature of life. The history of Artificial Intelligence provides a good example, in that early interest in the nature of cognition quickly was lost to the process of building tools, such as "expert systems" that, were certainly useful, but provided little insight in the nature of cognition. Based on this lesson, I will discuss criteria for increasing the biological relevance of A-life and the probability that this field may provide a theoretical foundation for Biology.

Colombano, Silvano↗

Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned

Engineering design is a challenging activity for any product. Since launch vehicles are highly complex and interconnected and have extreme energy densities, their design represents a challenge of the highest order. The purpose of this document is to delineate and clarify the design process associated with the launch vehicle for space flight transportation. The goal is to define and characterize a baseline for the space transportation design process. This baseline can be used as a basis for improving effectiveness and efficiency of the design process. The baseline characterization is achieved via compartmentalization and technical integration of subsystems, design functions, and discipline functions. First, a global design process overview is provided in order to show responsibility, interactions, and connectivity of overall aspects of the design process. Then design essentials are delineated in order to emphasize necessary features of the design process that are sometimes overlooked. Finally the design process characterization is presented. This is accomplished by considering project technical framework, technical integration, process description (technical integration model, subsystem tree, design/discipline planes, decision gates, and tasks), and the design sequence. Also included in the document are a snapshot relating to process improvements, illustrations of the process, a survey of recommendations from experienced practitioners in aerospace, lessons learned, references, and a bibliography.

Blair, J. C.↗

Compton Gamma Ray Observatory: Lessons Learned in Propulsion

The Compton Gamma Ray Observatory was the second of NASA's Great Observatories. At 17 1/2 tons. it was the heaviest astrophysical payload ever flown at the time of its launch on April 5, 1991 aboard the Space Shuttle. During initial, on-orbit priming of the spacecraft's monopropellant hydrazine propulsion system, a severe waterhammer transient was experienced. At that time, anomalous telemetry readings were received from on-board propulsion system instrumentation. This led to ground analyses and laboratory investigations as to the root cause of the waterhammer, potential damage to system integrity and functionality, and risks for switching from the primary (A-side) propulsion system to the redundant (B-side) system. The switchover to B-side was ultimately performed successfully and the spacecraft completed its basic and extended missions in this configuration. Nine years later, following a critical control gyroscope failure, Compton was safely deorbited and re-entered the Earth's atmosphere on June 4, 2000. Additional risk assessments concerning viability of A- and B-sides were necessary to provide confidence in attitude and delta-V authority and reliability to manage the precisely controlled reentry. This paper summarizes the design and operation of the propulsion system used on the spacecraft and provides "lessons learned" from the system engineering investigations into the propellant loading procedures, the initial priming anomaly, mission operations, and the commanded re-entry following the gyro failure.

Dressler, G. A.↗

Lessons from Adaptive Level One Accelerator (ALOA) System Implementation

The Adaptive Level One Accelerator (ALOA) system was developed as part of the Earth Science Data and Information System (ESDIS) project. The reconfigurable computing technologies were investigated for Level 1 satellite telemetry data processing to achieve computing acceleration and cost reduction for the next-generation Level 1 data processing systems. The MODIS instrument calibration algorithm was implemented using reconfigurable a computer. The system development process and the lessons learned throughout the design cycle are summarized in this paper.

Patel, Umesh D.↗

Rapid Spacecraft Development: Results and Lessons Learned

The Rapid Spacecraft Development Office (RSDO) at NASA's Goddard Space Flight Center is responsible for the management and direction of a dynamic and versatile program for the definition, competition, and acquisition of multiple indefinite delivery and indefinite quantity contracts - resulting in a catalog of spacecraft buses. Five spacecraft delivery orders have been placed by the RSDO and one spacecraft has been launched. Numerous concept and design studies have been performed, most with the intent of leading to a future spacecraft acquisition. A collection of results and lessons learned is recorded to highlight management techniques, methods and processes employed in the conduct of spacecraft acquisition. Topics include working relationships under fixed price delivery orders, price and value, risk management, contingency reserves, and information restrictions.

Watson, William A.↗

Satellite Ground Operations Automation: Lessons Learned and Future Approaches

Reducing spacecraft ground system operations costs is a major goal in all missions. The Fast Auroral Snapshot (FAST) flight operations team at the NASA/Goddard Spacecraft Flight Center developed in-house scripts and procedures to automate monitoring of critical spacecraft functions. The initial staffing profile of 16x7 was reduced first to 8x5 and then to 'lights out'. Operations functions became an offline review of system performance and the generation of future science plans for subsequent upload to the spacecraft. Lessons learned will be applied to the challenging Triana mission, where 24x7 contact with the spacecraft will be necessary at all times.

Catena, John↗

Testing Planetary Rovers: Technologies, Perspectives, and Lessons Learned

Rovers are a vital component of NASA's strategy for manned and unmanned exploration of space. For the past five years, the Intelligent Mechanisms Group at the NASA Ames Research Center has conducted a vigorous program of field testing of rovers from both technology and science team productivity perspective. In this talk, I will give an overview of the the last two years of the test program, focusing on tests conducted in the Painted Desert of Arizona, the Atacama desert in Chile, and on IMG participation in the Mars Pathfinder mission. An overview of autonomy, manipulation, and user interface technologies developed in response to these missions will be presented, and lesson's learned in these missions and their impact on future flight missions will be presented. I will close with some perspectives on how the testing program has affected current rover systems.

Thomas, Hans↗

Lessons Learned From CM-2 Modal Testing and Analysis

The Combustion Module-2 (CM-2) is a space experiment that launches on Shuttle mission STS-107 in the SPACEHAB Double Research Module. The CM-2 flight hardware is installed into SPACEHAB single and double racks. The CM-2 flight hardware was vibration tested in the launch configuration to characterize the structure's modal response. Cross-orthogonality between test and analysis mode shapes were used to assess model correlation. Lessons learned for pre-test planning and model verification are discussed.

McNelis, Mark E.↗

Lessons Learned From Developing A Streaming Data Framework for Scientific Analysis

We describe the development and usage of a streaming data analysis software framework. The framework is used for three different applications: Earth science hyper-spectral imaging analysis, Electromyograph pattern detection, and Electroencephalogram state determination. In each application the framework was used to answer a series of science questions which evolved with each subsequent answer. This evolution is summarized in the form of lessons learned.

Wheeler. Kevin R.↗

Lessons from the Dark Side

Lessons to project managers Include the following in case of failure: a) make a timeline of events and include everything that is known; b) put down known facts and check every theory against them; c) don't beat the data until it confesses, i.e., know when to stop trying to force-fit a scenario; d) do not arrive at a conclusion too rapidly. Make sure any deviation form the norm is explained--remember the wrong conclusion is prologue to the next failure; and e) know when to stop.

Madden, Jerry↗