Search NASA⌕ Search

SEARCH · Search NASA

Results for “qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Screening and Qualification of BME Feedthrough Capacitors for a Space Project

Surface mount technology feedthrough ceramic capacitors are gaining popularity in Hi-Rel systems due to small size and great filtering characteristics. In this work, BME feedthrough capacitors compliant with AEC-Q200 requirements have been evaluated, screened and qualified for a space project. Evaluation included analysis of the effect of post-soldering thermal shocks, temperature dependencies of leakage currents, distribution of breakdown voltages, assessments of high-current capability, and thermal resistance of the parts. The parts have been screened and qualified at conditions close to the military requirements for ceramic capacitors. No failures were detected during screening including burning-in, but two samples failed during monitored 2000 hour life testing at 125C and two times rated voltage. Failure analysis revealed manufacturing defects that required additional analysis of screening and qualification test conditions. Highly accelerated life testing (HALT) has been carried out to assess reliability acceleration factors and the probability of failure at the use conditions. An approach to selection of adequate burning-in and life test conditions is discussed.

Alexander Teverovsky↗

Screening and Qualification of BME Feedthrough Capacitors for a Space Project

Surface mount technology feedthrough ceramic capacitors are gaining popularity in Hi-Rel systems due to small size and great filtering characteristics. In this work, BME feedthrough capacitors compliant with AEC-Q200 requirements have been evaluated, screened and qualified for a space project. Evaluation included analysis of the effect of post-soldering thermal shocks, temperature dependencies of leakage currents, distribution of breakdown voltages, assessments of high-current capability, and thermal resistance of the parts. The parts have been screened and qualified at conditions close to the military requirements for ceramic capacitors. No failures were detected during screening including burning-in, but two samples failed during monitored 2000 hour life testing at 125C and two times rated voltage. Failure analysis revealed manufacturing defects that required additional analysis of screening and qualification test conditions. Highly accelerated life testing (HALT) has been carried out to assess reliability acceleration factors and the probability of failure at the use conditions. An approach to selection of adequate burning-in and life test conditions is discussed.

Alexander Teverovsky↗

Process Qualification Concepts in NASA-STD-6030

- Terminology - Definition and role of QMP in the NASA-STD-6030 framework - Qualification checklist for evaluating a candidate AM material process - Types of data needed to evaluate the metrics for a QMP - Advocacy for a singular, contained data entity that enables QMP evaluation and other aspects of the AM ecosystem - Material Engineering Equivalence Baseline - Discussion of Material Engineering Equivalence concepts - Summary

Doug Wells↗

NASA's Certification and Qualification Challenges for Additively Manufactured Hardware: What Is Next?

In 2021, NASA released NASA-STD-6030 “Additive Manufacturing Requirements for Spaceflight Systems” to create qualification and certification strategies for mature metallic and non-metallic AM materials and technologies. While these standards have had an immediate impact on the additive manufacturing (AM) industry, there remain many challenges that have yet to be overcome. NASA and its partners in academia and industry are working together to proactively address these issues. One of the most critical needs is a Probabilistic Damage Tolerance Assessment (PDTA) approach, which includes the development of computational modeling, understanding the “effect of defects”, and the implementation of in-situ process monitoring and inspection techniques.

Will Tilson↗

Powder Bed Fusion Laser Beam Metals Additive Manufacturing: Process Monitoring Approaches for Qualification and Certification

The use of in-situ process monitoring is of interest to lower the cost of inspection for the qualification of powder bed fusion laser beam metal (PBF-LB/M) additively manufactured (AM) parts. Precise monitoring of the PBF-LB/M AM build process constitutes a multi-scale and multi-discipline task. There are several significant challenges to the in-situ approach: the synchronization of sensor signals to process steps; the physical interpretation and classification of sensor signals; managing very large datasets; and comparing the inputs with the observed monitoring signals. At NASA Langley Research Center, a configurable architecture additive testbed has been developed to monitor the build process with synchronized sensors. The philosophy and method adopted for the synchronization of the cameras with laser power and position throughout a complex PBF-LB/M AM build will be described. The synchronized in-situ monitoring signals are compared with ex-situ nondestructive inspection, x-ray computed tomography (XCT). Such comparisons permit a better understanding of how the sequential process actions of LPBF-AM can affect build quality. The multi-scale and complex process of printing additively manufactured (AM) parts can have unexpected, but predictable, build conditions that result in material microstructure variability. This presentation will describe an additive manufacturing model-based process metric (AM-PM) computational method that is a fully parallel reduced order modeling approach developed to evaluate the evolution of AM processes. This method couples the known sequence of the AM process with a physically informed nearest neighbors’ calculation to map the conditions of a part-scale build. The result is a map of the build that is derived directly from build files or in-situ process monitoring sensors. The methodology of the approach will be described and mapped to the porosity observed from XCT for a complex PBF-LB/M build. Such comparative results develop understanding of how the sequential process actions can affect the PBF-LB/M AM build quality and microstructure variability.

Laser Powder Bed Fusion↗

LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelerator) PASS (Payload Adapter Separation System) Design & Qualification

On November 10, 2022, NASA, in partnership with United Launch Alliance (ULA), launched Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) as a secondary payload on an Atlas V Centaur out of the Vandenburg Space Force Base (VSFB). After successfully delivering the primary payload, Joint Polar Satellite System-2 (JPSS-2), to a sun synchronous trajectory, the Centaur upper stage reoriented LOFTID onto the desired reentry trajectory. After conducting a de-orbit burn to enter the atmosphere the Payload Adaptor was ejected to expose the packed LOFTID vehicle. The LOFTID Hypersonic Inflatable Aerodynamic Decelerator (HIAD) was deployed and inflated. The Centaur pointed LOFTID to the desired entry attitude and spun the vehicle up to roughly three rpm before separating the reentry vehicle over the Middle East. The LOFTID vehicle flew freely before reentering the atmosphere over Alaska at >8km/sec and decelerating as designed. LOFTID demonstrated stable flight from hypersonic entry through subsonic parachute deployment. LOFTID was enabled by a mission-unique Payload Adapter Separation System (PASS) which separated the Payload Adapter prior to the start of the LOFTID flight demonstration, allowing the launch vehicle to accommodate a superstack of two independent, similarly sized payloads. This paper will discuss the design, development, and qualification effort of the LOFTID PASS.

Sean M Hancock↗

Design and Qualification or the Low-Earth Orbit Flight Test of an Inflatable Decelerator(LOFTID) Payload Adapter Separation System (PASS)

On November 10, 2022, NASA and United Launch Alliance (ULA) launched Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) as a secondary payload on an Atlas V Centaur from Vandenburg Space Force Base (VSFB). After deploying the primary payload, JPSS-2, to a sun-synchronous orbit, the Centaur reoriented LOFTID for reentry, ejecting the Payload Adaptor to expose the stowed LOFTID reentry vehicle (RV). The Hypersonic Inflatable Aerodynamic Decelerator (HIAD) was then deployed and inflated, and the Centaur reoriented the RV to the desired entry attitude, spun the vehicle to roughly three rpm, and separated the reentry vehicle. After nearly half an orbit of free flight, LOFTID reentered the atmosphere at >8 km/sec, demonstrating stable flight from hypersonic entry through subsonic parachute deployment. A mission-unique Payload Adapter Separation System (PASS) enabled the successful LOFTID flight demonstration, allowing the launch vehicle to accommodate a superstack of two independent, similarly sized payloads. This paper discusses the design, development, and qualification of the LOFTID PASS along with lessons learned.

HIAD↗

12-kW Advanced Electric Propulsion System Hall Current Thruster Qualification and Production Status

The AEPS contract was awarded to AR in May of 2016 with the goal of developing a 12.5kW Hall Thruster System, including the Hall Current Thruster (HCT), Power Processor Unit (PPU) and Xenon Flow Controller (XFC). It was originally targeted to support the Asteroid Redirect Mission, which was cancelled early in the project. The project was subsequently restructured to support the Gateway PPE propulsion mission, with modified scope that consisted of the development, qualification and delivery of three 12kW flight thrusters. The PPU and XFC components were designed and development hardware fabricated with initial testing performed prior to being de-scoped from the contract. System level testing was performed by AR using these engineering components in early 2022 at the Aerospace Corporation’s EP-3 test facility.

Hall thruster↗

Additive Manufactured Hardware Qualification and Certification at NASA

Additive Manufacturing (AM) is certainly changing the space industry and providing new opportunities to travel to low earth orbit and explore our universe New design opportunities –not previously possible –for new high performance metal alloys, light-weighting, managing thermal, structural, and dynamic loads are being enabled by AM. Additively manufactured parts are already being inserted for complext system for NASA programs in critical applications –“ready to fly” Human exploration of space, especially deep space, requires extreme reliability Qualification of AM design/parts/process and Flight Certification

Alison Park↗

Proposed Junction-Box Stress Test (Using an Added Weight) for Use During the Module Qualification (Presentation)

Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development. Furthermore, there are historical incidences of adverse effects (e.g., fires) caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp heat' IEC qualification test isproposed to verify the basic robustness of the j-box adhesion system. The details of the proposed test are described, in addition to the preliminary results conducted using representative materials and components.

14 SOLAR ENERGY↗

AlGaN UV LED and Photodiodes Radiation Hardness and Space Qualifications and Their Applications in Space Science and High Energy Density Physics

This presentation provides an overview of robust, radiation hard AlGaN optoelectronic devices and their applications in space exploration & high energy density physics. Particularly, deep UV LED and deep UV photodiodes are discussed with regard to their applications, radiation hardness and space qualification. AC charge management of UV LED satellite payload instruments, which were to be launched in late 2012, is covered.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Trial Run of a Junction-Box Attachment Test for Use in Photovoltaic Module Qualification (Presentation)

Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development and manufacturing process control. There are historical incidences of adverse effects (e.g., fires), caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp-heat', 'thermal-cycle', or 'creep' tests within the IEC qualification protocol is proposed to verify the basic robustness of the adhesion system. The details of the proposed test are described, in addition to a trial run of the test procedure. The described experiments examine 4 moisture-cured silicones, 4 foam tapes, and a hot-melt adhesive used in conjunction with glass, KPE, THV, and TPE substrates. For the purpose of validating the experiment, j-boxes were adhered to a substrate, loaded with a prescribed weight, and then subjected to aging. The replicate mock-modules were aged in an environmental chamber (at 85 deg C/85% relative humidity for 1000 hours; then 100 degrees C/<10% relative humidity for 200 hours) or fielded in Golden, Miami, and Phoenix for 1 year. Attachment strength tests, including pluck and shear test geometries, were also performed on smaller component specimens.

14 SOLAR ENERGY↗

Results from the DOE Advanced Gas Reactor Fuel Development and Qualification Program

Modular HTGR designs were developed to provide natural safety, which prevents core damage under all design basis accidents and presently envisioned severe accidents. The principle that guides their design concepts is to passively maintain core temperatures below fission product release thresholds under all accident scenarios. This level of fuel performance and fission product retention reduces the radioactive source term by many orders of magnitude and allows potential elimination of the need for evacuation and sheltering beyond a small exclusion area. This level, however, is predicated on exceptionally high fuel fabrication quality and performance under normal operation and accident conditions. Germany produced and demonstrated high quality fuel for their pebble bed HTGRs in the 1980s, but no U.S. manufactured fuel had exhibited equivalent performance prior to the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. The design goal of the modular HTGRs is to allow elimination of an exclusion zone and an emergency planning zone outside the plant boundary fence, typically interpreted as being about 400 meters from the reactor. To achieve this, the reactor design concepts require a level of fuel integrity that is better than that claimed for all prior US manufactured TRISO fuel, by a few orders of magnitude. The improved performance level is about a factor of three better than qualified for German TRISO fuel in the 1980’s. At the start of the AGR program, without a reactor design concept selected, the AGR fuel program selected to qualify fuel to an operating envelope that would bound both pebble bed and prismatic options. This resulted in needing a fuel form that could survive at peak fuel temperatures of 1250°C on a time-averaged basis and high burnups in the range of 150 to 200 GWd/MTHM (metric tons of heavy metal) or 16.4 to 21.8% fissions per initial metal atom (FIMA). Although Germany has demonstrated excellent performance of TRISO-coated UO2 particle fuel up to about 10% FIMA and 1150°C, UO2 fuel is known to have limitations because of CO formation and kernel migration at the high burnups, power densities, temperatures, and temperature gradients that may be encountered in the prismatic modular HTGRs. With uranium oxycarbide (UCO) fuel, the kernel composition is engineered to prevent CO formation and kernel migration, which are key threats to fuel integrity at higher burnups, temperatures, and temperature gradients. Furthermore, the recent poor fuel performance of UO2 TRISO fuel pebbles measured in Chinese irradiation testing in Russia and in German pebbles irradiated at 1250°C, and historic data on poorer fuel performance in safety testing of German pebbles that experienced burnups in excess of 10% FIMA [1] have each raised concern about the use of UO2 TRISO above 10% FIMA and 1150°C and the degree of margin available in the fuel system. This continues to be an active area of study internationally.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ON-GOING STATUS OF KJRR FUEL (U-7MO) QUALIFICATION

In order to cope with global shortage of Mo-99 supplies and with growing demand of neutron transmutation doping, KJRR construction plan has been launched since April 2012 to provide self-sufficiency of domestic RI demand, and to extend Si doping capacity for power device market growth. Through comprehensive surveillance of the fuels in-reactor behavior, KAERI has selected the fuel meat of U-7%Mo dispersion in an aluminum matrix with 5wt%Si for the KJRR fuel. As part of the efforts for fuel licensing and qualification of the KJRR fuel, an LTA irradiation test at the ATR started from November 2015 was successfully completed by reaching at 219 EFPD in the end of February 2017. Together with the results of HAMP-1 already completed irradiation and PIE, the successful irradiation of the LTA also demonstrates the fuel integrity under more rigorous conditions than the KJRR operation conditions. This paper updates the current status of the KJRR U7Mo (8 g-U/cm3) LTA irradiation and PIE plan up to date as of February 2017.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cavity Procurement and Qualification Plan for LCLS-II

The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.

Marhauser, Frank↗

Sealability Qualification of Material Extruded Zytel Gaskets at Extreme Temperatures

In this work, an in-depth qualification of additively manufactured Zytel for gasketing proton exchange membrane fuel cells (PEMFC’s) subject to extreme temperature conditions. The temperature cycling of the PEMFC from 55°C to 100°C accelerates the deterioration of these gaskets compared to that of conventional operation. The additive manufacturing process employed to print these gaskets is material extrusion using Zytel filament. In order to see the effects of the temperature of interest on the printed specimen, each specimen was thermally soaked and then charactered and tested according to ASTM standard F37B. ASTM F37B tests a materials ability to seal and maintain it while bearing both a compressive load and internal pressure load to simulate being in static operation. This process of thermally soaking and sealability testing is shown to show the validity of both this material and additive manufactured components for other applications as well. It is observed that soaking the gaskets at 100°C corrects some of the defects that are present after printing such as missing layers and small voids on the surface of the samples. This allowed for the hot soaked materials to perform better than the samples at room temperature and cold soaked.

Sealability↗