Search NASA⌕ Search

SEARCH · Search NASA

Results for “sludge”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Global diversity and biogeography of bacterial communities in wastewater treatment plants

Microorganisms in wastewater treatment plants (WWTPs) are essential for water purification to protect public and environmental health. However, the diversity of microorganisms and the factors that control it are poorly understood. Using a systematic global-sampling effort, we analysed the 16S ribosomal RNA gene sequences from ~1,200 activated sludge samples taken from 269 WWTPs in 23 countries on 6 continents. Our analyses revealed that the global activated sludge bacterial communities contain ~1 billion bacterial phylotypes with a Poisson lognormal diversity distribution. Despite this high diversity, activated sludge has a small, global core bacterial community ( n = 28 operational taxonomic units) that is strongly linked to activated sludge performance. Meta-analyses with global datasets associate the activated sludge microbiomes most closely to freshwater populations. In contrast to macroorganism diversity, activated sludge bacterial communities show no latitudinal gradient. Furthermore, their spatial turnover is scale-dependent and appears to be largely driven by stochastic processes (dispersal and drift), although deterministic factors (temperature and organic input) are also important. Finally, our findings enhance our mechanistic understanding of the global diversity and biogeography of activated sludge bacterial communities within a theoretical ecology framework and have important implications for microbial ecology and wastewater treatment processes.

59 BASIC BIOLOGICAL SCIENCES↗

Approach on environmental risk assessment of nanosilver released from textiles

Based on the increased utilization of nanosilver (silver nanomaterials=AgNM) as antibacterial agent, there is the strong need to assess the potential environmental implication associated with its new application areas. In this study an exemplary environmental risk assessment (ERA) of AgNM applied in textiles was performed. Environmental exposure scenarios (via municipal sewage treatment plant (STP)) with wastewater supply from domestic homes) were developed for three different types of textiles equipped with AgNM. Based on these scenarios predicted environmental concentrations (PECs) were deduced for STPs and for the environmental compartments surface water, sediment as well as soil. These PECs were related to PNECs (predicted no effect concentrations). PNECs were deduced from results of ecotoxicity tests of a selected AgNM (NM-300K). Data on ecotoxicology were derived from various tests with activated sludge, cyanobacteria, algae, daphnids, fish, duckweed, macrophytes, chironomids, earthworms, terrestrial plants as well as soil microorganisms. Emission data for the AgNM NM-300K from textiles were derived from washing experiments. The performed ERA was based on the specifications defined in the ECHA Guidances on information requirements and chemical safety assessment. Based on the chosen scenarios and preconditions, no environmental risk of the AgNM NM-300K released from textiles was detected. Under conservative assumptions a risk quotient for surface water close to 1 indicated that the aquatic compartment may be affected by an increased emission of AgNM to the environment due to the high sensitivity of aquatic organisms to silver. Based on the successful retention of AgNM in the sewage sludge and the still ongoing continual application of sewage sludge on farmland it is recommended to introduce a threshold for total silver content in sewage sludge into the respective regulations. Regarding potential risk mitigation measures, it is emphasized to preferably directly introduce AgNM into the textile fiber since this will strongly minimize the release of AgNM during washing. If this is not possible due to technical limitations or other reasons, the introduction of a threshold level controlling the release of AgNM from textiles is suggested. It has to be noted that this study is a case study which is only valid for the investigated NM-300K and its potential application in textiles. - Highlights: • Washing: release rates of AgNM depend on furnishing in textiles. • Calculated PNECs for the aquatic compartment were low. • For the chosen scenarios no environmental risk of AgNM from textiles was observed. • AgNM is retained in sewage sludge. • In WWTP most of the silver adsorbs to sewage sludge and thus, may reach farmland.

54 ENVIRONMENTAL SCIENCES↗

Colour and toxic characteristics of metakaolinite–hematite pigment for integrally coloured concrete, prepared from iron oxide recovered from a water treatment plant of an abandoned coal mine

A metakaolinite-hematite (KH) red pigment was prepared using an ocherous iron oxide sludge recovered from a water treatment plant of an abandoned coal mine. The KH pigment was prepared by heating the kaolinite and the iron oxide sludge at kaolinite's dehydroxylation temperature. Both the raw sludge and the KH specimen were characterised for their colour properties and toxic characteristics. The KH specimen could serve as a pigment for integrally coloured concrete and offers a potential use for the large volumes of the iron oxide sludge collected from mine water treatment plants. - Graphical abstract: A kaolinite based red pigment was prepared using an ocherous iron oxide sludge recovered from an abandoned coal mine water treatment plant. Display Omitted - Highlights: • A red pigment was prepared by heating a kaolinite and an iron oxide sludge. • The iron oxide and the pigment were characterised for their colour properties. • The red pigment can be a potential element for integrally coloured concrete.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Comparing urban solid waste recycling from the viewpoint of urban metabolism based on physical input-output model: A case of Suzhou in China

Highlights: Black-Right-Pointing-Pointer Impacts of solid waste recycling on Suzhou's urban metabolism in 2015 are analyzed. Black-Right-Pointing-Pointer Sludge recycling for biogas is regarded as an accepted method. Black-Right-Pointing-Pointer Technical levels of reusing scrap tires and food wastes should be improved. Black-Right-Pointing-Pointer Other fly ash utilization methods should be exploited. Black-Right-Pointing-Pointer Secondary wastes from reusing food wastes and sludge should be concerned. - Abstract: Investigating impacts of urban solid waste recycling on urban metabolism contributes to sustainable urban solid waste management and urban sustainability. Using a physical input-output model and scenario analysis, urban metabolism of Suzhou in 2015 is predicted and impacts of four categories of solid waste recycling on urban metabolism are illustrated: scrap tire recycling, food waste recycling, fly ash recycling and sludge recycling. Sludge recycling has positive effects on reducing all material flows. Thus, sludge recycling for biogas is regarded as an accepted method. Moreover, technical levels of scrap tire recycling and food waste recycling should be improved to produce positive effects on reducing more material flows. Fly ash recycling for cement production has negative effects on reducing all material flows except solid wastes. Thus, other fly ash utilization methods should be exploited. In addition, the utilization and treatment of secondary wastes from food waste recycling and sludge recycling should be concerned.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ANALYSIS OF SAMPLES FROM TANK 5F CHEMICAL CLEANING

The Savannah River Site (SRS) is preparing Tank 5F for closure. The first step in preparing the tank for closure is mechanical sludge removal. Following mechanical sludge removal, SRS performed chemical cleaning with oxalic acid to remove the sludge heel. Personnel are currently assessing the effectiveness of the chemical cleaning. SRS personnel collected liquid samples during chemical cleaning and submitted them to Savannah River National Laboratory (SRNL) for analysis. Following chemical cleaning, they collected a solid sample (also known as 'process sample') and submitted it to SRNL for analysis. The authors analyzed these samples to assess the effectiveness of the chemical cleaning process. The conclusions from this work are: (1) With the exception of iron, the dissolution of sludge components from Tank 5F agreed with results from the actual waste demonstration performed in 2007. The fraction of iron removed from Tank 5F by chemical cleaning was significantly less than the fraction removed in the SRNL demonstrations. The likely cause of this difference is the high pH following the first oxalic acid strike. (2) Most of the sludge mass remaining in the tank is iron and nickel. (3) The remaining sludge contains approximately 26 kg of barium, 37 kg of chromium, and 37 kg of mercury. (4) Most of the radioactivity remaining in the residual material is beta emitters and {sup 90}Sr. (5) The chemical cleaning removed more than {approx} 90% of the uranium isotopes and {sup 137}Cs. (6) The chemical cleaning removed {approx} 70% of the neptunium, {approx} 83% of the {sup 90}Sr, and {approx} 21% of the {sup 60}Co. (7) The chemical cleaning removed less than 10% of the plutonium, americium, and curium isotopes. (8) The chemical cleaning removed more than 90% of the aluminium, calcium, and sodium from the tank. (9) The cleaning operations removed 61% of lithium, 88% of non-radioactive strontium, and 65% of zirconium. The {sup 90}Sr and non-radioactive strontium were measured by different methods, and the differences in the fraction removed are not statistically significant. (10) Chemical cleaning removed 10-50% of the barium, chromium, iron, magnesium, manganese, and silicon. (11) Chemical cleaning removed only {approx}1% of the nickel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RHEOLOGY OF SETTLED SOLIDS IN THE SMALL COLUMN ION EXCHANGE PROCESS

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank (i.e., Tank 41H) to house the process. This process adds monosodium titanate (MST) to a waste tank containing salt solution (and entrained sludge solids). While the process is operating, the solid particles will begin to settle at temperatures up to 45 C. Previous testing has shown that sludge-MST slurries that sit for extended periods (i.e., 1-61 days) at elevated temperatures (i.e., 23-80 C) can develop large shear strengths which could make them difficult to resuspend and remove from the tank. The authors are conducting rheological testing of mixtures containing various concentrations of sludge, MST, and crystalline silicotitanate (CST, ground and unground) that have been aged at different times (i.e., 0 to 13 weeks) and isothermally heated to 30, 45, or 60 C. Additional tests are being conducted that will allow the solid particles to settle at 45 C for 6, 12, and 24 months. The objectives of this task are to determine the impact of settling time and temperature on the shear strength, yield stress, and consistency of the slurries and to determine the impact of radiation on slurry rheology. The testing will determine the relative impact of these parameters rather than predict the shear strength, yield stress, and consistency as a function of feed and operating conditions. This document describes the rheology of slurries containing MST and simulated sludge that sat at elevated temperatures (i.e., up to 60 C) for up to 13 weeks. Rheology of CST-containing slurries, as well as results of the long term settling (6, 12, and 24 months) and irradiation tests (10 and 100 MRad), will be reported later. The conclusions from this analysis follow: (1) MST only slurries that sat at elevated temperatures had larger shear strength, yield stress, and consistency than MST plus sludge slurries that settled at elevated temperatures. (2) The addition of sludge to an MST slurry reduces the shear strength, yield stress, and consistency. (3) The impact of settling time and temperature on slurry rheology is inconclusive at this time. The authors are collecting additional data to attempt to determine the impact of settling time and temperature on slurry shear strength, yield stress, and consistency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RHEOLOGY OF SETTLED SOLIDS IN THE SMALL COLUMN ION EXCHANGE PROCESS

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank as process housing. This method includes the addition of monosodium titanate (MST) to a waste tank containing salt solution and entrained sludge solids, followed by tank mixing and filtration. The filtrate is then processed through in-tank ion exchange columns containing crystalline silicotitanate (CST) media. While the process is operating, it is known that solid particles begin to settle in the tank and temperatures may reach beyond 45 C. Previous testing has shown that sludge-MST slurries that sit for extended periods at elevated temperatures can develop large shear strengths, making them difficult to resuspend and remove from the tank. The authors conducted rheological testing of mixtures containing various concentrations of sludge simulant, MST, and CST (three preparations) that were aged at different times (i.e., 0 to 13 weeks) and isothermally maintained to 30, 45, or 60 C. Two types of grinding methodologies were employed to prepare CST for this testing, herein called Savannah River National Laboratory (SRNL) and Vitreous State Laboratory (VSL) ground materials. Unground CST particles were also tested. A small number of samples were irradiated prior to 4 week settling and 60 C temperature treatment, with exposures ranging from 0 to 100 MRad. Additional tests are also being conducted that will allow the solid particles to settle at 45 C for 6, 12, and 24 months. The objectives of this task are to determine the impact of feed composition, settling time, and temperature on the shear strength, yield stress, and consistency of the slurries and to determine the impact of radiation on slurry rheology. The testing will determine the relative impact of these parameters rather than predict the shear strength, yield stress, and consistency as a function of feed and operating conditions. This document describes the rheology of slurries containing MST, CST, and simulated sludge that sat at indicated temperatures for up to 13 weeks. A previous SRNL report described preliminary rheology data of slurries containing MST and sludge. Preliminary results of the irradiation tests are also presented in this report, though additional data are still being collected. Rheology of the long term settling samples (6, 12, and 24 months) and additional irradiation test results will be reported at a later date. Conclusions from this analysis are as follows: (1) Slurries containing MST and unground CST have the largest shear strength. Due to the high shear strengths measured in slurries containing unground CST, evaluations of specific tank contents and mixing capability should be performed prior to any addition of this material into a waste tank. Experimentally determined shear strengths indicate mixing could be problematic in mixtures containing unground CST. (2) Increasing the ground CST fraction in the slurry increases the slurry shear strength, yield stress, and consistency. (3) Increasing the sludge fraction in the slurry decreases the slurry shear strength, yield stress, and consistency. (4) Slurries containing VSL ground CST have larger shear strength, yield stress, and consistency than slurries containing SRNL ground CST. (5) The effects of settling time and temperature on slurry shear strength are slurry dependent. (6) No effects of settling time and temperature on slurry yield stress or consistency were observed. (7) Radiation up to 100 MRad does not appear to affect properties of shear strength, yield stress, or consistency of process feeds.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DESORPTION OF SORBATES FROM MST, MMST, AND CST UNDER VARIOUS CONDITIONS

The Small Column Ion Exchange (SCIX) Program (formerly referred to as the Modular Salt Processing (MSP) Project) seeks to deploy equipment to remove the {sup 134,137}Cs, {sup 90}Sr, and alpha-emitting radionuclides (principally {sup 238,239,240}Pu and {sup 237}Np) from the high level waste salt solutions. The equipment is installed within a high level waste tank to take advantage of the shielding provided by the waste tank. The process will involve adding monosodium titanate (MST) to the waste tank (i.e., Tank 41H) to sorb the Sr and select actinides, removing the MST and entrained sludge with in-riser rotary microfilters, and subsequently using ion-exchange columns containing crystalline silicotitanate (CST) to remove the Cs. After being loaded with Cs, the CST will be ground to reduce the particle size and then transferred into another waste tank (e.g., Tank 40H). The MST and sludge solids stream will be transported to a sludge batch preparation tank (i.e., Tank 42H or Tank 51H) once the SCIX batch is processed. Both streams, MST/solids and CST, will ultimately be transported into and vitrified inside the Defense Waste Processing Facility (DWPF). A series of experiments were performed to examine desorption from monosodium titanate (MST), modified monosodium titanate (mMST), and crystalline silicotitanate (CST) under various conditions. The first two experiments examined desorption from MST and CST under two different sludge treatment processes, aluminum dissolution and sludge washing. Desorption of all sorbates was observed to varying degrees under the aluminum dissolution conditions. The extent of desorption ranged from < 3% to about 50% after 4 weeks, with Pu exhibiting the lowest desorption. At the end of the experiment, the temperature was reduced from 65 C to 25 C and the tests monitored for an additional two weeks. After reducing the temperature, partial resorption of the sorbates was observed with both MST and CST. Under the sludge washing conditions, no desorption of sorbates was observed with MST; however, some additional sorption did occur. For CST, a small amount of Cs leached from the material during the first day of testing, but no further leaching was observed over the remaining test period. The final test was designed to examine the possibility of desorption from both MST and mMST upon increasing the solid to liquid phase ratio. The results of these tests indicated some desorption of Pu from MST within the first two weeks after changing the phase ratio, then resorption of some of the leached Pu over the remaining 4 weeks of the experiment. No desorption of any sorbates was observed for mMST under these conditions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DEMONSTRATION OF THE GLYCOLIC-FORMIC FLOWSHEET IN THE SRNL SHIELDED CELLS USING ACTUAL WASTE

Glycolic acid was effective at dissolving many metals, including iron, during processing with simulants. Criticality constraints take credit for the insolubility of iron during processing to prevent criticality of fissile materials. Testing with actual waste was needed to determine the extent of iron and fissile isotope dissolution during Chemical Process Cell (CPC) processing. The Alternate Reductant Project was initiated by the Savannah River Remediation (SRR) Company to explore options for the replacement of the nitric-formic flowsheet used for the CPC at the Defense Waste Processing Facility (DWPF). The goals of the Alternate Reductant Project are to reduce CPC cycle time, increase mass throughput of the facility, and reduce operational hazards. In order to achieve these goals, several different reductants were considered during initial evaluations conducted by Savannah River National Laboratory (SRNL). After review of the reductants by SRR, SRNL, and Energy Solutions (ES) Vitreous State Laboratory (VSL), two flowsheets were further developed in parallel. The two flowsheet options included a nitric-formic-glycolic flowsheet, and a nitric-formic-sugar flowsheet. As of July 2011, SRNL and ES/VSL have completed the initial flowsheet development work for the nitric-formic-glycolic flowsheet and nitric-formic-sugar flowsheet, respectively. On July 12th and July 13th, SRR conducted a Systems Engineering Evaluation (SEE) to down select the alternate reductant flowsheet. The SEE team selected the Formic-Glycolic Flowsheet for further development. Two risks were identified in SEE for expedited research. The first risk is related to iron and plutonium solubility during the CPC process with respect to criticality. Currently, DWPF credits iron as a poison for the fissile components of the sludge. Due to the high iron solubility observed during the flowsheet demonstrations with simulants, it was necessary to determine if the plutonium in the radioactive sludge slurry demonstrated the same behavior. The second risk is related to potential downstream impacts of glycolate on Tank Farm processes. The downstream impacts will be evaluated by a separate research team. Waste Solidification Engineering (WSE) has requested a radioactive demonstration of the Glycolic-Formic Flowsheet with radioactive sludge slurry be completed in the Shielded Cells Facility of the SRNL. The Shielded Cells demonstration only included a Sludge Receipt and Adjustment Tank (SRAT) cycle, and not a Slurry Mix Evaporator (SME) cycle or the co-processing of salt products. Sludge Batch 5 (SB5) slurry was used for the demonstration since it was readily available, had been previously characterized, and was generally representative of sludges being processing in DWPF. This sample was never used in the planned Shielded Cells Run 7 (SC-7).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Tank 21 and tank 24 blend and feed study: blending times, settling times, and transfers

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where salt solutions of up to 1.2 million gallons will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. In particular, Tanks 21 and 24 are planned to be used for blending and transferring to the SDI feed tank. These tanks were evaluated here to determine blending times, to determine a range of settling times for disturbed sludge, and to determine that the SWPF Waste Acceptance Criteria that less than 1200 mg/liter of solids will be entrained in salt solutions during transfers from the Tank 21 and Tank 24 will be met. Overall conclusions for Tank 21 and Tank 24 operations include: (1) Experimental correction factors were applied to CFD (computational fluid dynamics) models to establish blending times between approximately two and five hours. As shown in Phase 2 research, blending times may be as much as ten times greater, or more, if lighter fluids are added to heavier fluids (i.e., water added to salt solution). As the densities of two salt solutions converge this effect may be minimized, but additional confirmatory research was not performed. (2) At the current sludge levels and the presently planned operating heights of the transfer pumps, solids entrainment will be less than 1200 mg/liter, assuming a conservative, slow settling sludge simulant. (3) Based on theoretical calculations, particles in the density range of 2.5 to 5.0 g/mL must be greater than 2-4 {micro}m in diameter to ensure they settle adequately in 30-60 days to meet the SWPF feed criterion (<1200 mg/l). (4) Experimental tests with sludge batch 6 simulant and field turbidity data from a recent Tank 21 mixing evolution suggest the solid particles have higher density and/or larger size than indicated by previous analysis of SRS sludge and sludge simulants. (5) Tank 21 waste characterization, laboratory settling tests, and additional field turbidity measurements during mixing evolutions are recommended to better understand potential risk for extended (> 60 days) settling times in Tank 21.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Biorefinery Design and Research Targeted for 2022: Hydrothermal Liquefacation Processing of Wet Waste to Fuels

The Department of Energy Bioenergy Technologies Office (BETO) invests in research and development of new pathways for commercially viable conversion of biomass into drop-in ready transportation fuels, fuel blendstocks and products. The primary emphasis has been on terrestrial and algae feedstocks, but more recently BETO has begun to explore the potential of wet wastes for biofuel production, with focus on wastewater residuals, manure, food waste, and fats, oils and grease. A recent resource analysis estimates that 77 million dry tons per year of these wastes are generated annually, 65% of which are underutilized for any beneficial purpose. Approximately 14 million dry tons of the total resource is wastewater residuals (sludge and biosolids) generated at the nation’s wastewater treatment plants (WWTPs). Conversion of this resource into transportation fuels could significantly contribute to the creation of a new domestic bioenergy and bioproduct industry, while providing an economically and environmentally sustainable alternative for current waste disposal practices. Hydrothermal liquefaction (HTL) is a process that uses hot, pressurized water in the condensed phase to convert biomass to a thermally stable oil product, also known as “biocrude”, which can then be thermo-catalytically upgraded to hydrocarbon fuel blendstocks. HTL is conceptually simple, has a high carbon efficiency, and can be applied to a wide range of wet feedstocks at similar processing conditions. The purpose of this report is to document the conceptual design, economics and supporting data for a sludge-to-fuel pathway via HTL and biocrude upgrading. The configuration includes a HTL plant that is co-located with a WWTP and a larger scale biocrude upgrading plant for production of hydrocarbon fuel blendstocks. Experimental data from bench scale testing of a 1:1 mixture of primary:secondary sludges are used to establish the economic and technical assumptions for the analysis. The design represents a goal case for the pathway, targeting performance that is anticipated to be achievable by 2022 with further research and development. The year 2022 is BETO’s target year for verification of hydrocarbon biofuel pathways. As this analysis represents a goal case, assumed values of several design parameters represent improvements in the technology relative to what has currently been demonstrated in the laboratory. While HTL is fairly well developed and may therefore be ready for commercialization prior to 2022, there are specific advancements addressed in this analysis that are necessary to enhance performance compared to what has been demonstrated to date. In addition, an important aspect to the pathway is the upgrading of biocrude to fuel blendstock, an area that has received much less attention and requires significant research to validate the goal case performance parameters. The estimated plant gate minimum fuel selling price for fuel blendstock from sludge HTL and upgrading is $3.46/gasoline gallon equivalent (gge). This price is within the tolerance (+$0.49/gge) of BETO’s $3/gge programmatic cost target and illustrates that fuel blendstocks generated from HTL of sludge and centralized biocrude upgrading have the potential to be competitive with fossil fuels. This analysis illustrates the feasibility of HTL for point-of-generation conversion of waste feedstock at a scale 1/20th that of the standard lignocellulosic biorefinery scale typically used in BETO design cases. The relevance of this work reaches beyond wastewater treatment sludge to lay the groundwork for application to other distributed wet wastes and blends that together represent a significant resource of underutilized biomass.

09 BIOMASS FUELS↗

TANK 26 EVAPORATOR FEED PUMP TRANSFER ANALYSIS

The transfer of liquid salt solution from Tank 26 to an evaporator is to be accomplished by activating the evaporator feed pump, located approximately 72 inches above the sludge layer, while simultaneously turning on the downcomer. Previously, activation of the evaporator feed pump was an isolated event without any other components running at the same time. An analysis of the dissolved solution transfer has been performed using computational fluid dynamics methods to determine the amount of entrained sludge solids pumped out of the tank to the evaporator with the downcomer turned on. The analysis results showed that, for the maximum and minimum supernate levels in Tank 26 (252.5 and 72 inches above the sludge layer, respectively), the evaporator feed pump will entrain between 0.05 and 0.1 wt% sludge solids weight fraction into the eductor, respectively. Lower tank liquid levels, with respect to the sludge layer, result in higher amounts of sludge entrainment due to the increased velocity of the plunging jets from the downcomer and evaporator feed pump bypass as well as decreased dissipation depth.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 26 Evaporator Feed Pump Transfer Analysis

The transfer of liquid salt solution from Tank 26 to an evaporator is to be accomplished by activating the evaporator feed pump, located approximately 72 inches above the sludge layer, while simultaneously turning on the downcomer. Previously, activation of the evaporator feed pump was an isolated event without any other components running at the same time. An analysis of the dissolved solution transfer has been performed using computational fluid dynamics methods to determine the amount of entrained sludge solids pumped out of the tank to the evaporator with the downcomer turned on. The analysis results showed that, for the maximum and minimum supernate levels in Tank 26 (252.5 and 72 inches above the sludge layer, respectively), the evaporator feed pump will entrain between 0.03 and 0.1 wt% sludge undissolved solids weight fraction into the eductor, respectively, and therefore are an order of magnitude less than the 1.0 wt% undissolved solids loading criteria to feed the evaporator. Lower tank liquid levels, with respect to the sludge layer, result in higher amounts of sludge entrainment due to the increased velocity of the plunging jets from the downcomer and evaporator feed pump bypass as well as decreased dissipation depth. Revision 1 clarifies the analysis presented in Revision 0 and corrects a mathematical error in the calculations for Table 4.1 in Revision 0. However, the conclusions and recommendations of the analysis do not change for Revision 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RHEOLOGICAL AND ELEMENTAL ANALYSES OF SIMULANT SB5 SLURRY MIX EVAPORATOR-MELTER FEED TANK SLURRIES

The Defense Waste Processing Facility (DWPF) will complete Sludge Batch 5 (SB5) processing in fiscal year 2010. DWPF has experienced multiple feed stoppages for the SB5 Melter Feed Tank (MFT) due to clogs. Melter throughput is decreased not only due to the feed stoppage, but also because dilution of the feed by addition of prime water (about 60 gallons), which is required to restart the MFT pump. SB5 conditions are different from previous batches in one respect: pH of the Slurry Mix Evaporator (SME) product (9 for SB5 vs. 7 for SB4). Since a higher pH could cause gel formation, due in part to greater leaching from the glass frit into the supernate, SRNL studies were undertaken to check this hypothesis. The clogging issue is addressed by this simulant work, requested via a technical task request from DWPF. The experiments were conducted at Aiken County Technology Laboratory (ACTL) wherein a non-radioactive simulant consisting of SB5 Sludge Receipt and Adjustment Tank (SRAT) product simulant and frit was subjected to a 30 hour SME cycle at two different pH levels, 7.5 and 10; the boiling was completed over a period of six days. Rheology and supernate elemental composition measurements were conducted. The caustic run exhibited foaming once, after 30 minutes of boiling. It was expected that caustic boiling would exhibit a greater leaching rate, which could cause formation of sodium aluminosilicate and would allow gel formation to increase the thickness of the simulant. Xray Diffraction (XRD) measurements of the simulant did not detect crystalline sodium aluminosilicate, a possible gel formation species. Instead, it was observed that caustic conditions, but not necessarily boiling time, induced greater thickness, but lowered the leach rate. Leaching consists of the formation of metal hydroxides from the oxides, formation of boric acid from the boron oxide, and dissolution of SiO{sub 2}, the major frit component. It is likely that the observed precipitation of Mg(OH){sub 2} and Mn(OH){sub 2} caused the increase in yield stress. The low pH run exhibited as much as an order of magnitude greater B and Li (frit components) leachate concentrations in the supernate. At high pH a decrease of B leaching was found and this was attributed to adsorption onto Mg(OH){sub 2}. A second leaching experiment was performed without any sludge to deconvolute the leach rate behavior of Frit 418 from those of the SB5 sludge-Frit 418 system. At high pH, the sludgeless system demonstrated very fast leaching of all the frit components, primarily due to fast dissolution of the main component, silica, by hydroxide anion; various semiconductor studies have established this reactivity. Overall, the frit-water system exhibited greater leaching from a factor two to almost three orders of magnitude (varying by conditions and species). The slower leaching of the sludge system is possibly due to a greater ionic strength or smaller driving force. Another possible reason is a physical effect, coating of the frit particles with sludge; this would increase the mass transfer resistance to leaching. Based on this study, the cause of clogs in the melter feed loop is still unknown. A possible explanation is that the SME product, like the simulant, is too thin and could contribute to a loss of two-phase flow which could cause plugging of a restricted and poorly mixed zone like the melter feed loop. This is feasible since a previous study of a slurry showed an increase in resistance to flow at lower flow rates. Testing with a radioactive SME sample is underway and should help understand this potential mechanism.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bench‐Scale Evaluation of Hydrothermal Processing Technology for Conversion of Wastewater Solids to Fuels: Marrone et al.

ABSTRACT: Hydrothermal Liquefaction (HTL) and Catalytic Hydrothermal Gasification (CHG) proof‐of‐concept bench‐scale tests were performed to assess the potential of hydrothermal treatment for handling municipal wastewater sludge. HTL tests were conducted at 300 to 350 °C and 20 MPa on three different feeds: primary sludge, secondary sludge, and digested solids. Corresponding CHG tests were conducted at 350 °C and 20 MPa on the HTL aqueous phase output using a ruthenium‐based catalyst. Biocrude yields ranged from 25 to 37%. Biocrude composition and quality were comparable to biocrudes generated from algae feeds. Subsequent hydrotreating of biocrude resulted in a product with comparable physical and chemical properties to crude oil. CHG product gas methane yields on a carbon basis ranged from 47 to 64%. Siloxane concentrations in the CHG product gas were below engine limits. The HTL‐CHG process resulted in a chemical oxygen demand (COD) reduction of > 99.9% and a reduction in residual solids for disposal of 94 to 99%.

Marrone, P. A.↗

Successful Deployment of System for the Storage and Retrieval of Spent/Used Nuclear Fuel from Hanford K-West Fuel Storage Basin-13051

In 2012, a system was deployed to remove, transport, and interim store chemically reactive and highly radioactive sludge material from the Hanford Site's 105-K West Fuel Storage Basin that will be managed as spent/used nuclear fuel. The Knockout Pot (KOP) sludge in the 105-K West Basin was a legacy issue resulting from the spent nuclear fuel (SNF) washing process applied to 2200 metric tons of highly degraded fuel elements following long-term underwater storage. The washing process removed uranium metal and other non-uranium constituents that could pass through a screen with 0.25-inch openings; larger pieces are, by definition, SNF or fuel scrap. When originally retrieved, KOP sludge contained pieces of degraded uranium fuel ranging from 600 microns (μm) to 6350 μm mixed with inert material such as aluminum hydroxide, aluminum wire, and graphite in the same size range. In 2011, a system was developed, tested, successfully deployed and operated to pre-treat KOP sludge as part of 105-K West Basin cleanup. The pretreatment process successfully removed the vast majority of inert material from the KOP sludge stream and reduced the remaining volume of material by approximately 65 percent, down to approximately 50 liters of material requiring management as used fuel. The removal of inert material resulted in significant waste minimization and project cost savings because of the reduced number of transportation/storage containers and improvement in worker safety. The improvement in worker safety is a result of shorter operating times and reduced number of remote handled shipments to the site fuel storage facility. Additionally in 2011, technology development, final design, and cold testing was completed on the system to be used in processing and packaging the remaining KOP material for removal from the basin in much the same manner spent fuel was removed. This system was deployed and successfully operated from June through September 2012, to remove and package the last of the SNF fragments from the 105-K West Basin, ending the long and complex history of the KOP sludge materials. The planning and execution of this project demonstrated how the graded application of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets[1], DOE-STD-1189-2008, Integration of Safety into the Design Process[2], and DOE G 413.3-4, U.S. Department of Energy Technology Readiness Assessment Guide[3], can positively affect the outcome of project implementation in the DOE Complex. Provided herein are relevant information, ideas, and tools for use by other projects facing similar issues in managing high risk waste streams in a complex regulatory environment. Positive aspects are also provided of appropriate time spent in detailed planning, design, and testing in non-hazardous environments to reduce project risks in both cost and safety performance, as well as improving confidence in meeting project goals through predictable and reliable performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming Waste Removal Challenges at Savannah River Site: A Case Study of Tank 15 - 16198

Tank 15 is a High Level Waste Tank at the Savannah River Site containing sludge waste that had been allowed to dry due to several flaws in the primary tank wall. In order to remove the tank waste, the sludge had to first be re-hydrated. Due to the age of Tank 15 and the thirty years of 'dry sludge tank' status, there were numerous technical challenges and risks that had to be addressed to demonstrate operational readiness to add liquid to a tank with known flaws. Liquid management was a key to readiness since Tank 15 did not have the infrastructure to mitigate waste accumulating in the annulus or to transfer waste out of the primary tank as a means to control a large leak. The project team's fundamental expectation was that some amount of liquid would migrate to the annulus through identified flaws as the sludge waste was re-hydrated. Communication was crucial to ensuring this expectation was propagated to management, the customer, and the regulators. Equipment upgrades, provisions for annulus liquid management (monitoring and removal), and readiness for outgoing transfers mitigated waste migration. Liquid addition methodology and facility modifications were developed to safely re-hydrate the sludge while monitoring the integrity of the primary tank. These efforts culminated in successfully adding 697 m{sup 3} (184,000 gal) of liquid to Tank 15, re-hydrating the sludge waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pseudo-dynamic Aspen Plus{sup R} Model of the Defense Waste Processing Facility - 18475

The Defense Waste Processing Facility (DWPF) at the Savannah River Site converts legacy high-level waste from the Cold War into borosilicate glass for permanent disposal in a geological repository. The waste sludge is chemically adjusted by the addition of acid, mixed with frit, and concentrated in the DWPF Chemical Process Cell (CPC) to ensure that the final glass has the desired properties. The resulting mixture is fed into the melter where the waste is melted and poured into stainless steel storage canisters. We present an Aspen Plus{sup R} model of the DWPF CPC, which is being developed to aid chemical processing decisions pertaining to the current flowsheet and to aid decisions regarding optimizing future processing. Given a waste feed composition with acid and frit additions, the model will predict the sludge and off-gas compositions throughout the processing, as well as the final melter feed composition. This allows different processing scenarios to be investigated easily, reducing the reliance on experimental testing, and hence saving time and money. The model has multiple potential applications, including calculating the acid and frit additions required to give acceptable glass properties, off-gas permitting, tracking mercury steam-stripped from the waste in the off-gas system, tracking flammable gases in the offgas system, investigating the effect of reducing air purges in the condensers, and general process optimization. The waste is processed in the CPC in batches, requiring dynamic simulation to track the time-dependent operations. Accurate modeling of the processing also requires calculations of phase and electrolyte chemical equilibria and parallel rate-dependent reactions. Due to existing technical limitations with dynamic simulation of the complex chemical system, we have adopted a pseudo-dynamic approach in which time intervals are treated as consecutive steady-state operations in Aspen Plus{sup R}. Thus, the model consists of ∼100 replicas of the processing vessel and its off-gas system, with the sludge output by one replica (representing one time interval) becoming the feed to the next (representing the next time interval). By examining the results from these replicas in sequence, one can see the time evolution of the model. This general approach can be used wherever simultaneous calculation of phase and electrolyte chemical equilibria in a dynamically evolving system is needed. In addition to describing the general structure and chemistry of the model, we present results from tests of the model against experimental data. These data are from laboratory-scale process simulations of the CPC with a nonradioactive waste sludge simulant. These tests include the model's predictions of the offgas composition, the sludge pH, and the final sludge composition. We will also discuss planned future developments of the model. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗