Search NASA⌕ Search

SEARCH · Search NASA

Results for “technology roadmap”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

DOE SFWST Campaign R&D Roadmap Update Rev.1.

The Spent Fuel and Waste Science and Technology (SFWST) Campaign of the U.S. Departmentof Energy (DOE) Office of Nuclear Energy (NE), Office of Spent Fuel and Waste Disposition(SFWD) is conducting research and development (R&D) on deep geologic disposal of spentnuclear fuel (SNF) and high-level nuclear waste (HLW). R&D addressing the disposal ofSNF/HLW in the U.S. is currently generic (i.e., "non-site-specific") in scope, following thesuspension of the Yucca Mountain Repository Project in 2010. However, to prepare for theeventuality of a repository siting process, the former Used Fuel Disposition Campaign (UFDC) ofDOE-NE, which was succeeded by the SFWST Campaign, formulated an R&D Roadmap in 2012outlining generic R&D activities and their priorities appropriate for developing safety cases andassociated performance assessment (PA) models for generic deep geologic repositories in severalpotential host-rock environments in the contiguous United States. This 2012 UFDC Roadmap alsoidentified the importance of re-evaluating priorities in future years as knowledge is gained fromthe DOE's ongoing R&D activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Energy Efficiency Scaling for 2 Decades (EES2) Roadmap for Computing

In response to the looming crisis in global energy consumption required for advanced computing applications, the United States Department of Energy (DOE) Advanced Materials and Manufacturing Technology Office (AMMTO) is leading a multi-organizational effort to define a roadmap for energy efficiency scaling for two decades (EES2) with the aim to reduce energy use in all aspects of computation by more than a factor of 1000 in two decades. By July of 2024, over 60 organizations representing industry, academia, and the national laboratories have pledged to work in various aspects of research and development to enable energy efficiency in computing including in the development of the EES2 roadmap, with an initial public release in 2024 as the first phase of an ongoing commitment to energy-efficient and sustainable computation.

Kaarsberg, Tina [U.S. Department of Energy (DOE)]↗

2022 roadmap on 3D printing for energy

The energy transition is one of the main challenges of our society and therefore a major driver for the scientific community. To ensure a smart transition to a sustainable future energy scenario different technologies such as energy harvesting using solar cells or windmills and chemical storage in batteries, super-capacitors or hydrogen have to be developed and ultimately deployed. New fabrication approaches based on additive manufacturing and the digitalization of the industrial processes increase the potential to achieve highly efficient and smart technologies required to increase the competitiveness of clean energy technologies against fossil fuels. In this frame, the present roadmap highlights the tremendous potential of 3D printing as a new route to fully automate the manufacturing of energy devices designed as digital files. Additionally, this article gives numerous guidelines to maximize the performance and efficiency of the next generation of 3D printed devices for the energy transition while reducing the waste of critical raw materials. In particular, the paper is focused on the current status, present challenges and the expected and required advances of 3D printing for the fabrication of the most relevant energy technologies such as fuel cells and electrolysers, batteries, solar cells, super-capacitors, thermoelectric generators, chemical reactors and turbomachinery.

36 MATERIALS SCIENCE↗

Transactive Energy Systems Research, Development and Deployment Roadmap

The GWAC transactive energy roadmap outlines a vision and path forward to achieve deployment of transactive energy systems at scale as an operational element of the electric power system to facilitate the integration of distributed energy resources and dynamic end-uses such as connected buildings. It also considers the application of transactive energy systems for the coordination and control for end-uses, for example, in managing energy in buildings and campuses. The roadmap considers drivers of change, triggers for transactive energy system deployment, and required infrastructure for deployment at scale. Gaps in technology and infrastructure that may require investment are identified. The roadmap captures potential changes over time (Stages) and organizes them by business and technical Tracks. Within each Track it also groups potential changes into Swim Lanes that identify what it is that we hope to see, what it takes for this to occur, what we see as a result, and what these features do to add value.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Site Sustainability Plan (SSP) with FY2012 Performance Data

Oak Ridge National Laboratory (ORNL) is both the largest science and energy laboratory of the Department of Energy (DOE) and one of the oldest national laboratories still operating at its original site. These characteristics provide a unique opportunity to integrate sustainability into our facilities and activities. As a leading performer of clean energy research and development (R&D), ORNL delivers advances in energy efficiency, renewable energy, and environmentally sound and cutting-edge technology and practices. ORNL is committed to accelerating the deployment of these advances in support of DOE’s goal of catalyzing the timely, material, and efficient transformation of the nation’s energy system and securing US leadership in clean energy technologies. A comprehensive modernization effort, undertaken to provide ORNL with a 21 st century research environment, provided the starting point for the Sustainable Campus Initiative, a 10-year effort to achieve benchmark levels of sustainability across ORNL. This aggressive campaign will continue the transformation of ORNL’s physical environment and enable us to meet DOE goals for energy management and environmental performance. As outlined in this report, the Sustainable Campus Initiative is leveraging the outcomes of our DOE-sponsored R&D programs to maximize the efficient use of energy and natural resources across ORNL. Wherever possible, ORNL is integrating technical innovations into new and existing facilities, systems, and processes. We continue to pursue and deploy innovative solutions and initiatives to advance regional, national, and worldwide sustainability. We are also taking actions to transform ORNL’s culture and engage employees in supporting sustainability at work, at home, and in the community. In its current structure, ORNL’s Sustainable Campus Initiative consists of 26 unique projects or roadmaps, ranging from foundational methods to transformational technologies as represented in Figure 1.

Nichols, Teresa A.↗

NASA 2018 Green Propulsion Roadmap

The Green Propulsion Working Group (GPWG) is a technical guidance working group formed April 2017 under the Agency's Capability Leadership Team The GPWG was tasked with recommending an agency road map and providing guidance to NASA on green propulsion technology development and infusion The GPWG's efforts focus on ionic liquid propellants and related technologies The GPWG was chartered with three representatives from NASA Centers currently exploring green propulsion technologies As other Centers may explore programs that utilize green propulsion, membership of the working group can be expanded to include more interested parties Working group also solicits and coordinates with other government agencies (e.g. AFRL, MDA) In 2015, JANNAF hosted a Technical Interchange Meeting (TIM) on Green Monopropellant Alternatives to Hydrazine (GMAH) Included both Government and non-Government contributions on the State-of-the-Art in Green Propulsion Technology Following the TIM, a Government-only session (USAF/AFRL/NASA/MDA/DLA) reviewed and identified remaining technical gaps in Green Propulsion In 2016, an inter-agency team (AFRL/NASA/MDA) worked together to develop an informal inter-agency "roadmap" based on the outcome of the TIM Approach consisted of near-term, mid-term, and long-term technology advancement areas, approaching incrementally larger thrust classes The NASA Green Propulsion Working Group reviewed the work of the 2016 Inter-Agency Working Group, and concurs that the identified technical gaps and technology development areas are still relevant and necessary to see green propulsion technology advanced The GPWG recommends the 2016 roadmap be adopted as baseline for NASA needs, with some additions The focus of the 2016 inter-agency roadmap was primarily on the thruster technology. The Agency must also invest in understanding the broader propulsion system-level technology gaps in parallel. Timeframes are considered suggested from a priority standpoint, but are also flexible as some efforts will need to occur in the nearer term or concurrently in order to meet specific mission requirements The GPWG developed 2018 roadmap breaks down the technology development goals into Technology Development Areas (TDA's), and identifies the near-, mid, and long-term sub-goals within those areas. Those TDA's are: Thruster Hardware Development Modeling & Tools Development Materials Properties and Compatibility Propellant Development.

Cavender, Dan↗

Development and Deployment Assessment of a Melt-Down Proof Modular Micro Reactor (MDP-MMR)

The objective of this project is to perform feasibility assessment and technology gap analysis and establish a development roadmap for an innovative and highly compact Micro Modular Reactor (MMR) concept that integrates power production, power conversion and electricity generation in a single unit. The MMR is envisioned to use fully ceramic micro-encapsulated (FCM) fuel, a particularly robust form of TRISO fuel, and to be gas-cooled (e.g., He or CO 2 ) and capable of generating power in the range of 10 to 40 MW-thermal. It is designed to be absolutely melt-down proof (MDP) under all circumstances including complete loss of coolant scenarios with no possible release of radioactive material, to be factory produced, to have a cycle length of greater than 20 years, and to be highly proliferation resistant. In addition, it will be transportable, retrievable and suitable for use in remote areas. As such, the MDP-MMR will represent a versatile reactor concept that is suitable for use in various applications including electricity generation, process heat utilization and propulsion.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Entry, Descent and Landing Systems Analysis Study: Phase 1 Report

NASA senior management commissioned the Entry, Descent and Landing Systems Analysis (EDL-SA) Study in 2008 to identify and roadmap the Entry, Descent and Landing (EDL) technology investments that the agency needed to make in order to successfully land large payloads at Mars for both robotic and human-scale missions. This paper summarizes the motivation, approach and top-level results from Year 1 of the study, which focused on landing 10-50 mt on Mars, but also included a trade study of the best advanced parachute design for increasing the landed payloads within the EDL architecture of the Mars Science Laboratory (MSL) mission

DwyerCianciolo, Alicia M.↗

Entry, Descent and Landing Systems Analysis: Exploration Class Simulation Overview and Results

NASA senior management commissioned the Entry, Descent and Landing Systems Analysis (EDL-SA) Study in 2008 to identify and roadmap the Entry, Descent and Landing (EDL) technology investments that the agency needed to make in order to successfully land large payloads at Mars for both robotic and exploration or human-scale missions. The year one exploration class mission activity considered technologies capable of delivering a 40-mt payload. This paper provides an overview of the exploration class mission study, including technologies considered, models developed and initial simulation results from the EDL-SA year one effort.

DwyerCianciolo, Alicia M.↗

Overview of the NASA Entry, Descent and Landing Systems Analysis Study

NASA senior management commissioned the Entry, Descent and Landing Systems Analysis (EDL-SA) Study in 2008 to identify and roadmap the Entry, Descent and Landing (EDL) technology investments that the agency needed to make in order to successfully land large payloads at Mars for both robotic and human-scale missions. This paper summarizes the approach and top-level results from Year 1 of the Study, which focused on landing 10-50 mt on Mars, but also included a trade study of the best advanced parachute design for increasing the landed payloads within the EDL architecture of the Mars Science Laboratory (MSL) mission.

Zang, Thomas A.↗

Entry, Descent and Landing Systems Analysis: Exploration Feed Forward Internal Peer Review Slide Package

NASA senior management commissioned the Entry, Descent and Landing Systems Analysis (EDL-SA) Study in 2008 to identify and roadmap the Entry, Descent and Landing (EDL) technology investments that the agency needed to successfully land large payloads at Mars for both robotic and human-scale missions. Year 1 of the study focused on technologies required for Exploration-class missions to land payloads of 10 to 50 mt. Inflatable decelerators, rigid aeroshell and supersonic retro-propulsion emerged as the top candidate technologies. In Year 2 of the study, low TRL technologies identified in Year 1, inflatables aeroshells and supersonic retropropulsion, were combined to create a demonstration precursor robotic mission. This part of the EDL-SA Year 2 effort, called Exploration Feed Forward (EFF), took much of the systems analysis simulation and component model development from Year 1 to the next level of detail.

Dwyer Cianciolo, Alicia M.↗

Entry, Descent and Landing Systems Analysis Study: Phase 2 Report on Exploration Feed-Forward Systems

NASA senior management commissioned the Entry, Descent and Landing Systems Analysis (EDL-SA) Study in 2008 to identify and roadmap the Entry, Descent and Landing (EDL) technology investments that the agency needed to successfully land large payloads at Mars for both robotic and human-scale missions. Year 1 of the study focused on technologies required for Exploration-class missions to land payloads of 10 to 50 t. Inflatable decelerators, rigid aeroshell and supersonic retro-propulsion emerged as the top candidate technologies. In Year 2 of the study, low TRL technologies identified in Year 1, inflatables aeroshells and supersonic retropropulsion, were combined to create a demonstration precursor robotic mission. This part of the EDL-SA Year 2 effort, called Exploration Feed Forward (EFF), took much of the systems analysis simulation and component model development from Year 1 to the next level of detail.

Dwyer Ciancolo, Alicia M.↗

Constellation Overview: Ares V Solar System Science Workshop

Presentation topics include: what is NASA's mission, why the Moon next, options for Moon landings, NASA's exploration roadmap, building on a foundation of proven technologies - launch vehicle comparisons, Ares nationwide team, Ares I elements, vehicle integration accomplishments, Aires I-X test flight, Ares I-X accomplishments, Orion crew exploration vehicle, Altair lunar lander, and Ares V elements.

Horack, John M.↗

Extreme Access & Lunar Ice Mining in Permanently Shadowed Craters Project

Results from the recent LCROSS mission in 2010, indicate that H2O ice and other useful volatiles such as CO, He, and N are present in the permanently shadowed craters at the poles of the moon. However, the extreme topography and steep slopes of the crater walls make access a significant challenge. In addition temperatures have been measured at 40K (-233 C) so quick access and exit is desirable before the mining robot cold soaks. The Global Exploration Roadmap lists extreme access as a necessary technology for Lunar Exploration.

Technology Portfolio System↗

Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Funding Mechanisms for Federal Geothermal Permitting

The Department of Energy's (DOE) Geothermal Technologies Office (GTO) initiated a Geothermal Regulatory Roadmap (GRR) in March 2012 to facilitate the development of utility-scale geothermal power. The GRR team conducted a series of workshops during the summer of 2012, which included key representatives from federal and state agencies, as well as industry and other stakeholders involved in the permitting and development of utility-scale geothermal projects. In many of the GRR meetings held with agencies, industry, and other stakeholders, a recurring issue was competing priorities for agency staff's time, which result in permit processing delays. Some agency personnel explained how only a percentage of their weekly or monthly time is allocated to geothermal due to geothermal budget allocations. Others described how their time allocation was determined by agency priorities, and not by specific geothermal budget allocations. In these cases, geothermal may not be a priority at all. One suggestion that was to increase geothermal permit fees or to develop some other mechanisms of cost recovery to fund additional geothermal positions or contractors to process permits more quickly. Because much of the geothermal resource available in the western U.S. is on federal lands, analysis of cost recovery programs could identify opportunities for additional funding mechanisms to support federal agency personnel and processing permits for geothermal projects. This paper discusses: federal agency revenues received for geothermal projects, including: (1) lease revenues, (2) fixed fees, and (3) cost recovery fees; and potential federal agency budget sources for processing geothermal applications, including: (1) cost-recovery fees for services rendered, (2) set-aside funds (such as those employed by EPAct2005), and (3) the appropriations process. This paper then analyzes the three budget sources as mechanisms for increasing funds available to federal agencies for processing geothermal permits and approvals. This paper concludes that both set-asides and cost-recovery fees for services rendered were effective ways of ensuring sufficient funding for processing geothermal authorizations on federally-managed public lands in a timely manner.

15 GEOTHERMAL ENERGY↗

RADIANCE Cybersecurity Plan: Generic Version

Under its Grid Modernization Initiative, the U.S. Department of Energy(DOE),in collaboration with energy industry stakeholders developed a multi-year research plan to support modernizing the electric grid. One of the foundational projects for accelerating modernization efforts is information and communications technology interoperability. A key element of this project has been the development of a methodology for engaging ecosystems related to grid integration to create roadmaps that advance the ease of integration of related smart technology. This document is the product of activities undertaken in 2017 through 2019.It provides a Cybersecurity Plan describing the technology to be adopted in the project with details as per the GMLC Call document.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RADIANCE Cybersecurity Plan: Generic Version

Under its Grid Modernization Initiative, the U.S. Department of Energy (DOE), in collaboration with energy industry stakeholders developed a multi-year research plan to support modernizing the electric grid. One of the foundational projects for accelerating modernization efforts is information and communications technology interoperability. A key element of this project has been the development of a methodology for engaging ecosystems related to grid integration to create roadmaps that advance the ease of integration of related smart technology. This document is the product of activities undertaken in 2017 through 2019. It provides a Cybersecurity Plan describing the technology to be adopted in the project with details as per the GMLC Call document.

24 POWER TRANSMISSION AND DISTRIBUTION↗